Exemption from Shoreline Management Act
Case No.: SHX2009-00039 Substantial Development Permit Requirement
The Proposal By: GARY REED
1402 3RD AVE STE 1318
SEATTLE, WA 98101
To undertake the following development:
Lilliwaup Falls Streambank Protection/Restoration Project. Stream bank armoring shall be
installed landward of active channel using large woody debris with root wads and single angular
rock, along approx. 100' of Lilliwaup Creek.
Within LILLIWAUP CREEK and/or its associated wetlands is exempt from the requirement of substantial development
because the development is categorized under WAC 173-27-040(2) as being category
D-em _ onstructioniI'Ac; ����i, r,�
Please contact Rebecca Hersha at ext 287 if you have any questions.
Issued: 9/11/2009
Expires: 9/11/2011 Authorized Local Government Official
cc: APPLICANT WDFW USACOE WDOE TRIBAL COUNCIL
SON.STA MASON COUNTY
�P c DEPARTMENT OF COMMUNITY DEVELOPMENT
o A 0,0 = Planning Division
i o T z P O Box 279, Shelton, WA 98584
�o N Y o~ (360)427-9670
J �
1864
Exemption from Shoreline Management Act
Case No.: SHX2009-00039 Substantial Development Permit Requirement
The Proposal By: GARY REED
1402 3RD AVE STE 1318
SEATTLE, WA 98101
To undertake the following development:
EMERGENCY BANK PROTECTION AND RESTORATION
Within LILLIWAUP CREEK and/or its associated wetlands is exempt from the requirement of substantial development
because the development is categorized under WAC 173-27-040(2) as being category
D-emergency construction
Please contact Kell McAboy at ext 363 if you have any questions.
Issued: 9/11/2009 1k99:2Z
Expires: 9/11/2011 Authorized Local Government O icial
cc: APPLICANT WDFW USACOE WDOE TRIBAL COUNCIL
--------------------------------------�
t
/� O O A M
AGENCY USE ONLY
L �7
t
WAS H I N G TO N STATE US Army Corps Date received:
of
of Engineers• ,
Seattle District t '
t
Joint Aquatic Resources Permit
t
Application (DARPA) Form hel
Agency reference#:
t ,
'
USE BLACK OR BLUE INK TO ENTER ANSWERS IN WHITE SPACES BELOW. Tax Parcel#(s):,
t
Part 1—Project Identification
t '
Unique project information that makes it easy to identify. hel --------------------------------------
'
1a. Unique Project Identifier Number (UPI #) hel
• Don't have one yet?Get one at http://www.epermitting.wa.gov or call the Washington Governor's Office of Regulatory Assistance
at(800)917-0043.
1 b. Project Name (Examples: Smith's Dock or Seabrook Lane Development) [helpj
Lilliwaup Falls Emergency Streambank Protection Project
Part 2—Applicant
The person or organization legally responsible for the project. h[ elf
2a. Name (Last, First, Middle)and Organization (if applicable)
Gary Reed
2b. Mailing Address (Street or PO Box)
1402 3rd Ave STE 1318
2c. City, State, Zip
Seattle, WA 98101
2d. Phone(1) 2e. Phone(2) 2f. Fax 2 . E-mail
Please contact ( ) ( )
agent
Part 3—Authorized Agent or Contact
Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b. of this
application.) nei
3a. Name (Last, First, Middle) and Organization (if applicable)
Kim Schaumburg
3b. Mailing Address (Street or PO Box)
10112 Bayview Rd KPN
3c. City, State, Zip
Vaughn, WA 98394
3d. Phone(1) 3e. Phone(2) 3f. Fax 3 . E-mail
(253) 884-5776 (253) 225-2973 (253) 884-5776 Kimberly035@centurytel.net
JARPA 2009 Page 1 of 12
Part 4—Property Owner(s) hel
Contact information for people or organizations owning the property(ies) where the project will occur. [
X ❑ Same as applicant. (Skip to Part 5.)
❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.)
