Loading...
HomeMy WebLinkAboutBLD2024-01502 Roof Solar - BLD Inspections - 2/14/2025 INSPECTION CARD Mason County 615 W. Alder St. Building 8, Shelton, WA 98584 �� 360-427-9670 ext 352 www.masoncountywa.gov PERMIT# BLD2024-01502 PROJECT ADDRESS 121 E CARDINAL CT ALLYN, WA 98524 PARCEL# 122085111001 PROJECT DESCRIPTION Installation of 8.725 kW AC Solar system on roof of SFR OWNER OTTENBACHER MELISSA RENEE PHELPS ADDRESS AKA MELISSA R PHELPS OTTENBACHER&JEFFREY J PHONE OTTEN CONTRACTOR SOLTERRA GLOBAL ADDRESS 2909 1 s Ave S PHONE 206-462-1103 CONTRACTOR LICENSE SOLTEGL831BZ LENDER INSPECTION INSP I DATE Comments INSPECTION INSP I DATE Comments BLD-Final Inspection F-0 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.mason countywa.gov B DD2024-01502 ROOF MOUNT SOLAR PANEL- RESIDENTIAL PROJECT DESCRIPTION: INSTALLATION OF 8.725 KW AC SOLAR ISSUED: 01/08/2025 SYSTEM ON ROOF OF SFR SITE ADDRESS: 121 E CARDINAL CT ALLYN EXPIRES: 07/07/2025 PARCEL: 12208511 1001 APPLICANT: OTTENBACHER MELISSA RENEE PHELPS & OWNER: OTTENBACHER MELISSA RENEE PHELPS& JEFFREY JOE JEFFREY JOE AKA MELISSA R PHELPS OTTENBACHER& AKA MELISSA R PHELPS OTTENBACHER& JEFFREY J OTTEN JEFFREY J OTTEN SILVERDALE,WA 98383 SILVERDALE,WA 98383 CONTRACTOR: Solterra Global LLC 2909 First Avenue SSeattle,WA 98134 206-462-1103 GENERAL CONTRACTOR'S LICENSE: SOLTERRA GLOBAL License: SOLTEGL831BZ 2909 1 s Ave S Expires: 01111/2027 SEATTLE, WA 98134 206-462-1103 FEES: Paid Due Technology Surcharge $1.94 $0.00 Final Inspection $97.00 $0.00 Solar/PV Fee $475.00 $0.00 State Fee-Residential $6.50 $0.00 Solar/PV Base Fee $30.00 $0.00 Totals : $610.44 $0.00 REQUIRED INSPECTIONS BLD-Final Inspection CONDITIONS Printed by:Brittany King on:01/08/2025 11:43 AM Page 1 of 4 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncoun"a.gov ROOF MOUNT SOLAR PANEL-RESIDENTIAL BLD2024-01502 OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED. * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * All construction must meet or exceed all local and state ordinances in addition to the Intemational Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. Printed by:Brittany King on:01/08/2025 11:43 AM Page 2 of 4 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov ROOF MOUNT SOLAR PANEL-RESIDENTIAL BLD2024-01502 * The installation of solar(thermal or photovoltaic) energy systems to provide space heating or cooling, hot water and swimming pool heating shall conform to Chapter 23 of the International Residential Code, Chapter 14 of the International Mechanical Code, Uniform Plumbing Code, the International Fire Code, and be shall be listed and labeled in accordance with UL1703. Roof mounted panels shall weigh no more than 4 Ibs per square foot. Supports for solar panels are to be installed to spread the dead load across as many roof-framing members as needed to ensure that no point loads in excess of 50-Ibs are created. Panels may be installed on roof assemblies with a single layer of roofing material. Roof assemblies with more than one roofing material layer shall require an engineered analysis demonstrating that the roof will support the additional load of the solar panel system. Attachment to the roof shall be in accordance with manufacturer specifications provided during the inspection by the Mason County Building Inspector. Roof mounted equipment shall comply with the International Fire Code Section 605.11, including signage and access pathways. Roof access points shall not be located in areas where access ladders would block window or doors openings. Not less than two-3-foot wide access pathways shall be provided from the eave to ridge. Ground-mounted panels and modules, installation must be in accordance with the manufacturer's instructions and be available at time of inspection. Inverters shall be listed and labeled in accordance with UL 1741. Systems connected to the utility grid shall use invertors listed for the utility interaction Collectors and thermal storage units shall be listed and labeled to show manufacturer's name, model number, serial number, collector weight, collector maximum allowable temperatures and pressures, and the type of heat transfer fluids that are compatible with the collector. Connections to potable water supplies shall be provided with backflow protection in accordance with the Uniform Plumbing Code. Solar energy systems containing pressurized fluids shall be protected with a temperature and pressure relief valve and be protected from freeze damage. Systems shall be equipped with means to limit the maximum water temperature of the system fluid entering or exchanging heat with any pressurized vessel inside the dwelling to 180 degrees Fahrenheit. Solar energy collectors, controls, dampers, fans, blowers and pumps shall be accessible for inspection, maintenance, repair and replacement. The roof shall be constructed to support the loads imposed by roof-mounted solar collectors and shall be constructed of noncombustible materials, flashed and sealed to prevent entry of water, rodents, and insects. The building inspector may require additional information, including an engineered design, to verify that existing roof or floor construction are adequate to support the additional load of the solar energy equipment. When required provide an engineered design for inspection. The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency (ORCAA). It is unlawful for any person to cause or allow the demolition (or major renovation) of any structure unless all asbestos containing materials have been identified and removed from the area to be demolished. Work shall not commence on an asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org