Loading...
HomeMy WebLinkAboutGEO2012-00004 for BLD2011-00993 - GEO Geological Review - 12/16/2011 Mason County Review Checklist GE For a Geological Assessment Instructions: This checklist is intended to assist Staff in the review of a Geological Assessment. The Assessment is reviewed for completeness with respect to the Resource Ordinance. If an item is found to be not applicable, the report should explain the basis for the conclusion. The Assessment is also reviewed for clarity and consistency. If the drawings, discussion, or recommendations are not understandable, they should be clarified. If they do not appear internally consistent or consistent with the application or observations on site, this needs to be corrected or explained. If resolution is not achieved with the author, staff should refer the case to the Planning Manager or Director. Applicant's Name: AW Al �. Permit#: o2o/l_ 2 Parcel#'s: �33 �� �� T el Date(s) of the Document(s) reviewed: 1. A discussion of geologic conditions in the general vicinity of the proposed development, with geologic unit designation based on referenced maps. OK? Comment: 2. (a) A discussion f the ground water conditions at the site, OK? Comment: (b) A discussio f the estimated depth to water, OK? Comment: (c) A discussion of the quantity of surface seepage, OK? V' Comment: (d) A discussion of the upslope geomorphology, OK? ✓ Comment: (e) A discussion of location of upland waterbodies and wetlands. OK? 1/ Comment: 3. The approximate depth to hard or dense competent soil, e.g. glacial till or outwash sand. OK? I-' Comment: 4. A discussion of any geomorphic expression of past slope instability (presence of hummocky ground or ground cracks, terraced topography indicative of landslide block movement, bowed or arched trees indicating downslope movement, etc.). OK? 7 Comment: 5. A discussion of the history of landslide activity in the vicinity, as available in the referenced maps and records. OK? 1--"' Comment: 6. An opinion on whether the proposed development is within the landslide hazard area or its associated buffer or setback and the potential for landslide activity at the site in light of the proposed development. OK? ✓ Comment: 7. A recommendation by the preparer whether a Geotechnical Report should be required to further evaluate site conditions and the proposed development of the subject property. OK? v1 Comment: A/ /c( 8. If the presence of a hazard is determined within 300 feet of the proposed development, then the following are delineated on a geologic map/site map: Page 1 of 2 Form Effective June 2008 (a) the aZofeposed development, OK? omment: (b) the boundaries of the landslide hazard area (top, both sides, and toe), V OK? Comment: �p ( the associated buffers (top, both sides, and toe) t OK? Comment: (d) building or other setbacks (top, both sides, and toe). OK? Comment: 9. A site map drawn to scale showing the property boundaries, scale, north arrow, and the location and nature of existing and proposed development on the site. OK? Comment: Are the Documents signed and stamped? y 5 By whom? License#: �(� License type: FIRST REVIEW Approved ❑ Need more info. If not approved, what is the next action/recommendation for further action? Reviewed by lL� on ,7 Time spent in review: < ' y� �►+. --� SECOND REVIEW/UPDATE ❑ Approved ❑ Need more info. If not approved, what is the next action/recommendation for furt er ac 'on. Reviewed by on . Time spent in second review: THIRD REVIEW/ UPDATE ❑ Approved ❑ Need more info. If not approved, what is the next action/recommendation for further action? Reviewed by , on . Time spent in third review: Disclaimer. Mason County does not certify the quality of the work done in this Geological Assessment Page 2 of 2 Form Effective June 2008 2/9/2012) Rebecca Hersha- Re: Mason Lake LLC Page 1 From: <envirotech@geotechnicalinfo.com> To: "Rebecca Hersha" <RebeccaH@co.mason.wa.us> Date: 2/8/2012 12:20 PM Subject: Re: Mason Lake LLC Hi Rebecca, I've caused some grief for the homeowner with this line in the past. I revised this in my reports, but not the assessments. I'll clarify it better next time. For this project it is suppose to be an "or." My intention is that an engineer is not needed during construction if the report is followed, and soil conditions are just as I presented them (i.e. no significant groundwater, no clay, no landfill, etc..) Since we are suppose to provide a depth to competent bearing soil in the report, this presents some unknowns for us. It is standard in our industry to look at the bearing soils in one or two or three locations beneath the proposed building, but there is always a possibility that there is soft clay or buried garbage where we did not check. Also, there are occasions where the owner decides to put the house in a different location that originally planned. For the most part, soils are pretty consistent on a property, and we can easily identify fill by looking at the ground surface. I believe that the engineer should be called out to inspect footings if the building requires over 2000 psf bearing, or the inspector finds soft, saturated or susceptible soils. Thank you, Michael Staten > Hello Michael, > Thank you for the Geological Assessment prepared for Mason Lake LLC. It > looks great, but I just need one minor clarification. On page 10 you > stated "... it is recommended that a qualified engineer observes and > documents the construction, or Envirotech is promptly notified if the > project or subsurface conditions found on-site are not as presented in > this report..." > Did you mean for the"or"to be an "and?" > Thank you. > Rebecca Hersha, Planner > Mason County DCD > 360-427-9670 ext. 287 > P Go