HomeMy WebLinkAboutBLD2024-01500 Mechanical - BLD Inspections - 1/30/2025 INSPECTION CARD
Mason County
k l; 615 W. Alder St.
Building 8, Shelton, WA 98584
360-427-9670 ext 352 "Y/
www.masoncountywa.gov
�V
PERMIT# BLD2024-01500 PROJECT ADDRESS 23900 N US HIGHWAY 101 HOODSPORT, WA 98548
PARCEL# 422132270080 PROJECT DESCRIPTION New ductless heat pumps
OWNER LEMKE CAMILLE L ADDRESS P O BOX 896 PHONE
CONTRACTOR DALEY ELECTRIC LLC ADDRESS PO BOX 268 PHONE 360.888.7667
CONTRACTOR LICENSE DALEYEL881JE LENDER
INSPECTION INSP DATE Comments INSPECTION INSP DATE T Comments
Mechanical/Plumbing Final : !/301 Y7
it k7�AL Is CL-V4C� 410,)V ���
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
B DD2024-01500 MECH/PLUMB - RESIDENTIAL
PROJECT DESCRIPTION: NEW DUCTLESS HEAT PUMPS ISSUED: 01/28/2025
SITE ADDRESS: 23900 N US HIGHWAY 101 HOODSPORT
EXPIRES: 07/27/2025
PARCEL: 422132270080
APPLICANT: Daley, Robert OWNER: LEMKE CAMILLE L
PO Box 268 P 0 BOX 896
Shelton,WA 98584 HOODSPORT,WA 98548
360-888-7667
GENERAL CONTRACTOR'S LICENSE: DALEY ELECTRIC LLC License: DALEYEL881JE
PO BOX 268 Expires: 04/05/2026
SHELTON,WA 98584
360.888.7667
FEES: Paid Due
State Fee-Residential $6.50 $0.00
Mechanical Fees $38.00 $0.00
Mechanical Base Fee $30.00 $0.00
Final Inspection $97.00 $0.00
Technology Flat Convenience $5.00 $0.00
Fee
Totals : $176.50 $0.00
FIXTURES
Qty Mechanical Fixtures
2.0000 Ductless Heat Pump
REQUIRED INSPECTIONS
Mechanical/Plumbing Final Inspection
CONDITIONS
Printed by:Brittany King on:01/29/2025 09:04 AM
Page 1 of 4
Mason County
Development
Mason County - Division of Community W. Alder St.
4
,• Building 8
Shelton,WA 98584
360-427-9670 ext 3
52 www.masoncountywa 9ov
UMB - RESIDENTIAL BLD2024-01500
MECHIPL Building Department prior to
roved by Mason County al property
inspection performed and approved
will be documented in the legalprp
* All building permits shall have a final insp inspection or to obtain aPP ordinances and buildingregulations.
iration.The failure to request a final insp liant with Mason County and Olympic Region Clean Air Agency
permitexp as being no
disposal of debris must meet the regulations of Mason County
records on file with Mason County structure unless all asbestos
* Thedemolition and disp of any
n an
( person to cause or allow the demolition(or major renovation)
ORCIW). royal from ORCCA.2490 B
moved from the area to be demolished.
appWorroval shall not commence o
It is urbwful for any p operator has obtai
contaisng materials have been runless the owner or .4 orcaa.org
asbesbs project or demolition project the WA State Dept of Labor and Industries,
Olympia WA 98502,360.586.1044 1 800.422.5623 www.
Limited Lane NW, liabilities to the homeowner for using an
governed under RCW 18.27 and enforced by person signing this condition is either
* Contactor registration laws are g potential risks and monetary The p
Contractor Compliance Division.There are p to WA state law. The Building
contractor. Further information iste ed otntracdtortaccording 7 098 inspection activity is performed.permit
unregictered c rior to per
the homeowner, agent for the owner or a reg or 180 days after the last inspe
* mits expire 180 days after permit issuance,s u on the receipt of a written extension evented action from being
All per and the control of the permit holder p
Officialmay grant one or more extension of 180 day P requirements as
expiralon. Letter must indicate that circumstances bey and permitted
taken. Occupancy is limited to the approved
II local and state ordinances in addition to the International Codes re
excee
* All instruction must mee r)county and the State of Washington-
adopted result in permit revocation.
and amended by roved change of use or occupancy
tion. Any non-approved structures,which must meet setbackconditions. Please check your
classifca um s are permit
* By definition, propane tanks and heatp P result in a stop work order or p
owners legal representative, or
�� d Site Plan"to ensure these structures meet
of in:
info information may clare that I ari)the owner, obtained
Apprae es submission
. I have o The
* OWNER 1 BUILDER cement of such is by signature below. erm t and to do the work asproposed arding this project.
revocation• Acknowledglare that I am ement parties of interest reg
an easement holder or p rants employees of Mason County
contractor. I further decnecessary parties,including iv Y his provided is accurate andThis permitlapplication be
null &
permission from all the ection ended for a period of
agent represents that the informatiofo review and inspection.
