Loading...
HomeMy WebLinkAboutSEP96-00263 Metal Bldg - SEP Determinations - 10/30/1996 SEP96-0263 MASON COUNTY F60 DEPARTMENT OF COMMUNITY DEVELOPMENT Planning-Landfill-Utilities DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-340) Description of Proposal : CONSTRUCT 20, 000 SQ FT METAL BIIILDING FOR PLANER MILL, TO REPLACE PREVIOUS 12, 000 SQ FT BIIILDING IN SAME LOCATION. Proponent: SKOOKUM LUMBER COMPANY Location of Proposal : W 780 STATE ROUTE 108 SHELTON PARCEL#:419243100020 TR 2 NE SW N OF R.R.R/W EXIT HWY 101 AT S.R. 108, PROCEED WEST ON S.R. 108 APPROX 1 MILE, LOOK FOR SKOOKUM LUMBER SIGN ON NORTH SIDE OF ROAD. FOLLOW GRAVEL ROAD TO SITE. Lead Agency: MASON COUNTY The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43 .21C. 030 (2) (c) . This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. Please contact [7A-Yh. ?JET1''— 0-VM m 1 N4-at ext. with any questions . This DNS is issued under 197-11-340 (2) , the Lead Agency will not act on this proposal for 15 days from the date below. Comments must be submitted by 11/13/96 . DATE: 10/30/96 Signatur esponsible official Date Responsible Official : Gary Yando Director of Community Development 426 W. Cedar, PO BOX 578 Shelton, WA 98584 (3 60) 427-967 0 NON_SIG, rev: 08/23/96 I -DN R, SCE L'A-x I N 1? 1�� ; � nca���rn U �'c7�v• �� 8; �2 w N j�lr !S z72lC,� l 'P�-1G�t�l T �, GI I�� C�JC�-• Tom{ A�1 T f�c�l1N�T7 'R0/09/1996 18:54 3603527638 DELSUN LUMBER GU rE;Ut Uj it LEGAL DESCRIPTION The Southeast quarter (SE 1/4) of the Northwest quarter (NW 1/4) ; AND, all those portions of the South half (E 1/2) of the Northeast quarter (NE 1/4) , the Northeast quarter (NE 1/4) of the South-vest quarter (SDI 1/14) and the Northwest quarter (NW 1/4) of the Northwest quarter (NW 1/4) of the southeast qucx-t.cr (sE 1/4) which lie Northerly of the Northwest boundary of the , Vorthern Pacific Railroad Company (now Burlington Northern Railroad Company) right- of-way, all in Section twentyfour (?,4) , Township Ili'leteCIi (1.9) North, Range four (4) Hest, W.M. TOGETHER WITH a rion_exclusivc easement, 30 feet iii width, ,for road and utility purposes, the centerline of which is -the centerline of an existing road which runs in a Northwesterly direction from 6econdary State llighuay No. 106 (formerly Highway Nu. 9-D) to the above described land, over and across that portion of section twe.ntyfour (24) , Township nineteen (19) North, Range four (4) West, W.H. , lying Northerly of said Highway No, lob and southerly of the Northern Pacific Railroad (now Burlington Northern Railroad Company) right-of-way, as described in instrument recorded August 11, 1972, Auditor`s rile No. 271895, and as anenoea by instrument recorded September 23, 1975, Auditor 's File 11o. 306640. ALSO, TOGETHER WITH and SUBJECT TO a non-excltsive easement for ingress, egress and public utilities, over, under and across an existing road as noW establi6hed and in use over and across the south half (S 1/2) of the Northeast quarter (NE 1/4) of Section tw•entyfour (24) , Township nineteen (19) North, Range four (4) West, W.M. , AND over and across all that portion of the Northwest quarter (Nw 1/4) of section nineteen (19) , Township nineteen (19) North, Range three (3) West, N.M. , lying Northerly and 11esterly of State Highway No. 108, EXCEPTING therefrom the North 1100 feet thereof . MASON COUNTY ;� EC E I V E D ENVIRONMENTAL CHECKLIST OCT 9 - 1996 Purpose of Checklist: �,�rrl}� EI �;� � I ��TECR���IL ►i` ,��" "sorn - The State Environmental Policy Act (SEPA), chapter 43.21 C RCW, requires all _E. governmental agencies to consider the environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. Instructions for Applicants: This environmental checklist asks you to describe some basic information about your proposal. Governmental agencies use this checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best description you can. You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or if a question does not apply to your proposal, write "do not know" or "does not apply". Complete answers to the questions now may avoid unnecessary delays later. Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if you can. If you have problems, the governmental agencies ran assist you. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Use of Checklist for Non-project Proposals: Complete this checklist for non-project proposals, even though questions may be answered "does not apply". IN ADDITION, complete the SUPPLEMENTAL ACTIONS (part D). There is a $105.00 fee required for the processing of the checklist. Please make your check payable to "Mason County Treasurer." 0 For non-project actions, the references in the checklist to the w}� rbjec�t , Do "property ,. „p p .. , propRS, „' IJJ6 applicant", andor site should be read as ro osal , "affected geographic area", respectively. ''� 4FALTH .(,;FRVIrFr' art Eleven—Chapter 197-11 SEPA Rules 1p WAC 197-11-960 Environmental checklist. , ENVIRONMENTAL CHECKLIST purpose of Checklist: The State Environmental Policy Act (SEPA), chapter 43.21C RCW, requires all governmental agencies to consider \ the environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the quality of the environment. The purpose of .his checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. Instructions for Applicants: This environmental checklist asks you to describe some basic information about your proposal. Governmental agen- cies use this checklist to determine whether the environmental impacts of your proposal are significant, requiring JJ preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best de- scription you can. You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or if a question does not apply to your proposal, write 'do not know' or 'does not ap- ply'. Complete answers to the questions now may avoid unnecessary delays later. Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer -tse questions if you can. if you have problems, the governmental agencies can assist you. he checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on _.;ferent parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional in- formation reasonably related to determining if there may be significant adverse impact. Use of checklist for nonprojcct proposals: Complete this checklist for nonproject proposals, even though questions may be answered 'does not apply.' IN AD- w-moN, complete the SUPPLEMENTAL SHEET FOR NONPROJECT AcnoNs (part D). For nonproject actions, the references in the checklist to the words 'project,' 'applicant.' and 'property or site' should be read as 'proposal,* "proposer.* and 'affected geographic area.' respectively. A. BACKGROUND I. Name of proposed project, if applicable: Skookum Lumber Company Vehicle Washrack 2_ Name of applicant:Jerome W. Morrissette & Associates Inc. , P.S. 3. Address and phone number of applicant and contact person: CONTACT: Doug Eklund 1700 Cooper Point Rd SW, Olympia, WA 98502 (360) 352-9456 4. Date checklist1;y7yaFgg: 5. Agency requesting checklist: Mason County Department of Community Development 6. Proposed timing or schedule (including phasing, if applicable): Permit intake on or about 11/4/96 7. Do you have any plans for future additions, expansion, or further activity re!ated to or connected with this proposal? If yes, explain. Future placement of above ground fuel tank [Q. 19-7-11 --9 401 SEPA Rules Part Eleven-197-11-960 %8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. None 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal'? If yes, explain. NO 10. List any government approvals or permits that will be needed for your proposal, if known. None 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There arc several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific infor- mation on project description.) Demolish existing oil storage shed (160s.f. ) , construct concrete vehicle washrack, washrack holding tank, oil water separator, oil storage building (3200 s.f.) , and concrete slab for future placement of above ground fuel tank at existing site. 