HomeMy WebLinkAboutFPA2019-00010 Findings of Fact - FPA Letters / Memos - 5/13/2019 i FINDINGS OF FACT
Y
FPA Case#2019-00010
APPLICANT: Dan Miller
APPLICATION DATE: May 13, 2019
Mason County has reviewed the above referenced application for Class IV General Forest
Practices and finds it in conformance with all applicable County land use regulations in
effect at the time of application.
FINDINGS
The proposed FPA is compliant with the following conditions:
The proponent has paid the prescribed fees.
The proponent has filed a complete, signed application.
A map has been received that complies with the requirements of 11.05.120:
(I) Harvest boundaries and tree retention areas.
(II) The approximate location of any structures.
(III) The location of all existing and proposed streets, right-of-ways, easements, skid
roads, haul roads, and landings within the proposal.
(IV) The location of future land development including stormwater management
facilities and vegetation to be retained for site landscaping, open space, wildlife
habitat, screening, and/or buffers.
(V) Site topography at contour intervals of 40 feet.
(VI) Critical areas and critical area buffers regulated pursuant to the Critical Areas
Ordinance.
(VII) Drainage ways and culverts.
(VIII) Site area targeted for further harvest including proposed timing.
(IX) North arrow and scale shall be shown on all site plans. The scale shall be no
smaller than one inch to 200 feet.
That this FPA is in conformance with the following Mason County ordinances:
11.05
That the proposed FPA involves 5 acres on one parcel.
That the notifications required by 11.05.060 have been made if applicable.
Note: Harvest unit is greater than 500 ft from State Park.
Mason County Resource Ordinance
1
X_That at the issuance of this permit will not result in a violation of the Mason
County Resource Lands and Critical Areas Ordinance. The site was inspected by
Michael MacSems of the Mason County Planning Department who determined
that any critical area buffer and/or steep slope issues have been resolved.
Geo-Technical Report/Assessment Review
A Geo-Technical__ Assessment_Report(check one) was written by
and a submittal checklist was approved by Michael MacSems
of Mason County DCD on
N/A
Washington State Department of Transportation
A DOT Access Permit is not required for this proposal.
_X_A DOT Access Permit is required for this proposal.
Date Approved by DOT:
N/A
Mason County Road Access Permit
Road Access Permit 19-48 was issued by Mason County Public Works on 7/22/19
Shoreline Master Program
That, if applicable, all activity under this application are in conformance with the
Mason County Shoreline Master Program and has a shore line designation of
N/A.
State Environmental Policy Act
This application for FPA#2019-00010:
_X_Has been reviewed for SEPA compliance under case#: SEP 2019-00045.
Is SEPA exempt.
X_DNS
MDNS
Stormwater Management
This project has been represented as disturbing less than 2,000 sq ft and creating
less than 5,000 sq ft of new impervious surfaces. The applicant provided a BMP
narrative in accordance with WSECY 2012 Manual, Minimum Requirement#2.
2
Permission from Underlying Property Owners:
1
Yes—Signed by Dan and Norrine Miller.
CONCLUSION
In conclusion, this application for Class IV General Forest Practices is consistent with the
above criteria and that the public uses and Mason County has fulfilled its statutory
obligations.
RECOMMENDATIONS
I,being the Director of the Mason County Community Services, hereby attest to and
certify that appropriate provisions have been made for this Class IV General Forest
Practices Application and hereby recommend approval. In addition to these facts
evidenced by the contents of the file for this Forest Practice Application.
Signed,
David Windom, Director Community Services Dept. Date
/7kv,j A'/�— x-
Michael Ma8ems, FPA Reviewer Date
3