HomeMy WebLinkAboutBLD2001-01280 Cancelled Demo - BLD Permit / Conditions - 2/5/2003 ' Inspection Line (360)427-7262
MASON COUNTY DEPT. OF COMMUNITY Phone: (360)427-9670, ext. 352
DEVELOPMENT
Mason County Bldg. 3 426 W. Cedar P.O. Box 186
t Shelton, WA 98584
RESIDENTIAL BUILDING PERMIT BLD2001-01280
OWNER: DALE KRAMP
CONTRACTOR: RECEIVED: 12/14/2001
SITE ADDRESS: 2411 E MASON LAKE DR E GRAPEVIEW ISSUED: 12/26/2001
PARCEL NUMBER: 222335200036 EXPIRES: 6/26/2002
LEGAL DESCRIPTION: MADINGS SUNNY SHORE ADD#6 TR 36
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
DEMOLISH OLD CABIN PERMIT
NULL & VOID BY EXPIRATION
DATE 5.03 BY k�
General Information Construction & Occupancy Information Square Footage Information
No. of Bedrooms: Type of Constr.:
Type of Use: SF Insp. Area: No. of Bathrooms: Occ. Group: Lot Size: Deck:
Type of Work: DEM Fire Dist.: 5 No. of Stories: Occ. Load: Building:
Valuation: Building Height: Occ. Status: Basement:
Manufactured Home Information Setback Information Shoreline & Planning Information
Make: Length: Ft. Front: Ft. Shoreline: Ft. Water Body:
Rear: Ft. Slope: Ft. SEPA?:
Model: Width: Ft. Side 1: Ft. Shoreline Desig.:
Year: Serial No.: Side 2: Ft. Comp. Plan Desi .:
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Demolition Fee R1 R 19nannn rcq nn c;Rnao
Building State Fee RI R 1911a19nn c;Rnza
Total $46.50
BLD2001-01280 Please refer to the following pages for conditions of this permit. 1 of 3
CASE NOTES FOR
BLD2001-01280
CONDITIONS FOR
BLD2001-01280
1) In accordance with the Uniform Building Code, all sites shall have approved numbers or addresses located in such a position as to be plainly visible and
legible from the street or road fronting the property. Mason County Building Department requires that this be completed prior to calling for any site
inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the Uniform Building Code will be assessed if the owner and/or
contractor fail to post the address on site prior to requesting inspections.
X_
2) Demolition actitvities must conform with all State and local County regulations as a condition to the issuance of this permit. The applicant/owner is directed
to conatct Olympic Air Pollution Control Authority at (360)438-8768 or 1-800-422-5623 extension 104 prior to the commencing demolition.
X U,.-:—--r
3) THE DEMOLITION AND DISPOSAL OF DEMOLITION DEBRIS MUST MEET REQUIREMENTS AS PER MASON COUNTY REGULATIONS.
X
4) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circ
umstances beyond the control of the permit
holder have prevent
ed ed action from being taken. No more than one extension may be granted.
X 4_$:;_2 _
5) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason County ordinances and building regulations.
X �� _{ �
6) Applicant shall contact Fire Marshall Dave Salzer at (360)427-7535 regarding the necessary permits for the training fire. Approval of demolition permit
does NOT constitute approval to burn building. x U
7) All upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt
fencing or straw matting). X(� 2-1
8) Temporary erosion control measures must be implemented to prevent water quality degradation of adjacent waters or wetlands. Silt fencing must be
installed and maintained until upland vegetation has become established. X f� 15-c�
9) All construction and demolition debris must be removed from the beach after project completion. Proper disposal of construction debris must be on land
in such a manner that debris cannot enter or cause water quality de redation of State waters. X
BLD2001-01280 Please refer to the following pages for conditions of this permit. 2 of 3
f �
10) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered. X
This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of
180 days at anytime after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be
approved before building can be occupied.
OWNER OR AGENT: �` - ---"�,� DATE:
BLD2001-01280 Please refer to the following pages for conditions of this permit. 3 of 3
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Found Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Attic
Groundwork date by
date b
WALLBOARD NAILING
D.W.V. date by
date by
FINAL Line NAL INSPECTION
date by date by date by
I�
J �
<
A
,
J
PERMIT NO.: F4P zoo/
MASON COUNTY OI�80
DEMOLITION PERMIT APPLICATION
426 W.Cedar/P.O.Box 186,Shelton,WA 98584
Shelton 360 427-9670 Belfair 360 2754467 Elma 360 482-5269 Seattle 206 464-6968
APPLICANT INFORMATION CONTRACTOR INFORMATION
Owner Oo4 , /C"gyp Contractor Name
Mailing Address f ✓-%sou ut_ L, Mailing Address
Cityj 1,441 State 1M Zip Code 8 `4 City t Zip Code
Phone( )�_jz;t Other Ph.( ) 42ro-3Lz8 Ph.L) O er Ph.(
Lien/Title Holder Contractor Reg. # _
Address Expiration
PARCEL INFORMATION-12 digit Tax Parcel No. Fire District
Legal Descriptionk
'Ag1 I VA/ ab
Site Address(includ street n me and city '
Directions to site: C L
Is your roperty within 200' of the following: Body of Water(Name) C7►�1 1 Saltwater
Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or
Bluffs If your project is located adjacent to or within an area that is listed above, it is advisable to contact the Dept.
of Community Development regarding future development prior to demolition; since removal of an existing structure could
affect future building locations.
How will the debris be disposed of?
�1r2G �)s�rI c I rfc157
What is the use of the building being demolished?_Cw(fit n
NOTICE: THIS PERMIT BECOMES NULL&VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF
CONSTRUCTION WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER THE WORK IS COMMENCED.
PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. The owner or agent on owner's behalf,represents that the
information provided is accurate and grants employees of Mason County access to the above described property and structures for review and
inspection of this project. Acknowledgment of such is by signature below:
OWNER AFFIDAVIT-I certify that I am exempt from the requirements of CONTRACTOR'S AFFIDAVIT-I certify that I am currently registered as a
the Contractor Registration Law RCW 18.27 and am aware of the contractor in the State of Washington and that I am aware of the
ordinance requirements for which this permit is issued and that all work ordinance requirements regulating the work for which this permit is issued
will be done in conformance therewith. No changes shall be made without and all work shall be done in conformance therewith. No changes shall
first obtaining approval, be made without first obtaining approval.
X Date�2` ' 0/ X Date
Provide a plot plan indicatin loc tion of il�nµr.ovements and structure to be demolished.
C)
CA-R t +�
A /-)d A-0 x 2-0
C/� i e5 � �p•�S � �
`off
5
0 FOR OFFICIAL USE BEYOND THIS POINT
Accepted by 54%1 Date I N61 Submittal Amount Due Receipt No. 5x o3
DEPARTMENTAL REVIEW APPROVED DF
ik
CONDITION CODES
Building Department _Occ Gr T e of Const. L I r��11 t lz u;) IE—
Planning Department
Fire Marshal �/�
t i O� f CT
L.
FEES
Building Permit Fee 1 Other ,q
Violation Fee '1 Other ✓
Site Inspection Pre-Paid at Submittal ( )
F»: TOTAL EES
1