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your pro- posed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the sitc(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you arc not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. Project Location: 700 nest Highway 108, Shelton, WA, see attached sheet for section, town- ship, range map legal, site plan, vicinity and topo maps with plan set. TO BC COMPL11TF.D RY APPLICANT EVALUATION FOR AGENCY USE ONLY B. ENVIRONMENTAL CLEMENTS 1. Earth a. General description of the site (circle one): Flat, rolling, hilly, steep slopes, mountainous, other Site for washrack is flat. Surrounding area hilly/rolling b. What is the steepest slope on the site (approximate percent slope)'.' Adjacent to washrack limited length 1:1 slopes [CIL 197-11 —p dil Part E3even-197-11-960 SEPA Rules TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY c. What general types of soils are found on the site (for example, clay, sand, gravel, peat. muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. Sandy gravel d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. NO e. Describe the purpose, type, and approximate quantities of any filling or grading pro- posed. Indicate source of fill. Fill required to level washrack and approach oil storage offsite pit. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. None anticipated since site is currently paved and gravelled. g. About what percent of the site will be coverrld with impervious surfaces after project construction (for example, asphalt or buildings)? ncrease itl impervious area less than 5,000 s.f. h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: None required since site slopes to existing log yard. 2. Air a. What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. No clearing of vegetation is required. No site burning is required. Construction equipment will be moderate source of odors b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. NO c. Proposed measures to reduce or contro l of emissions or other impacts to air, if any: NONE 10h. 197-11 II� SEPA Rules Part Eleven-197-11-960 -TO BE COMPLL•TED BY APPLICANT EVALUATION FOR 3. Water AGI':NCY USE ONLY a. Surface- 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)'? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. Little Skookum Creek located approximately 700 ft. plus or minus south of project site. Un-named tributary to Little Skookum Creek located approximately 70 ft North- east of project. 2) Will the project require any work over, in, or adjacent to (within 200 feet) the: described waters? If yes, please describe and attach available plans. Yes, see attached plan. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. In- dicate the source of fill material. None 4) Will the proposal require surfacc water withdrawals or diversions? Give general dc- scription, purpose, and approximate quantities if known. No 5) Does the proposal Iic within a 100-year Roodplain? if so, note location on the site plan. No 6) Does the proposal involve any discharges of waste materials to surface waters? if so, describe the type of waste and anticipated volume of discharge. No b. Ground: 1) Will ground water be withdrawn, or wiN water be discharged to ground water*! Give general description, purpose, and approximate quantities if known. Washwater will initially be supplied from existing water system. Thereafter, wash water will be recycled. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage: industrial, containing the following chemicals . . .: agricultural: ctc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) arc expected to serve. None 1Ch- 19-1-1I -p 431 Part Eleven-197-11-960 SEPA Rules TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY c. Water Runoff (including storm water): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. Source concrete washrack slab 2) Could waste materials enter ground or surface waters? if so, generally describe. NO d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: oa escing oft water sep rator for washrack runoff, of ing tank for washract wash water. 