Green! Please consider the environment before printing this email or > its attachments. > C�Eb 20 12-C,bao� RECEIVED JAN 3 0 2012 426 W. CEDAR ST. Mason County Department of Community Development Submittal Checklist For a Geological Assessment Instructions: This checklist must be submitted with a Geological Assessment and completed,signed,and stamped by the licensed professional(s)who prepared the Geological Assessment for review by Mason County pursuant to the Mason County Resource Ordinance. If an item found to be not applicable,the report should explain the basis for the conclusion. Applicant/Owner �19,1 ("k - Parcel# ZZ2/3 3 -S Z-y 006t Site Address 27�'� /yam�^,� !mac„b� ur�lir L ,y� L,r� ?C dr e�✓ r (1) A discussion of geologic conditions in the general vicinity of the proposed development,with geologic unit designation based on referenced maps. Located on page(s) (2) (a)A discussion of the ground ater conditions at the site, Located on page(s) (b) A discussion of the estimated depth to water Located on page(s) 6 (c) A discussion of the quanti of surface seepage Located on page(s) E• (d) A discussion of the upslope geomorphology Located on page(s) 3 (e) A discussion of location of upland waterbodies and wetlands_ Located on page(s) (3) The approximate depth to hard or dense competent soil,e.g.glacial till or outwash sand. Located on page(s) S (4) A discussion of any geomorphic expression of past slope instability(presence of hummocky ground or ground cracks,terraced topography indicative of landslide block movement,bowed or arched trees indicating downslope movement,etc.). Located on page(s) .3 (5) A discussion of the history of landslide activity in the vicinity,as available in the referenced maps and records. Located on page(s) 7 0 (6) An opinion on whether the proposed development is within the landslide hazard area or its associated buffer or setback and the potential for landslide activity at the site in light of the proposed development. Located on page(s) 7 (7) A recommendation by the preparer whether a Geotechnical Report should be required to further evaluate site conditions and the proposed development of the subject property. Page 1 of 2 Form Effective June 2008 Located on page(s) 10 (8) If the presence of a hazard is determined within 300 feet of the proposed development, then the following are delineated on a geologic map/site map: (a) the area of the proposed d velopment, Located on Map(s) �✓I/� (b) the boundaries of the Ian tide hazard area(top,both sides,and toe), Located on Maps)/)` (c) the associated buffers(t911,both sides,and toe) Located on Map(s) /V (d) building or other setbacks,(top,both sides,and toe). Located on Map(s) /V /r (9) A site map drawn to scale showing the property boundaries,scale, north arrow,and the location and nature of existin and Proposed development on the site. Located on Map(s) S 6An_(A10n.4) I, i L V1 • hereby certify under penalty of perjury that I am a civil Ibngineer licensed in the State of Washington with specialized knowledge of geotechnical/geological engineering or a geologist or engineering geologist licensed in the State of Washington with special knowledge of the local conditions. I also certify that the Geological Assessment,dated/� JUG �� Z'9IZ and entitled�G}�,i �•� LL(, 11je- �M I �i�per � I"l9/�W�� meets all the requirements of the Masofi County Re ource Ordinance, Landslide Hazard Section,is complete and true,that the assessment demonstrates conclusively that the risks posed by the landslide hazard can be mitigated through the included geotechnical design recommendations,and that all hazards are mitigated in such a manner as to prevent harm to property and public health and safety_ (Signature and Stamp) �L CLYpE S of WASy TI J� C , ll�F/(L Fcis �sS/CNAL.F�G`� Disclaimer: Mason County does not certify the quality of the work done in this Geological Assessment. Page 2 of 2 Form Effective June 2008 • ED ?-O a - DDOv� RECEIVED OIL, ?�(d l - DD q 173 JAN 3 0 2012 426 W. CEDAR ST. Geological Assessment for Mason Lake, LLC Single Family Residential Property 2741 E Mason Lake Drive East Parcel No. 22233-52-00064 Mason County, Washington January 16, 2012 Project#1103 Prepared For: Mason Lake, LLC, 625 Windsor Drive SE PAL CLYpE s� Sammamish, Washington 98074 ��� °� w ;'���c9�F� 0 Prepared By: Envirotech Engineering 43045 'Z PO Box 984 OAF�FQ-ISTf Belfair, Washington 98528 SS�ONALV Phone: 360-275-9374 Fax: 360-275-4789 TABLE OF CONTENTS 1.0 INTRODUCTION.................................»...............................................................................................1 1.1 PROJECT INFORMATION.....................................................................................................................1 1.2 PURPOSE OF INVESTIGATION AND SCOPE OF WORK.........................................................................1 2.0 SURFACE CONDITIONS....................................................................................................................3 2.1 GENERAL OBSERVATIONS..................................................................................................................3 2.2 TOPOGRAPHY......................................................................................................................................3 2.21 Upslope Geomorphology and Upland Water Bodies.................................................................3 2.3 SURFACE DRAINAGE...........................................................................................................................3 2.4 SLOPE AND EROSION OBSERVATIONS................................................................................................3 