HomeMy WebLinkAboutSHX2006-00060 JARPA Sheer Key Buttress - SHX Permit / Conditions - 8/14/2006 yON.STArFO MASON COUNTY
P c DEPARTMENT OF COMMUNITY DEVELOPMENT
� �
o A o yN Planning Division
}'- o T z P O Box 279, Shelton,WA 98584
o N Y o~ (360)427-9670
J �
1864
Exemption from Shoreline Management Act
Case No.: SHX2006-00060 Substantial Development Permit Requirement
The Proposal By: WASHINGTON DEPARTMENT OF TRANSPORTATION �'� 3)C1_ 00 - � 000d
P.O.BOX 47440
OLYMPIA,WA 98504-7440
To undertake the following development:
Construct a sheer key buttress. Construction includes excavtion of slide material and backfilling
with quarry spalls. Two existing culverts will be replaced to drain the bottom of the buttress.
Within Hood Canal and/or its associated wetlands is exempt from the requirement of substantial development because
the development is categorized under WAC 173-27-040(2)as being category
B-normal maintenance
Please contact Tammi Clark at ext 295 if you have any q stions.
Issued: 8/14/2006
Expires: 8/14/2008 Authorized Local Government Official
cc: APPLICANT WDFW USACOE WDOE TRIBAL COUNCIL - Ske)koNuskTjLj0,
mayvz Scluzu'v
Washington State Olympic Region
Department of Transportation Environmental and Hydraulic Services Office
Douglas B. MacDonald 150 Israel Road SW,FI 4,Tumwater
9 PO Box 47417
Secretary of Transportation Olympia,WA 98504-7417
360-570-6700/Fax 360-570-6697
TTY: 1-800-833-6388
www.wsdot.wa.gov
June 9, 2006
RECEIVED
Mason County Community Development J U N 1 3 2006
Planning Department
PO Box 279 MASON CO.PLANNING DEPT.
Shelton, WA 98584tQ 3 IG -Q®• co 00od
RE: US 101 Lilliwaup Vicinity Slide—Unstable Slope
MP 326.84 to MP 326.87
Shoreline Substantial Development Permit Exemption
Dear Mr. Fink:
Enclosed please find a Joint Aquatic Resources Permit Application (JARPA), which
will serve as our application for the above referenced project. This project is located
on US 101 between Mile Post (MP) 326.84 and MP 326.87 in Mason County. Also
enclosed you will find a check in the amount of$410.00 for processing, a vicinity
map, and plan sheets for the proposed work.
This proposed project will build a shear key buttress. Construction activities include
excavation of the slide material and backfill the area with quarry spalls. Two existing
cross culverts, presently buried by slide material, will be replaced to adequately drain
the bottom of the buttress.
Other work items include removing a buried existing timber retaining wall, widening
the southbound shoulder and roadway striping.
A SEPA checklist was prepared, and a determination of non-significance was issued.
The end of the comment period was May 26, 2006.
Based upon our knowledge of the project and language in the Mason County
Shorelines Management Master Program, we believe this project is exempt from the
shoreline substantial development permit requirement. We interpret this work to be
exempt under WAC 173-27-040(2)(b) as normal maintenance or repair of existing
structures or developments, including damage by accident, fire or elements.
Mason County Community Development
June 9, 2006
Page 2
If you have any questions, please contact Tom Barton III at 360-570-6727 or Stacie
Kelsey at 360-570-6729.
Sincerely,
Jeff Sawyer
Environmental and Hydraulic Manager
Olympic Region
JBS:tb
Enclosures: Check in the amount of$410.00
DARPA
Vicinity map&Plan sheets (4 sheets)
cc: Dept of Ecology,Jeffree Stewart w/enclosures
Neal Uhlmeyer w/enclosures
Project File w/enclosures
SF0608006(3666)
AGENCY USE ONLY
Agency Reference#: Date Received:
Circulated by: (local govt.or agency)
JOINT AQUATIC RESOURCES PERMIT APPLICATION FORM (JARPA)
(for use in Washington State)
r PLEASE TYPE OR PRINT IN BLACK INK.