4. Plants of Check or circle types of vegetation found on the site: _ deciduous tree: alder, maple, aspen, other x evergreen tree: fir, cedar, pine, other Site is paved/gravelled surrounding area has types x shrubs native noted. x grass _ pasture _ crop or grain _ wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other _ water plants: water lily, celgrass, milfoil, other _ other types of vegetation b. What kind and amount of vegetation will be removed or altered? None c. List threatened or endangered species known to be on or near the site. None d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: None 5. Animals a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: birds: hawk, heron, eagle, songbirds, other: . . . . . . . ... . . . . . . . . . . . . . . . . . . . ... . mammals: deer. bear, elk, beaver, other: fish: bass, salmon, trout, herring, shellfish, other: . . . . . . . . . . .. . . . . . . . . . . . . . . . . b. List any threatened or endangered species known to be on or near the site. None ICI. 197-11 —9 441 Muic� i'ari r_ic.en—iv, i i—you TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY LSF ONLY c. Is the site part or a migration route'' Ir so, explain. NO d. Proposed measures to preserve or enhance wildlife, it any: None 6. Energy and Natural Resources a. What kinds or energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for hcuting, manu- racturing, ctc. Electric/gasoline for pressure washer b. Would your project arrcct the potential use or solar energy by adjacent properties'. I so, generally describe. No c. What kinds or energy conservation rcatures are included in the plans or this proposal'.' List other proposed measures to reduce or control energy impacts, if any: None 7. Environmental Health a. Arc there anv environmental health hazards, including exposure to toxic chemicals, risk or fire and explosion, spill, or hazardous waste, that could occur as a result or this proposal? Ir so, describe. None 1) Describe special emergency services that might be required. None ?) Proposed measures to reduce or control environmental health hazards, it any: None b. Noise 1) What types or noise c.xist in the arcu which may arrcct your project (for example: traffic, equipment, operation, other)'' None ?) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)'' Indi- cate what hours noise would come from the site. Short term - construction noise Long term - monthly pressure washer noise _ Ict,. 197_1 t —p l51 l Part Eleven--197-11-960 SEPA Rules TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY 3) Proposed measures to reduce or control noise impacts, if any: None 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties? Site: Sawmill operations Adjacent: Forest/Agricultural b. Has the site been used for agriculture? If so, describe. No c. Describe any structures on the site. Wood frame shed w/galvanized steel sheeting d. Will any structures be demolished? If so, what? Wood frame shed with galvanized steel sheeting e. What is the current zoning classification of the site? Rural area f. What is the current comprehensive plan designation of the site? Rural land g. If applicable, what is the current shoreline master program designation of the site? Does not apply h. Has any part of the site been classified as an 'environmentally sensitive' area? If so, specify. No i. Approximately how many people would reside or work in the completed project? One part time j. Approximately how many people would the completed project displace? None k. Proposed measures to avoid or reduce displacement impacts, if any: None 1. Proposed measures to ensure the proposal is compatible with existing and projected (and uses and plans, if any: None (Ch. I97-11 -q"I SEPA Rules Part Eleven—197-11-960 TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY 9. Housing a. Approximately how many units would be provided, if any'? Indicate whether high, mid. dle, or low—income housing. None b. Approximately how many units, if any, would be eliminated'? Indicate whether high, middle, or low—income housing. None c. Proposed measures to reduce or control housing impacts, if any: None 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas: what is the principal exterior building material(s) proposed? 