3.0 SUBSURFACE INVESTIGATION......................................................................................................5 3.1 FIELD METHODS,SAMPLING AND FIELD TESTING............................................................................5 3.2 GEOLOGIC CONDITIONS.....................................................................................................................5 3.3 SPECIFIC SUBSURFACE CONDITIONS..................................................................................................5 3.3.1 Groundwater...............................................................................................................................6 4.0 ENGINEERING CONCLUSIONS.......................................................................................................7 4.1 LANDSLIDE HAZARDS.........................................................................................................................7 4.1.1 Landslides and Slope Stability Analysis.....................................................................................8 4.1.2 Surface and Subsurface Drainage.............................................................................................8 4.2 EROSION HAZARDS.............................................................................................................................8 4.3 SEISMIC HAZARDS..............................................................................................................................9 4.4 OTHER CONSIDERATIONS...................................................................................................................9 5.0 CLOSURE............................................................................................................................................10 Appendix A-Site Plan Appendix B- Soil Information 1.0 INTRODUCTION Envirotech Engineering (Envirotech) has completed this geological assessment for a residential property located at 2741 E Mason Lake Drive East, identified as parcel number 22233 52 00064 in Mason County, Washington (Project). As presented herein, this assessment includes information pertaining to the Project in this Introduction Section;observations of the property and surrounding terrain in the Surface Conditions Section; field methods and soils descriptions in the Subsurface Investigation Section; and, assessments for landslides, erosion, seismic hazards, and other considerations in the Conclusions Section. An initial geological/geotechnical evaluation of the Project was conducted by Envirotech without the property owner or owner's representative on January 9, 2012. It was determined that natural slopes between 15% and 40% were present within 300 feet of the Project. Due to these slope grades, a geological assessment is required pursuant to landslide hazard areas of the Mason County Resource Ordinance(MCRO). During the evaluation and site visit by Envirotech, surface and subsurface conditions were assessed in order to determine if further geotechnical studies are required. After completion of the field work and applicable Project research, Envirotech prepared this geological assessment. 1.1 Project Information Information pertaining to the Project was provided by the property owner's representative, and observations from a field visit by Envirotech. The property consists of a garage, paved driveway/ parking, and other ancillary developments. The proposed development is expected to consist of a new single family residence and septic features. Approximate site development with relation to existing site features are illustrated in the Site Map in Appendix A. 1.2 Purpose of Investigation and Scope of Work The purpose of this geological assessment was to evaluate the Project in order to confirm that the proposed development is outside of any landslide hazard area and its associated buffers and setbacks as determined in the MCRO. The investigation included characterizing the general Project surface and subsurface conditions,and evaluating the suitability of the soils to support the planned site development. In order to fulfill the purpose of investigation, the geological/ geotechnical program completed for the proposed improvements of the Project include: • Review project information provided by the Project owner's representative; • Conduct a site visit to document the site conditions that may influence the construction and performance of the proposed improvements; • Define general subsurface conditions of the site by observing soils within test pit excavations, review well logs from existing wells near the Project, and evaluate geological maps depicting the site geology for the vicinity of the Project; • Perform soils testing, such as visual classifications,to determine selected index properties of the soils; • Complete an engineering assessment supported by planned site alterations and the surface and subsurface conditions that were identified by the field investigation, soil testing, and applicable Project research; and, • Establish engineering conclusions based on findings and anticipated Project. Envirotech Engineering Mason Lake, LLC Geological Assessment Ph.360-275-9374 page 1 Parcel 22233-52-00064 Fax: 360-275-4789 Mason County,Washington January 16,2012 1 awC*'*p ' Project 32 3 34 ,o oa er''a► 3 g j � 2 Vicinity Map from Mason County Website Envirotech Engineering Mason Lake,LLC Geological Assessment Ph.360-275-9374 page 2 Parcel 22233-52-00064 Fax:360-275-4789 Mason County,Washington January 16,2012 2.0 SURFACE CONDITIONS Information pertaining to the existing surface conditions for the Project was gathered on January 9, 2012 by Michael Staten, geotechnical engineer with Envirotech. During the site visit, site features were documented that may influence construction or reveal potential geological hazards. This Surface Conditions Section provides information on general observations, vegetation, topography,drainage and slope/erosion conditions for the Project and surrounding areas. 