Loading...
HomeMy WebLinkAboutMEP2003-00037 L Shaped Dock - MEP Permit / Conditions - 8/18/2003 1%-Sr"r MASON COUNTY Mo DEPARTMENT OF COMMUNITY S N DEVELOPMENT Z O N 2,T 2 7 ti Planning Division '86a P O Box 279, Shelton, WA 98584 MAg60)4E7&0IVRONMENTAL PERMIT August 18, 2003 JULIO 0 9 TlO RINI 303H AVE S TO BE KEPT IN THE FEDERAL WAY WA 253-941-61 PARCEL FILE Parcel No.: 222335200087 Issued: 8/18/2003 Case No.: MEP2003-00037 Project Description: Construction of a new L shaped dock to replace dock in disrepair. Dock to be anchored to lake bed with treated wood pilings. The dock length is 50' with a 16' x 16' end piece. Construction shall be a fully supported structure (not floating), supported on 15 driven piles. The following critical areas are present on this property: Long-Term Commercial Forest XAquatic Management Areas Ch. 17.10.060; Ch. 17.01.110; Mineral Resource Lands Frequently Flooded Areas Ch. 17.01 .066; Ch. 17.01.090; Inholding Lands Landslide Hazard Areas Ch. 17.01.062; Ch. 17.01.100; Wetlands Seismic Hazard Areas Ch. 17.01 .070; Ch. 17.01.102; Critical Aquifer Recharge Erosion Hazard Areas Ch. 17.01 .080; Ch. 17.01 .104. This permit, with conditions, is granted pursuant to the Mason County Resource Ordinance (Chapter 17.01 MCC.) Nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this project. This permit may be rescinded if the permitee fails to complete the project as proposed or fails to comply with the standards of this ordinance. Lt Offic aw Date Mason Environmental Permit 8/18/2003 Case No.: MEP2003-00037 Conditions: 1.) A Hydraulic Project Approval from the Washington State Department of Fish +Wildlife must be granted prior to construction. For more information contact the Habitat Biologists, at (360)895-4756. x 2.) Proper erosion and sediment control practices must be used on the construction site and adjacent areas to prevent upland sediments from entering shoreline waters. Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent soil from being carried into surface water by stormwater runoff. Sand, silt, and soil will damage aquatic habitat and are considered pollutants. Any discharge of sediment-laden runoff or other pollutapollutants to waters of the state is in violation of Chapter 90.48 RCW, Water Pollution Control, and WAC 173-201A, Water Quality Standards for Surface Waters of the State of Washington, and is subject to enforcement action. Any work in or adjacent to waterways that will adversely affect water quality must receive specific prior authorization from the Department of Ecology pursuant to WAC 173-201 A-1 10. A short-term water quality standards modification may be issued if the proponent agrees to a number of specific construction practices and techniques designed to minimize water quality impacts. All areas disturbed or newly created by construction activities must be revegetated using bioengineering techniques, clean durable riprap, or some other equivalent type of protection against erosion when other measures are not practical. 3.) A water quality standards modification may be required from the Department of Ecology for this project(WAC 173-201-035(8)(e)), in conjunction with the US Army Corps of Engineers permit for this project. Please contact Helen Pressley(Federal Permit Coordinator)for more information at 360-407-6926. x 4.) All upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). x 5.) The applicant acknowledges that the project will be completed as proposed, so that the project will be consistent with all applicable standards of the Mason County Resource Ordinance. 6.) All construction and demolition debris must be removed from the beach after project completion. Proper disposal of construction debris must be on land in such a manner that debris cannot enter or cause water quality degradation of State waters. x 7.) Pressure treated wood must be completely dry prior to placement in water. Use of creosote or pentachlorophenol is prohibited. x 8.) Temporary erosion control measures must be implemented to prevent water quality degradation of adjacent waters or wetlands. Silt fencing must be installed and maintained until upland vegetation has become established. x 9.) Approved per dimensions and setbacks on submitted site plan. x 10.) All other necessary permits from Mason County, Washington State and/or Federal agencies that are required for this proposed development and construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION (Dept. of Fish and Wildlife, Corps, DOE Water Quality Concurrence). x 8/18/2003 3 of 3 MEP2003-00037 Julio Bonnie Fiorini 3021 E Mason Grapeview, Washington Wrecked dock j p• PROPOSED DOCK REP 1 EX18T.PICNIC