Printed by:Brittany King on:01/08/2025 11:43 AM Page 3 of 4 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov ROOF MOUNT SOLAR PANEL-RESIDENTIAL BLD2024-01502 hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: Contractor or Authorized Agent: 0ok-A—LA, Date: Printed by:Brittany King on:01/08/2025 11:43 AM Page 4 of 4 PROPOSED 10.75 KW DC SYSTEM (STC) AT 121 E CARDINAL CT., ALLYN, WA 98524 ID# SCOPE OF WORK: THE INSTALLATION CONSISTS OF A 10.75 KW DC SYSTEM ]5'-D" ----— -- (STC)ROOFTOP SOLAR ARRAY,MULTIPLE Ridge Setback Calculations Z LL MICRO-INVERTERS,AND RELATED ELECTRICAL METERING Total Roof Area:2600 SgFt. (��—_=____—--—-R-—-- r✓ AND SAFETY EQUIPMENT.ALL EQUIPMENT WILL BE Single Module Area:21 SgFt. III (E)Fence I I INSTALLED AS REQUIRED BY APPLICABLE CODES AND THE Total Number of Modules:25 II w LOCAL UTILITY COMPANY. Total PV Area:525 Sq Ft. III it Percentage of Coverage:20% III I I I Q Plot Plan 6 Photovoltaic Layout PV-1.0 Fire Sprinklers Installed:NO II I I I 2 Project Notes,Conduit 6 Grounding Detail PV•1.1 IY Racking Details PV-2.06PV•2.1 m I II 0 Fire Labels 6 Equipment Elevation PV-3.0 LL Fire Placard PV-3.1 Utility: Mason County PUD No.3 III Ii_ (E)Fence _ ' Z 3 Line Diagram PV-4.1 Manufacture Spec.Sheets Attached I A I /\ 0u Sheet Index Q u"«,ro o to mNw Scale:N/A . �. OCCUPANCY GROUP:R-3 pi' Is,6. Z o Iri a rn W TYPE OF CONSTRUCTION:TYPE V-B I I'I 0 AUTHORITY HAVING JURISDICTION:MASON COUNTY III U L°¢ti 1- ON ASSESSORS PARCEL NUMBER:#122085111001 r, OF STORIES:1-Story one - v ROOF PITCH:30.5'or(7:12) c II c III m I Site Information 2111 CrIII 2 Scale:N/A I I I x III (E)Single Family Home III (N)(25)Enphase IQ8A-72.2-US(24OV) II (N)(25)Silfab_Solar_Prime III 0 b NTC SIL-430 QO(430W) I III V o ry SNOW LOAD:25 PSF (N)Junction Box—III III Q m WIND SPEED:110 MPH N E III III � d E NNN 3 AHJ NOt25_.. (N)"PV Dedicated"BOA Enphase Combiner jA I CC a O N Scale:N/A I 0 6,Q Z Q (N)60A Utility Fused AC Disconnect#1 F III LL U a M (E)Utility Meter/Main III Z x ry a` (E)200A MSP w/(E)200A Main Breaker = _ 2 -,o ml a 121 E CARDINAL CT. I I W Ln`u ~ALLYN,WA 98524 I --�---- I In M IF w N i I � N 2. (E)Driveway.: i 4 0 = p I'n / N N O If 1LL ^M Z Q V m A b m Aerial View I t— w6m ;o'Q 4 Scale.NTs I I U U, O Im m N n I In N Q'nZ Z0 0 REVISION BLOCK —— "- DESCRIPTION DATE Initial Draftof Plans 12/19/24 121 E CARDINAL CT. 121 E Cardinal Ct. ALLYN,WA 98524 Roof Access P.- Property Lines Fence Llm Block Wall Cmdux On Roof Cmd,it In Attic Conduit In Trench _______ -------- Design By.CNG SOLAR ENGINEERING,INC. Vicinity Map 6 Plot Plan SHe� 5 Scale:NITS Scale:1"=20' PV-1.0 if 1 2020 NATIONAL ELECTRICAL CODE 1.ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR 1.RACKING SYSTEM S PV ARRAY WILL BE INSTALLED ACCORDING TO I D# 2021 INTERNATIONAL RESIDENTIAL CODE PURPOSE.CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE-COMPLIANT INSTALLATION TOP CLAMPS REQUIRE A DESIGNATED SPACE 2021 INTERNATIONAL EXISTING BUILDING CODE CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. BETWEEN MODULES,AND RAILS MUST ALSO EXTEND A MINIMUM DISTANCE 2022 INTERNATIONAL BUILDING CODE 2.DC WIRING LIMITED TO MODULE FOOTPRINT.MICRO INVERTER WIRING BEYOND EITHER EDGE OF THE ARRAY/SUBARRAY,ACCORDING TO RAIL 2021 INTERNATIONAL MECHANICAL CODE SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY WITH MANUFACTURER'S INSTRUCTIONS. 2021 INTERNATIONAL ENERGY CONSERVATION CODE SUITABLE WIRING CLIPS. 2.JUNCTION BOX WILL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS.IF 3.AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: ROOF-PENETRATING TYPE,IT SHALL BE FLASHED 6 SEALED PER LOCAL z 3.1. PHASE A OR Ll-BLACK REQUIREMENTS. 3.2. PHASE B OR L2-RED,OR OTHER CONVENTION IF THREE PHASE 3.ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED 0 LJ.J Applicable Codes 3.3. PHASE C OR L3-BLUE,YELLOW,ORANGE',OR OTHER CONVENTION WITH APPROVED CHEMICAL SEALANT PER CODE BYA LICENSED CONTRACTOR. Q '.1 Scale: PHASE WITH HIGHER VOLTAGE TO BE MARKED ORANGE. SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. 2 J cr CODEBOOK: 2020NEC Wlrinq 6 Conduit Notes 0 BREAKER SIZES: NEC 240.6(A) 6 ' Style.N/ LL WIRE AMPACITY TABLE: NEC 310.15(B)(16) 10 Structural Notes Z MAX SYSTEM VOLTAGE CORRECTION: NEC 690.7(A) 1.GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, Sole:N/A _ NUMBER OF CONDUCTORS CORRECTION: NEC 310.15(B)(3)(A) AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR 1.DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE AMBIENT TEMPERATURE CORRECTION: NEC 310.15(B)(2)(A) SUCH USE. SWITCH IS OPENED,THE CONDUCTORS REMAINING ENERGIZED ARE 0 AMBIENT TEMPERATURE ADJUSTMENT: NEC 310.15(B)(3)(C) 2.PV EQUIPMENT SHALL BE GROUNDED METAL PARTS OF MODULE FRAMES, CONNECTED TO THE TERMINALS MARKED"UNE SIDE'(TYPICALLY THE 1-- s DC GROUNDING ELECTRODE CONDUCTOR: NEC 250.166 MODULE RACKING,AND ENCLOSURES. UPPER TERMINALS). U O m NEC 690.47(A) 3.EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO 2,DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL,BE Q U a st GoAC GROUNDING ELECTRODE CONDUCTOR: NEC 690.47(B) MICRO INVERTER MANUFACTURER's INSTRUCTIONS. LOCKABLE,AND BE A VISIBLE-BREAK SWITCH gym"m RACK GROUNDING ELECTRODE CONDUCTOR: 4.THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH MAXIMUM OCPD 120%RULE: NEC 705.12 3.RAPID SHUTDOWN OF ENERGIZED CONDUCTORS BEYOND 10 FT OF PV a rn ID W ( ) C) THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING 0 vi ARRAY OR 5 FT INSIDE A BUILDING WITHIN 30 SECONDS.CONTROLLED CONDUCTOR TO ANOTHER MODULE. CONDUCTORS 530V AND 5240VA.LOCATION OF LABEL ACCORDING TO AHJ. m>3 O Electrical Code References 5.GROUNDING AND BONDING CONDUCTORS,IF INSULATED,SHALL BE 4.IF REQUIRED BY AHJ,SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT U `4 w a 2 Scale:N/A COLORED GREEN OR MARKED GREEN IF M4 AWG OR LARGER. PROTECTION. e _ 6.IF EXISTING SYSTEM IS INACCESSIBLE,OR INADEQUATE,A GROUNDING I°n o In`- 1.ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS. ELECTRODE SYSTEM PROVIDED. CH 2.WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE. 7 Grounding Notes Disconnection&OCPD No 3.ADDITIONALAC D SCONNECT(S)HALL BE PROVIDED WHERE THE INVERTER IS 7 Scale:N/A ng NOLES 11.:Scai e:N/A tion&OCPD Notes W x NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT. 4.ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL. p 5.ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR CONDUIT RUN ABOVE ROOF CONDUIT RUN THROUGH ATTIC USAGE WHEN APPROPRIATE O 0 Equipment Location WYADO•AO^I 3 MMP,"P,H.I,H,7(B• MNImPmH.aBQ,B• Q Ev Scale: /A sw,sm w,s � E N�N 1.THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS INPUT MAY NOT ' 4 B1pch P „✓1 u EXCEED 120%OF BUSBAR RATING. •"ce���« R•I"n°Nc«M«..sM`I O In'a z 2.WHEN SUM OF THE PV SOURCES EQUALS>100%OF BUSBAR RATING,PV u- B°' E"""°"B°° LL O Y E O DEDICATED BACKFFED BREAKERS MUST BE LOCATED OPPOSITE END OF THE ..�"R.INr sv.N R.ISF z BUS FROM THE UTILITY SOURCE OCPD. 3.AT MULTIPLE PV OUTPUT COMBINER PANEL,TOTAL RATING OF ALL OVER Dc IPVI R,Ac Dc cart P,Ac CURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. IMK..Inr.v.auel. IMm.AUW.N.n om. LU o 0 0 0. 4.SUPPLY SIDE TAP INTERCONNECTION WITH SERVICE ENTRANCE CONDUCTORS EPMD I- NI BACK FEEDING BREAKER FOR UTILITY-INTERACTIVE INVERTER OUTPUT IS FIANNm } m ry EXEMPT FROM ADDITIONAL FASTENING. RPwF,.mNa to D' 4` Interconnection Notes IXE R..IF,.mI R N E V ". Scale:N/A FLuea a w-11 Conduit Run Details 1.MODULES ARE LISTED UNDER UL 1703 AND CONFORM TO THE STANDARDS. - - w 8 Scale:NTS 2.INVERTERS ARE LISTED UNDER ,I 1741AND CONFORM AR ANGEMTHE NTOFT RAIL TO RAIL RAIL TO RAIL O 61 gl:e 3.DRAWINGS ARE DIAGRAMMATIC,INDICATING GENERAL ARRANGEMENT OF THE MODULE TO MODULE 81 PV SYSTEM AND THE ACTUAL SITE CONDITION MIGHT VARY. z m V N N.H b N 4.WORKING CLEARANCES AROUND THE ELECTRICAL EQUIPMENT WILL BE MODULE TO RAIL UFO (IN THE SAME Row) (IN SCREW (IN THE DIFFERENT ROWS) F- E 11 m MAINTAINED. Q 1O 0 5.ALL GROUND WIRING CONNECTED TO THE MAIN SERVICE GROUNDING IN MAIN caouvo WIRE W O U 3 m SERVICE PANED SERVICE EQUIPMENT. Pv noouLE FRAME E y -�`e,,. •-1 ti r$*�LD 6.ALL CONDUCTORS SHALL BE 600V,75°C STANDARD COPPER UNLESS PY roaAE O D 4 m a g O OTHERWISE NOTED. cc d U, 4 7.WHEN REQUIRED,A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 8.THE SYSTEM WILL NOT BE INTERCONNECTED BY THE CONTRACTOR UNTIL REVISION BLOCK APPROVALFROMTHE LOCAL JURISDICTION AND/ORTHE UTILITY. r-- - - - -1 9.ROOF ACCESS POINT SHALL BE LOCATED IN AREAS THAT DO NOT REQUIRE THE j I DESCRIPTION DATE PLACEMENT OF GROUND LADDERS OVER OPENINGS SUCH AS WINDOWS OR -- '-' - L_____ _____ EaIaMENT Initial D,dr O/Plans 12/19/24 DOORS,AND LOCATED AT STRONG POINTS OF BUILDING CONSTRUCTION IROARHHXE RAIL IRON IXE RAIL WHERE THE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD A Esm OeL..DeT OBSTRUCTIONS SUCH AS TREES,WIRES OR SIGNS. UNIVERSAL FASTENING aa..Ecr(uF0) NTS REMOVAL OF ONE PIECE OF FAIL SPLICE Nt5 REMDV4 OF ONE PIECE OF GROUNROUJN D LUGS 10PV ARRAY COMBINER/JUNCTION BOX PROVIDES TRANSITION FROM ARRAY THE UFO SECURELY BONDS SOLAR MODULES TO XR EQUIPMENT SHALL NOT DISCONNECT EQUIPMENT SHALL HOT DISCONNECT W(S_Ess STEEL WIRING TO CONDUIT WIRING RAILS.RCOMESASSEMBLEDANDLUSRICATED,AND THE BONDING CONNECTION BETWEEN THE BONDING CONNECTION BETWEEN MACHINE SCREW Design By:CNG SOLAR ENGINEERING,INC" CAN FR A WIDE RANGE OF MODULE HEIGHTS. ANY OTHER PIECES. ANY OTHER PIECES" (FOR EXT"" NET EET General Notes Grounding Details LOGTNN•SI li SH 5. Scale:N/A '9 Scale:NTS PV-1.1 a . Array Quantity Mounting Type Array Tilt Azimuth Att.Spacing Roof Type Fire Path-18"On Ridge Ridge Setback Calculations ID# AR-Ol 19 Flush Mounted 30.50 180 72" Comp.Shingle" Solar cover less than 33% Total Roof Area:2600 SgFt. AR-02 6 Flush Mounted 30.5° 180 72" of total roof,no 36"pathway Single Module Area:21 Sq Ft. Q required Total Number of Modules:25 Total PV Area:525 SgFt. Percentage of Coverage:20% Z Fire Sprinklers Installed:NO O H w Q 2 _! LL O LL z cc O U o UNa a) C J Z ova v O u U N o in �Na �o 18"Clearance both sides of the ridge I w x I 3 I � o ------- ---------------------J Z >' O oa H e M� -- Q '^ on �- -- i -- t -- — —F-- �- O Gaza LL o3 E6 LU AR-02 Ci--F f — —� —■ AR O1 LU no o c V) a� is -- N o� dd, \ LL �ddNg�� J who ^^mm w ou I <�€� i; O JNamago ---J a 3'Clearance REVISION BLOCK DESCRIPTION DATE Initial Draft of Plans 12/19/24 Modules Fire Clearance Obstructions Attachments Rafters Rails ❑O ® A' D.Ign By:CNG SOLAR ENGINEERING,INC. PV Racking&Roof Framing Plan s�EET`' P y—2.0 Atra�hment Spacing:6' r-- Attacl'1111 nt Point ROOF INFORMATION Roof Material: Comp.Shingle. � n Roof Framing: Manufactured Trusses. Z L�l Framing Size 6 Spacing: 2"x 4",24"O.C. Framing Span S Roof Pitch: 20'-0",30.5°or(7:12)Pitch O LLJ SlOpe! x Framing Species 6 Grade: Douglas Fir Larch#2. 30.5°'OR(7:12 PV Module �-- ;r I d. (u�i w RACKING INFORMATION cc PV Rail I F : Racking/Rail Manufacture: IronRidge XR Rail 10 Ft.Rails O ! � �= Attachment Manufacture: IronRidge Quick Mount HUG. LL Number of Attachments: 50 Attachments Z L ®I ® Racking Weight: 3.56 Lbs./Module MODULE INFORMATION O �—Max Cantilever 33%Rail Span:72"x 33%=24" Modules: (25)Silfab_Solar_Prime NTC SIL-430 QD(430W) Q J e Module Dimensions: 67.8"x 44.6"x 1.37" F J�mm Module Weight 6 Sq.Ft.: 46.3 Lbs.,21 Sq.Ft. Z o v¢m W 1 Roof S Attachment Spacing _ ___.._.____ _.__ ____ _________ _..