Loading...
HomeMy WebLinkAboutFPA2022-00007 - Findings of Fact - FPA Permit / Conditions - 8/5/2022 r FINDINGS OF FACT FPA Case#2022-00007 APPLICANT: Tru North APPLICATION DATE: May 10, 2022 Mason County has reviewed the above referenced application for Class IV General Forest Practices and finds it in conformance with all applicable County land use regulations in effect at the time of application. FINDINGS The proposed FPA is compliant with the following conditions: The proponent has paid the prescribed fees. The proponent has filed a complete, signed application. A map has been received that complies with the requirements of 11.05.120: (I) Harvest boundaries and tree retention areas. (II) The approximate location of any structures. (III) The location of all existing and proposed streets, right-of-ways, easements, skid roads, haul roads, and landings within the proposal. (IV) The location of future land development including stormwater management facilities and vegetation to be retained for site landscaping, open space, wildlife habitat, screening, and/or buffers. (V) Site topography at contour intervals of 40 feet. (VI) Critical areas and critical area buffers regulated pursuant to the Critical Areas Ordinance. (VII) Drainage ways and culverts. (VIII) Site area targeted for further harvest including proposed timing. (IX) North arrow and scale shall be shown on all site plans. The scale shall be no smaller than one inch to 200 feet. That this FPA is in conformance with the following Mason County ordinances: 11.05 That the proposed FPA involves 18 acres of a 40 acre site. That the notifications required by 11.05.060 have been made if applicable. Note: Harvest unit is greater than 500 ft from any State Park. Mason County Resource Ordinance 1 _X_That at the issuance of this permit will not result in a violation of the Mason County Resource Lands and Critical Areas Ordinance. The site was inspected by Michael MacSems of the Mason County Planning Department who determined on 7/7/22 that any critical area buffer and/or steep slope issues have been resolved. Slope setbacks shall be reflagged to 50'. Stream setbacks on Lots 7 and 8 are flagged 75'buffer. No logging is permitted east of the most western Ns buffer on Lots 7 and 8. Planner Michael MacSems hung blue and white stripe ribbons at this line. Geo-Technical Report/Assessment Review A Geo-Technical_X Report Assessment(check one) was written by Envirotech Eng and a submittal checklist was approved as complete by Michael MacSems of Mason County DCD on 6/17/22. Washington State Department of Transportation X A DOT Access Permit is not required for this proposal. A DOT Access Permit is required for this proposal. Date Approved by DOT: Mason County Road Access Permit Road Access Permits were issued by Mason County Public Works on On a private road. Shoreline Master Program That, if applicable, all activity under this application are in conformance with the Mason County Shoreline Master Program and has a shoreline designation of N/A. State Environmental Policy Act This application for FPA#2022-00007: _X_Has been reviewed for SEPA compliance under case#: SEP 2022-00034. Is SEPA exempt. X DNS MDNS Stormwater Management 2 A Stormwater and Erosion Control plan written by Envirotech Engineering has been reviewed by and approved on ' NOTE: Ground disturbance will not exceed.75 acre and new impervious surfaces will not exceed S,000 sq ft. In lieu of a Minimum Requirements 1-5 narrative, stormwater was adequately addresses by Envirotech Engineering as part of the geo report. Permission from Underlying Property Owners: Yes Permit Signed by Operator: Same as applicant(according to application) DOR Tax ID # 604-280-511 CONCLUSION In conclusion,this application for Class IV General Forest Practices is consistent with the above criteria and that the public uses and Mason County has fulfilled its statutory obligations. RECOMMENDATIONS I,being the Director of the Mason County Community Services, hereby attest to and certify that appropriate provisions have been made for this Class IV General Forest Practices Application and hereby recommend approval. In addition to these facts evidenced by the contents of the file for this Forest Practice Application. Signed, Kell Rowen,Planning Manager Date A1111 I IN.