❑ There are multiple property owners. Complete the section below and use JARPA Attachment A for each
additional property owner.
4a. Name (Last, First, Middle) and Organization (if applicable)
4b. Mailing Address (Street or PO Box)
4c. City, State, Zip
4d. Phone(1) 4e. Phone(2) 4f. Fax 4g E-mail
Part 5—Project Location(s)
Identifying information about the property or properties where the project will occur. LheAl
❑ There are multiple properties or project locations (e.g., linear projects). Complete the section below and use
JARPA Attachment B for each additional property.
5a. Street Address (Cannot be a PO Box. if there is no address, provide other location information in 5n.) [hel-]
501 Lilliwaup St
5b. City, State, Zip(If the project is not in a city or town, provide the name of the nearest city or town.) hel
Lilliwaup, WA
5c. County [iielpJ
Mason
5d. Provide the section, township, and range for the project location. hel
'/4 Section Section Township Range
NW 19 23N 03W
5e. Provide the latitude and longitude of the project location. [
• Example:47.03922 N lat. /-122.89142 W long
5f. List the tax parcel number(s) for the project location. hel
• The local county assessor's office can provide this information.
�2 �/� z y � � �► L
5g. Indicate the type of ownership of the property. (Check all that apply.) hel
❑ State Owned Aquatic Land ❑ Tribal X❑ Private
❑ Other publicly owned (federal, state, county, city, special districts like schools, ports, etc.)
5h. Contact information for all adjoining property owners, lessees, etc. (If you need more space, use JARPA Attachment
JARPA 2009 Page 2 of 12
C.) hel
Name Mailing Address Tax Parcel #(if known)
5i. Is any part of the project area within a 100-year flood plain? ei
X❑ Yes ❑ No ❑ Don't know
5j. Briefly describe the vegetation and habitat conditions on the property. hei
The property,which supports a SFR, is moderately vegetated with native vegetation.
5k. Describe how the property is currently used. hei
There is an existing SFR on the property.
51. Describe how the adjacent properties are currently used. hei
The adjacent properties to the north, south, and west are forested,while the property to the east
supports a fish hatchery.
JARPA 2009 Page 3 of 12
5m. Describe the structures (above and below ground) on the property, including their purpose(s). hei
There is a single-family residence, a concrete bulkhead, and a small power plant on the site.
5n. Provide driving directions from the closest highway to the project location, and attach a map.
The site is located off Hwy 106, west of Lilliwaup, on the north side of Lilliwaup Creek.
Part 6—Project Description
6a. Summarize the overall project. You can provide more detail in 6d. hei
Emergency streambank protection shall be installed on Lilliwaup Creek landward of the active channel
and OHWM, using large angular rock along approximately 100 lineal feet. No materials or equipment
will enter Lilliwaup or Beardslee Creeks at anytime.
6b. Indicate the project category. (Check all that apply.) hel
X❑ Commercial ❑ Residential ❑ Institutional ❑ Transportation ❑ Recreational
❑ Maintenance ❑ Environmental Enhancement
6c. Indicate the major elements of your project. (check all that apply.)
❑ Aquaculture ❑ Culvert ❑ Float ❑ Road
X❑ Bank Stabilization ❑ Dam /Weir ❑ Geotechnical Survey ❑ Scientific Measurement
❑ Boat House ❑ Dike / Levee / Jetty ❑ Land Clearing Device
❑ Boat Launch ❑ Ditch ❑ Marina / Moorage ❑ Stairs
❑ Boat Lift ❑ Dock/ Pier ❑ Mining ❑ Stormwater facility
❑ Bridge ❑ Dredging ❑ Outfall Structure ❑ Swimming Pool
❑ Bulkhead ❑ Fence ❑ Piling ❑ Utility Line
❑ Buoy ❑ Ferry Terminal ❑ Retaining Wall (upland)
❑ Channel Modification ❑ Fishway
❑ Other:
JARPA 2009 Page 4 of 12
6d. Describe how you plan to construct each project element checked in 6c. Include specific construction
methods and equipment to be used. [help]
• Identify where each element will occur in relation to the nearest waterbody.