2.1 General Observations The Project is currently vacant land with few improvements as previously mentioned, and surrounded by rural residential development. East Mason Lake Drive East extends along the southeast side of the property, and Mason Lake is primarily adjacent to the northwest. Vegetation on and near the property consists primarily of 2"d growth firs, huckleberry, salal, and other trees and shrubbery common to this area of the Pacific Northwest. An aerial photo of the Project and immediate vicinity is provided on the following page. 2.2 Topography The topographic information provided in this section was extrapolated from a public lidar source, and incorporated observations and field measurements. Where necessary, slope verification included measuring slope lengths and inclinations with a cloth tape and inclinometer. See the Site Map in Appendix A for an illustration of the general slope indicators with respect to the planned development. The new residence will be located on or near slopes exceeding 15%. These slopes average 21%, with a vertical relief of nearly 15 feet, and the land is terraced with walls of less than 4 feet in height. 2.2.1 Upslope Geomorphology and Upland Water Bodies Ascending grades are generally located to the southeast of the planned development. This slope is relatively minor within 300 feet of the Project, with no apparent slope grades of at least 15%. The upland area of the property is situated on a gentle sloping hillside to a crest along the roadway. Additional geomorphology that is pertinent to both upslope and downslope areas are provided in the Subsurface Investigation Section of this report. Wetlands are located beyond the roadway, after the terrain descends. This water appears to drain to the northeast,and not significantly influence the Project. 2.3 Surface Drainage The majority of the stormwater runoff originating upslope from the anticipated development is expected to be minimal. Significant scour, erosion and sediment transport was not apparent near the Project. 2.4 Slope and Erosion Observations The existing moderate slopes near the Project signal a potential landslide or erosion hazard area. Envirotech Engineering Mason Lake,LLC Geological Assessment Ph.360-275-9374 page 3 Parcel 22233-52-00064 Fax:360-2754789 Mason County, Washington January 16,2012 Some indicators that may suggest past slope movements include: • Outwash of sediments near the bottom of the slope, • Fissures, tension cracks or naturally stepped land masses on the face or top of the slope, and parallel to the slope, • Fine, saturated subsurface soils, • Old landslide debris, • Significant bowing or leaning trees,or, • Slope sloughing or calving. The above mentioned indicators, or other signs of significant mass wasting on the property or within the general vicinity of the Project were not observed or discovered during research. Indications of past landslides, current unstable slopes, deep-seated slope problems, or surficial slope failures were not observed during the site visit. 1' e~ 4.y v W son Lalw �; i J� 2009 Aerial Photo from Mason County Website Envirotech Engineering Mason Lake,LLC Geological Assessment Ph.360-275-9374 page 4 Parcel 22233-52-00064 Fax:360-2754789 Mason County,Washington January 16,2012 3.0 SUBSURFACE INVESTIGATION Information on subsurface conditions pertaining to the Project was gathered during research and a site reconnaissance. The site visit was accomplished on January 9, 2012 by Michael Staten, geotechnical engineer with Envirotech. Specific information on field methods, sampling, field testing, subsurface conditions, and results from soil testing are presented in this section of the report. Appendix B has pertinent information on subsurface conditions for the Project, including test pit log(s) representative of the site soils, and water well report(s) originating from the subject property and/or nearby properties. 3.1 Field Methods,Sampling and Field Testing Information on subsurface conditions for the Project was accomplished by probing anticipated foundation areas with hand tools, and observing soils within test pit excavations and/ or earth cuts. Information on subsurface conditions also included reviewing geological maps within the Project vicinity, and water well reports originating from nearby properties.No soil samples were collected for this Project. Envirotech measured the relative density of the in-situ soils by gauging the resistance of hand tools. 3.2 Geologic Conditions In general, soils at the project are composed of materials from glacial advances. The geologic conditions as presented in the "Geologic Map of Washington," compiled by J. Eric Schuster, 2002 indicates Quaternary sediments, Qg. Quaternary sediments are generally unconsolidated deposits, and dominantly deposited from glacial drift, including alluvium deposits. This project is located within the Puget Lowland. Typically, "lower tertiary sedimentary rocks unconformably overlie the Crescent Formation."as revealed in the Geologic Map. Initial sedimentary rocks were formed from shales, sandstones and coal deposits from rivers. During the Quaternary period, the Puget Lowland was covered by numerous ice sheets,with the most recent being the Fraser glacier with a peak of approximately 14,000 years ago. Upon the glacial retreat, the landscape was formed by glacial erosion