__. Array Sq.Ft.: 525 Sq.Ft. O ,„ n U mQ'3a� O WEIGHT CALCULATION Weight w/Racking G Add Ons: 1331.5 Lbs. o e _ Weight(Lbs.)/Attachment: 26.63 Lbs./Attachment. Distributed Weight on Roof: 2.54 Lbs./Square Foot. w x l8°M�q Roof 1 Calculations 3 Scale:NTS m Z ((an"scap > O oa MN Q N TN N t�LR V ry T-Bolt O ^a z c ILL End Clamp Z E Cr �a IronRidge Support XR Rail 1 o of a x LLl o 6 c mw mPV Module Min.3.5"Above Roof U m in c IronRidge Quick Mount HUG v 0 G) N Comp.Shingle Roof O = m rr /atrUSSe LL Z Q V,,N. m �C, ? co S rn g N � m H aQroo ry 2% W oU"3MNn� awcFa a. O JrvQ^ZgZ 0 D_ O i (2)5x60 mm wood screws d a (Min.2.5"Embedded) „ REVISION BLOCK DESCRIPTION DATE Initial Draft of Plans 12/19/24 Design.By:CNG SOLAR ENGINEERING,INC. Modules Fire Clearance Obstructions Attachments Rafters Rails swEE. ScattNas Framing Details ® 4 Roof 1 Attachment Detail 2 N ❑ e NT5 PV-2.1 _ t OVER-THE-COUNTER BUILDING PERMIT CHECKLIST FOR RESIDENTIAL SOLAR PHOTOVOLTAIC SYSTEMS: ROOFTOP MOUNTED Contractors can apply for an Over-The-Counter(OTC)permit where the PV system meets the requirements listed in this Checklist.All project plans and supporting documentation must be provided on site for the inspector. --------TO BE COMPLETED BY APPLICANT------- © Project Information Property Owner Name: Melissa "Lisa" Ottenbacher Project Address: 121 a cardinal ct P reel 11001 City: State. ZIP: Allyn WA 98524 Day Phone: 360-633-5042 Contractor Name Solterra Solar Contractor License#: SOLTEGL831 BZ Contractor day phone: 206-462-1103 Describe project: conventional framed built dwelling orgarage, Installation of 8.725 kW AC solar system on Pole structure,steel building,etc. roof Of S F R Note: Manufactured/mobile homes require L&I Approval PV system description (25) Silfab Prime 430W Panels (include manufacturer (25) Enphase IQ 8A Microinverters and model#of PV modules and inverters): ©Determine if your project qualifies for expedited permitting: Yes No 1. PV system is designed and proposed for a detached one-or two-family dwelling or townhouse not more than three stories above grade or detached accessory structure that 0 ❑ is code compliant to setbacks and height,or code allows expansion of nonconformity for solar modules. [IRC 101.2] 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by 0 ❑ the local jurisdiction. 3. Rooftop is made from lightweight material such as a single layer of composition shingles, ❑ metal roofing, lightweight masonry,or cedar shingles. 4. The installation shall comply with the manufacturer's instructions. [IRC M2302.21 0 ❑ 5. The installation shall meet the requirements of NFPA 70 National Electric Code,and all required electrical permit(s) must be obtained from the Authority Having Jurisdiction to ❑ administer the electrical code. [IRC M2302.2] 6. The installation shall meet the requirements of the International Fire Code as amended ❑ by WA State. [IRC M2302.2] 7. The PV system is designed for the wind speed of the local area,and will be installed per 0 ❑ the manufacturer's specifications. [IRC M2302.2.1(1)] 8. The ground snow load does not exceed 70 pounds per square foot. [IRC M2302.2.1(2)] 0 ❑ 9. Total dead load of modules,supports, mountings, raceways and all other appurtenances 0 ❑ weigh no more than four pounds per square foot. [IRC M2302.2.1(3)] I Enter total dead load of system(lbs/ftz): Click here to enter text. 2.54 Ib/sq.ft 10. To address uplift,modules are mounted no higherthan 18" above the surface of the 0 ❑ roofing to which they are affixed. [IRC M2302.2.1(4)] 11. Supports for solar modules are installed to spread the dead load across as many roof- framing members as needed to ensure that no point load exceeds fifty(50) pounds. ❑� ❑ [IRC M2302.2.1(5)] 12. The photovoltaic modules and supporting structure shall be constructed of noncombustible materials or fire-retardant treated wood equivalent to that required for I] ❑ the roof construction. [IRC M2302.2.1] 13. Roof and wall penetrations shall be flashed and sealed to prevent entry of water, ❑ rodents, and insects. [IRC M2302.2.2] 14. PV modules are listed and labeled with a fire classification in accordance with UL 1703. ❑ [IRC M2302.2.3] Comments: If you answered yes to all of the above questions,the project qualifies for the over-the- counter permitting process. © Submit this Checklist, Site Plan, and other required permit application forms to: [insert contact info for jurisdiction having authority] 111110 As the property owner or authorized representative of the above listed property, I attest that all information in this checklist is accurate to the best of my knowledge. Digitally signed by Paige Farris Date: Applicant Signature: a I g Farris Date: 2024.12.24 12:29:21 -08'00' 12/24/24 Applicant Name(Please Print): Paige Farris Kantl'OWItZ --------TO BE COMPLETED BY MASON COUNTY STAFF------ Qualifiesfor OTC Building Permit? ❑Yes ❑No Permit Application#: Staff Initials Date: 2 f MASON COUNTY COMMUNITY SERVICES Permit No: `Z(� 01569 PERMIT ASSISTANCE CENTER: •BUILDING •PLANNING •FIRE MARSHAL rd 615 W.Alder St-Shelton, WA 98584 RECEIVED www.co.mason.wa.us Phone Shelton:(360)427-9670 ext 352• Fax:(360)427-7798 DEC 2 224 Phone Belfair.