• Indicate which activities are within the 100-year flood plain.
Emergency streambank protection shall be installed on Lilliwaup Creek landward of the active channel
and OHWM, using large angular rock along approximately 100 lineal feet. No materials or equipment
will enter Lilliwaup or Beardslee Creek at anytime.
All activities are within the 100-year flood plain. The nearest waterbody is Lilliwaup Creek.
6e. What are the start and end dates for project construction? (month/year) [hel
• If the project will be constructed in phases or stages, use JARPA Attachment D to list the start and end dates of each phase or
stage.
Start date: As soon as all required permits have been obtained, and as per the time provisions of
the HPA. End date: ❑ See JARPA Attachment D
6f. Describe the purpose of the work and why you want or need to perform it. [ I
To prevent a mass wasting event on an unstable hillside above Lilliwaup Creek.
6g. Fair market value of the project, including materials, labor, machine rentals, etc. hel
$25,000.
6h. Will any portion of the project receive federal funding? [ ;
• If yes, list each agency providing funds.
❑ Yes X❑ No ❑ Don't know
Part 7—Wetlands: Impacts and Mitigation
❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area.
(If there are none, skip to Part 8.)
7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. nel
X❑ Not applicable
JARPA 2009 Page 5 of 12
7b. Will the project impact wetlands? [hel
❑ Yes ❑ No ❑ Don't know
7c. Will the project impact wetland buffers? hel
❑ Yes ❑ No ❑ Don't know
7d. Has a wetland delineation report been prepared? LeM
• If yes, submit the report, including data sheets,with the JARPA package.
❑ Yes ❑ No
7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating
System? [
• If yes, submit the wetland rating forms and figures with the JARPA package.
❑ Yes ❑ No ❑ Don't know
7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? hel
• If yes, submit the plan with the JARPA package.
❑ Yes ❑ No ❑ Not applicable
7g. Use the table below to list the type and rating of each wetland that will be impacted; the extent and duration
of the impact; and the type and amount of compensatory mitigation proposed. If you are submitting a
compensatory mitigation plan with a similar table, you may simply state (below) where we can find this
information in the mitigation plan. hel
Activity causing Wetland type Impact area Duration Proposed Wetland
impact (fill, and rating (sq. ft. or acres) of impact2 mitigation mitigation area
drain, excavate, category type (sq. ft. or acres)
flood, etc.)
Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System. Provide the wetland
rating forms with the JARPA package.
2 Indicate the time(in months or years,as appropriate)the wetland will be measurably impacted by the activity. Enter"permanent"if
applicable.
3 Creation (C), Re-establishment/Rehabilitation (R), Enhancement(E), Preservation (P), Mitigation Bank/In-lieu fee(B)
Page number(s) for similar information in the mitigation plan, if available:
7h. For all filling activities identified in 7g., describe the source and nature of the fill material, the amount in
cubic yards that will be used, and how and where it will be placed into the wetland. [i,t i
7i. For all excavating activities identified in 7g., describe the excavation method, type and amount of material in
cubic yards you will remove, and where the material will be disposed. hei
JARPA 2009 Page 6 of 12
J. Summarize what the compensatory mitigation plan is meant to accomplish, and describe how a watershed
approach was used to design the plan. hel
Part 8—Waterbodies (other than wetlands): Impacts and Mitigation
In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) [hale]
❑ Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.)
8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment.
hel
❑ Not applicable
BMP's shall be followed during construction to protect water quality at the site. The WDFW's HPA
provisions and construction rules shall also be strictly adhered to.
