HomeMy WebLinkAboutBLD92-01009 Cancelled Mobile Home - BLD Permit / Conditions - 11/19/1997 MASON COUNTY
PERMIT
Mason County Bldg. 111 426 W. Cedar MULL & VOID BY EXPI AT16H
P.O. Box 186 Shelton, Washington 98584 DATE &A--q By
14. 44 A I I 1 4.: 1 J-4 1"I t I
ME 5521 BEAR--V�REFK UVIIJAII10 kit ixk i I
MARY CHURCH 3 12-2 1 0.�
014NER t% CONTRACIOR
I 1 66 1 it I so It 11 1 it SIP 11641 Is 0114-11 H 444
I t-0 I p f'4 1",W I H I yvf ANY1191 iI 0 A I I I;f t.I p If fief A00041 IST 0 6 If p I=1 P1
tj Iff 1 14 i
'I Yf-t 01 t ttN!'; f 1, 1 t it 0IFf,
0 1 [4 1
f'f 1)p A t4
f 114 6
I 1 00 t t A I I I fi 0
t 1A I i I 11.1
i I.I I t4 Y I
L 'v'
i N I i "i N
6 1 N It k k'ii V 0 f,
0,-, ! A 1(6 1) 1 '-PO I 0 10CA 0 t III j't 1 1; 0
0 0 4 0 0 1 1 it Ill, 1 1 0
(10
t'(p T r I N.,0011[f, Hoot
poll ICI L A I 14 0 p OfAR toftiI ofwjo NU ON I Ef 1 114 Ant! woef ffff,#DAlf. pks-'
INIS pf f 0 11 N1 f oo s Nott AND voll if Von ftp (Oc4p111100 Aplw'l"fii 1� 001 fitNifNifti w-1011 180 wl" 0 If (9410ROf 1100 OR U441 m 11, �111'
offte f4p A
or to# I lof AfTER Vogt v) (AAAmfe, momf of foolio"Alm OF um 11, A plomii wpmfoo ulluo f"F 19.0 Ith'i ffrWIP fTwAI WpF1110 Phi Ff
APPROVIP bf ft4f 'Al I bjp�, CAN ttf oft"PIF1
r
LX1 "wv
CONdRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
Gate by INSULATION date 3 by
BG/SLAB Insulation Floors Final
ate by date by date by
r-RAMING Walls FIRE DEPT.
date by date b date by
PLUMBING y OTHER
Attic 5�'J�
Groundwork ,C�s ,r
date b date by
WALLBOARD NAILING
D.W.V. date by /�✓zr /4�Py �CGCJ fi���c' Y
date by FINAL INSPECTION
Water Line �ffy
date by date by date by
NAME ON PERMIT ( Pr9--{ O qrc�CA 4 DATE OF PERMIT
PERMIT NUMBER ►()bG TYPE OF HEAT
s
t �
Washington State Energy Code 1 Ventilation and Indoor Air Quality Code
SET-UP INSPECTION CHECKLIST FOR MODULAR HOUSING ,
1I2� Z. 0r-A
Note: (-PS 't�'AeV-LO OD ZV1 V Z4
This checklist is not comprehensive: other code regt&cmcnts may apply. This checklist can be
used by local by building departments for Modular homes built to the 1991 Washington State
Energy Code (WSEC) and innspectcd in the factory by dhc Washington Stan Department of Labor
and Industries (L&I).
Ground Cover: 6 mil, black
Ventilation: Ventilation in crawlspacc must be a minimum of one square foot of ate
ventilation aria (without louvers) per thrtt hundred square fect of
=wlspace aria, or a passive radon vent pipe must be installed. Noce: UBC
regulations may require mart ventilation.
Pipe Insulation: Cold and hot pipes insulated to R-3 in unconditioned areas.
Floor Insulation:No damaged or missing insulation; if floor insulation is done on-site,
R-value installed is consistent with NLEA form
Ducts: Where appropriate, doss over ducts are properly joined,scaled, and supported.
Duct insulation is in place and in good condition. If duct insulation is
installed on site, insulation value shall be R-8,or according m NLEA form. ,
_„Marriage Line: Sections are properly aligned and sealed or gaskemd with appropriate
materials (a norr-porous mareriai;sucir as a foamsiU scat) cadmic-
infiltration.