�(360)275-4467• Phone Elma:(360)482-5269 PLUMBING & MECHANICAL PERMIT APPLICATION 615 W. Alder St"t OWNER INFORMATION: CONTRACTOR INFORMATION: NAME:Melissa"Lisa"ottenbacher NAME:Solterra Solar MAILING ADDRESS:121 a cardinal ct MAILING ADDRESS:2909 1st Ave s CITY:Allyn STATE:wA ZIP:98524 CITY:seattle STATE:wA ZIP:98134 1st PHONE:360-633-5042 PHONE:2064621103 CELL: 2064621103 21 PHONE: EMAIL :solaradmin@solterra.com EMAIL:lisarpo60@gmail.com L&I REG#604041594 EXP. 10 /31 /25 PARCEL INFORMATION: PARCEL NUMBER(12 Digit Number):122085111001 Zoning: LEGAL DESCRIPTION(Abbreviated):single family residential SITE ADDRESS:121 a cardinal ct CITY:AIIyn DIRECTIONS TO SITE ADDRESS: Mason County COUP 419 N 4ih St,Shelton..WA WA 95594 Take W Alder St to E Pina St TYPE OF JOB: NEW=ADD=ALT=REPAIR=OTHER=USE OF BUILDING LOCATION OF FIXTURES/UNITS—1 ST FLOOR=2ND FLOOR=BASEMENT=GARAGED OTHER= PLUMBING FIXTURES(SHOW NUMBER OF EACH) MECHANICAL UNITS Type of Fixture No.of Fixtures Fees Fuel Type:Electric=LPG=Natural GasE�Ductless= Toilets Type of Unit No.of Units Fees Bathroom Sink Furnace Bath Tubs Heat Pump Showers Spot Vent Fan Water Heater Propane Tank Clothes Washer Gas Outlets Kitchen Sinks Wood/Gas/Pellet Stove Dishwasher Kitchen Exhaust Hood Hose bibs Dryer Vent Other Solar Panel 1 system SECTION Other Base Fee Base Fee N/A TOTAL PLUMBING TOTAL MECHANICAL OWNER acknowledge submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative,or contractor.I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties,including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection.This permit/application becomes null&void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OFTHIS PERMIT IS BY MEANS OF INSPECTION.INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. X 714&to a&Lqll�al^_ L 12/24/24 Signature of Owner Date DEPARTMENTAL REVIEW APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS BUILDING DEPARTMENT PLANNING DEPARTMENT FIRE MARSHAL Rev:1/27/2016 JBN ID# Q [[ICTMGIL,i/gCIFIGTE0N6 ..-... _-_ A" Z LL No O wodcmevoww m„q .w L j a PRIME NTC F— rNw, 51LFAB wr„mN,l., J SOLAR` mNM, roa. O mmum.oe,i.nal laa ty . su-a!n Qo srwsna...11ns " Z N powM ra,.Naa wp Nmwn.••a„.s.,.mRmr,..,s c•Nx„mwrm'•m,rs.Nrm. rcrnrr*nn �wr....wr�Nr•.s]T O sr,rw...we�.wn«r.n..aN.,wmn..wN.i o.nn,a.N w m Nn51ewN/M rigf 114 - V Oca ,INrl.q 1]il mmallaimm.55mm j m Madmum wrb Nwtl arRNnrowY tM01Y,wrbdf54W N0•nl b,tl � tl.54'R'�aw YUEItIILR Ww'ReMIwJ � �•+M � 0)� naX gny,n mw„ne pxwa,Ntllrua slnnSlempM1 Z O N m b l7 Caltl I IOIIIWMr•NTjpaSMwndrW 1®HW rNa-Wryp 551mnfdrW M J ltlwwatlwp 1lt In r]9M O din b crw i]wwlYAbwnArww.hmpnq axlnNttlu.wm,luMa,wmw,pa. V `G�°-;N a wNa.Rm:.rwr,E wR.aw.w.m.l.a « wl.r.w..w�.n..i�.rwrox.lanNlanmN�r,n nse+.R.ec]en.wu n.M sww ! nlr<.anlnuiaecG wurm srwo o aa.RtlwN rM tvtbllllp,uppMrlwdaly,w,W WnYwro,mNw4ryrdlabcbk Rtln, VI p RuwYraw NaNY1M, 01 nNM Maaw,tl WNrwml9t[N N w lNNlbn ax U31xCMtlW,R[Ctil50CatlM.a'M rawtl,itlbdx X TrnpRw,wwCpArintb[ O.MM/'C ,YiiRpmAatwedwseltlpnN,rNy 35 yan" 3 TrapnwpGNtYNvnr d115N'C ..- tlwrppw�prbmry ON.^wr wrtr+ Cr nws..waae..alel.wrlw.. an.v'e `0.9°�•.`:�wu•`•� e 1 ia"112 C1 ttc :pM!amC>Sl�ay Z 0> Cpenenfem.rNw. aW.tlY esa__rr O or F_ f 0Meeb*e N 1461r11,U.6trM.(31W.xil]A,IFCtIiLi.IKtl]D.IKa1x115N11ap M pin[ CrmNa,I.�Kti116 NnnmYCanmbnlCKtNwd UlFndtlryr mwi ~`pRRN: xwrx Katlor.tl Q E a N N leiee NTUci at«x KWMNq E tn'V N j.V I-r fx1Nr ISOR001mx MMwMTM anwmmKaxwNM In Z •wrnwi.Ml Mf+„ryaNwMresWw�NrwpwMafprt�Ne�pNMw.w.Ml.bmMV.+ITrawMm•Waa Z O Y vaxn.,im«r,a,mm aarmp.�m.a•rs.......r.ae..+ow.:,aeu,w,,...m,a..�w.e,. W to`I m r o 1p a 0 , w m w i In l lr laman.nl N.1•I1[xnmp tTr[]m.amml - I^ - - N 1 1 r : INTRODUCING NEXT-GENERATION • N-TYPE CELL TECHNOLOGY --,I' SILFABSOLARINC. O M u ry 8 N • Improved Shade Tolerance Enhanced Durability l t•taSmmL I 1T0Pb 0.. Z m m N g.. N Improved LoW.Light Performance •Reduced Degradation Rate ,y op o T-tese. III Z S m m o m • to Increased Performance in industry-Leading Warranty = L Inropaplpbwlpcwm V maw a High Temperatures sllraasol"R.cow Lll p U M n ti C ooe• 7 = rtnlWsd„L«N C) in >�u r l'J C -- If.5wtln1 € Eenreascis.._ O ut N Q m Z g Z Mir 2QC..ne'Na Od,,,Ear, d SILFABSOLAR.COM - - I11 ti MluYawwoH u]mwa, i a1505.iM.2501 thptlrpR,ao,R(4) f•I eo.mahi, REVISION BLOCK C E E , �Ec - - � �.a t•app,pl rp00m� - aa,,..Mr.pu �aaaaws DESCRIPTION DATE .,+.,•�. Ini[ial Draft of Plans 12/19/24 Design By:CNG SOLAR ENGINEERING,INC. Module Data Sheets dftDATA 1 Scale-NTS SHEET ID# Q ENPHASE. ® IQ8M and IQ8A Microinverters o W Q H commorvy«edmmlee r,,,I,mg,� w 27 -4eo 29, Nao 2 Modulecgnp.tromry ro m•el oompalbav Pv modd«mat b•y 'melolaweq maxmaan oc vahq nd max motluw lr W MndulacompNFllly can ba checkeANh p..%gpt'saeperp/krs,el la/m r,icakul tor. O a`a k Twlta,eanae v 30-45 32-45 LL �•.' opamnrp range v to-x z N Mlnl«anlM«Inum Can usage V 22/aB Maximum mpu,Dcvdtage v 00 0 u M«Nnm contkwous kput DC cgaM A 12 U O m MaxkrMm input DC Mnit-chcua gxrgrt A 25 <cc Maapnumnndule(I••) A 20 I— — m in W Ovarvolta9e<I«s DC port a O .2 a•2 n J DC ponbeckbedcv m mA o U r`o Q 1_ PJgr«conagura.n UngouMad wraY:rlo addtbnNa Nda gatwlbnre9Utred,AC,kle potx nrpui«arrex20Aper nrnh cxcut F G m NO N v O C PeekamWtpovwl IA 330 3. N d Maxlnlum cOnd—,output power YA 325 349 W X IQ8M and IQ8A Microinverters Nm°al grd wltage(t-1) 4D.mxa-Ph°°°"-U.00 MlMmum andM«Imam grit wltegea V 311-36d 3 Eery to Install Our newest 108 Microinverters are the industry's first microgrid-forming.software- LlgMweigM and compact withplug- MexNwmconngwc gaglt cvrent A 1.35 145 ""defined microinverters with split-phase pow -p ner conversion capability to convert DC a d la x.vconnectors so Noma.Ihe9uewr Z j power to AC power efficiently.The brain of the semlconductor-bawd mlcroinverter power line communication,(PLC) tl Cr is our proprietary application-specific integrated circuit(ASIC),which enables betweeneomponents Extended hegegny rage , n-ce u o r the microinvarter to operate In grid-tied or off-grid modes.This chip is built using Faster instillation withslmple two-wire Acshon<kcMt leuxcwreMder Na, 2 Q I~n v a advanced 55-Tim technology with high-speed digital logic and has superfast cabling 1Me•oycl« m N N response times to changing loads and grid events.alleviating constraints on battery �M.