8b. Will your project impact a waterbody or the area around a waterbody? [help
X❑ Yes ❑ No
8c. Summarize impact(s) to each waterbody in the table below. [ ]
Activity causing Waterbody Impact Duration Amount of Area (sq. ft. or
impact (clear, name location' of impact2 material to be linear ft.) of
dredge, fill, pile placed in or waterbody
drive, etc.) removed from directly
waterbody affected
Placement of Lilliwaup Landward of I week No material to be
large rock creek OHWM and place in water
landward of the the active
active channel channel
Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent, provide the distance between the impact and the
waterbody and indicate whether the impact will occur within the 100-year flood plain.
z Indicate the time(in months or years, as appropriate)the waterbody will be measurably impacted by the work. Enter"permanent"if
applicable.
8d. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland
waterbodies? hel
• If yes, submit the plan with the JARPA package.
❑ Yes X❑ No ❑ Not applicable
8e. Summarize what the compensatory mitigation plan is meant to accomplish. Describe how a watershed
approach was used to design the plan.
• If you already completed 7j., you do not need to restate your answer here. [help]
JARPA 2009 Page 7 of 12
8f. For all activities identified in 8c., describe the source and nature of the fill material, amount (in cubic yards)
you will use, and how and where it will be placed into the waterbody. hem
No fill shall be placed in the waterbody.
8g. For all excavating or dredging activities identified in 8c., describe the method for excavating or dredging,
type and amount of material you will remove, and where the material will be disposed. hei
Part 9—Additional Information
Any additional information you can provide helps the reviewer(s) understand your project.
9a. If you have already worked with any government agencies on this project, list them below. hel
Agency Name Contact Name Phone Most Recent
Date of Contact
Mason County Kell McAboy ( 360) 427-9670 ex:295 8-18-09
9b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 on the Washington Department of
Ecology's 303(d) List? [help
• If yes, list the parameter(s) below.
• If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at:
http://www.ecy.wa.gov/proqrqMa/�%yq/aQ3d/�.
❑ Yes X❑ No
Fecal Coliform
9c. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? heI
• Go to http://cfoub.epa.gov/surf/locate/index.cfm to help identify the HUC.
17110018.
9d. What Water Resource Inventory Area Number (WRIA#) is the project in? Lbeid
• Go to http://www.ecy.wa.gov/services/gis/maps/wria/wria.htm to find the WRIA#.
WRIA 16.
JARPA 2009 Page 8 of 12
9e. Will the in-water construction work comply with the State of Washington water quality standards for
turbidity? hel
• Go to http://www.ecy.wa.gov/programs/wq/swas/criteria.html for the standards.
X❑ Yes ❑ No ❑ Not applicable
9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline
environment designation? hel
• If you don't know, contact the local planning department.
• For more information, go to: hftp://www.ecy.wa.gov/programs/sea/sma/laws rules/173-26/211 designations html.
❑ Rural ❑ Urban ❑ Natural ❑ Aquatic X❑ Conservancy ❑ Other
9g. What is the Washington Department of Natural Resources Water Type? hel
• Go to httt ://www.dnr.wa.gov/BusinessPermitsrTopics/ForestPracticesApplications/Pages/fp watertyping.aspx for the Forest
Practices Water Typing System.
El X❑ F ❑ Np ❑ Ns
9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater
manual? [.
• If no, provide the name of the manual your project is designed to meet.
X❑ Yes ❑ No
Name of manual: Stormwater Management Manual for Western Washington.
9i. If you know what the property was used for in the past, describe below. hel
It has been used as a lodge for some time.
9j. Has a cultural resource (archaeological) survey been performed on the project area? hel
• If yes, attach it to your JARPA package.
❑ Yes ❑ No Unknown.
9k. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project
area or might be affected by the proposed work. [help]
The Chinook salmon, the Hood Canal summer-run chum, the bull trout, the Puget Sound
steelhead, the killer whale, the leatherback turtle, the humpback whale, the marbled
murrelet, and the Steller sea lion are the ESA listed threatened or endangered species in
the area.
91. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and
Species List that might be affected by the proposed work. [ j
Riparian. See above, plus fall-run chum, coho, cutthroat trout, bald eagle, osprey, etc.