CARAVEL & •YARDS OF PIT RUN AREA GRAVEL PALLED BEN AIN Ys O LEVEL '�- ExIST6+�REraM�k OF Mason Lake </ \` e. c ,"'� \\ � ` e' .p/ \ � STORMw4TER DISGaAI;rE POMT E>d3T.DOCK(FLOATED \/� \� y \ DOWN``FkW AND STORM WA WEST AND WRECKM IN / \ 6Tomv TO Be lwm-OVED \'�� ` \\ % . E>(IST.FIRE PIT / \\ FOOTPR�IT CF EXIST. / \ ` HOUSE OF N LOCATION EIGHBORING `\ \� Property ner's V JOdEAD ♦ \ \ EXISTING TREESALOWS SOUTH PROPERTY LINEj\♦ ♦ \\ \ SIDE YARD LINE y t Mfche�le fenntngs ���\\ \\ Pro ty Owner's ` \ lLOCATIONic '�s. \`\ \\ HOUSE \ \ �'♦A\\ \\ APPhZOx LOCATION \ \ OF EXIST.GARAGE `\ \ REPLACE 'ONE-MAN 406<18U1.106AD ♦\\ �$ � .15LOCICS \ 9 TO MATCH NE T. SIDE YARD SETBACK LINE APPROVED DDL-K MASON COUNTY DCD PLANNING 50 SITE PLAN REQUIRED TO BE ON SITE �Sa CHANGES SUBJECT TO APPROVAL ��� Carole Doherty �M By _ Date P I a n Property Owner's oile1 scale = 111=30, )� ` vc,k N_e, .M 9tv P/d-03 om_r d" cIS�dQa' PERMIT NO. �D� — Qa37 Nn f( DATE RECEI D: 0 MASON COUNTY DEPARTMENT OF RESOURCE ORDINANCE UNITY DEVELOPMENT (Chapter MCEC))T Q 411 N. 5TH Street/P.O. Box 279, Shelton, WA 98584 ENVIRONMENTAL PERMIT APPLICATION MASON ENVIRONMENTAL PERMIT® CONDITIONAL USE ❑ VARIANCE ❑ The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical areas and is under the authority of Chapters 36.32, 36.70A, 39.34, 58.17, 76.09, 84.33, 84.34 and 90.58 RCW. PLEASE PRINT 1. Owner: Julio & Bonnie F i or i n i Owner Mailing Address: 303300 — 9th Ave S Site Address: 3021 E Mason Lake Dr East City: Federal Way State: WA Zip: 98 City: Grapev i ew State WA Zip: 98546 Lien/Title Holder: Phone:Daytime 253 941-6180 Address: Fire Distr' 2.,� JC-_5 City: State: Zip: Signature: / Contact: Grant Foster 426-0511 u --ter=,� 2. Parcel Number: 22233 _ 52 - 00087 Legal description: Mad i ngs Sunny Shore Addition #6 Tract 87 EX A—B—C Parcel Size: 11 ,670 square feet 3. Directions to Site: Highway 3 to Mason—Benson Rd, Mason—Benson Rd to Mason lake D i rve, right on Mason Lake Drive, approximately 1 mile on rig . 4. State what sections require a permit: In-Holding Lands, Chapter 17.01.062 ❑ Long-Term Commercial Forest, Chapter 17.10.060 ❑ Wetlands, Chapter 17.01.070 ❑ Mineral Resource Lands, Chapter 17.01.066 ❑ Frequently Flooded Areas, Chapter 17.01.090 ❑ Aquifer Recharge Areas, Chapter 17.01.080 ❑ Landslide Hazard Areas, Chapter 17.01.100 0 Erosion Hazard Areas, Chapter 17.01.104 ❑ Seismic Hazard Areas, Chapter 17.01.102 ❑ Fish and Wildlife Habitat Conservation Areas, Chapter 17.01.110 5. Identify current use of property with existing improvements: Dock, bulkhead and single family residence, all in disrepair. 6. Identify and describe the proposed project, including the type of materials to be used, construction method i le dimensions and other pertinent information(Attach additional sheets if needed): Replace dock with j50' _ long "L" shaped dock. Replace damaged bulkhead with new bulkhead Replace � with a slightly larger house. �Qc >x r64 12 AD �! 7. Any water on or adjacent to property: Saltwater ❑ Lake ❑X River ❑ Pond ❑ Wetland ❑ Seasonal Runoff ❑ Other Mason Lake 8. Will there be an alteration of a wetland and/or wetland vegetation area? Yes ❑ No 9. If septic is located on project site, include records. Connect to septic? K Community Septic? ❑ Public Water Supply? ❑ Well? 10. Type of Job: New ® Add ❑ Alt ❑ Repair ❑ Demolition ❑ Other This permit is granted pursuant to the Resource Ordinance(Chapter 17.01 MCC)and nothing in this permit shall excuse the applicant from compliance with any other federal,state,or local statutes,ordinances, or regulations applicable to this project,but not inconsistent with the Resource Ordinance.The permit may be rescinded pursuant to the event the permittee fails to comply with the conditions of this ordinance. MASON ENVIRONMENTAL PERMIT: $500.00/$300.00(with another permit) MASON CONDITIONAL USE ENVIR.PERMIT: $1,2000.00 MASON RESOURCE ORDINANCE VARIANCE: $1,200,00 REVISED: 03-12-03 HEARINGS EXAMINER: $200.00 I:\PLANNING\R&GPAC\ENVIRONMENTAL PERMIT APPLICATION Show the following on the site plan 1� Lot Dimensions Flood Zones \ice Existing Structures Fences Water Lines Driveways Drainage Plans Shorelines Septic System Topography Indicate Directional by(N,S,E,W,etc.) Proposed Improvements Easements In relation to plot plan Name if Flanking Street APPLICANT TO DRAW SITE PLAN BELOW: • ISr' 6AI T House _ o _ aft-aft M (7lSYcAGGD 173. � 4ft_—_____ o 1 J (KW APPLICANT TO DRAW TOPOGRAPHY BELOW: EXIST.RETAINING WALL HOUSE NEW'KEYSTONE"BLOCK APPROX LAKE BULKHEAD WATER LEVEL DOCK 9 r ORDINARY HIGH WATER MARK u j u A LAKE CED \,#TREATED PILINGS •Im'-o"OG.MAX. 0 r FILL AMOUNT, 29FXWLF 160CF 160 CF/11 b YARDS u