TO FILL IN ELECTRONICALLY, USE F11 TO MOVE THROUGH THE FORM
Application for a Fish Habitat Enhancement Project per requirements of RCW 77.55.290. You must submit a copy of this
completed JARPA application form and the(Fish Habitat Enhancement JARPA Addition)to your local Government
Planning Department and Washington Department of Fish &Wildlife Area Habitat Biologist on the same day.
NOTE: LOCAL GOVERNMENTS—You must submit any comments on these projects to WDFW within 15 working days.
Based on the instructions provided, I am sending copies of this application to the following: (check all that apply)
nX Local Government for shoreline:[]Substantial Development Elconditional Use ❑Variance DExemption Revision
OFloodplain Management OCritical Areas Ordinance
Washington Department of Fish and Wildlife for HPA(Submit 3 copies to WDFW Region)
Washington Department of Ecology for 401 Water Quality Certification (to Regional Office-Federal Permit Unit)
Washington Department of Natural Resources for Aquatic Resources Use Authorization Notification
Corps of Engineers for: ❑ Section 404 ❑ Section 10 permit
Coast Guard for: General Bridge Act Permit Private Aids to Navigation (for non-bridge projects)
�x For Department of Transportation projects only: This project will be designed to meet conditions of the most current
Ecology/Department of Transportation Water Quality Implementing Agreement
SECTION A -Use for all permits covered by this application. Be sure to ALSO complete Section C(Signature Block)for all
permit applications.
1. APPLICANT
Washington State Department of Transportation— Jeff Sawyer Environmental and Hydraulic Manager
MAILING ADDRESS
PO BOX 47417 Olympia,WA.98504-7417
WORK PHONE E-MAIL ADDRESS HOME PHONE FAX#
(360)-570-6701 sawyerj@wsdot.wa.gov (360)570-6697
If an agent is acting for the applicant during the permit process, complete#2. Be sure agent signs Section C(Signature Block)
for all permit applications
2. AUTHORIZED AGENT
Not Applicable
MAILING ADDRESS
WORK PHONE E-MAIL ADDRESS HOME PHONE FAX#
3. Relationship of applicant to property: X OWNER PURCHASER LESSEE
4. Name, address and phone number of property owner(s)if other than applicant:
Not Applicable
5. Location (street address, including city, county and zip code,where proposed activity exists or will occur)
US 101 at Mile Post(MP)326.84,Mason County,Lilliwaup,Washington
Local government with jurisdiction (city or county)Mason
Waterbody you are working near Hood Canal Tributary of WRIA#
Is this waterbody on the 303(d)List" YES E] NO ❑X Not Applicable Puget Sound
If YES,what parameter(s)?
Shoreline designation Hood Canal
"For 303d List,
http://www.ecy.wa,.gov/programs/wg/303d/index.htmi Zoning designation Rural
Section Section I Township I Range lGovernment Lot
19930 23N 3W Not Applicable DNR stream type if known Not Applicable
Latitude and Longitude: 47°28'N 122°06'W Tax Parcel Number Not Applicable
ECY 070-15(Rev. 11/04) JARPA Contact the State of Washington Office of Regulatory Assistance for latest version or call 360/407-7037 or 800/917-0043
6. Describe the current use of the property, and structures existing on the property. Have you completed any portion of the proposed
activity on this property? YES �X NO
For any portion of the proposed activity already completed on this property, indicate month and year of completion.
This property is currently WSDOT owned right-of-way for US 101 in Mason County. The area is rural residential along
Hood Canal. There are no structures in the project limits.
Is the property agricultural land? ❑ YES ❑X NO Are you a USDA program participant? ❑ YES �X NO
7a. Describe the proposed work that needs aquatic permits: Complete plans and specifications should be provided for all work waterward
of the ordinary high water mark or line, including types of equipment to be used. If applying for a shoreline permit, describe all work
within and beyond 200 feet of the ordinary high water mark. If you have provided attached materials to describe your project,you still
must summarize the proposed work here. Attach a separate sheet if additional space is needed.
The proposed fix for this slide area is to build a shear key buttress. Construction of the shear key buttress involves sequential
excavation of the slide debris in the toe area of the slide and backfilling the excavated area with quarry spalls. A cross
culvert will need to be installed to drain the bottom of the shear key buttress. Once the buttress is built,a barrier will be
installed along the shoulder of the southbound lane.