ownerer authorized ag and structure(s) s or if construction work is suspended
IT
accessto the above described property THERWISE APPROVED.
ed construction is not commenced within 180 day O
IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERM
void if Tod or authorized post private road signs in accordance
180 days. PROOF OF CONTINUATION LI WOR urchase and p P
OF 180 DAYS WILL INVALIDATE THE a ePs la d�oO P UNLESS
APPLICATION responsible to post the assigned ad
*with
MlI 1 Agent is rCopde 14.28 and 14.17.
on County CORRECTED AS REQUIRED PER MASON COUNTY BUILDINGAll
with Mes13E Building Department.* COI6TRUCTAN PROCESS
ADOPTED BUILDING CODE by the Mason County adopted by Mason County. Any
DEPARMENT AND ermined project is subject a inspectionsprior to requesting
The crnstruction of the p Mason County Building Inspector shall be made
constrction must be
in conformance, the international codes as amended an a oN
correckins,changes or alterations required by a
additiml inspections. revent flotation. Flood proofing can be
itysystems(• protection,or other measures,areas of epetitive
interior and exterior of the structure .
* Theiaterior unit shall be elevated and secured o P component p
* Corr�iance is required for protection of utelevation, relocation, resistance.This is key component protection am
achlevd using several measures including rove flood damage
roaches can be used to improve
two key methods:elevation and comp
partial#rotection. Different app elevation required greater than the Base flood elevation or three feet
low-lead flooding.The principles of these measures apply rior to the clearing, grading or excavation for elevations.
lished at elevations higher than the el erformed p
can beaccomp grade See flood survey P
abovehe highest adjacent g page
Printed b)rBrmany King on:o112912025 09:04 AM
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
MECH/PLUMB - RESIDENTIAL BLD2024-01500
This property has been identified in a FEMA(AE) Flood Hazard Area. SUBSTANTIAL IMPROVEMENT as defined in the
2021 International Building Code is any repair, reconstruction, rehabilitation, alteration, addition or other improvement of a
building or structure, the cost of which equals or exceeds 50 percent of the market value of the structure BEFORE the
improvement or repair is started. If the structure has sustained substantial damage, any repairs are considered substantial
improvement regardless of the actual repair work performed. The term does not, however, include either:
1. Any project for improvement of a building to correct existing health, sanitary or safety code violations identified by the
building and that are the minimum necessary to assure safe living conditions.
2, Any alteration of a historic structure provided that the alteration will not preclude the structure's continued designation as a
historic structure.
When Substantial Development has been determined future work including such items as change of use, additions,
alterations, and repairs are subject to the requirements of the 2021 International Existing Building Code and 2021
International Building Code Section 1612.
Mason County Flood Prevention Ordinance definition (MCC 14.22.040):
"Substantial improvement" means any repair,reconstruction, or improvement of a structure, taking place DURING A TEN-
YEAR PERIOD, in which the cumulative cost equals or exceeds fifty percent of the market value of the structure either:
(1) Before the improvement or repair is started, or
(2) If the structure has been damaged and is being restored before the damage occurred. For this definition "substantial
improvement" is considered to occur when the first alteration of any wall, ceiling, floor, or other structural part of the building
commences, whether that alteration affects the external dimensions of the structure.
This term includes structures which have incurred "repetitive loss"or"substantial damage" regardless of the actual amount
of repair work performed.
The term does not, however, include either:
(1)Any project for improvement of a structure to comply with existing state or local health, sanitary, or safety code
specifications which have been identified by the local code enforcement official, and which was in existence prior to the
damage event or improvement, and which are solely necessary to assure safe living conditions, or
(2)Any alteration of a structure listed on the National Register of Historic Places or a State Inventory of Historic Places.
All future work will be evaluated at the time and by scope and value.
Printed by:Brittany King on:01/29/2025 09:04 AM
Page 3 of 4
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncoun"a.gov
MECH/PLUMB - RESIDENTIAL BLD2024-01500
" To perform an inspection the Mason County Building Inspector will need to access the interior of the structure. An
electrical permit completed and approved by Washington State Labor& Industries must be available on-site during the
inspection.
The Mason County Building Inspector will inspect the following: Verify that the system is installed in accordance with
manufacturer specifications;The inspector will check to make sure that the exterior unit is permanently installed and
supported, the exterior unit complies with required setbacks to property lines, fuel tanks are located at least 10-ft from the
system, a source of ignition,all exterior penetrations are properly sealed,condensate lines are installed and are properly
supported, including proper material, slope, and that the condensate line terminates to a proper location outside of the
foundation, copper refrigerant lines are insulated with '/2°thick continuous closed-cell foam insulation or better, indoor units
are located at least 3-ft from smoke and carbon monoxide alarms,and that modifications made to the structure, to install the
unit, does not affect existing structural members.
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other st�te/local law regulating construction or the performance of construction.
Issued B .
Contractor or Authorized Agent: �`n ��1. GL Date:
Printed by:Brittany King on:01/29/2025 09:04 AM
Page 4 of 4