Loading...
HomeMy WebLinkAboutSEP2012-00032 Relocate Winter Creek - SEP Determinations - 2/1/2013 ��4,$TA7',�Lx• 4. n ICY 1lIflG STATE OF WASHINGTON DEPARTMENT OF ECOLOGY PO Box 47775 •Olympia, Washington 98504-7775 •(360)407-6300 711 for Washington Relay Service •Persons with a speech disability can call 877-833-6341 February 1,2013 Rebecca Hersha, Planner Your address Mason County is in the Department of Community Development Skoko ish- Planning Division - "1,nwallips PO Box 279 watershed Shelton, WA 98584 Dear Ms. Hersha: Thank you for the opportunity to comment on the mitigated determination of nonsignificance for the Lilliwaup Falls Power-Winter Creek Relocation project(SEP2012-00032) located at 601 North Lilliwaup Street in Lilliwaup as proposed by Lilliwaup Falls Generating Company. The Department of Ecology(Ecology)reviewed the environmental checklist and has the following comment(s): SHORELANDS & ENVIRONMENTAL ASSISTANCE: Rick Mraz(360)407-6260 Ecology requests a pre-hearing site visit with the applicant and county staff. Please contact Rick Mraz at the phone number given above to schedule the visit. TOXICS CLEANUP: Joyce Mercuri(360)407-6260 If contamination is suspected, discovered, or occurs during the proposed action,testing of the potentially contaminated media must be conducted. If contamination of soil or groundwater is readily apparent,or is revealed by testing,Ecology must be notified. Contact the Environmental Report Tracking System Coordinator at the Southwest Regional Office at(360)407-6300. For assistance and information about subsequent cleanup and to identify the type of testing that will be required, contact Joyce Mercuri with the Toxics Cleanup Program at the phone number given above. SEPA REVIEWER: Sonia Mendoza WATER QUALITY CONTACT: Deborah Cornett(360)407-7269 Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48 RCW,Water Pollution Control, and WAC 173-201A, Water Quality Standards for Surface Waters of the State of Washington,and is subject to enforcement action. Erosion control measures must be in place prior to any clearing, grading,or construction. These control measures must be effective to prevent stormwater runoff from carrying soil February 1, 2013 Page 2 and other pollutants into surface water or stormdrains that lead to waters of the state. Sand, silt,clay particles, and soil will damage aquatic habitat and are considered to be pollutants. Proper disposal of construction debris must be on land in such a manner that debris cannot enter water of the state(e.g., Lilliwaup &Winter Creeks)and stormdrains draining to water of the state or cause water quality degradation of state waters. This project may require a construction stormwater permit(also known as National Pollutant Discharge Elimination System (NPDES) and State Waste Discharge General Permit for Stormwater Discharges Associated with Construction). This permit is required for projects which meet both of the following conditions: 1. One or more acres of soil surface area will be disturbed by construction activities. 2. The site already has offsite discharge to waters of the state or storm drains or will have offsite discharge during construction. An application with instructions can be downloaded from Ecology's website at: http://www.ecy.wa.gov/programs/wq/stormwater/construction/-Application. Construction site operators must apply for a permit at least 60 days prior to discharging stormwater. Ecology's comments are based upon information provided by the lead agency. As such,they may not constitute an exhaustive list of the various authorizations that must be obtained or legal requirements that must be fulfilled in order to carry out the proposed action. If you have any questions or would like to respond to these comments,please contact the appropriate reviewing staff listed above. Department of Ecology Southwest Regional Office (SM:13-0286) Revised cc: Deborah Cornett,WQ Joyce Mercuri, TCP Rick Mraz, SEA Joyce Smith, HQ/WQ Lilliwaup Falls Generating Company(Applicant) Craig Norsen, Seneca Group(Contact) Rebecca Hersha - Notice of Habitat Management Plan From: Rebecca Hersha To: Gloria Rogers; Randy Lumper Date: 1/18/2013 10:03 AM Subject: Notice of Habitat Management Plan CC: kimberly035(a)centurytel.net Attachments: Winter Cr Relocation HMP.pdf Good Morning, Please see the attached Habitat Management Plan for Lilliwaup Falls Generating Company's relocation of Winter Creek. Comments on the HMP are due by February 15th. Thank you. Rebecca Hersha, Planner Mason County DCD 360-427-9670 ext. 287