Since US 101 is a major transportation route,there will be no detour. During construction,US 101 will be restricted to one-
way traffic 24-hours a day 7-days a week using a temporary portable traffic signal.
PREPARATION OF DRAWINGS: See sample drawings and guidance for completing the drawings. ONE SET OF ORIGINAL OR GOOD QUALITY REPRODUCIBLE
DRAWINGS MUST BE ATTACHED. NOTE: Applicants are encouraged to submit photographs of the project site,but these DO NOT substitute for drawings. THE CORPS
OF ENGINEERS AND COAST GUARD REQUIRE DRAWINGS ON 8-112 X 11 INCH SHEETS. LARGER DRAWINGS MAYBE REQUIRED BY OTHER AGENCIES.
7b. Describe the purpose of the proposed work and why you want or need to perform it at the site. Please explain any specific needs that
have influenced the design.
The purpose of the proposed project is to stabilize the slope located just north of Lilliwaup on US 101 from MP 326.84 to MP
326.84. This slope has been active for many years. In 1995 and 1996 major slide events crossed US 101 with debris reaching
Hood Canal. There are yearly problems will the slide area creeping onto the southbound lane requiring continuing clean up
to maintain a safe driving surface.
7c. Describe the potential impacts to characteristic uses of the water body. These uses may include fish and aquatic life,water quality,
water supply, recreation and aesthetics. Identify proposed actions to avoid, minimize,and mitigate detrimental impacts and provide
proper protection of fish and aquatic life. Identify which guidance documents you have used. Attach a separate sheet if additional
space is needed.
We anticipate no impacts to characteristic uses. Work being performed within 200 feet of Hood Canal will be minimal. To
ensure that no petroleum projects or other construction materials enter the canal,a spill prevention,control and
countermeasures plan will be developed and implemented. A Temporary Erosion and Sedimentation Control(TESC)Plan
will also be developed and implemented. A biological assessment is being performed,and all conservation measures
recommended for protection of threatened or endangered species will be included in the contract.
7d. For in water construction work,will your project be in compliance with the State of Washington water quality standards for turbidity
WAC 173.201A-110? X YES NO (See USEFUL DEFINITIONS AND INSTRUCTIONS)
8. Will the project be constructed in stages? YES ❑ NO X❑
Proposed starting date: August 2007
Estimated duration of activity: 20 working days
9. Check if any temporary or permanent structures will be placed: Not Applicable
Waterward of the ordinary high water mark or line for fresh or tidal waters AND/OR
Waterward of the mean higher high water for tidal waters?
10.Will fill material (rock,fill, bulkhead, or other material)be placed: No
❑ Waterward of the ordinary high water mark or line for fresh waters?
If YES,VOLUME(cubic yards) /AREA (acres)
Waterward of the mean higher high water for tidal waters?
If YES,VOLUME(cubic yards) /AREA (acres)
ECY 070-15(Rev. 11/04) JARPA Contact the State of Washington Office of Regulatory Assistance for latest version or call 360/407-7037 or 800/917-0043
11. Will material be placed in wetlands? YES X❑ NO
If YES:
A. Impacted area in acres:
B. Has a delineation been completed? If YES, please submit with application. ❑ YES NO
C. Has a wetland report been prepared? If YES, please submit with application YES NO
D. Type and composition of fill material (e.g., sand, etc.)
E. Material source:
F. List all soil series(type of soil)located at the project site,and indicate if they are on the county's list of hydric soils. Soils information
can be obtained from the natural Resources Conservation Service(NRCS).
G. WILL PROPOSED ACTIVITY CAUSE FLOODING OR DRAINING OF WETLANDS? ❑ YES EJ NO
If YES, IMPACTED AREA IS ACRES OF DRAINED WETLANDS.
NOTE:If your project will impact greater than'h of an acre of wetland,submit a mitigation plan to the Corps and Ecology for approval along with the JARPA form.
NOTE:A 401 water quality certification will be required from Ecology in addition to an approved mitigation plan if your project impacts wetlands that are: a)greater than'fe acre in size,
or b)tidal wetlands or wetlands adjacent to tidal water. Please submit the JARPA form and mitigation plan to Ecology for an individual 401 certification if a)or b)applies.
12. Stormwater Compliance for Nationwide Permits Only: This project is(or will be)designed to meet ecology's most current
stormwater manual,or an Ecology approved local stormwater manual. YES ❑ NO
If YES—Which manual will your project be designed to meet?