—una>Par20A(L-Ulxarnb n CC N�F n Nigh produo lvity and regabllky sizing for home energy systems. produce power even when the grid'a LL m Q Z s1 dow n Total harmonic tlistcnion x s LL U m •Moret hen onemillloncumulanvshours Overvohegecl°«AC port st Z Q 3 E. a 01 testing — �n a� • - CIev ll douhle-Irnulated encbaure AC portbxkIced current wA 3o C m It • O Optimized for the fetesthigh-powered W Poww lacror>erting t.o h a o PV modules GI IJ-IIaJ powq leap Udp,atabk) 0051eatli m...o.as laggblq N aIN Miprogrb-lormirq Pwkealnlency 97.0 9?T x } =•N• 91 N aeE—gy 5yatam.roe span cis Saris,Mkrdnwrters redexrn rallaClFly Cemplle>with the lMest advanced grid CEC wa.9MW sentiency x 9].5 N Mlcidrnartom ntegretewhFIM IO Battery, staMardawllh more lhanone milxon support" IO Gaiawey.end iha Enpha«PUP monarxmy aid umulanvahwn ofpcwq-on te>tmg. NlgMtime paver cansumptbn 21 22 •••• p Remote automatic updates fcr the latest aw am ysl>sottwara. eneNln9an Muziry»adlig--warranty grid leRuiraments of up to 25 seers Canes blatoau tawideren f gore ppor geo AmbleM temperature rarge -4VCto60'C(-/D'Fto 140'F7 grid profllea w •Meets CA Rule 2l(UL 1741-SA)end ndenvalvmidltY rerpe 4%to t00%IcondenNnq) O = o N IEEE 1547:2018(UL 1741-SB) slum Mc4 LL L)V ry N8 m a connect«ryDe Z pp xosE. Dim«arom M.w•DI 21z men(e.3')•zl5 mm(6.q`).3a2 mm(t3'7 Z ONOi N m m e _ wplMw„IM1 p«Mwgomaticr�N Enpluae wekfa 1.1 kg(2.a3 1ba) U IN C k Q b tV (a]aa»,.roe SeM,.aMnoNa caanng NahaN comecaon-np rena W O w 2mo,NN-r v toe sane,Mlaalnaanga.ra u L»ted« PVrapd ehundownaqulpnant aldconfwm tM��� ADDmv<d for rrotlacetlgn r« O INj)N?m Z~Z cglneptwmoanea RWckly and aaA,lctM ynm v.rioua regw.tlone wnen awlalMd M.,amwnw.wPwaaaNwu wmns,mN m.a -< (-g O IGeswaLtwnnwarers matlnw mtegrN.d ape a hemgx4ac,wa;>mmrwnona. ^"•'�A—',MIE nn an.moww�ao..,w.w wnunon degl« Poi cc u, C � W4 pplawptora ar�t•t m.mela.��->Pwiac edry,Im,m,mryM a w;,.da.,aaiFa,liyN.,lrn��nd,a.a,n,alal E,nle,ure Dlaa,ndpuble-Intt�a,gE,xMq,roll-,eaht.mpMymgk a�Ingae nN vaywlwn eronurov.+m;os—c.n.ewrxa3. tomwlMw elwlgsa dw.ps qullaxonEEw ErnhonnlerrtNcniogory/UV expa>ure retaq NEMAtype a/outdoor REVISION BLOCK IOBM aM IgeA wPparaplt plvea.2a0V>,aMNlaaaxy. OMI aE w W,,rw.rwd rduw.tivaa,N cc kqx lQagcan.waF..m.M,rxWa al No--co-i— DESCRIPTION DATE e kwago- - .a,an N.Wiwh,dE wE,wmy ke wtl»u.AAMaMrawxna (21Nan»»vaapsrapaeanMartaM,tlbayeneweealM aga,edbyeMNmy Initial Draft Of Plans 12/19/24 DNa,uWci�a ECMmIs _ GerANU .--a.E. 13111MIa m.yvary.Ibinrobcalrapwemw,ato EeXna,M,umbwdmieMrvena.•>pw bnneM1mrw.a.a geMaMC.-DSH 003053.-Fx-U5202a 0?-o0 Design By:CNG SOLAR ENGINEERING,INC. Microinverter Data Sheets DATA ,' Scale:NTS marra>wa„ SHEET ID# Q Enphase IQ Combiner 4/4C NODELNUMSER data ems. ..- EnphsseNe.ulrkiri(J gComan.4(%IQ AMI-2104) IQCemd 'tireddi lqC ayosso( ala6it board%)es"e altar Mereseldin""I"In"PV t enrg iANId O C17.20.1.05`a)atM amgrmrPtMr monitorir0(el 1 St),I.v.le¢oeiher cola.sate tPmmchtM lO Ba rygYstern and _ I IQ syaemcontroll.2and Iod.fl th Nd. m a 1— IQCoMn4C(X40�AM124C-4C) IQ.ton le4Qw.EPph...IQG.ew.r punted cucull MAW far inte'rat.drannaegrede rV ndd-1—metering Q r (ANSI Cl72n1r.a5v)arc<n--nolon—do,1,(N 25s).111—Fnpha¢e Mnh'I,Coon- 10,w m�rlsm G i (CELLMODEM MI 06-Sp 0S).e 01 and piaf coil nwckm(pr sys—w to 60 m:aclmenac. L f—LAblem 1.US.Canal..Mexico,Puerto Ri -ol-USsn nWtont.wheremerei¢erlepuelecalelAlaawcein The thek,aaesonslee,mildeee.HraIN-1hwd—unlol—OliuMrYadus.temcnmr la old rod~rhall O Enphase ACCESSORIES AND REPLACEMENT PARTS (not Included,order separately) LL •a• IQ Gateway and integrated LTE-Ml cell 'Enaambrcanmwvp aon.Xii ----- ------ I,wK•iI;dIWl50 iA`s.K�T-0 s�dcEu:%wDeM i.06sP-o5>ith5-re'osvnnideara.�ro`r`--`�•— Z IQ Combiner 4/4C till modem(included only with lO Combiner 4C) COI4M5-CELLMODEMMt-06 EnxmO..i« CELLMODEM•MI-06-5P-OS -Oba>ed LIE Mtoe6uler madam wgM SMrSprint d.a plan cc X-IQ-AM1-240-4 consolidates interconnection equipment CELLMODEMM406-AT-06 4G based LTEMic em ail,$11mdwlm5 eaAT&T dot,plen Or""'.A." .uppAneEatenNR21n.BR215BR220,BR230,BR24G,BR25O.AndBR2b0efrcvnMeabn f— a X-IQ-AM1-240-4C into a single enclosure and streamlines IQ BRKIOA2-240Y Cimnbreakar2 pole.IOA51-BR210 U Vt 0 Xl"A-2240Y Circuit breeker,2 Pole,15A.Eaton OP215 Q V ry or m microinverters and storage installations by SRX,2OA2P-240V Circrxlbreeker,2 dole,20A.Eaton DR220 J—tiM Blk-1 SA-2P 240V8 CnGAl,breakeL2pW',l$A,Eaton BR215B wmh Anid downkneuPporl — do to providing a consistent,pre-wired solution for BRK-20A2P-240VB C. ultMesker.2oI 20A,EatonBR2208withhokdownkitsupWt ~ -0 me? W EPLC 01 wenes r Por lisw(eommundenbn brki'e pale),quantity-Arr Z O r,Q M ~ residential applications.It offers up to tour lo pa O XA SOLARSHIELD-ES Raplacement soar&held for 10 ComUiner 4/4C U 2-pole input circuits and Eaton BR series XA-PLUG120-3 Attnaa7reagxbMPp a LMCr aingCemah r4aCOegWedMERCAI) e busbar assembly. XAhENV- r— Raplecomem IQ Gate..r Onion,cweoe hoard local for Cnmbin.4 C yl O!� u I 1 %-W-NA-1,10415A —d dow leaf,Eaton alcult tweakawBhacrae. N d - ELECTRICAL SPECIFICATIONS W X Smart R.Irg ......... ...._.Geer.. _..-._-Conunuou&drny •Includes lO Gateway for communication and Control srvem vWlAge 1nm24Dvacbc Ni l Includes Enphase Mobile Connect cellular modem E¢bn BR serlen huabar rating 25A m (CELLMODEM-MI-06-SP-05),included onlywith 10 M.,,wnt oaw'aremrabng 65A Z Combine,4C Mm.rvxk,a .ream raurglnpin r,anPvnmrape) 64A O pea Includes solar shield to match Enphase IQ Battery Maas tuge:crcPit nI rig(.torn) 90 A - r O N, aesthetics and deflect heat Brellcheltculte(,.let and.,.sage' Up to I-2p.1.Eaton BRsa,ea DAI—wee G.