_____ At`ir Qreck for baits moved and not=placcd during set-up.Loose fill insulation is of
tmifcrm depth. Baffles displaced dttting set-up or transit are properiy reinsrall�
Doors: Check doors to ensrut that they close and larch properly.
Notice to Local Enforcement Agency Form (NLEA): ?he NLEA has been reviewed and
the items listed have been inspected,
I:"7,91
s
Washington State Fnergy Code - Ventilation and Indoor Air Quaiiry Code
- MODULAR HOUSING SET-UP LNSPECTION PROCEDURES
Background
The Washington Stare Department of Labor and Industries (L&I) performs Washington State
Energy Code (WSEC) plan reviews and inspections in the factory for modular homes subject to
the Uniform Building Code (UBC). Although many of the WSEC and Ventilation &Indoor Air
Quality Code (VIAQ) requirements are inspected by L&I, some items can only be inspected on
site, and therefore, may fall within the jurisdiction of the local building orficial.
The Notice To Local Enforcement agency (NLEA)
Attached to each modular home inspected by L&I is the NLEA, which provides the local
enforcement agency with information pertinent to the site inspection. Often, a modular home is
shipped to the site before some items normally inspected by L&I are completed. In these cases,
the L&I inspector fills out the NLEA form and lists items not inspected at the factory. For
instance, when a manufacturer ships a modular home before floor insulation is installed;the
NLEA form will indicate the R-value of the required floor insulation. The local building
officials' careful review of the NLEA form is an extremely important part of the modular
housing set-up inspection.
Damage Incurred During Transit
Sometimes a modular home may be damaged during uansir. Although L&I is the building code
authority for the home until it arrives at the building site, often no L&I inspector will see the
home after it is delivered. If the local inspector discovers any damage incurred in transit. L&I
should be notified as soon as possible. (Contact Dan Sevcik at 206-664.-0548.)
Authority of the Local Building Official
The local inspector has the authority and responsibility to inspect any work done by the set-up
crew. Some of the work to be inspected will be listed on the NLEA form. Frequently, however,
the set up crew may damage or alter work previously inspected by tar The local authority does
not have the authority to inspect work already approved by L&.L except those specific items
altered by the set-up crew. For example, if attic insulation is moved out of place by the set-up
crew, the building inspector may require that the insulation be properiy replaced, but may not
require that the attic be insulated with bate of a higher R-value than approved by L&L
The WSEC Set-up Inspection Checklist
RCW 19.27A.035 requires that utilities provide an "owner at the time of construction payment"
for WSEC homes (only electric resistance heated homes 2000 square feet and under qualify for
the payment). Some utilities may ask for verification of a local jurisdiction set-up inspection
prior to making a payment for modular homes. On the reverse side of this page is a sample of a
WSEC Set-up Inspection Checklist for Modular Housing that may be accepted as adequate
vC2ifiication by the local utility.
121I7N I
J
��p ���`� ��(.(�-+'�" LT1�> a�•(� T� Permit No.BLD
MASON CO
BUILDING PERMIT APPLICATION
PLEASE PRINT B LC✓ �- (0 0 1
#1 Owner 1`/Ir, �)OSsrk� ne 0 M 11 r`h_Phone# c,�7o -,a-70;;L
Site Address oj-eeK Z>ej'j? o c
City T:�P1 ; r St l'oG _ "zip _q8SQS
Directions to Job Site Cie e
1
Owner Mailing Address
City ;C- St Zip q 215�X
Lien/Title Holder el
Address
City St Zip
#2 Contractor Name GP 711 Contractor Reg#
Address Expiration date / /
City St Zip Phone
#3 If septic is located on project site, include records.
Connect to Septic? Public Water Supply Well ill-ise`k 7/42
(If residential, proof of potable water may be required)
#4 Parcel No. ! P301 - 13 - goo I n
Legal Description] 1 &�c S\,oc-t V\cc, - I SLI I
No(-th) Cknc)e v-)-eS-t-
#5 Building Square Footage: (existing/proposed)
1st Fl / 2nd Fl / 3rd Fl / Loft /
\� Basement / Deck / #bedrooms #bathrooms__
Garage / Carport / (Circle: Attached or Detached?)