If NO—For clean water act Section 401 and 404 permits only—Please submit to Ecology for approval, along with this JARPA
application, documentation that demonstrates the stormwater runoff from your project or activity will comply with the water quality
standards,WAC 173.201(A)
13.Will excavation or dredging be required in water or wetlands? YES ❑X NO
If YES:
A. Volume: (cubic yards)/area (acre)
B. Composition of material to be removed:
C. Disposal site for excavated material:
D. Method of dredging:
14. Has the State Environmental Policy Act(SEPA)been completed ❑X YES NO
SEPA Lead Agency: WSDOT
SEPA Decision: DNS, MDNS, EIS, Adoption, Exemption DNS Decision Date(end of comment period)05/26/06
SUBMIT A COPY OF YOUR SEPA DECISION LETTER TO WDFW AS REQUIRED FOR A COMPLETE APPLICATION
15. List other Applications, approvals or certifications from other federal, state or local agencies for any structures, construction discharges
or other activities described in the application (i.e. preliminary plat approval, health district approval, building permit, SEPA review,
federal energy regulatory commission license(FERC), Forest practices application, etc.). Also, indicate whether work has been
completed and indicate all existing work on drawings. NOTE: For use with Corps Nationwide Permits,identify whether your project has
or will need an NPDES permit for discharging wastewater and/or stormwater.
TYPE OF APPROVAL ISSUING AGENCY IDENTIFICATION DATE OF APPLICATION DATE APPROVED COMPLETED?
NO.
16. Has any agency denied approval for the activity you're applying for or for any activity directly related to the activity described herein?
YES QX NO
If YES, explain:
ECY 070-15(Rev. 11/04) JARPA Contact the State of Washington Office of Regulatory Assistance for latest version or call 360/407-7037 or 800/917-0043
SECTION B - Use for Shoreline and Corps of Engineers permits only:
17a.Total cost of project. This means the fair market value of the project, including materials, labor, machine rentals, etc.
1,68.2,100.00
17b. If a project or any portion of a project receives funding from a federal agency,that agency is responsible for ESA consultation. Please
indicate if you will receive federal funds and what federal agency is providing those funds. See instructions for information on ESA.*
FEDERAL FUNDING ❑X YES NO If YES, please list the federal agency. Federal Highway Administration
18. Local government with jurisdiction: Mason County
19. For Corps, Coast Guard and DNR permits, provide names, addresses and telephone numbers of adjoining property owners, lessees,
etc. Please node: Shoreline Management Compliance may require additional notice—consult your local government.
NAME ADDRESS PHONE NUMBER
SECTION C-This section MUST be completed for any permit covered by this application
20. Application is hereby made for a permit or permits to authorize the activities described herein. I certify that I am familiar with the
information contained in this application,and that to the best of my knowledge and belief,such information is true, complete, and
accurate. I further certify that I possess the authority to undertake the proposed activities. I hereby grant to the agencies to which
this application is made,the right to enter the above-described location to inspect the proposed, in-progress or completed work. I
agree to start ork ONLY after all necessary permits have been received..
DATE
SIGATORIL OF APPLICANT
DATE
SIGNATURE OF AUTHORIZED AGENT
I HEREBY DESIGNATE TO ACT AS MY AGENT IN MATTERS RELATED TO THIS APPLICATION FOR
PERMIT(S). I UNDERSTAND THAT IF A FEDERAL PERMIT IS ISSUED, I MUST SIGN THE PERMIT.
SIGNATURE OF APPLICANT DATE
SIGNATURE OF LANDOWNER(EXCEPT PUBLIC ENTITY LANDOWNERS, E.G. DNR)
THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND THE AGENT, IF AN AUTHORIZED AGENT IS DESIGNATED.
18 U.S.0§1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly
falsifies,conceals, or covers up by any trick, scheme, or device a material fact or makes any false,fictitious, or fraudulent statements or
representations or makes or uses any false writing or document knowing same to contain any false,fictitious, or fraudulent statement or
entry,shall be fined not more than $10,000 or imprisoned not more than 5 years or both.
