Loading...
HomeMy WebLinkAboutSEP2003-00065 L Shaped Dock - SEP Determinations - 7/30/2003 .,b,,%NST F MASON COUNTY �P MO c DEPARTMENT OF COMMUNITY DEVELOPMENT 4 v o n u N Planning Division o T �? P O Box 279, Shelton,WA 98584 J Y �,o~ (360)427-9670 1864 MITIGATED DETERMINATION OF NONSIGNIFICANCE TO BE KEPT IN THE (WAC 197-11-350) PARCEL FILE SEP2003-00065 Description of Proposal: Construction of a new L shaped wooden dock to replace dock in disrepair. Dock to be anchored to lake bed with treated wood pilings. Dock length is 50' with 8 x16 L shape (total end piece 16 x 16'). Construction shall be a fully supported structure (not floating), supported on 13 to 15 driven pilings. Proponent: JULIO FIORINI Site Address (If Assigned): 3021 E MASON LAKE DR EAST GRAPEVIEW Directions to Site: HWY 3 TO MASON BENSON RD, MASON BENSON RD TO MASON LAKE DR, RIGHT ON MASON LAKE DR, APPROX 1 MILE ON RIGHT Parcel Number: 222335200087 Legal Description: MADINGS SUNNY SHORE ADD #6 TR 87 EX A-B-C 3021 E MASON LAKE DR E GRAPEVIEW Lead Agency: Mason County The Lead Agency for this proposal has determined that it does not have a probable significant adverser impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21 C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. MITIGATED MEASURES ARE ATTACHED. Please contact Diane M-Jones at ext. 363 with any questions. This DNS is issued under 197-11-340(2), the Lead Agency will not act on this proposal for days from the date below. Comments must be submitted to Diane M-Jones, C/O Mason County DCD, Planning Division, PO Box 279, Shelton WA 98584 by 8/14/2003. Authorized L cal Gover vial Date IL)P<t'- - Glo,-,u w0a e �etc; in 7r be. - /7, L4,i!` ��t►. c� 1 MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2003-00065 CONDITIONS OF THIS DETERMINATION 1) Residential developers and individuals shall be required to control erosion during construction. Removal of vegetation should be minimized and any areas disturbed should be restored to prevent erosion and other environmental impacts.X 2) The pier, ramp, float, and associated moorings shall be located to avoid shading of eelgrass and other aquatic vegetation.X 3) Floatation for the structure shall be entirely enclosed and contained to permanently prevent the breakup or loss of the floatation material into the water. X 4) Debris or deleterious material resulting from construction shall be removed from the beach area and project site and shall not be allowed to enter waters of the State. X 5) Water quality is not to be degraded to the detriment of the aquatic environment as a result of this project. X 6) Recreational piers shall be no higher than 11 feet above mean higher high water. Piers and docks shall have at least an eight foot span between pilings. X 7) The surface of floating structures shall be a minimum of eight inches about the surface of the water.X 8) All floating structures shall include intermittent supports which run parallel to the shoreline to keep structures off the tidelands at low tide.X 9) The proposed project must be consistent with all applicable policies and other provisions of the Shoreline Management Act, its rules, and the Mason County Shoreline Master Program. x 10) All other necessary permits from Mason County, Washington State and/or Federal agencies that are required for this proposed development and construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION (Dept of Fish and Wildlife, Corps, DOE Water Quality Concurrence). x 11) The total length of the proposed project shall not extend waterward further than either 50 feet or minus 3 tide, whichever is more landward. x 12) Approved per dimensions and setbacks submitted on site plan. x r i QC..� • ` ` ' APPROVED MASON COUNTY DCj PLANNIIVG SITE PLAN REQUIRED TO BE ON SITE CHANGES SUBJECT TO APPROVAL By alr f DocK d'-w-03 i � HIGH�D EXIST.PICNIC YARDS OF PIT RUN AREA GRA LL BE PALCED RET WALL TO LEVEL 110X OF EJa9TPG RETA�NbIG LL41LL \ ¢ Mason Lake <� \�\ a• o° � \ \ \ \ STOFM1IATER DISCHAme POINT EXIST.DOCK(FLOATED \� \T -W \ FOR DOWNSPOUT AND STORM WA 6 gT AND WRECXED IN TO1Q7J TOME I!Q'IOVED J \C \\ \\ \ Ender.RIRE PIT \ \ Is - EAST \ HOUSE \ Law—/ Richard t ela Hril oF�Xkfleol� \\ \ Property ner's BuuaeoiD ♦ \ \ EXISThJG TREES \ \ Atom eourH \ \ PROPERTY LME ` \ \ \ \ SIDE YARD LME y t Mtchel�e Jenntnga ���\\ \\ Pr ty Owner's APPROX \\ \ Lor-ATION OF HOUSE \ \ *A\\ \\ APPROX.LOCATION \ \ OF EXIST.GARAGE `\ \ •EAST.24 ROCK BULKHEAD- REPLACE WI KEYS TONE'BLOCKS \ TO MATCH O WEST. SIDE YARD SETBACK LIIE� A 00 50 Carole Doherty Site Plan Property Owner's scale = 1 II=301 Julio • Bonnie Fiorini Mason Grapeview, Washington .. 