JARPA 2009 Page 9 of 12
Part*10—Identify the Permits You Are Applying For
Use the resources and checklist below to identify the permits you are applying for.
• Online Project Questionnaire at http://apps.ecy.wa.gov/opas/.
• Governor's Office of Regulatory Assistance at (800) 917-0043 or help(aD_ora.wa.gov.
10a. Compliance with the State Environmental Policy Act (SEPA). (Check all that apply.) hel
• For more information about SEPA,go to www.ecy.wa.gov/programs/sea/sepa/e-review.htmi.
❑ A copy of the SEPA determination or letter of exemption is included with this application.
X❑ A SEPA determination is pending with_Mason County (lead agency). The expected
decision date is
❑ I am applying for a Fish Habitat Enhancement Exemption. (Check the box below in 1 Ob.)
• Submit the Fish Habitat Enhancement Project form with this application. The form can be found at
http://www.epermifting.wa.gov/Portals/ JarpaResourceCenter/images/default/fishenhancement.doc
❑ This project is exempt (choose type of exemption below).
❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt?
❑ Other:
❑ SEPA is pre-empted by federal law. hel
10b. Indicate the permits you are applying for. (Check all that apply.) hel
LOCAL GOVERNMENT
Local Government Shoreline permits:
❑ Substantial Development ❑ Conditional Use ❑ Variance
X❑ Shoreline Exemption Type (explain):
Other city/county permits:
❑ Floodplain Development Permit X❑ Critical Areas Ordinance
STATE GOVERNMENT
Washington Department of Fish and Wildlife:
X❑ Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption
Washington Department of Ecology:
❑ Section 401 Water Quality Certification
Washington Department of Natural Resources:
❑ Aquatic Resources Use Authorization
FEDERAL GOVERNMENT
United States Department of the Army permits (U.S. Army Corps of Engineers):
❑ Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters)
United States Coast Guard permits:
❑ General Bridge Act Permit ❑ Private Aids to Navigation (for non-bridge projects)
JARPA 2009 Page 10 of 12
i
ALK'1--19--:009 17:49 =IMPSOhti 20G. 224 E-:4 0 P.02%02
part 11--Authorizing Signatures
Signatures required before submitting the JARPA package.
11a. Applicant Signature (required) [ham]
I certify that to the best of my knowledge end belief, the Information provided in this appliCatior► is true, complete,
and accurate. t also certify that I have the authority t0 carry out the proposed activities, and I agree to start work
only after I have received all necessary permits,
I hereby authorize the agent named in Part 3 of this application to act on my behalf in matters related to this
a llca tian- /SN (initial)
I3Y initialing here. I state that I have the autho'Ity to grant access to the property. I also give my consent t k e
permitting agencies entering the property where the prt, oct is located to inspect the project site o y
related to the PrOjOci.
�itcant
AAP
11b. AL;..:c....L ' r:r'' ^'�trr`st►r ;^ ir%'
J
. . :ri !^.>!ic+' aye rrt.n r)rr��rlr`:(s Sr, tniW iluuu�,ain::i• �.� u.lu, C;L.: ;:.3.E,
to tify that tQ uia JoSk 6"MY
and acnurate. I also Certify that I have the authority to carry out the ,,rnpC-AAn :,rtiv1l6S"'(i I aurae;to$tcift WQF'c
onh after I! por'n4s have bt--L!i3 is>>M11G.
Authorized Agent —.v -- ._.�.. Dube —__-----_----- i
11 0. Eloper;+4wfn9r>igna+ure (if not applicant) Lb&lo
I c )nseant to thF, rer;mitting agtndes •rt�?rirtg the property where the project is Ioca`r.,d to inspect the pi-�Iact 5 :e
to da.u�aI.'rrr�'r rtfJ4!Gf:ti�J t ���
or any w7,rl . 1 h.se inspeciions snarl QCC
jar Downer.
