Loading...
HomeMy WebLinkAboutBLD2024-01492 DEMO - BLD Inspections - 2/7/2025 INSPECTION CARD Mason County 615 W. Alder St. Building 8, Shelton, WA 98584 / 360-427-9670 ext 352 ) www.masoncountywa.gov 4v V� PERMIT# BLD2024-01492 PROJECT ADDRESS 661 E RASOR RD BELFAIR, WA 98528 PARCEL# 122067690704 PROJECT DESCRIPTION DEMOLISH EXISTING HOME OWNER BLAKE KATHLEEN ADDRESS P O BOX 2115 PHONE CONTRACTOR SOUTH SHORE CONSTRUCTION ADDRESS PO BOX 963 PHONE 1.360.275.0818 CONTRACTOR LICENSE SOUTHSCO16NL LENDER INSPECTION INSP I DATE Comments INSPECTION INSP DATE Comments Connection is to be verified by 1,90 12-1-2ADemolition Final Inspection Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov B DD2024-01492 DEMO PROJECT DESCRIPTION: DEMOLISH EXISTING HOME ISSUED: 12/19/2024 SITE ADDRESS: 661 E RASOR RD BELFAIR EXPIRES: 06/17/2025 PARCEL: 122067690704 APPLICANT: RICHARD MOORE* OWNER: BLAKE KATHLEEN PO BOX 963 P 0 BOX 2115 BELFAIR,WA 98528 BELFAIR, WA 98528 360-509-1342- Rich GENERAL CONTRACTOR'S LICENSE: SOUTH SHORE CONSTRUCTION License: SOUTHSCO16NL PO BOX 963 Expires: 02/10/2026 BELFAIR,WA 98528 1.360.275.0818 FEES: Paid Due State Fee-Residential $6.50 $0.00 Demolition Fee $131.00 $0.00 Technology Flat Convenience $5.00 $0.00 Fee Totals : $142.50 $0.00 REQUIRED INSPECTIONS Connection is to be verified by Health or Utilities Demolition Final Inspection CONDITIONS The demolition and disposal of demolition debris must meet requirements as per Mason County regulations. it is unlawful for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos containing materials have been removed from the area to be demolished. work shall not commence on an asbestos project or demolition unless the owner or operator has obtained written approval from ORCAA @ 2490 B Limited Lane NW, Olympia WA 98502, 360-586-1044, 800-422-5623,www.orcaa.org Printed by:Brittany King on:12/20/2024 08:57 AM Page 1 of 2 „r w Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov DEMO BLD2024-01492 * Proper erosion and sediment control practices must be used on the construction site and adjacent areas to prevent upland sediments from entering the aquatic environment. Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent soil from being carried into surface water by stormwater runoff.Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of state regulations. Any work in or adjacent to waterways that will adversely affect water quality must receive specific prior authorization from the Department of Ecology. Silt fencing, straw matting, etc. must be installed and maintained until seeding or upland vegetation has become established around all areas disturbed or newly created by construction activities. * The Washington State Clean Air Act prohibits the burning of any construction or demolition debris in an outdoor fire. * All other necessary permits from Mason County, Washington State, Federal Agencies, and/or other agencies/groups that are required for this proposed development and construction must be obtained PRIOR TO DEVELOPMENT AND CONSTRUCTION. ” All construction debris must be removed from the site after project completion to an approved location. Proper disposal of construction debris must be on land in such a manner that debris cannot enter or cause water quality degradation of aquatic environments. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * For public safety, it is the responsibility of the applicant to confirm through written verification all utility services (electric, gas,water, sewer, ...) have been terminated prior to demolishing a structure. --- _____________ _ -------------------------------------------------- * OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/ cal law regulating construction or the performance of construction. Issued B Contractor or Authorized A nt: ���-�1���� Date: Printed by:Brittany King on:12/20/2024 08:57 AM Page 2 of 2