1. � .yF, �•- _� !_ F T' -.a._ `�.� "^`ar _ _ice -` �./� _ Wrecked dock (nei • background) ' MASON COUNTY �15 2lda3D .M ENVIRONMENTAL CHECKLIST FOR BULKHEADS AND DOCKS a0z 0 Nr1r Purpose of Checklist: nn The State Environmental Policy Act(SEPA), Chapter 43.21 C RCW, requires all Fri mental agencies to consider the environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. Instructions for Applicants: This environmental checklist asks you to describe some basic information about your proposal. Governmental agencies use this checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best description you can. You must answer each question accurately and carefully, to the best of your knowledge. Inmost cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or if a question does not apply to your proposal, write "do not know" or"does not apply". Complete answers to the questions now may avoid unnecessary delays later. Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if you can. If you have problems, the governmental agencies can assist you. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Use of Checklist for non-project proposals: Complete this checklist for non-project proposals, even though questions may be answered "does not apply". In addition, complete the Supplemental Sheet for Non-Project Actions (Part D). For non-project actions, the references in the checklist to the words "project', "applicant", and "property or site" should be read as "proposal", "proposer", and "affected geographic area", respectively. A. BACKGROUND 1. Name of proposed project, if applicable: New Dock and Bulkhead for Julio and Bonnie Fiorini 3021 E. Mason Lake Dr. East f„ rI Grapeview, WA 98546 K E T I N T i-�i` 2. Name of applicant: As�*CEL FILE Julio and Bonnie Fiorini 3. Address and phone number of applicant and contact person: Applicant: Julio and Bonnie Fiorini 30330 91h Ave. S Federal Way, WA 98003 253-941-6280 I Contact Person: Grant Foster Foster and Williams Architects PO Box 102 Shelton, WA 98584 360-426-0511 4. Date checklist prepared: June 23, 2003 5. Agency requesting checklist: Mason County Planning. 6. Proposed timing or schedule (including phasing, if applicable): Dock and Bulkhead approximately May 1, 2004 to August 2003. 7. Do you have any plans for future additions, expansions, or further activity related to or connected with this proposal? If yes, explain. House construction upland at about the same time or possibly sooner. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. None known. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. A Joint Aquatic Resources Permit Application (JARPA) was been prepared and submitted at the same time as this Checklist. 10. List any government approvals or permits that will be needed for your proposal, if known. Shorelines Substantial Development Permit; Washington Department of Fish and Wildlife Hydraulic Project Approval; Washington Department of Natural Resources for Aquatic Resources Use Authorization Notification;U.S. Corps of Engineers Section Permit;All covered by the JointAquatic Resources Application (JARPA). Mason County Building Permit. 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description). Construction of a new 1"shaped wooden dock to replace a similar dock that floated out of place during a storm, sometime in the last three years. The new dock will be anchored to the lake bed with 13 to 15 treated pilings (the old dock was anchored with concrete filled barrels which failed to secure the dock). The dock will be a total of 50'long. There will be a section that is 8'x 16'added at the end of the dock, to create an "L". This will allow a boat slip. This dock is intended to be similar in size, shape and construction to the neighbor's dock to the west. The proposed Bulkhead is to replace an existing failing, stone bulkhead that has eroded to about 24"high. The proposed bulkhead is 48"high and made out of"Keystone"blocks. This matches the height and material of the bulkhead on the adjacent property to the west. 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. 