- x/ 3 � 2Z Michael MacSems, FPA Reviewer Date 3 Mason County Imo' Planning Division of Community Development 615 W.Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us FPA2022-00007 FOREST PRACTICES PROJECT DESCRIPTION: FOREST PRACTICE APPLICATION ISSUED: 08/05/2022 SITE ADDRESS: 171 E JOHNSON RIDGE DR BELFAIR EXPIRES: 08/05/2024 PARCEL: 222137700010 APPLICANT: TRU NORTH INVESTMENTS LLC OWNER: TRU NORTH INVESTMENTS LLC 10441 CASE RD SW 10441 CASE RD SW OLYMPIA,WA 98512 OLYMPIA,WA98512 360.426.4987 OWNER'S REP: DIETZ KADOUN SE 2901 ARCADIA RDSHELTON,WA98594 360.426.4987 FEES: Paid Due Forest Practice Review $300.00 $0.00 Totals : $300.00 $0.00 CONDITIONS * 1. ARCHAEOLOGICAL RESOURCES Archaeological or historical resources, such as ruins, sites, buildings, artifacts, fossils, or other objects of antiquity that may have significance from an historical or scientific standpoint, which may be encountered by the developer/contractor, shall not be further disturbed. If the developer/contractor encounters any such artifacts, he/she shall immediately stop work and notify Mason County and the Washington State Department of Archaeology and Historic Preservation. Failure to do so may result in civil penalties. * 2. STORM WATER& EROSION CONTROL Escape of silty water or mud from this property shall be considered a violation of County and State storm water management regulations and could subject the applicant(s)to civil fines or penalties. The applicant shall follow the requirements, of the stormwater and erosion control plan written by Enviotech Engineering (Project#22130). Printed by:Genie Mcfarland on:08/31/2022 02:20 PM Page 1 of 2 �/'�"'" Mason County If Planning Division of Community Development '"''�1 615 W.Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us FOREST PRACTICES FPA2022-00007 * 3. HOURS OF OPERATION Noise associated with this application shall not exceed what is allowed under Mason County Code 9.36. Harvest operations shall start no earlier than 7:00 AM and shall end before 8:00 PM on a daily basis. * 4. SLASH ABATEMENT This Forest Practice Application indicates that forest debris resulting from the proposed logging operation may create an extreme fire hazard under RCW 76.04.600 and WAC 332-24-650.An extreme fire hazard could be created if one or more of the conditions found in WAC 332-24-650 is located within 100 feet of the running surface of a public road; or is within 500 of an existing structure and/or designated public use area, which is not owned by the owner of the fire hazard area. The landowner is fully liable in the event of fire if he or she fails to appropriately abate the hazard. Extreme fire hazards shall be abated by removing the forest debris, or by other means approved by the Washington State Department of Natural Resources(DNR). * 5. STREAM and STEEP SLOP SETBACKS (Modified) The minimum setbacks from the off-site F-Stream is 150'. Cutting setback from the two on site Ns streams is 75'on each side. Per an e-mail from Michael Staten of Envirotech Engineering dated 8/24/2022, modifying his original geotechnical report(Project#22130), trees may be cut in the 50'LSHA buffer provided that stumps are left in place and that two trees are replanted for every one tree that is cut in the LSHA buffer. The area between the two Ns streams on Lots 7 and 8 cannot be logged under this permit. Cutting that area will first require a Mason Environmental Permit from Mason County and a Hydraulics Project Permit from Washington State Fish and Wildlife in order to cross one of the Ns streams. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: Q -ZZ Contractor or Authorized 4�et: DI' _,J= Date: Printed by:Genie Mcfarland on:08/31/2022 02:20 PM Page 2 of 2 MASON COUNTY • COMMUNITY SERVICES Building,Planning,Environmental Health,Community Health Dietz Kadoun Tru North Investments LLC 10441 Case Rd SW Olympia, WA 98512 June 10, 2022 Re: 22213-77-00010 through 00080 Letter of Incompleteness , Dear Mr. Kadoun, This letter is to acknowledge that the Mason County Planning Department has received the application for your Class IV G FPA(FPA 2022-00007)on the above referenced parcels. Unfortunately,the application submittal was incomplete, and I won't be able to review this project until it is complete. Here