Other sq ft /
#6 Use of building Si��P,.�i Describe work p ,
#7 Type of Job: New _ Add Alt Repair Demolition
Woodstove Re-Roof Bulkhead Other
#8 MOBILE HOME INF RMAT N
Model Year Make Model
Length Width `/ ' Serial No. S 7b7
#Bedrooms #Bathrooms_ Type of Heat Prnon ne-
#9 N// Any water on or adjacent to property: saltwater lake
river pond wetland seasonal runoff
other
J
Show following on the site plan
u- -
Lot Dimensions Flood Zones
Existing Structures Fences
Structure Setbacks Driveways
Water Lines Shorelines
Drainage Plan Topography
Septic Systems Wells
Proposed, r-ovements Easements
Name o F ing- Street Scale:
Name of Fronting Street Date-
APPLICANT TO DRAW SITE PLAN BELOW
���-t.._
P204 4 ,
�1
APPLICANT TO DRAW TOPOGRAPHY PROFILE BELOW
Plumbing Fixture-_ $2 each) Fee
No. Toilets Fee
Vent Systems X 3 . 00
Bath Basins Vent Fans X 3 . 00
Bath Tubs No. Boilers/Compressors
Showers 0-3 HP
Hot Water Htr 6 . 00
3-15 HP 6 . 00
Laundry Washer 15-30 HP
—Sinks
30-50-HP 6. 00
Floor Drains 50 + gp
Laundry Basins 6 . 00
— No. Air Handling Unit
Dishwasher <= 10000 cfm.
Disposal
> 10000 cfm. 7. 50
Urinals Other
Other Evap Coolers
Hoods
Permit Basic Fee 3 . 00 Fire Suppression
TOTAL PLUMING $ Domes . Incin.
Comml . Incin.
Reloc/Repair 6.00
No. Fuel Types '�n
Mechanical Fixtures ti Gas Outlets X 2 . 00 o
Woodstove 92pa,.4
Furn < 100K BTU 6 . 00 Other .
Furn >= 100K BTU 6 . 00
Furn - Floor 6 . 00 Permit Basic Fee 10 . 00
Heat Pumps 6 . 00 TOTAL MECHANICAL $
NOTICE: THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION
AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK
IS SUSPENDED OR ABANDONED FOR A PERIOD OF 190 DAYS AT ANYTIME AFTER WORK
IS COMMENCED
OWNERS AFFIDAVIT CONTRACTORS AFFIDAVIT
I CERTIFY THAT I AM EXEMPT FROM THE REQUIREMENTS OF THE I CERTIFY THAT I All A CURRENTLY REGISTERED CONTRACTOR
CONTRACTORS REGISTRATION LAW RCW 18.27 AND AM AWARE IN THE STATE OF WASHINGTON AND I AM AWARE OF THE
OF THE MASON COUNTY ORDINANCE REQUIREMENTS FOR WHICH ORDINANCE REQUIREMENTS REGULATING THE WORK FOR WHICH
THIS PERMIT IS ISSUED AND THAT ALL WORK OONE WILL BE IN THE PERMIT IS ISSUED AND ALL WORK DONE WILL BE IN
CONFORMANCE THEREWITH. NO CHANGES SHALL BE MADE CONFORMANCE THEREWITH. NO CHANGES SHALL BE MADE
WITHOUT FIRST OBTAINING APPROVAL FROM THE BUILDING WITHOUT FIRST 08TAINING APPROVAL FROM THE BUILDING
OEPARTMENT. DEPARTMENT.
X OWNER � Wit- �t C� X BY
DATE DATA
Return permit to : Department of General Services
426 W. Cedar/P.O. Box 186, Shelton, WA 98584 427 -9670/1-800 - 562 -5628
FOR OFFICIAL USE ONLY: Accepted by: Date :
LrjrH1t11v1L'lr 1Aj-d 1C� v mrr
FOR OFFICE USE ONLY -
----� Approved Cond Hold
Approval
Plaaaing:
Environmental Health: 11
Building Plan Review: Ito
Occupancy Group:
Fire Marshal:
Other:
FEES
(ISpecial Conditions : 11 IlSite Inspection
II II I
II II IlBuilding Permit
II II If
If II Ilviolati.on Fee
li H
�) 11 IlViolatioa Investigation Fee II
II I
II Il Plan Check
II II I
II II IlPlumbing Fee I II
II II I
II II IlMechanical Fee I II
II II I (
II II IlWoodstove Fee I ()
II II I� 'I
II II IlBuilding State Fee I II
I
IlBuilding Valuation: II II TOTALI !� r II
L� ,1 , ,!