3021 E. Mason Lake Dr. East, Grapeview, WA 98546 Section 34, Township 22N, Range 2W, Government Lot 5 Tract 87 of Mading's Sunny Shore Addition No. 6, according to the recorded plat thereof in the office of the Auditor for Mason County, Washington, Volume 4 of Plats, Page 107. AGENCY COMMENTS TO BE COMPLETED BY APPLICANT B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the site (circle one): flat, rolling, hilly, steep slopes, mountainous, other b. What is the steepest slope on the site (approximate percent slope)? 20% c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. Sandy gravel with possible areas of hardpan. d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. There is some indication of erosion at the waterline, probably by storm action and boat wakes. e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. There will be minor filling behind the bulkhead. Approximately 6 cubic yards of material, probably imported from a commercial gravel facility. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. No. The bulkhead is for erosion control. The dock should cause no erosion. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? Not Applicable. h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any. None needed. 2. Air a. What types of emissions to the air would result from the proposal (i.e., dust, automobile odors, industrial wood smoke) during construction and when the project is completed?. If any, generally describe and give approximate quantities if known. None anticipated. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. None. c. Proposed measures to reduce or control emissions or other impacts to air, if any: Not Applicable. 3. Water a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate state what stream or river it flows into. Yes. Mason Lake. 2) Will the project require any work over, in, or adjacent to(within 200 feet)the described water? If yes, please describe and attach available plans. Yes. A new dock and bulkhead are proposed. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. None. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities, if known. None. 5) Does the proposal involve any discharges of waste materials to surface water? If so, describe the type of waste and anticipated volume of discharge. None. 6) Does the proposal lie within a 100 year floodplain? If so, note location on the site plan. Unknown. b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities, if known. None. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: domestic sewage, industrial, containing the following chemicals, agricultural, etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. None. c. Water Runoff (including storm water): 1. Describe the source of runoff (including storm water) and method of collection and disposal, if any (including quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. Accommodation for storm water to flow through the bulkhead will be provided. 2. Could waste materials enter ground or surface waters? If so, generally describe. None. d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: None. 4. Plants: a. Check or circle types of vegetation found on the site: deciduous tree: alder, maple, aspen, other x evergreen tree: fir, cedar, pine, other x shrubs x grass pasture crop or grain wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eel grass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? None. c. List threatened or endangered species known to be on or near the site. None known. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: Existing lawn areas will remain. 5. Animals: a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: Birds: hawk, heron, eagle, songbirds, other Mammals: deer, bear, elk, beaver, other Fish: bass, salmon, trout, herring, shellfish, other b. List any threatened or endangered species known to be on or near the site. None known. c. Is the site part of a migration route? If so, explain. No. d. Proposed measures to preserve or enhance wildlife, if any. Not Applicable. 6. Energy and Natural Resources: a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. None. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. None. c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: Not Applicable. 7. Environmental Health: a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that occur as a result of this proposal? If so, describe. 1) Describe special emergency services that might be required. None. 2) Proposed measures to reduce or control environmental health hazards, if any: Not Applicable. b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? None. 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction,operation, other)? Indicate what hours noise would come from the site. Vocal noise from swimmers and possible motor boat noise. 