glacial drift deposits. According to the "Geologic Map of the Mason Lake 7.5-minute Quadrangle, Mason County, Washington" by Robert E. Derkey, et al, July 2009, the site soils are described as Vashon advance outwash(Pleistocene),Qge,and provides the following caption: Vashon advance outwash (Pleistocene)—Sand and gravel with lacustrine clay,silt,and sand; Qga gray to light brown;compact;consists of sediment rich in northern-provenance clasts;well rounded and most commonly well sorted;mostly polycrystalline quartz,plutonic,volcanic,and minor metamorphic grains;deposited during Vashon glacial advance;generally more compact than recessional outwash;most easily distinguished from recessional outwash if covered directly by Vashon till;may also contain pre-Vashon sediment at its base. 3.3 Specific Subsurface Conditions The following subsurface conditions are estimated descriptions of the Project subgrade utilizing information from the depth of penetration at all testing, sampling, observed and investigated locations. Soils for this project were described utilizing the Unified Soil Classification System (USCS). Using the USCS in conjunction with estimated relative densities and other anticipated Envirotech Engineering Mason Lake,LLC Geological Assessment Ph.360-275-9374 page 5 Parcel 22233-52-00064 Fax: 360-275-4789 Mason County, Washington January 16,2012 engineering properties of the soil, susceptibility for potential landslides, erosion and seismic hazards may be assessed. The Project is composed of native soils beneath an organic/ soil mixture of about 8 to 12 inches. Competent bearing soils were encountered at 18 inches below the existing native ground surface. However, existing retaining wall fill may be within foundation areas, and is not suitable for bearing. For engineering purposes, these native soils consist of distinguishable layers, as presented below. Soils within the upper 4 feet of natural ground were observed to be moist, brown poorly graded sand with gravel (SP). Soils from 4 to 5 feet below the ground surface were observed to be a relatively impermeable silty clayey sand (SM-SC). This layer with variable amounts of sand and clay are believed to extend to depths of at least 25 feet. This is based on nearby well reports, site geology, and/ or knowledge of the general area. Expanded and specific subsurface descriptions, other than what is provided in this section, are provided in the soil logs located in Appendix B of this report. According to the "Soil Survey of Mason County," by the United States Department of Agriculture, Soil Conservation Service (SCS), the site soils are described as Alderwood gravelly sandy loam, Ab,with 5%- 15% slopes. See the SCS soil profiles in Appendix B of this report. aw V, }�� it 4 �•� Vr T22N N2Vi R•� �11 R]] AW Soil Survey From USDA Natural Resources Conservation Service 3.3.1 Groundwater From the water well report(s)and knowledge of the general area, permanent groundwater is at least 50 feet directly below the property at the building pad location. Surface seepage or perched groundwater at shallow depths was not observed on-site, nor indicated on the well reports. However, some seasonal groundwater is expected to flow directly above the relatively impermeable soils on occasion. Envirotech Engineering Mason Lake, LLC Geological Assessment Ph. 360-275-9374 page 6 Parcel 22233-52-00064 Fax: 360-275-4789 Mason County, Washington January 16,2012 4.0 ENGINEERING CONCLUSIONS The following sections present engineering assessments and conclusions concerning the Project. These conclusions have been made available based on the planned construction activities as outlined in the Introduction Section of this report; general observations of drainage and topography as summarized in the Surface Conditions Section; and, soil conditions that were identified by the field investigation and soils testing as outlined in the Subsurface Investigation Section. Conclusions for the Project that is provided herein, includes pertinent information for landslide,erosion and seismic hazards. 4.1 Landslide Hazards For the planned development, as provided in the Introduction Section, surface and subsurface conditions as presented in this report, it is Envirotech's opinion that the proposed development is not subjected to or cause adverse impacts to a landslide hazard area or its associated buffer or setback as defined in the MCRO. Landslides are natural geologic processes, and structures near slopes possess an inherent risk of adverse settlement, sliding or structural damage due to these processes. Geotechnical-engineering cannot eliminate these risks for any site with sloping grades because gravity is constantly inducing strain on the sloping soil mass. Excessive wet weather and/ or earthquakes will exacerbate these strains. Geotechnical engineering considers excessive wet weather and `design' earthquakes in order to provide an acceptable factor of safety for developing on or near sloping terrain. These factors of safeties are based on engineering standards such as defining engineering properties of the soil,topography,water conditions, seismic acceleration and surcharges. Surface sloughing or other types of surficial slope movements usually do not affect the deep- seated structural capability of the slope. However, excessive and/or repeated surficial slope movements, if not repaired, may represent a threat to the structural integrity of the slope. Maintenance of the slope should be completed if the situation does arise in order to prevent the possibility of further surficial or deep seated slope movements that may be damaging to life or property. According to the Department of Natural Resources (DNR) "LHZ — Final A-1 Map — Landslide Inventory— Mason Watershed, by Sarikhan, et. al., May 2007," previous landslide activity is not recorded near the project. Per the Resource Map from DNR, the Project is not within terrain labeled `highly unstable' or `highly erodible' relating to soils. DNR labeled portions of this project as medium slope instability with relation to slopes. This delineation is primarily dependent upon slopes and convergence. Secondly, lithology and precipitation are modeled within this delineation. In summary, this designation is based on mapping without field observations or knowledge of the specific site geology or soils. A resource map from DNR is provided below: Envirotech Engineering Mason Lake, LLC Geological Assessment Ph.360-275-9374 page 7 Parcel22233-52-00064 Fax: 360-2754789 Mason County, Washington January 16,2012 :8 Q� Project 1701r iJ0�480 1704484 1 1 04400 1 17 64 ♦ 'A A •9%a - k •Y�w Lake :y ._�• 4 AAAAA11 ;y �.j'AAAAAA, 'AAAAAAAA:-- Ty;1A4AAAAAA p AAq _ �T i 348 17 4 1704442 l LJ17 44 tit L 3 Map from Washington State Department of Natural Resources Website 4.1.1 Landslides and Slope Stability Analysis Past landslide activity or high slope instability indicators near the proposed development was not revealed during the Project research. In addition,detrimental landslide activity or potential high landslide indicators were not observed during the site visit as outlined in the Surface and Subsurface Conditions Sections of this report. Therefore,a slope stability analysis was not deemed necessary for this Project. Considering the planned construction as summarized in the Introduction Section of this report; the aforementioned surface and subsurface conditions for the Project; the slope stability assessment provided herein; and the Engineering Conclusions provided later in this report, it is our opinion that the Project is not within a landslide hazard area, and that the proposed site alterations will not encourage a landslide hazard. 4.1.2 Surface and Subsurface Drainage This project does not appear to experience significant subsurface drainage or surface runoff. It is our opinion that groundwater or surface drainage is not a limiting factor for this Project. 4.2 Erosion Hazards Based on the USCS description of the Project soils, the surface soils are considered moderately erodible. According to the Resource Map from the Washington State DNR, as provided above, Envirotech Engineering Mason Lake,LLC Geological Assessment Ph.360-275-9374 page 8 Parcel 22233-52-00064 Fax:360-2754789 Mason County,Washington January 16,2012 the Project is not within terrain labeled `highly erodible.' This Project is not within an erosion hazard area as defined by the MCRO. Erosion hazard areas are those with USDA SCS designations of River Wash (Ra), Coastal Beaches (Cg), Alderwood Gravelly Sandy Loam on slopes 15% or greater (Ac and Ad), Cloquallum Silt Loam on slopes 15% or greater (Cd), Harstine Gravelly Sandy Loam on slopes 15% or greater (Hb), and Kitsap Silt Loam on slopes 15%or greater(Kc). Temporary and/ or permanent erosion control measures may be required for any site when land disturbance is involved. Erosion control will mostly depend on the timeliness of construction, moisture content of the soil,and amount of rainfall during construction. Soil erosion typical to the existing conditions and planned disturbance of this Project include wind-borne silts during dry weather, and sediment transport during prolonged wet weather. Sediment transport of disturbed soils could be from stormwater runoff or tracking off-site with construction equipment. Although an engineered erosion control plan is not warranted for this project, Best Management Practices (BMP's) should be employed during and after construction. Ordinary BMP's includes sit ` fencing,protection of drainage outlets and vegetating denuded areas. Erosion control information and specifications may be found in the applicable "Stormwater Management Manual for Western Washington,"prepared by the Washington State Department of Ecology Water Quality Program. 4.3 Seismic Hazards Soils immediately below the expected foundation depth for this Project are generally Type D, corresponding to the International Building Code (IBC) soil profiles. According to the IBC, the regional seismic zone is 3 for this Project. The estimated peak ground acceleration ranges from 0.50g to 0.60g. This estimation is based on the United States Geological Survey(USGS)National Seismic Hazard Project in which there is an estimated 2% probability of exceedance within the next 50 years. There are no known faults beneath this Project. The nearest Class `A' or 'B' fault to this property is the Tacoma Fault Zone. This fault is a Class `A,` and is located approximately 1.5 miles to the north of the Project. This information is supported by the USGS Quaternary Fault and Fold Database for the United States. The potential for liquefaction and other earthquake induced hazards are believed to be low for this Project. This is based on subsurface conditions such as soil characteristics and the lack of a permanent and substantial shallow water table. Subgrade characteristics that particularly contribute to problems caused by seismic events include submerged and confined, poorly-graded granular soils. Although gravel- and silt-sized soil particles could be problematic, fine and medium grained sands are typically subjected to these types of seismic hazards. 