is a list of required items: Needs a site map that contains the information required by MCC 11.05.120 (can be found on page 3 of the FPA application). Needs a SEPA Environmental Checklist(cost$1,100) Needs a geological assessment or geotechnical report(review fee$300) Needs some level of stormwater and erosion control review. If you are disturbing no more than.75 acres of ground and creating no more than 5,000 square feet of new impervious surface,you can submit a Minimum Requirements 1-5 narrative. Beyond that, an engineered stormwater plan is required(review fee$300). Need the DOR Tax Number The County can not begin the formal review of this FPA until the submittal is considered complete. When the above item(s)have been submitted I can make a Finding of Completeness,which will start a 120-day review clock(though it will not necessarily take that long) as, specified under Mason County Title 15 (15'.09.100). The review clock does not start until the application is deemed complete. This letter should not be construed to mean that no other information will be required prior to approval. These are just the basic elements needed to accept this as a complete application. Also,for your information,per 15.05.040.C,you have up to 180 days to provide the items requested in this letter. Failure to provide the required material with in 180 days will result in the closing of this case. All these items can be sent directly to me at 615 W Alder St, Shelton, WA 98584. If you have any questions,please contact me at extension 571 or by e-mail at mms@masoncountywa.gov. Sincerely, Michael MacSems FPA and Subdivision Planner MASON COUNTY COMMUNITY SERVICES Building.Planning,Environmental Health,Community Health 615 W.Alder St.-Bldg.8,Shelton,Wa 98584 FPA Phone:(360)427-9670 ext.352 ♦ Fax:(360)427-7798Z FOREST PRACTICES APPLICATION/NOTIFICATION Type IV General This application should be accompanied with an Environmental Checklist (SEPA) as well as an activity map/site plan which addresses items listed below. TYPE OR PRINT IN INK: 1. Landowner Timber Owner and Operator information. Legal Name of LANDOWNER Legal Name of TIMBER OWNER Legal Name of OPERATOR Tr u No f-Al Inv. -rif , N0-A1n lxxv I L LC. -rr u WMM Unv. L LL Mailing Address: Mailing Address: Mailing Address: 104 41 Caste R d . W 0441 Case_ R8. S1nl City, State,Zip City,State,Zip City, State,Zip 3(60- L4 13--7 So 0 Phone:.3ko0_4 Q�U_4 9 g_7 Phone: 3W_q A(,-y-9 S 7 Phone: 67 W Email: si e. ran , C mail: b m �.CUY1n Email: s '�� O 2. Contact person information. Contact Person 3 Uv_ L4 a(p_4 9$-7 "A0 �/ Phone: @� 0.(46 o_vl Email: 0. S;de_KM t,C 3. If you are harvesting timber,enter the Forest Tax Reporting Account Number of the Timber Owner: 60 - Z W - S For tax reporting information or to receive a tax number,call the Department of Revenue at(800)548-8829. 4. Legal description where the forest practices will occur. Parcel Number Sub Division 'h'/s Section Township Range E/W 2 'I S 5. Answer each question as it applies to your proposed forest practice. a. No. ❑ Yes. Is the activity within an urban growth area? b. No. Yes. Is the activity within a public ark? ❑ h' p P C. No. ❑ Yes. Is the activity within 500 feet of a public park? Park name: d. No. ❑ Yes. Is the activity located on lands platted after January 1, 1960? e. ❑No. ❑ Yes. Is the activity within 200 fee f saltwater Q lake Q ri creek/stream Q pond Q wetland seasonal runoff lopes which exceed 15%? f. What is the expected duration of FPA? Proposed start date: A-1 oposed end date: S 6. Are you cutting or removing timber. ❑No. ,� Yes. Complete the table below and identify all timber harvest and salvage activity boundaries on the activity map. Rev.August 2017 Acres Volume to be Steepest Slope in Unit# Harvest Type Yardin4 Method net Harvested(mbo Harvest Unit 4 oy vfASA 7. Are you constructing or abandoning roads? No. ❑ Yes. Complete the table below. Show locations and identify all road activities on the activity map. Total Length Steepest Side Slope Abandonment Date Type of Activity feet % Mo/Yr Road Construction Does Not Apply Temporary Road Construction Road Abandonment Work in or over typed water may require a Hydraulic Project Approval(HPA)from the Washington Department of Fish and Wildlife (WDFW). If you have questions