3) Proposed measures to reduce or control noise impacts, if any: None. 8. Land and Shoreline Use: a. What is the current use of the site and adjacent properties? Single family residence with a dock and a bulkhead. b. Has the site been used for agriculture? If so, describe. No. c. Describe any structures on the site. Existing deteriorated house, unusable dock and failing bulkhead. d. Will any structures be demolished? If so, what? Ruined dock to be removed. Stone bulkhead to be removed to allow construction of new bulkhead. e. What is the current zoning classification of the site? Rural Residential 5 (RR5). f. What is the current comprehensive plan designation of the site: Unknown. g. If applicable, what is the current shoreline master program designation of the site: Urban h. Has any part of the site been classified as an "environmentally sensitive area"? If so, specify. Not known. i. Approximately how many people would reside or work in the completed project? Two to four occupants in the adjacent residence. j. Approximately how many people would the completed project displace? None. k. Proposed measures to avoid or reduce displacement impacts, if any: Not Applicable. I. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: Adherence to Mason County's requirements for dock construction. 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. Not Applicable. b. Approximately how many units, if any, would be eliminated? Indicate whether low, middle or high-income housing. Not Applicable c. Proposed measures to reduce or control housing impacts, if any: Not Applicable 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principle exterior building material(s) proposed? Dock: 48"above low water line. Material to be treated wood. Bulkhead 48"high. Material to be man-made "Keystone"blocks. b. What views in the immediate vicinity would be altered or obstructed? None. c. Proposed measures to reduce or control aesthetic impacts, if any: The material and size of the dock and bulkhead will be consistent with the site improvements on surrounding and nearby building lots. 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? Low level lighting will be installed on the dock. It will be used only at night when the dock is being used. No glare should result. b. Could light or glare from the finished project be a safety hazard or interfere with views? No. c. What existing off-site sources of light or glare may affect your proposal? None. d. Proposed measures to reduce or control light and glare impacts, if any: Not Applicable. 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? Mason Lake. b. Would the proposed project displace any existing recreational uses? If so, describe. No. c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: Not Applicable. 13. Historic and Cultural Preservation a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. None known. b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. None known. c. Proposed measures to reduce or control impacts, if any: None. 14. Transportation a. Identify public streets and highways serving the site and describe proposed access to the existing street system. Show on the site plans, if any: Access is by Mason Lake Road East. b. Is site currently served by public transit? If not, what is the approximate distance to the nearest transit stop? Not Applicable. c. How many parking spaces would the completed project have? How many would the project eliminate? Not Applicable. d. Will the proposal require any new roads or streets or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). Not Applicable. e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. Not Applicable. f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. Not Applicable g. Proposed measures to reduce or control transportation impacts, if any: Not Applicable. 15. Public Services a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe. Not Applicable. b. Proposed measures to reduce or control direct impacts on public services, if any. Not Applicable. 