COMPLETED BY LOCAL OFFICIAL
A. Nature of the existing shoreline. (Describe type of shoreline,such as marine, stream,lake, lagoon, marsh, bog, swamp,flood
plain,floodway, delta;type of beach, such as accretion,erosion, high bank,low bank, or dike;material such as sand, gravel, mud,clay,
rock,riprap;and extent and type of bulkheading, if any)
B. In the event that any of the proposed buildings or structures will exceed a height of thirty-five feet above the average grade level,
indicate the approximate location of and number of residential units,existing and potential,that will have an obstructed view:
C. If the application involves a conditional use or variance, set forth in full that portion of the master program which provides that the
proposed use may be a conditional use, or,in the case of a variance,from which the variance is being sought:
These Agencies are Equal Opportunity and Affirmative Action employers.
For special accommodation needs,please contact the appropriate agency in the instructions
ECY 070-15(Rev. 11/04) JARPA Contact the State of Washington Office of Regulatory Assistance for latest version or call 360/407-7037 or 800/917-
004343
T 2 3 N o R o 3 W o W o M o ®LYMPoC
•� oa�aau®�
•' I I4 ►.I� .YII�
fmPe
CLALLAM
19 ' 20 - ----------- -----� o
JEFFERSON ---
—�--------HASON _
i GRAYS ARBOR•
Qj
ILgIL]LgWP��JP�
0 »..
.. . Gib EN[) PROJECT �
SRIOI MP 326. 78 _ ���® � PIERCE
G.O URSTON
I
BEGIN PROJECT
SR101 MP 326e84
30
27 oe �
28
V IPSSO - HOLLY RD
O'
O E
f
�\ 0 Boy o
..................................................... ----------- SHORE RD i
0 H...
N
Little
DewGtto
x
9� 34
31 0
CreeK 36 v
` 33
32
T 23 N
...................... .................................................................................. 0- 30 0
. ... ...---. m 1(�J00 2
...-----•--•-----•...................•---•---•---.....-------------•-•--.....•--•-...---......:
T22N --
Aldrich SCALE IN FEET
Lake
i Robbins
Don
Loke e i
U Lake Lake
FILE NAME G:\DESIGN\ScopersV03- '05\P3\US 101-LI[IlwuOP VIc-Slide\15 CADD\vic ma .d n PLOTI
TIME 08:51:20 AM REGION STATE FED.AID PROJ.NO. Adft
N0.
' .`- DATE 05/26/2005 l0 WASH
MAP I
SR 101/LILLIwAUP VIC.-SLIDE
DESIGNED BY D. MATLOCK J013 NUMBER a 1
Washington Statt: SHEET
ENTERED BY D. MATLOCK
CHECKED BY 0. MATLOCK CONTRACT Ho. EocaTloH NO. Department of Transportationl I 0v
PROD. ENGR. J. WYNANDS DATE DATE VICINITY MAP SHEETS
REGIONAL ADM. R. HAIN REVISION DATE BY P.F. STAMP BOX P.E. STAND BOx
L — -
m'---
------------------
�...
100 175
100
150
\�. 75
\ 125
125
Too of Excavation
7s �\ loo
»_- 100
loo
Back of Buttress
50
ToD
50 -- - -
0- 5c
f Ln
----------L �`� ----- — » --
a - ---- --- ---- -------------------- - -- ---------------------
--
❑�'
In Us 101 N
1O
---------------------------------------------a ------------------------------------- °' ---
---- -- -- ------ -- ------------------ --- Y^
0.
NEV CROSS CULVERT
NEV CROSS CULVERT _ _ -
0 20 40
SCALE 1N FEET
—--- --------------------------------------------------------
PLOT4
FILE NAME G:\DESIGN\Sco ers\'03- '05\P3\US 101-Lilliwuo Vic-Slide\15 CADD\New CAD Files 7-1-05\LM-Plans.d n
TIME 09s58s58 AM
RED STATE FED.AID PROJ.NO. US 101
,b.
DATE 12/12/2005 WrAf LILLIWAUP VICINITY SLIDE
PLOTTED BY Kell 7 10 WASH
DESIGNED BY C.LANGFORD 10°111°E" Washington Stag UNSTABLE SLOPE SeEET
ENTERED BY C.LANGFORD Department of Transportation OF
CHECKED BY J.KLOCKENTEGER CONTRACT NO. LOCATION ro.
