Loading...
HomeMy WebLinkAboutShoreline Pre-Inspection - SPI Application - 9/4/1990 MASON COUNTY DEPARTMENT of GENERAL SERVICES Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 (206) 427-9670 building environmental health maintenance landfill parks&recreation fair/convention center planning sewer&water September 4, 1990 Tom Cosper 743 Purkey Aberdeen, WA. 98520 RE: Madding Sunny Shore #6, Lot 43 Dear Mr. Cosper, The shoreline pre-inspection which was requested by Roger Denny was conducted by myself on August 22, 1990. Your property at Mason Lake is designated as Urban Residential in the Mason County Shoreline Master Program. The proposal involves replacing the existing mobile home with a two story residence in the same location. The existing mobile home may be continued and repaired in it 's present location. New construction and replacement requires a setback determined by drawing an imaginary line between the roof lines of adjacent residences. This imaginary line would run diagonally through a portion of your mobile home and possibly behind it. By taking the north roof line of the brown house to the north of you and drawing a line over to the furthest projection toward the water of the blue house to the south of you, a setback line would be established. This would mean that the proposed residence needs to be set back at a greater distance than the mobile home. Therefore, to replace the mobile home with either a one-story or two-story residence at this time is not possible with just a building permit because it is inconsistent with the Mason County Shoreline Master Program regulations. An approved Shoreline Variance would be required for a building permit to be issued. I have enclosed a copy of the Shoreline Variance Chapter from the Master Program. I have also enclosed an application form and environmental checklist. All of the Variance criteria must be met in order for a Variance Permit to be approved. The five criteria stated on page 94- Variances must be adequately addressed for the review of the application. The decision is ultimately up to the Mason County Commissioners and the State Department of Ecology. The procedure is outlined in the enclosed shoreline permit process. The time to process the request is approximately four to five months. If you have any further questions, please give me a call at the number above. Thank you. Sincerely, !'c e Miller, 2 race Planner DEPT. OF GENERAL SERVICES GM/encls. cc: Roger Denny ' MASON COUNTY DEPARTMENT of GENERAL SERVICES Mason County Bldg. III 426 W.Cedar P.O. Box 186 Shelton, Washington 98584 (206) 427-9670 building environmental health fire marshal[ parks & recreation fair/convention center planning September 12 , 1991 Tom Cosper 7433 Purkey Aberdeen, WA 98520 RE: Setback of new residence - lot 43 . Dear Mr. Cosper: At your request, I conducted a site inspection on September 11, 1991 to re-evaluate the shoreline setback required for the proposed new residence on lot 43 , Maddings Sunny Shore Addition #6 . The setback which you are proposing is hereby approved for the construction of a new residence. This does not constitute the granting of a Variance by the Planning Department. A Variance cannot be granted by the Planning Department for shoreline setbacks . The County Commissioners make that decision. A Variance is not required for the placement of a residence 15 ' landward of the existing mobile home on the site. This setback is consistent with the shoreline setback using the common or imaginary line. During my site inspection I considered the residence on lot 45 , to the north of Mr. Giesy and Mr. Geisy' s residence on lot 44 . I then drew an average setback between them and the residence to the south of your property or lot 42 . Therefore, your proposal is consistent with the Mason County Shoreline Master Program and does not require a Variance. Please submit your building permit application forms, 2 sets of structural drawings, site plan to my office when available so that I may further process your permit through the Planning Department . Thank you. Sincerely, Grace Miller, Planner DEPT. OF COMMUNITY DEVELOPMENT cc: Roger Denny James Giesy August 23, 1991 Mason County Department of Public Works Shelton, Wa. Dear Grace; This letter is in regards to the home that I would like to build on Mason Lake, Mading' s Sunny Slope Addition #6, lot 44. I was informed by your office that I will have to build my home approx. 20' further back from it' s present location. I would hope that after you read this letter that you will grant me a variance to build on or near the present location. I have had preliminary plans drawn for the home to be built approx. 