—on,(DG)bn.ka.onlr(no,Incelded) Q NO •Flesihle networking supports wl-FI, Max.rota branch v-11 break.,ratng(uput) 80Ao,nlslnbu ng.rwr.tion;94A won 10 6a1aw.y blaekarmch,ded N-.o Etherne4 Or cellular E..break. IOA or ISAnnh,q OE,S—..1Erwp rcludcd fY HL'V •Optional AC receptacle available for PLC bridge O 0 Q Z rrotluctlpn meter.rp eT 200 a aul,d.:rxe preestakd and wind w IQ Galewrry •Provides production metering and consumption monitorirg conaenpuan momtorirlg CT(cT2oa-spur) A paw w 200aaplit cnrc cgrrmt vemtormers z OS.E.3 d At MECHANICAL DATA ..______.._.._._.-..__.-...._.__ . _ ________.--3_5X-49—x16—_a_n4)__._'___63_1. a Simple Val w Waght T.S kp(16 LLI O6.5Iba) Centered mounting brackets support single Amblem temisarstura rerl'a -40•C To•46•C(.40•A,115•F) V) mN i' stud rtrounnOg Cooling Nid-1 omecllon.p.,heashleld ill... •Supports bottom,back and side conduit entry Insole—&noon—nun' CwMoor.NRTI-oertill NEMA"an.pelya.bervt.eonatrvollm � •Up to four 2-pole branch circuits for 240 VAC plug-in breakers(not Included) wire a5ea 20 A to 50 A breeders irmutd:14 to A AWD copper Condia as ' arrr.. MAbneLer wench Input 4 to 1l0 awn,cnmes conduct.. XIQ AM7-24WC BOA total PV or storage blanch CIYCUIt3 .in lug combined outprd:10 to 2/0 Ak9G o,sl,and-l— i •N.—I and Orou.E 141.1In o.Pp.ealdumAl. Alwayo folbw hfca coda reoulamred for d0nducler er¢g W .s Reliable Attitude To2odgmel.4(6.5601eeD LL Q V ry ry n N m INTERNET CONNECTION OPTIONS Z •+ •Durable NRTl-certifed NEMA lY0e 3R enclosure _._. ...- -........ _.. _ _ _ ._._.._-._.._.. ....._ — Zcm$^CrNn •Flve-year limited warranty imegnlea wed 902nb/yn W v Q.m o'p Two years labor reimbursement program coverage C'lirler CELLMOUEM-Mi-0 $P-05,CLLLMOUEM-MI06-Af-05(4GbawdLTL�MIcalWa,modom).ol-thatanEnpheea U r V 3 m ON 4 N included for both the lO Combines SKU'$ Mabi!eC 1ceNWrnxxlemurMurM la all Enenmbie noodereld. IJJ O -p V•+ UL listed Etronni! OgwIIe1.802.3.C.5E for G,6)UTP Ethar.t cable(not Included) 1 0 ti=tp#F Z CONPLIANCE _._- cc w-'Q Q O compHanan,IQCombimx UL 1'.41,CANlCSAC222 No 107.1,4l LFRP115,rlasa B,ICLS 003 Il O -. -- P d elerin'ANSI ccura y"I's"26 nl.ae 0.5(PV dlctlAn) C p1 nmae 1220esa26 *wwwr+v DanPl IOG LL6060 CANCSA2 2h.61010.1 LISTED X-IQ-AMi-240d _ _ ------ .^------------__----- REVISION BLOCK ENPHASE. J ENPHASE. DESCRIPTION DATE To learn more about Enphase offerings,visit anphase.Dom V To learn more about Enphase offerings visit l�Rba66CAm Initial Draft or Plans 12/19/24 !•N22 E Iµieve F.,,AH rw,,reaelm I TV see.the Erylha.ktj.w)Cnmbina 4/4C.Inn mile,mmwe No u.demaks of Enr'neu En.gy.Inc.Data Subject In Change 0'14-2C22 Design By:CNG SOLAR ENGINEERING,INC. Combiner Box Data Sheets dft DATA 1 Scale:NTS 7� ,ta SHEET ID#; Q of /Qk IRONRIDGE XR Rail® Family XR Rail`s Family o LJ The XR Rail@ Family otters the strength of a curved rail in three targeted sizes.Each size supports specific Q ♦— Solar IS Not Always Sunny design loads,while minimizing material costs.Depending on your location,there is an XR Rails to match. Cc J O Over their lifetime, Z solar panels experience countless LL Z extreme weather events.Not just the worst storms in years, but the worst storms in 40 years.High winds capable of '`— cc - ripping panels from a roof,and snowfalls weighing O enough to buckle a panel frame. f— v o XR Rails®are the structural backbone \„w Q U preventing these results.They resist uplift, _ xRio XR100 xR1000 N protect against buckling and safely xR,o's a sleek,low profile mounting xR1oo is a residential and commercial xR1!xa Is a neavyweigm among z .2 pi a^ J and efficiently transfer loads into the re 1,desgned for regions with light or mourning rail.It supports a range of sear mounrrg ni Is.It s wit to hand* O �01 3 r N w.It achieves spans up to 6 feet w nd and snow conditions,whl*also extreme climates and spans up to 12 V Q N buildingstructure.Their superior t °sit° • p wN*reme nag Ight and economical. roes miffing spans up to l0 feet. feet for commercial applications. 12 ti.DI spanning capability requires fewer i 1 D 1n S u roof attachments,reducing the 6•spamingcapebdAy 10'spammngeapabnay 12 spanning capability un N number of roof penetrations Moderate wad capability Heavy load capability E.mme load calrei0y a ,qT Clear&black anodized finish Clear d black anodzed finish Clear anod ed 1'nisn w and the amount of Internal spices available internal splices ayallable Internal splices avarab+e installation time. " a Rail Selection ') The table below was prepared in compliance with applicable engineering codes and standards.'Values are Z o S based on the following criteria:ASCE 7-16,Gable Roof Flush Mount,Roof Zones 1 8 2e,Exposure B,Roof o a Slope of 8 to 20 degrees and Mean Building Height of 30 ft.Visit IronRidge.com for detailed certification letters. Q N w a a�NN U N V F n z o EO Force-Stabilizing Curve 90 N sloped roofs to both vertical and lateral ^o=genera forces on mount ng rails which can reuse them to None 1 LLJ 0 m bend and twist.The curved shape of XR Ralls� a specially designed to nc+ease strength in both 140 XR10 to m r dimi"nens write resisting the re t ng.This unique >- N N feature ensures greater security during extreme 1E0 In N weather dr*a*tiger system gletime. tit) 120 ` 20 W 140 m 160 O V Q U,p 8'z."o • •�,.>. Z m g N rf b Imfl 90 30 ~ aQtpO N 160 W pu3°Nt:.N, Compatible with Flat 8 Pitched Roofs Corrosion-Resistant Materials 90 _ N N a$Z z %11 Radse ero I—Ridges offers All XR Rate are made of 6000-ser*s 40 a compatible with a range of tilt leg aluminum alloy the a otectl won an Who too FlashFoot^and options for flat anodized finish Anod Zrg praventa surfaceIA Othe Dlwhod tool III.. roof mounting and structural wh le also pruv d!rg 160 attach-cts. applications. athere attract appearance 120 L60 REVISION BLOCK DESCRIPTION DATE ' ,.