SHEETS
PROJ. ENGR. T.COWAN DATE DATE
REGIONAL ADM. R.HAIN REVISION DATE BY P.E.STAMP!mc P.E.STr/OR
---- -------------- Ar
Op
OS
i de.
Proposed
All,
°,o° Proposed 6' 12' 1 2' 4 ' - l0. 5 ' Pu I I Out
s�aF Quarry Spa I I
+0 Buttress
o '
O�
----------------
--------------
4 ' 11 . 5' 11 . 5' 3' - 11 ' Pull Out
Current Conditions
Hood Canal
0.3 HMA 0
0.7 CSBC
FILE NAME GADESIGN\Scopers\'03- '05\P3\US 101-Ltlliwuo Vic-Slide\15 CADD\New CAD Flies T-1-05\CrossSections.d n PLOT1
TIME 11:23:02 AM REGIION STATE FED.AID PROJ.NO.
DATE 12/06/2005 10 WASH � US 101
PLOTTED BY KromerB -„ LILLIWAUP VICINITY SLIDE
JOB NUMUR Washington State
DESIGNED BY C.LANGfORD UNSTABLE SLOPE SHEET
ENTERED BY C.LANGFORD
CHECKED BY J.KLOCKENTEGER CONTRACT NO. LOCATION NO. Department of Transpoiiation
OF
PROJ. ENGR. T.COWAN
DATE DATE SHEETS
REGIONAL ADM. R.HAIN REVISION DATE BY P.E. STAMP BOX
P.E. STAMP Box
� I
' TOP OF EXCAVATION
I
t ——— — —BACK OF BUTTRESS —_J _Ft,
R/Y
TOP OF BUTTRESS
- - 2 - -
--------- - -'------------------------------------------------ � 3
LEGEND
WETLAND IMPACT AREA I- I
CATCH BASIN D
0 50 100
CULVERT
SCALE IN FEET
....... ....... ....... .. ....... ....... ....... ....;. .. .. ..... :.:.: .:: :: :....:. ::.: :.. :: .. ......: .1:::::: ...
s::.:..:.:: ....... ... ... ..
::.......::: ...................::.:... ...... ....... .. ... ... ... .... ....... .....
..................:......... i:....... ::: . ! .......
.... ........ ........ .........s. .. ... .. ..
7
�i�
! s.........s....... :i: i
i ....... ....... .....
i s.......: i:..: ....... ....... .. ... ......
f:
.................... ...................7............................ ...... ....... 'i ... ........ .. .... ....... .. .... ... ... .... ....... ..
i................... .... ...... ....... i:..
... ....... ... .......
......... ......... ......... .........:.........:.........:..... .... .. .... .... .. .... ..... '; ..... ....... .......
.......t................... ................... ....... i i.. : .I. ... .... .. .. .... .... .. ~ice .... -.—�"_
. . ................... .. .. .. .. `` ..... .. ... ... .. ... ...... ....... .......
...................I.................... .. .. ... ... .... .. ... .... .. ...� .... ... ....
....... ......... .... .. ... ... ... ....... .. .. ... ....... ...... ....
........ ......... ......... ......... i I 0_... O i:::.. .. ..... .. .... ... ...
ii............
: r . ......... .....:::. . !! .... m
.. ......:0 .P. .... ...... ..: :S:
is
....f.........t.........1......... ......... .........,.........,. I i i..... ..'M :i::... _ ...... ... .'......... .....:::':I:
! .m .... ... :i. :!:'
...................t......... ....... ....t ........ .. .i. .;.
_—' _
......... .. ......... ......i .... ..... ...... .......:f .... .. ....... T .... ....... ... ... ......
t.........l. : ....... i:... ... ... ..... i
...s......... ....a.. .a
............................................... m w oa c+ ...
I .............. ..
......... ......... ......... .............................. is Q .... ...... -..
s.........f.... : s N Q i:. :I:' j:
.. .... .. ....... ....... .. ....
o +:l................... w. !....... !: ...... ......
..s......... ....... u m i:.... :l::'
s 7 N,. ......... .... ... . .... o+ o, i'.
.. t.�.........7....H.t $E.+. ....I......... .. .i. _
... '-...... ......... ........:t-.........h------r-----t----��---i .. -'�i-.. .. ...... ..V�.. :: '::: ....... ....... ......t .. .. .:' ....... ..... ....... ...... ....... ....... ......