15' back of it's present site. The deck on the front of the new house would extend out to the frontof the home on lot 42. If I had to build any further back I would lose a lot of view of the lake. I also would be looking mostly at the side and rear portion of the home next to me on lot 42. The slope of our lot rises very steeply to the rear of our present home and this would add a great deal of expense to construction. A good portion of our present site is already excavated. I have talked with Jim Giesy, the neighbor that owns lot 44, and have explainedto him my intentions for construction. We have both sat down and discussed the proposed building site and home, and both agree that the present site is suitable to the both of us. I thank you for your time and hope that our concerns meet to your approval . It is in hopes that I may be granted this variance without having to wait for the 120 day process. I would like to get the lot prep started before the rainy seasons. Thanks Again. Sincerely, Tom Cosper August 21 1991 Mason County Department of Public Works Shelton , Washington Attention : Grace I am writing this letter in regard to the proposed home that is going to be built by Tom Cosper on Mason Lake , Lot 43 of Mading ' s Sunny Shore Addition #6 . I own the home on lot 44 . Tom and I have discussed the location site and have looked over the preliminary plans of his new home. We have mutually agreed that it is in our best interest to have the new home built in the same general location that it is presently in . The county inspector has determined that the new home should be set back 20 ' or more due to line of sight obstruction . I am opposed to this proposal due to the fact that the two homes would be too close together and I would have less view of the lake than I do now. If the home were to be built on the current site , I will be able to look over the top of the home and we would both have a more open feeling . Therefore I am giving my approval for a variance to allow Tom to build the new home on the site of his existing home . If you have any questions , please feel free to contact me . Sincerely , James E . Giesy 6020 Highlands Parkwa No . 121 Tacoma , Wa . 98406 752-4219 BUILDING PERMIT APPLICATION MASON COUNTY DEPARTMENT of GENERAL SERVICES qd P.O. BOX 186 SHELTON, WASHINGTON 98584 427-9670 DATE ISS Q PERMIT NO. NAME MAILADDRESS CITY&STATE ZIP PHONE OWNER G COM -71VS DIRECTIONS _ TO JOB SITE W Zti Z 1 1bA5on/ L,C 04 -A-S?-F er aAl LOFT PARCEL LEGAL NUMBER 2 Z DESCR. *0//Va/j(11VA / IoT- -13 NAME MAIL ADDRESS CITY&STATE LICENSE NO. ZIP PHONE CONTRACTOR "Ou DE71/A/� F/'7�i/ I7A)" LR4 F, C174,4VItV /)FUNYti//9L �/ZC 7 USE OF BUILDING CLASS OF NEW ADDITION ALTERATION REPAIR MOVE REMOVE WORK r I I n DESCRIBE WORK S TQ 64116b Z S f," 2CS/IJ EW�6E� �A/ rrE //�/��' / /�/'� UJAAv% LvC.a a CrSIT/'�C MUB/4L- BEDROOMS DECKS YORN CARPORT NOTICE TOTAL SQ.FT. DECK GARAGE SEPARATE PERMITS ARE REQUIRED FOR PLUMBING, HEATING, VENTILATING OR AIR BATHROOMS TOTAL SQ.FT. TOTAL SQ.FT. CONDITIONING. NO.OF STORIES BASEMENT Y OR N THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT LIVING AREA BASEMENT COMMENCED WITHIN 180 SAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR TOTAL SQ.FT. TOTAL SQ.FT. CHECK ONE ABANDONED FORA PERIOD OF 180 DAYS AT ANYTIME AFTER WORK IS COMMENCED. PERMANENT FIREPLACE ATTACHED SEASONAL SHORELINE DETACHED OWNERS AFFIDAVIT CONTRACTORS AFFIDAVIT I CERTIFY THAT I AM EXEMPT FROM THE REQUIREMENTS OF THE CONTRACTORS I CERTIFY THAT I AM A CURRENTLY REGISTERED CONTRACTOR IN THE STATE OF REGISTRATION LAW RCW 18.27, AND AM AWARE OF THE MASON COUNTY ORDINANCE WASHINGTON AND I AM AWARE OF THE ORDINANCE REQUIREMENTS REGULATING THE REQUIREMENTS FOR WHICH THIS PERMIT IS ISSUED AND THAT ALL WORK DONE WILL BE WORK FOR WHICH THE PERMIT IS ISSUED AND ALL WORK DONE WILL BE IN IN CONFORMANCE THEREWITH. NO CHANGES SHALL BE MADE WITHOUT FIRST CONFORMANCE THEREWITH.NO CHANGES SHALL BE MADE WITHOUT FIRST OBTAINING OBTAINING APPROVAL FROM THE BUILDING DEPARTMENT. APPROVAL FROM THE BUILDING DEPARTMENT. XOWNER DATE XBY '�-� __ DATE /O FOR OFFICE USE ONLY DEPARTMENT APPROVED DEPARTMENT APPROVED BUILDING VALUATION YES NO YES NO HEALTH PUBLIC WORKS FEE PLANNING FIRE BUILDING PERMIT D.O.T. BUILDING PLAN CHECK SPEgKL C NDITIONS BUILDING GROUP PRE-INSPECTION 17-1Pw� C�� SHORELINE WOODSTOVE PLUMBING MECHANICAL STATE BUILDING FEE STATE SURCHARGE APPLICATION ACCEPTED BY PLANS CHECK BY APPROVED FOR ISSUANCE I PERMIT VALIDATION TOTAL BY CASH CK MO