4.4 Other Considerations Conclusions in this report are based on the type and location of the anticipated development, and existing on-site and off-site conditions. Site development that significantly deviates from the anticipated improvements presented in this report may require geotechnical design recommendations. Envirotech Engineering Mason Lake, LLC Geological Assessment Ph. 360-275-9374 page 9 Parcel 22233-52-00064 Fax: 360-275-4789 Mason County, Washington January 16,2012 5.0 CLOSURE Based on the project information and site conditions as presented in this report, it is Envirotech's opinion that additional geotechnical studies are not required to further evaluate this Project. Due to the inherent natural variations of the soil stratification and the nature of the geotechnical subsurface exploration, there is always a possibility that soil conditions encountered during construction are different than those described in this report. Therefore, it is recommended that a qualified engineer observes and documents the constmQtion, or Envirotech is promptly notified if project and su su ace conditions found on-site are not as presented in this r_port so that we can Te-evaluate our recommendations. This report presents a geological/geotechnical assessment, and is intended only for the owner, or owners' representative. Furthermore, this report is only valid for the project information and location described herein. The services described in this report were prepared under the responsible charge of Michael Staten, a professional engineer with Envirotech. Michael Staten has appropriate education and experience in the field of geotechnical engineering in order to assess landslide hazards, earthquake hazards,and general soil mechanics. Please contact Michael Staten at 360-275-9374 if you have any questions, comments, or require additional information. Sincerely, Envirote/ch EEngin�eering 1 fi �7� Michael Staten, P.E. Geotechnical Engineer Envirotech Engineering Mason Lake, LLC Geological Assessment Ph. 360-275-9374 page 10 Parcel 22233-52-00064 Fax:360-2754789 Mason County,Washington January 16,2012 APPENDIX A SITE PLAN EXISTING 2' A BLOCK SCALE 1 INCH = 60 FEET MASON BULKHEAD LAKE 1� 0 c, PR SED H❑US APPRX) O EXISTING 3' F❑U ON AND 3.5' PROBE BLOCK WALLS, CONCRETE PATI❑, EXISTING PAVED DRIVEWAY EXISTING GARAGE g�Tp �T TP1 9 q� PROPOSED DRAINFIELD AREA A, P5 PROPERTY LINE PROJECT/ OWNER/ LOCATION, SINGLE FAMILY PROPERTY GE❑L❑GICAL ASSESSMENT MASON LAKE, LLC 2741 E MASON LAKE DRIVE E PARCEL 22233-52-00064 MASON COUNTY WASHINGTON LEGEND ENGINEER, ENVIROTECH ENGINEERING SLOPE INDICATOR PO BOX 984 HELFAIR, WASHINGTON 98528 360-275-9374 TPI@ TEST PIT SITE PLAN APPENDIX B SOIL INFORMATION Map Unit Description:Alderwood gravelly sandy loam,5 to 15 percent slopes— Mason County,Washington Mason County, Washington Ab—Alderwood gravelly sandy loam, 5 to 15 percent slopes Map Unit Setting Elevation: 50 to 800 feet Mean annual precipitation: 25 to 60 inches Mean annual air temperature:48 to 52 degrees F Frost-free period: 180 to 220 days Map Unit Composition Alderwood and similar soils: 100 percent Description of Alderwood Setting Landform: Moraines Parent material: Basal till with a component of volcanic ash Properties and qualities Slope: 5 to 15 percent Depth to restrictive feature: 24 to 32 inches to dense material Drainage class: Moderately well drained Capacity of the most limiting layer to transmit water(Ksat):Very low to moderately low (0.00 to 0.06 in/hr) Depth to water table:About 18 to 36 inches Frequency of flooding: None Frequency of ponding: None Available water capacity. Very low (about 2.5 inches) Interpretive groups Land capability(nonirrigated):4s Typical profile 0 to 10 inches: Gravelly sandy loam 10 to 28 inches: Very gravelly sandy loam 28 to 60 inches: Gravelly sandy loam Data Source Information Soil Survey Area: Mason County, Washington Survey Area Data: Version 6, Sep 22, 2009 USDA Natural Resources Web Soil Survey 1/12/2012 i1111111iil Conservation Service National Cooperative Soil Survey Page 1 of 1 TEST PIT LOG TEST PIT NUMBER TP-1 PROJECT: SFR Geological Assessment DATE OF LOG: 01/9/2012 PROJECT NO: 1201 LOGGED BY: MCS CLIENT: Mason Lake, LLC EXCAVATOR: N/A LOCATION: Parcel 22233-52-00064 DRILL RIG: None Mason County, Washington ELEVATION: N/A INITIAL DEPTH OF WATER: N/A FINAL DEPTH OF WATER: N/A SOIL STRATA, STANDARD PENETRATION TEST DEPTH SAMPLERS USCS DESCRIPTION LL PI CURVE AND TEST DATA DEPTH N 10 30 50 0 SP Brown, moist, medium dense POORLY GRADED SAND with GRAVEL. Gravel is fine and subrounded. Sand is primarily 1 coarse. Non plastic. 2 3 q . .. .. .. . . . . . .... .... . . . . . SM-SC Brown, moist, dense SILTY CLAYEY SAND with GRAVEL. Low to medium plasticity. Silty clay pockets. 5 Dense sandy 'hardpan.' Excavation terminated at approximately 5.0 feet 6 7 8 9 110 No Groundwater Encountered ENVIROTECH ENGINEERING This information pertains only to this boring and should not be Geotechnical Engineering interpreted as being indicitive of the entire site. File Original end FirstCopy with WATER WELL REPORT Start c•`d"° 218314 f)♦pMnient of Ecology 'y Second Copy—Owner's Copy . UNIQUE WELL I.D.ff Third Copy—Drillers Copy STATE OF WASHINGTON Water Right Parma No. (1) OWNER: N...William Fletcher _ Address Olo n3agruAl c r 4]R >< (2) LOCATION OF WELL: County Mason 34 __ T 22 2W —�'A NW 1i Sea N..R W.M. 30t U M14S11H C L1 /ii/PdPL= r✓/E-r+LJ J.✓1F �t (2e) STREET ADDDRESS OF WELL(or nearest address) &' /Q_[—� �_yl 1 (3) PROPOSED USE: ® Domestic Industrial El Municipal❑ (10) WELL LOG or ABANDONMENT PROCEDURE DESCRIPTION r O Irrigation • ❑ DoWater Test Well ❑ Other ❑ Formation: Describe by color. character, sire of material and structure• and show 1 thickness of o"d•rs and the kind and nature of the material in each stratum penetrated. (4) TYPE OF WORK: Owne"s number of well with at Waal one entry for each change of Information. (it more than one) -- MATERIALFROM To Abandoned❑ New well 7K Method: Dug ❑ Bored ❑ _ - -- - — — - Deepened ❑ Cable ® Driven ❑ Reconditioned ❑ Rotary❑ Jetted ❑ TODit with gravel 0 10 (6) DIMENSIONS: Diameter of well 6 inches. = Drilled 155 feet. Depth of completed well 155 _--ft.. la with-gravel 10 so (6) CONSTRUCTION DETAILS: Blue la with P-ravel & water ... 