12 Feet, enameled steel b. What views in the immediate vicinity would be altered or obstructed? None c. Proposed measures to reduce or control aesthetic impacts, if any: None 11. Light and Clare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? None b. Could light or glare from the finished project be a safety hazard or interfere with views? No c. What existing off—situ sources of light or glare may affect your proposal? None d. Proposed measures to reduce or control light and glare impacts, if any: None 12. Recreation a. What designated and informal recreational opportunitie., arc in the immediate vicinity'? None b. Would the proposed project displace any existing recreational uses? If so, describe. NO (Ch. 197-11 —9 a71 Part Eleven-197-11-960 SEPA Rules TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY c. Proposed measures to reduce or control impacts on recreation, including recreation op- portunities to be provided by the project or applicant, if any: None 13. Historic and Cultural Preservation a. Are there any places or objects listed on, or proposed for, national, state, or local preser- vation registers known to be on or next to the site? If so, generally describe. None b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. None c. Proposed measures to reduce or control impacts, if any: None 14. Transportation a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if any. Access to site via gravel road to State Route 108 b. Is site currently served by public transit? If not, what is the approximate distance to the nearest transit stop? No. Distance to highway approximately .5 miles c. How many parking spaces would the completed project have? How many would the project eliminate? None provided, none elimiated d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). NO e. Will the project use (or occur in the immediate vicinity oo water, rail, or air transporta- tion? If so, generally describe. NO f. How many vehicular trips per day would be generated by the completed project? If known. indicate when peak volumes would occur. NONE (CIL 197-11 - p 481 SEPA Rules Part Eleven-197-11-960 TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY g. Proposed measures to reduce or control transportation impacts, if any: None 15. Public Services a. Would the project result in an increased need for public services (for example: fire pro- tection, police protection, health care, schools, other)'? If so, generally describe. No increase in need b. Proposed measures to reduce or control direct impacts on public services, if any. 16. Utilities LCSC—r-v--, a. Cir cle utilities currently available at the site: electricity, natural gas, water cruicc, c cphonc, sanitary scwcr, optic system, other. b. Describe the utilities that are proposed for the project, the utility providing the service, and the gencrai construction activities on the site or in the immediate vicinity which might be needed. Electric supplied by PUD#3 C. SIGNATURE The above answers are true and complete to the best or my knowledge. I understand that the lead agency is re�yi�g on them to a its cision. Signature: . . . . . .}.)).�i 4z.�'1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Date Submitted: . . . • . ,November 4, 1996. . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . (OL 197-11 -9 491 Part Eleren--197-11-960 SEPA Rules TO BE MPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY D. SUPPLE. NTAL SHEET FOR NONPROJECT ACTIONS (do not use this sheet for project actions) Because these questions are very general, it may be helpful to read them in conjunction with the list of the elements of the environment. When answering these questions, be aware of the extent the proposal, or the.types of activities likely to result from the proposal, would affect the item at a greater intensity or at a faster rate than if the proposal were not implemented. Respond briefly and in general teens. 1. How would the proposal be likely to increase discharge to water; emissions to air: pro- duction, storage, or release of toxic or-hazardous substances; or production of noise? Proposed measures to avoid or reduce such increases are: 2. How would the proposal be likely to affect plants, animals, fish, or marine life? Proposed measures to protect or conserve plants, animals, fish, or marine life are: 3. How would the proposal be likely to deplete energy or natural resources? Proposed measures to protect or conserve energy and natural resources are: 4. How would the proposal be likely to use or affect environmentally sensitive areas or ar- eas designated (or eligible or under study) for governinental protection; such as parks, wil- derness, wild and scenic rivers, threatened or endangered species habitat, historic or cultural sites, wetlands, floodplains, or prime farmlands? Proposed measures to protect such resources or to avoid or reduce impacts are: 5. How would the proposal be likely to affect land and shoreline use, including whether it would allow or encourage land or shoreline uses incompatible with existing plans'? lCbL t 97-11 —9 501 10/09/1996 18:54 3603527638 DELSON LUMBER CO PAGE 03 LEGAL DESCRIPTION The Southeast quarter (sE 1/4) of the Northwest quarter (NW 1/4) ; p.ND, all those portions of the South half (E 1/2)' of the Northeast quarter (NE 1/4) , the Northeast quarter (NE 1/4) of the Southwest quarter ('SW 1/4) and the Northwest quarter (Nil 1/4) of the Northwest quarter (NW 1./4) of the southeast qucrt-cr (SE 1/4) which lie Northerly of the Northwest boundary of the * Northern Pacific Railroad Company (ncv Burlington Northern Railroad Company) right- of-way, all .in Section twentyfour (24) , Township nineteec; (19) North, Range four (4) West, W.M. ToGErHE.R WITH a rion-exclusi.vc ease=cnt, 30 feet in width, for road and utility purposes, the centerline of which is -the centerline of an existing road which runs in a Northwesterly direction from Secondary state Highwmy No. los (formerly Highwav Nu. 9-D) to the above described land, over and across that portion of Section t` e-ntyfour (24) , Township nineteen (19) North, Range four (4) West, W.M. , lying Northerly of said Highway No. 1os and Southerly of the Northern Pacific Railroad (now Burlington Northern Railroad Company) right-of-way, as described in instrument recorded August 11, 1972 , Rudltot`s File No. 271995, and as anendea by instrument recorded September 23, 1975, Auditors File 11o, 306640 . ALzo, TOGET= WITH and SUBJECT TO a non-exclusive easement for ingress, egress and public utilities, over, under and across an existing road as now established and in use over and across the South halt (S 1/2) of the Northeast quarter (NE 1/4) of Section twentyfour (24) , Township nineteen (19) North, Range four (4) West, W.M. , AND over and across all that portion of the Northwest quarter (NW 1/4) of section nineteen (19) , Township nineteen (19) North, Range three (3) West, K.M. , lying Northerly and J-7esterly of State Highway No. 108, EXCEPTING therefrom the 2dorth 1100 feet thereof . 10/e9/1996 1e: 54 3603527638 DELSON LUMBER CO PAGE 02 Sec. 24 Twp. 19 N. pl. 4 County of MASON SCAlK t u.C--600 FCC? ....................... ......... .. ......... ...... ...................... .................... ....................... ...................... ...................... 