Ptt party t9wner
:_ �.. .. ...,...,fin rnP if fl,-101 UOM Of iffy iiar.ai.l1':�.`:it ec-)n^;of ft'a t MR('yt:llke 4)ov ngly
16:1. .G SIUWI pruvrcwue.rr a...... _: , . _._....,..nrr
fal:!�ps rnncraLR.Or covers up by any trick,scheme,or oovire a rc,a`uarial fact or iraa4e s any taises,nouuuvn,u, :ra�...-
�. •-- Of
rgl;,rmantShOns or makes or uses any false writing or docurovot kni,:.';-,g G-r'e to co iwn any false, nctitious,or fraudulent statement.or
en'rr, shall be fined not rnors than 510,000 or inlpriscitied not more than 5 years or both.
- �r Regul,tuy As"tarre(ORA). re^n!v`Kiln rlCi 1;-A a)sc
If I'eu require this document ter enU'.he�r roirr,a,, Ycr:a::.:i:: ;��'�.�.;,,:.� _�.. ..__. .
ca^.-11 741 f.,r W^mNncton Relay Service People with a speech disabWty car,;;Ili W )6,3-o34 i.
Oft publlr'P'inn number: ENV-019-09
FSge i t of 12
Ino7G oM0
P.0<'
SITE PLAN
APPROX 1894
5!/�lj�cJ SF AREA WHERE
ALLUVIAL SEDIMENTS
WERE PREVIOUSLY o
REMOVED TO ACHIEVE A
3 TO 1 SLOPE 1 *t
FALLS POOL r,_•,
PROPOSED STREAMBANK-STABILIZATION
SHALLCONSISTOt INSTALLING LARGE ANGULAR
ROCK(GRANITE 4-MAN)SUBGRADE TO THE SCOUR DEPTH
AND LANDWARD OF THE ACTIVE CHANNELALONG APPROX ,
80'TO 1W OF THE PREVIOUSLY RESLOPED BANK THE ROCK
SHALL BE PLACED IRREGULARLY TO CREATE INTERSTITIAL Or
HABITAT LARGE WOODY DEBRIS WITH ROOT WADS(APPROXIMATELY
8 PIECES THAT ARE 2(Y'DIAMETER AND 16 IN LENGTH AND AT
LEAST SMALLER PIECES THATARE UT IN DIAMETER AND 19) 00
SHALL BE PLACE ON TOP OF THE BASE ROCK WITH THE ROOT %
WAD IN THE ACTIVE CHANNEL. 1/2 TO 2/3 THE LENGTH OF THE
LWD SHALL BE EMBEDDED IN THE BANKAND ANCHORED WITH
ROCK BALLAST. IN ADDITION,THE LWD SHALL BE ANCHORED WITH CABLE AND A MANTA RAY ANCHORS. ""-
_` ~� APPROX LOCATION
j OF BEARDSLEE
APPROX LOCATION -"�' CREEK
OF OHVW
//i
DOSTINGFLUME
ULLIW4UP CREEK
ANCHOR POINT, '
CONSISTING OF - W g
BURIED ROCK O
AND LWD ANCHORED z r Z 100-YEAR FLOOD
WITH CABLE AN _ > D ELEVATION
mzC�
MANTA RAY INTO cn V
STEEP SLOPE. -- c Z
T
ENLARGED VIEW OF '" 0 o
.0
0 m
PROPOSED LWD AND !~� -0 0 -
ROCK BANK STABILIZATION.
MANTA RAY ANCHORS NOT . - k\ o z z
SHOWN. r Z f
ACCESS BRIDGE
PARCEL#323192400032 PRQECT-E.REED RESIDENCE
►roam+
NW19-T23WR03W-W.M. 501
2.08ACRES PROJECTAppREgg:LILLIWAUPWAUP AUPST
IL ,WA ~•LfEO1
flE APPPDXIN
LWD BANK STABILIZATION
PROFILE VIEW (ENTIRE LENGTH NOT SHOWN)
t
\ _ r
- w
SUB-GRADE r \
k
LWD BANK STABILIZATION
t
CROSS SECTION VIEW