concerning the HPA,visit the WDFW website at www.wdfw.wa.gov/habitat.htm. 8. Are you installing or replacing water-crossings? %No. ❑ Yes. Complete the table below. Show locations and identify all proposed water-crossings on the activity map. Crossing Crossing Dimensions Crossing Crossing Dimensions Identifier Type width x length) Identifier Type width x length) 9. Mark the following activities that will be done in or over typed water. Activity in or over: Type I Stream Type II Stream Type III Stream T e IV Stream Type V Stream Removing culverts of bridges Equipment crossing ❑ ❑ Ground skidding ❑ ❑ ❑ Suspending cables ❑ Cable yarding ❑ ❑ Falling and bucking ❑ El 1:1 El Other ❑ ❑ ❑ ❑ 10. Is any activity in a wetland or wetland buffer? ❑No. ❑ Yes. Complete the table below. Show locations and identify all wetlands and buffers on the activity map. Wetland Wetland Type Activity Type in Activity Type in Total Wetland Total Area Total Area Identifier (I,II,III,IV, Wetland Buffer Area(acres) Drained(acres) Filled(acres) other 11. Describe how the following are identified on the ground. • Harvest boundaries/unit corners: • Right-of-way limits and centerlines for road work,culverts and bridges: • Critical areas and critical area buffer boundaries: Page 2 of 4 r 12. Have you reviewed this forest practices activity area to determine whether it may involve historic sites and/or Native American cultural resources? ❑No. ❑ Yes. 13. We affirm that the information contained herein is true,and understand that this proposed forest practice is subject to the Forest Practices Act and Rules and Mason County Forest Practices Conversion Ordinance as well as all other federal,state or local regulations. Compliance with the Forest Practices Act and Rules and the Mason County Forest Practices Conversion Ordinance does not ensure compliance with the Endangered Species Act or other federal state or local laws. Signature of LANDOWNER Signature of TIMBER OWNER Signature of OPERATOR (if different than landowner) (If different that landowner) Print name E T Z Print name: Print name: Date: S " —Z,, - Date: Date: Additional information: (Optional) �O Per Mason County Ordinance 11.05, Section 11.05.120,a site map shall accompany this application which includes the following information. I Harvest boundaries and tree retention areas. II The approximate location of any structures. III The location of all existing and proposed streets,right-of-ways, easements, skid roads,haul roads, and landings within the proposal. IV The location of future land development including stormwater management facilities and vegetation to be retained for site landscaping, open space,wildlife habitat, screening, and/or buffers. V Site topography at contour intervals of 40 feet. VI Critical areas and critical area buffers regulated pursuant to the Critical Areas Ordinance. VII Drainage ways and culverts. VIII Site area targeted for further harvest including proposed timing. IX North arrow and scale shall be shown on all site plans. The scale shall be no smaller than one inch to 200 feet. Staff asks that, at a minimum, the corners of the harvest unit(s)be flagged for clear identification. Page 3 of 4 1 NOTE: Copies of all FPA Applications will be forwarded to Mason County Public Works for stormwater and erosion control review. Projects which disturb more than one acre(regardless of total lot size)will require an engineered stormwater plan consistent with the Mason County Stormwater Ordinance(Chapter 14.48.)and the 2012 WSDOE Stormwater Manual. Applicants will be charged for Public Works staff time to review these plans and applications. Property owners should also be aware that the Washington State Department of Ecology(WSDOE)might ask for a NPDES(National Pollution Discharge Elimination System)Permit. The threshold for such a permit is equivalent to Mason County's threshold. WSDOE will notify applicants through SEPA review if a NPDES is required.An NPDES is not a perquisite for FPA approval. It is the responsibility of the applicant to obtain this permit when required. FPA FEE: $300 SEPA FEE: 0-9.99 Acres$730 10 to 20 Acres$880 Over 20 Acres$1,100 EIS(DS)$5,000+90/hr Departmental Review (For Office Use Only) Site visit: Date approved: Z �Z Mason County Community Services Page 4 of 4