HABITAT MANAGEMENT PLAN RECEIVED
SEP 2 9 2003
FOR THE FOSTER&WILLIAMS
ARCHITECTS
FIORINI PROPERTY
RECEIVED
Mason County Tax Parcel No. 222335200087 SEP 2 9 2003
3021 East Mason Lake Drive East 426 W. CEDAR ST:
SEPTEMBER 2003
Prepared for:
Julio Fiorini
C/O Grant Foster
Foster & Williams Architects
P.O. Box 102
Shelton, WA 98584
prepare y: .07 of Wet/,a'h
O F 0gas
3.
S. Shanewise PWS %S yX
CD
Senior Ecologist �4;o p0099sWs 11
wetland
Fiorsp03hmp ��Wv►��
CONTENTS
Introduction............................................................................l
Methods..................................................................................1
Results............................. . .
Recommendations..................................................................3
Figure 1.
Figure 2.
INTRODUCTION
This Habitat Management Plan has been prepared to address the repair of a deteriorated
shoreline bulkhead on a waterfront property on Mason Lake. The existing rock bulkhead
will be replaced with an ornamental stonewall that will replicate a neighboring wall on
adjacent property. This action is being taken to preserve a shoreline terrace with an
actively used fire pit. Existing shoreline habitat occurs as developed lawn,with volunteer
regrowth of woody vegetation controlled through cutting. The proposed bulkhead repair
will cause minimal additional impacts to the existing, degraded shoreline habitat.
However, if mitigation compensation is deemed necessary, allowing a small section of
shoreline to remain bulkhead-free and grow volunteer vegetation waterward from the top
of bank would provide at least some improvement to the existing habitat conditions. In
addition, aquatic emergents waterward of the bulkhead should be allowed to establish
naturally, and all solid waste, including the old bulkhead rock, should be removed and
disposed of away from the lake shoreline.
METHODS
Site Inspection
Site inspection was performed on 26 August 2003. All areas of the shoreline were
reviewed.
FIORINI HABITAT MANAGEMENT PLAN
THE COOT COMPANY - I -
RESULTS
EXISTING CONDITIONS
Old Embankment Bulkhead
This property contains an old embankment bulkhead that consisted of medium-sized rock
piled against the base of a near vertical earth wall approximately 3 feet high. Over time,
the wall has slumped and the rocks have become displaced to the point that bank
protection is now minimal. The OHWM of the lake occurs near the top edge of this
embankment.
Existing Waterfront Lawn
This property has its entire lake frontage as a terraced landscape with sporadically kept
lawn. The lower,waterfront terrace has a large fire pit that is actively used by the
landowners. Shoreline volunteer growth of shrubs and trees are continually suppressed
through cutting. Shoreline emergents are generally sparse, and are probably controlled to
some degree also. A list of the more common plant species found along the shoreline
where the bulkhead repair is proposed is provided below.
Douglas' spirea (Spiraea douglasii)
slough sedge (Carex obnupta)
soft-stem bulrush (Scirpus validus)
pointed rush (Juncus oxymeris)
taper-tip rush (Juncus acuminatus)
horsetail sedge (Dulichium arundinaceum)
Adjacent Undeveloped Shoreline
The property adjacent to the north is an undeveloped lot. The shoreline here has a dense
deciduous shrub growth along the top edge of the OHWM as well as a dense emergent
community extending into the shallow waters of the lake. This condition probably
represents what the subject property shoreline looked like prior to development into
waterfront lawn.
Adjacent Developed Shoreline
The property adjacent to the south is a fully developed with a well maintained waterfront
lawn and bulkhead wall along the same embankment edge that is proposed for repair on
the subject property. This maintained waterfront has almost no vegetation either along
the embankment top or in the lake shallows.
FIORINI HABITAT MANAGEMENT PLAN
THE COOT COMPANY -2-
PROPOSED USE
New Bulkhead Wall
The landowner wishes to repair the existing, degraded bulkhead condition by building a
wall with ornamental stones similar to the neighbor's design. Indeed, the new proposed
bulkhead would become a replicate extension of the neighbor's in location and height.
This action is desired to prevent erosion of the waterfront terrace where the fire pit is
located.
IMPACT ASSESSMENT
Minimal Habitat Disturbance
The proposed bulkhead repairs will cause minimal disturbance to the existing habitat
conditions. The entire frontage is currently kept mostly free of volunteer woody
vegetation, and shoreline emergent vegetation is also kept in check. Placement of the
ornamental stones to create a solid bulkhead will not substantially alter the existing,
degraded habitat values of the shoreline.
RECOMMENDATIONS
Allow Natural Shoreline Revegetation
If mitigation compensation is deemed necessary for the minimal habitat impacts that will
occur from the proposed bulkhead repair, setting aside a small portion of shoreline to
leave in an undeveloped state should be considered. Preserving approximately 15 feet of
shoreline along the northern waterfront adjacent to the existing undeveloped shoreline
would increase the habitat values of the entire property shoreline beyond what currently
exists. The idea would be to stop the new bulkhead at this 15 foot preservation edge, and
to just allow natural regrowth of all vegetation waterward from the top of the bulkhead
embankment.
No Aquatic Plant Removal
Emergent aquatics that establish waterward of the repaired bulkhead should be left intact.
This vegetation can provide water quality benefits and act as habitat structure for aquatic
invertebrates.
Remove Solid Waste/Old Rock
All solid waste along the shoreline should be removed and disposed of away from the
waterline. This is to include all rock removed from the old bulkhead as well as concrete
blocks, metal fence posts, etc.
FIORINI HABITAT MANAGEMENT PLAN
THE COOT COMPANY -3 -
5/lore%ham { /
<lc ro c.,i f Gig.
m �
•�P08ED,®,,�
E>ftT-pk2�*_- (.�`CXL YARDS CFPtr JWM
AWEA GRAY FLL ALL CE PALC
�WTAMr.ImLL To LEva.
' aF�OX LOGATtC�1 a?
Mason Lake <� �. .� �\ ♦ 'ETA •w�.
E?dST_Daps M.Q17M 1. �y,�Jr s*a0 ELA7ER +---:W pow
arcm v To aE� IDN �� �� / \\ FnR D°tlN3p=AIdD-STC R'+uu
£dST_Fbm pIT \ \
\ � f \\ ♦ OdsT.
MCLIBE
OF
BULIGEaD> \\ \\ f?fchard t Jah(
\ \ Property '$
EXdSThAs Tigms \\ \\
\ \
\ \ SIDE TARD L6E
Fr
y Owner's
HOMEAPFVwX
E `\ \
'mds'r zs•am-.,.pr,,= \euaD- \
TO T�aa lejC*W50FCT�eLoocs \
SkX YARD HOC LM_J
\\ P
s°
�a
Site Plan Carole Doherty
Property owner's
scale
1
ol
Ek187.RETAINING WALL
NousEE
NEW "KEY6TONE" BLOCK APPROX.LAKE
BULKHEAD WATER LEVEL
DOCK
N
ORDINARY NIGH
WATER MARK I '
ll u I 4
0
LAKE 15ED B"M TREATED PILINGS
+� 10'-0" OZ.MAX.
N
FILL AMOUNT
1 8F X 80 LW 160 cF l
160 CF/1-1 - 6 U. YARD8 i 1
I
u