90 125 Casing Installed: 6 Diam.from 0 it.to 150 ft _ Welded 7�3 Diem.from ft.to ft. Grayclaywith ravel & water 125 150 Liner installed❑ TMeoded El Dism.from ft.to ft. Perforatfons: Yee No Siand gravel-vith 150._ 155 Type of perforator used f SIZE of perforations in.by In. perforations from_—._ ft.to ft. perforations from ft.to ft. perforations from ft.to M. Schenk!: Yee 19 No Manutacturei a Name f o t c t n(t Type stainless wire wrap _ Model No. + Diam. 5"---- Slot size_ 30 —from 150 h.to 155 ft. + Diam. Slot size—from—ft.to ft. Y Gravel packed: Yea No 1A Size of gravel—_— = Gravel placed from ft.to tl. ■ • Surface teal: Yes® No❑ To what depth? 18 ft. Material used In**at Beton7 to Did any strata contain unusable water? Yes❑ No® _ s Type of water? Depth of strata '— Method of sealing*testa off (7) PUMP: Manufacturer's Name GnindfoS s sub. h TYPO: H.P. 11 (8) WATER LEVELS: abnovvesmeann elevation"l ft. ' Static level A 5 11.below top of well Data Artesian pressure ___lbs.per square inch Dale Artesian water is controlled by .heirs,arc. Work started 19. Completed (9) WELL TESTS: Drawdnwn la amovnt water level is towered below stalk:level tg_ Was a pump test msde?Yes r_.- No® If ye*,by whom? WELL CONSTRUCTOR CERTIFICATION: _ Yield: J gal./min.with ft.deswdownafter hre. I constructed and/or accept responsibility for construction of this well, and its compliance with all Washington well construction standards. + _ _ _ _ Materials used and the information reported above ore true to my best S Racovry data(lima takon as zero who pump turned oft)(water level measured knowledge and belief. Z from well top to water level) Time water Level Time wider Level Tres! widert.wel � NAME Davis Drilling (PERSON.FIRM.OR COPPORATION) (TYPE OR PRINT) Address Belfair WA 98528 : ______ - Oat a of leaf (Signed)_ "Cx _/ a License No-_ 1886 Bailm toot 10 gel_/min.with 8 ft.deswdown after 1 Ives. tv GRILLER) Contractor's Airiest gal.i min.with slew set at ft.for hro. Artesian flow pp.m. Dale Neogia) W4SDTa100A Data June tg93 Temperature of water_Was a chemical analysis mode?Yee❑ Noll (USE ADDITIONAL SHEETS IF NECESSARY) ECYG6o-1.20 (10187) -1329 i9•K%•';ic•Y. File Ortpind and Flrsi Copy pith 91yrt card tie. V'�'Q ( �a f� DeperbvwntofEcology WATER WELL REPORT UNIOMWULt).t�- pond CapY 0wTw s Copy STATE OF WASHiNGTON Third Copy—Drillw's Copy tighter Right Penh No.---- _ (1) OWNER: Namery u /0 L i ( LocATION OF wELL: Carry • C Sstx 1N sec 3 T ;�LN.R wa< // 1 (2s) STREET ADDRESS OF WELL(orneere'sfalxiresey 1t t� .[5 ell (a'_ Dr. '4 <xe XX I-1 j � - ' (3) PROPOSED USE. Domestk I p .-,}. �r O (10) WELL LOG or ABANDONMENT PROCEDURE DESCRIPTION ■ ❑ Irrig anon❑ Dewater CAS fn i l " ❑ Formatwr DesaZe by&*Y.cttuarser,ske of material and Mire,and sttoteitlicAness of aquifers r}ii ( G S and ft WA and nahae of lne material to sect,mf vi,peneb-.rted,*%at►sett one entry for each j (4) TYPE OF WORK: Owner's number of well drange of"onnasbn. (If more tt,an one) Abandoned❑ Newwefl �( Method: Dug❑ Borod El MATERIAL m Deepened ❑ Cab�&K Dtirren0 I Rawndtianod El Rotary❑ Jetmd ElS-QL_ RR i (5) DIMENSIONS: Dwnetor of weR Inches. L�l G = Dolled _feet Depot of cwnpleied wel i��.�' ft. C r.Ig- (6) CONSTRUCTION DETAILS: A —T CoWng ktstoned: 6 ' Dorm.from / ft.to R. aC Welded 9 Diam.Rom tL to R Liner installed❑ Threadod ❑ Mam.from —ft.to R. + + perrorotlons: Yen No❑ Type of perforaln read j SIZE of perforations In.by fri _ portorotions from ft.to R. pedonr&x s from ft Io R. + pedoratiorrs from ft.tD ft. Screens: YeqA No❑ Mamrfect+rrerb Name _ /I.Cko K j Type 65 Model W.g��i 'T Diem. slot size + Dlarn. Slot shze from ft.to-ft. SGravel pecked: Yes ❑ No 1K size of gravel = Gravel placed from ft.to n OW UNIT ■ Sutfaee Seel: Yes 5? No❑ To wtW depth?—!—jj ft- Material used in seal r Did any strata Contain un usable water? Yes❑ No Type of water? Depth or 6trata Method of sealing strata off ) : (7) PUMP: MarAacturer'sNpme Type: H.[' D (8) WATER LEVELS: Land-su"amafevatiom WohlrShrhed TM t9 cnrmgleted /N 1�.� t9 above mean sea haves Stack level � � It.below top cf we7 Date Artes*n pressure lbs.per square rndh Data WELL CONSTRUCTOR CERTIFICATION: Artestan water incontroledby I constructed andlor atxept responsibilfty for consnciKn of this well, and its jr,ap w - compliance with all Washington well rAmstniction standard&Materials used and + (9) WELL TESTS: Drawdawn is amount water level is lowered below stark level the information reported above are true to my best knowledge arid ballet. Was a pump Lost mado?Yos❑ No F- If yes,by whom? NAME Yield: gaUmin-with ft.drawdownaRer hf5. RwoIRCORPORPrr (TYPE ori PF*A�' -- Addrm �� e-16Arfjdz 11f144 Al e-14 , L .. / ay e 1 Vmcovwy data(tlrne takers as zero when pump turned of)(wabr level measurod frorn wen (signed) 2 L� LfCertSe t} JC top to water krvei) Time water Level Time water Level Time Water Level Contractors rJeorahen hale L I tlaa of heel (USE ADDITIONAL SHEETS IF NECESSARY) Bailer Gast peL/min.with- �_ft.drawdown aftor Z� tars. Airtost gal./min.with stem set at IL for his. Ecology Is an Equal Opportunity and Aifirmetive Action employer.For spe- Artesian flow g p.m. Date- cial accommodation needs,contact the Water Resources Program at(20s) Temperature of water Was a c hernlrml analysis made? Yes❑ No[RI 407-6600.The TDD number ir,(206)407-6006. ECYOSat-20I%gl$ '1