16. Utilities a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other. b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. None. c. SIGNATURE The above answers are true and complete to the best of my knowledge, I understand that the lead agency is relying on them to make its decision. Signature: ' 0 rant L. Foster (Foster & Williams Architects) for Julio & Bonnie Fiorini Date Submitted: /z 7/0 3 ESA LISTED SALMONIDS CHECKLIST Applicant Information Project Information Name Jul io & Bonnie Fiorini Name Jul io & Bonnie Fiorini Phone Location 3021 E Mason Lake Dr E Grapeview Contact: Grant Foster 426-0511 Description Replacement of Dock & Bulkhead Foster & Williams Architects This worksheet was designed to help project proponents, and government agencies, identify when a project needs further analysis regarding adverse effects on ESA (Endangered Species Act) listed salmonids. Salmonids are salmon, trout and chars, e.g. bull trout. For our purposes, "ESA Listed Salmonids" is defined as fish species listed as endangered, threatened or being considered for listing. If ESA listed species are present or ever were present in the water shed where your project will be located, your project has the potential for affecting them, and you need to comply with the ESA. The questions in this section will help determine if the ESA listings will impact your proj ect. The Fish Program Manager at the appropriate Department of Fish and Wildlife (DFW) regional office can provide information for the following two questions. I. Are ESA listed salmonids currently present in the watershed in which your project will be located? YES NO X Please describe. 2. Has there ever been an ESA listed salmonid stock present in this watershed? YES NO X Uncertain Please describe. If you answered "yes" to either of the above questions, you should complete the remainder of this checklist. April 2003 PROPOSED DOCK �o •PROPOSED REPAIRED BULKHEAD(48"HIGH) EXIST.PICNIC ('fix-i C�YARDS OF PIT RUN AREA GRAVEL FILL WILL BE PALLED BEHIND RETAMMG U14LL TO LEVEL GRADE) � ,4PpRpX• ' EXISTING RE7 LOCATION W4Y.L Mason Lake <�^\` A' d• „� \\ \ \ WORMWATER DISCHARGE POINT EXIST.DOCK(FLOATED ` \� " \ FOR DOWNSPOUT AND STORM WA WEST AND WRECKED IN STORM)TO BE REMOVED EXIST.FIRE PIT ` \ APPRDx EXIST. EXIST. / \ ` FO SE OF \ LAWN APPRO)L LOCATtar OF NEVSHeoRNG \ \ Property ner's BULKHEAD ♦ \ \ ExiSTw PAALACM SOM OPlIlTY LEE ♦\\ \\ \\ \\ SIDE YARD LINE Pro y t Mfchelie ,Jennings \ \ \ty Owner's \ % T \ \ A \\ \ ♦ \ \ APPROX.LOCATION \ \ OF EXIST.GARAGE `\ \ •EXIST.24"ONE-MAN ROC/C BULKHEAD- \ Alt, \REPLACE WITH 48•'KEYSTONE"6LOOKB TO MATCH NEIGHBORS TO WEST. \ tVF SIDE YARD SETBACK LINE \ At e We \,a oK\ �a5 Carole Doherty Site Plan � < Property Owner's F� v� L,e Scale a EXIST.RETAINIW-x WALL HOUSE NEW "KEYSTONE" BLOCK APPROX.LAKE BULKHEAD WATER LEVEL DOCK 9 iv ORDINARY HIGH n WATER MARK " u ii u LLl LAKE BED 841 TREATED PILIWGS +� 10'-0" O.C.MAX. 0 r FILL AMOUNT, i 2 SF X 80 LF 160 CF 160 CF/21 ■ 6 YARDS i u rRoJECT e1TE �sd DIRECTIONS TO SITE, �dc W Y,3 TO MASON-DENSON ROAD. L ON MAWN_BEN50N RD.TO MASON LACE DRIVE. R ON MASON LACE DRIVE 13 MILES, PROPERTY ON LEFT NAND SIDE OR ROAD. �qj Qr a LATITUDE.413546'N LONGITUDE.122.1246'W oc y a oc cy g o� TOSR3 TOSR3 Vicinity Map No Sca Is Julio • Bonnie Fiorini 3021 E Mason Grapeview, Washington N• Firepit, picnic _ w , • • retaining , upper Julio & Bonnie Fiorini 3021 E Mason Lake Dr East Grapeview, Washington %9 k t. 1� � 1i�7r M• t 1 µ, �s Wrecked dock (neighbor's dock in background) Julio Bonnie Fiorini 3021 E Mason Grapeview, Washington p err � y . .. ?`,'• �4 .� 1` � ✓ems �.'1`:" a,�,�,we � t.we Eroded Bulkhead ��. S1'A 7'F,'0 a - RECEIVED l x J AUG 2 0 2003 STATE OF WASHINGTON DEPARTMENT OF ECOLOGY MCCD - PLANNING PO Box 47775 • Olympia, Washington 98504-7775 • (360)407-6300 August 13, 2003 Ms. Diane M-Jones Your address Department of Community Development is in the Mason County,Planning Division g a PO Box 279 Shelton,WA 98584 `' - watershed Dear Ms.Jones: Thank you for the opportunity to comment on the mitigated determination of nonsignificance for the SEP2003-00065; construction of a new L shaped wooden dock to replace dock in disrepair,to be anchored to lake bed with treated wood pilings,with a length of 50 feet located at 3021 East Mason Lake Drive, as proposed by Julio Fiorni. We reviewed the environmental checklist and have the following comments: A water quality certification may be required from the Department of Ecology in conjunction with the U.S. Army Corps of Engineers'permit for this project. If you have any questions or would like to respond to these comments,please call Ms. Helen Pressley (Federal Permit Coordinator)at(360)407-6926. Sincerely, Jeri Berube Administrative Coordinator Southwest Regional Office TO BE KEPT IN T H E JB: smb(03-4765) PARS 1 FILE cc: Julio Fiorni, Applicant Helen Pressley, SWRO/SEA i~