- .:xnln aeeaxnneaed soanc re,con—:m. ca1r&b..s.Use aorwvad I—,far nr'..: Initial Dmftof Plans 12/19/24 //ram Design By.CNG SOLAR ENGINEERING.INC. Railing Data Sheets DATA 1 Scale:NTS �� m SHEET ID# ASL IRONRIDGE QUickMount ® Adaptive,Rafter-Friendly Installation z � o w Q The Respect Your Roof Deserves —� O When integrating with a home,solar attachments • • \1 LL z must be dependable for the lifetime of the rooftop. • _ Due to recent innovations,many asphalt shingles -. _ - W have bonded courses.A mount that protects without - --,— ---------- '-.-- O the need to pry shingles can really speed things up. • • J 8 Halo UitraGripe(HUG")is here to respect the roof. -- - -- Its Halo is a cast-aluminum barrier that encases the -'- ••-^•- I— A rn m toUltraGrip,our industrial-grade,foam-and-mastic z 0 0 a m r seal.This allows HUG to accelerate the installation m a' N process and provide the utmost in waterproofing Hit the rafter?Good to got Miss the rafter?Try it again. Stillluck?Installtherest. ;,ft N = protection.Give your roof a HUG:" aceanotscraw to te o 13 m v _ v or 7 RD Sir m1mal Screws ale...dthd rafter is Immil,Install 310 midl final I— sedme ii.adr—Wdeckmentot it, N d / — - Multi-Tiered Waterproofing } . HIIG milizes a ft-tre tic stet«or components to provide revolutionary Trusted Strength&Less Hassle c waterproofing protection. he Halo cast- m 8klmrnum,raised perimeter formdalien .Q.. s nds the UaraGnp base a roam- Structural capacities of HUG"were reviewed in z o g :• ;,, + f maatd seatcombmaton mat many load directions,with racking rail running O cy$ n s water unruslon by adhering C 0. - -I rig m1h the sin gle sunace. cross-slope or up-slope in relation to root pitch. Q N m a j E N N N ;rip^is part - �--; • For further details,see the HUG certification N rn A ..... I., iekMount" letters for attaching to rafters and decking. O N a i a .. _... _ - IronRidge designed the HUG,in combination z °3 c a yYaar UhreGrip'Seal Technology with the RD Structural Screw to streamline HUG LLtraGr p rl- Ito I mr -- installs,which means the following: an seal design that rip n o A a W d oc boom-and-masto cane r n Tre ®c yr ,;,w+rr,*-,.. l� I_-- roam backed adh-e p o an r '""'• r� No prying shingles L0 V entirely now nash„g system rn,r Via` ;: '-- No roof nail interference conforms and acheres to evt!ir 25-year Warranty N 9 and cranny or cor"Posn,on srn i P,edricr guaremsea free No pilot holes necessary fmrng gaps and shingle step tl:r, of u+marng detects. No sealant(in most cases) top in I Win-Vhn NO butyl shims needed O cc 8 m 3 1 llRatings a V ry N.r I^f1 fmrl v System Loading " lU pU3pMoNr�.Ni Ln,-r'1D Y f Rafter&Dock Mounting Options The rafter-mounted Parts are designed HUG passed both Systems conform to O =Nam z 5 z Mourn HUG'to the roof afters,the roes HUG has been and certified for the UL 441 Section UL 2703 mechanical cc •'- "' deck,or both with art custom-enginserad =- RD(milth eraack)Struavral screw The nD tested and rated to compliance with 27"Rain Test"and and bonding �eTriple Rated b CMlllad stNClarel screw anchors HUGrome root support 1004(Ibs)of the International TAS 100(A)-95 requirements.See to Heaped the Hoot-' , with an EPDM seating washer,completing UL z703,44t(27) thastack of waterproofing barriers.see uplift and 368(Ibs) Building Code& "Wind Driven Rain Flush Mount Manual REVISION BLOCK Interrek TAS IDOrAf-95 backside for more installation Imomauon. of lateral load. ASCE/SEI-7. Test"by Intertek. for more info. DESCRIPTION DATE Initial DWI of Plans 12/19/24 �• �- Design ay:CNG SOLAR ENGINEERING.INC. Attachment Data Sheets da DATA 1 Scale:NTS , �0, 14 SHEET ID# Q Z � O W a I— Specifications Enclosure Amperage Rating C) LL NEMA3R 60A Z Z � Enclosure material Fuse class provision CL Eaton D G 2 2 2 N R B Painted galvanized steel Class H loses 0 yc Fuse configuration Voltage rating U^)v m m ro Fusible with neutral 240V J I,mFi L9 d m Z ov¢m J Number Of Poles O to>�n O m Q ti IA Two-Dole C) «n # Catalog Number Number of wires 3 Product Category N m w General duly safety switch Eaton General duty cartridge fuse safety switch,60 A,NEMA 3R, Type Painted galvanized steel,Class H fuses,Fusible with neutral,Two- General duty,cartridge fused 3 0 pole,Three-wire,Category:general duty safety switch,240 V Z General specifications O °a$ Multimedia 0 F m n Double Up.,Sefcty Q d e E S N Product Name Catalog Number Switching Devicoe Plex Curter CC -�0 U ry U Eaton general duty cartridge fuse safety DG222NRB O 0 a Z Z Q switch specifications and dalasheets UL o Y E d UPC Eaton Specification Sh--DG222NRB Z 3:N a 782113144221 r- w noa W d oc Product Length/Depth Product Height F- al (n N 7.35 in 14.37 In - VI... EAe N Product Width Product Weight lowering 8viiiness Worldwide a a in 10 tb Warranty Compliances Cl w m Eaton Selling Policy 25-000,one(1)year NEC 230.62(C)Compliant Border L.L a e from the date of installation of the Eaton Corporation plc Z m c N g r tWo N Certifications Eaton House — Z d"m m m Product or eighteen(16)months from the 30 Pembroke Road F- ° ro ao Eaton is a registered trademark. date of shipment of the Product, UL Listed Dublin 4,Ireland 13©©� W p U m n N. whichever occurs first 4 Eaton.com All other trademarks are O N r S Z r l7 Catalog Notes ut N m Z ®2024 Eaton.All Rights property of their respective J g Maximum hp ratings apply only when f1)aering ganfaeaa fthlride Reserved. owners. Eaton.com/socialmedia d ~ < dual element fuses are used.3-Phase hp rating shown is a grounded B phase REVISION BLOCK rating,UL listed. DESCRIPTION DATE ousel Draft of Plans 12/19/24 Design By'CNG SOLAR ENGINEERING,INC. AC Disconnect Data Sheets DATA 1 sale:NTS SHEET