...... ..t:......::7:........':. .... .... :i: ..... ....... ....... .... .... .. . .:f: ...... .......:i::..
:.........:....... ::.. .. ..... ..... ....... .... .......
-i.
.............. .........i.......... ... .i ...... .... i.. ......... .. . . ....... ....
::. :;: is
......... ...................i......... .........i.........i.......... I ...... ....... ....... .. ... .. ... .... ... :j:
s.........• .. j:. 3{ .... .... ..
:: !'. ..... ....... ........
i......... ...... s .......' ::i: :i::.:
......... ......... ......... ......... .. I........:;:....... ...... ... .... ..... ..... �::j:....... ...
i ........ ......... ........ .... -
f:
ii �
i i.
l......... ......... ......... .........:......... .... s — — -.
1_
;. -... — :::: :::::: .... ..... .. .
i:....... :::::.
..... .... ::::: ..... :....:i::::.::: :::.. :::
... .. .... :::::: " :::: ....... ::::: ::::...
:.::.........::::.:i:....:.... .. .. ... ... .... ......
i:...
.......:.........:......... ...................:.........:.... ..... ....... ... ....... ... ... ....... ... . .
.. ...................................... .. t
t.... .. - - --+— -►-- is
;........ ... .... .. .. .....:
:.........:........ ....... ....... .......
s:
_..t.........• .......
:.........:......... ... .......
is
...
..........................i.................. ....... ....... ...... .. ...:. i. � is "' "is !: ... ..:i: i '.....:?:..... !: s: ....
.... :. ......... .. ....: .. :: . ------ _ '^ W_-- - i ----r= -25t-_zc -- i--_ _i_ _-i--'—_r-........
::::. ::..... ... ...11 : .u, .. ..... ....... .... .......
m i ....... h m ... ....... .... ....... ....... ....... ......
..... ....... .. .. ....... ..... ....... ....... ....... ....... _ ..... ...... ....... ....... ....... ...N .....N ....... ...... ....... ... .... .......
....... ....... .... .. .. .. ....... ... ... ....... .. .... ....... ..... ....... ... : .:< ....... ....... ....... .... ... .... ...... ....... ....... ....... ... ... ....... ....... ....... ....... ..
..'i'.... .. ....... ... ... ....... ....... ....... ..... ....... .... .. .... .. .... .. ..... ... ... ....... ....... ....... ....... ....... .......
....... ....... ..... .....Ay: ....... ....::lV : ::IV :.. ..... ....... ....... ....... ....... ... ..... .... ....... ....... ....... ....... ... .......
:: .... .... ......: ....... ..... :: :... .. .. .... .......:i:. .....
:..:i:... ..
... ..... ;. .:. .;. .... ... .:: .. .... ::J
....... ......................................:::....... _ _ _- _
;
20' __
60.'^ ..... .. .... .......
. ::� :�u ...
:.........:.........:....... ...... :::.. ::::. ......- :: :::: :::::: ::..
:........:E:....... . .. .......
24"
.......
i !. i. �::: .......... ....... .......
_....._........................................................ ....
99": ..
.... ..... ....... ....... ... ...... .......
24':: i24 ....... s:
....... ....... ....... ....... .. ....... .......
I.
—
........... .. .._. .. ..
FILE NAME G:\DESIGN\Sco ers\'03- '05\P3\US 101_Lilitwuo Vic-Slide\15 CADD\New CAD Files 7-1-05\Drn Pro.d n PLOTI
TIME 09:43:23 AM NtCNCDION sT.rt FED.AID PR0J.N0. US 101
DATE 12/13/2065 10 WASH LILLIWAUP VIVINITY SLIDE
PLOTTED BY Kell T
DESIGNED BY B.KRAMER '0B"" " Washington State ffl UNSTABLE SLOPE SHEET
ENTERED BY T.KELLY Department of TransFartation _ of
CHECKED BY J.KLOCKENTEGER CONYRaT"a. LOCATION W.
PROJ. ENGR. T.COWAN DATE - DAit DRAINAGE PLAN & PROFILE SHEETS
REGIONAL ADM. R.HAIN REVISION DATE BY