41/7 41 Privati access rD:add---, ...................... ...................... . ...... ............. . ........... ...... e/cess Northerri>Pacific 1 ai Private ... ..... ........... ........ ........................................... . .... .. .... .. ..... ... ... .... ................ ......... .................................. gamil�he Road Little Skookup Creek ............ ........... ...................... ...................... ........... ........ ................... ....................... ..... ........... LI j4 P kum 11,Tbar Ccn�any mUl site lease area-__ VI el j2=571 -��� F� �� �---pc.--�-c.��1 �,P`��•U tom. - __ —01ROJEC_T_.LOCAT1flR— ._ . F E 'S O sue: . t dan i ....FOR. 16 ( Wi1s(ow 1l , ; 7 aBell Nr. s�curc�snsN. [,don 90 „41.„r�N� IioAy �Yi ._�� ��11, � 'rr I M rcer nd Cam, •. u.nu ' ' i hog c■ Glliwaup ! hard Tukwi Rent( r—c BOB H��.u�R�[as ,w i t.. /Vaslgn. `✓' �r�ci�\n as fw•.., �tM�ir 10 O i NofRlandy a l0 -or ' I Park o+ 1, NATIONAL � — —� 3 �e5 Kent ��. C lies w tk.. ' y (/_i Potlatch ��n�n ::e+ � ) 302 o r-Molnes Oa.. I F ORE S. '. ,o union - Alm �.-., _/: - r :` r/ 13 f� -? ( ' I !+ e 5 I `20 t06 S Cn r . o er 7 C'i�v a� ry u rn t,f Y� I M A S OI` W O' A Y Si LMatbct �.ti...:i 102 2 F ' � \ — o t I Daft 1� 'Io r , 5 8 " 6 '•� ��1 3 Su�nne� I c t T / � I .o+ uyallup 1� S eil oom r 3 Bonney �'R B R: i ;� kart, :1 1/�v,\ C }2 . 7 I ( Lak 108 I AFA.101 — -- — d r — 8 n ti 7"Du Pont ` 8 Orting� ! - •' =� ,/t`� ary �Er+s 507• ,� ; Elma' 161 befd �►• lsabop 6 1' s ,.,.rs«,.�e cam., ' .n e s, 3 � T 12 11` 10 a- Malone 610 P h� MIIQ •0�•� porter I :`Y m •3 Aldrerr„ ..., . iGs ,tol $ Mebor.rte I .as P I E R r 12 I Lklferodc 'j Pk— o Nanr.,w T ok i T1 10 Inier tus«Tn Ceduv3e I Oakvil� 121 7 ' Tenlno 14��M RI ' Ea 607 ~ %4-,M Dw Alder °� o.... aOcoda U R T O Fan Ta+o R p 7 Ebe L` 51-5 LANOUVH PHILLIPs /n•' (St' ` �• ♦ C. 4~ ULN I it R HAR ! y < ` BURNS X Cyr 1110No y 4. 0! 14 LOcrcr5W U Z y r a(�x+ �r F o • o f '�' ���(ti �5. 4oA3 op ► _ .A•C DELTA SIMPSON T9R' y x MPSON TIMBER. \CO. � Ec o- *� a j}� 0 5 O D C.O. . ` 0.. H r fDS4 4 )TICK UD5EN RYAN RD. LAY U 4 o I 4 SIM44 R. CO. F�. uc.� � IH o 0 \e\ CIARENC KAOOUN ` V [3EPS10wL .Cr?� 0 � e E so 7r[tis � 39.5 c.L y0 V sws[ �0 Grave i �*Q�. CAN Pith���� AM0( a �.�a ♦ I 51MPI50 R. Co. ROer. HILL P` �!. `� Olt NMPSON TIMBER CO. o. NCH Tay c r s wul ittY yf GRAB KW-LC)IIE ° I 1a t L rArloR .INv. co., `( 0 U/77 IMMILC rk " 0 INV CO. C -my 31. Borrow srq� t c� o 0 Pit ' P. O• 11, F DONAL ram• C m 5LAKEIY I j N 4 13 3e. CO. Simi, TIMBER CO. MVN V7 SI TIM6 — —38.4L OIL CC v I o 4.) lM JUSTIN IND ►N ? ` ��,o `�.s M1 C r TAYLOR�j RE Rv F Z CIELSON CO. o 1 or oT r CLE AKY Y to JR,v I t J 5IMPSON Co. `�+r a .� 23WuY t O \I N. O y ��1� I. P 17C ow a ® 38.36 I n • w 0. rrrr �.7 UI INC. \ 7 STIN V7 1 it ?v O ♦ L 3 '•� TAY LOR � 71TT .�J2 A.KLLLLY F A V y4,y PORT BLN LY Lt0 KfCaG: M CD.t� S Q TONR 3e.3e I MIL R O G �1 1 M R. .I� WA.6E5 JQ•. I GD. 1 co. H. C♦R0. �c G TRUSTEE JY- C, a� KRAI Ll1A ri 1y 9 It 4 M/JNKf is H. WICK L. LOVEGREEN c0 SIMOSON r •04 C00.1NG. 1S3f R TOR. RELLER I L7 C'm CO. JOLLJR �I N WµDRI K. st.5KOOKUM VA1 eDr: ' LI TL � +t .Iy TLANITL�D CC o W RD uQT�y c T ss. o (Sl01NG) w P .1 5KOOKU Q �LIDI ' C Ei �°° / ILLER VPJ.I.�' 4URLiY f- •�f'� 2 6 TA LLO dT g 36.so Q r/y N& O L.fr 7373 r uHITED ARNOLD STOEHR O� A.1 LOVEGRECN a ; INC, a�[ S. C UY� P I NEIL M°DONALD 3e.54 5IMP50N sTOHR TOR.CO NE1L M°OONALD 1 A. / 38.74I S7bNR ,I LL e T Me LD s — — r 41.0o T< I ' 39.Io ��ct` TAYLOR u" LAN I COI I UNITED 11 �'Oa MC t 5CHOOL 04ST NO.309 hid�/ 36 3 . 6 31 l L� G 'Aa. s L 1i 11 NI�D co,nywj o fi - unit oi5 • LJnJ� Daly IC/1 yccM }aaj U� aFO�$ :661 -r-r---ry Puo �.iTolt :ca,nog r� .w;>>�o� •r•,-:.. •.i,J- �f OZ i O - Jamos WJOIS __."__ I , .;3c '�.`- + f•^�`.-_...•^- oIougsoJddy &Jo .r.% : x 1 Tf tuoA000-I puO suosuourd :DIoN lr^^"'. �-".N.r' d:ji�IItM •\ 1 �a / 1 Di/f 1 9;tiDJ.^.la / l_l_'Ylcylai b9 -Yb�d9T1t � f' ! It, cr .m A } j t� A �c:.i:�j i �• r n i CUM.", Z:2 ♦♦\ j j�td►��.a�r�Vb-���d1uc.".c�1!°G i. ab:,icyg � ? �aoJJ ` `^�, f 1 -'T 7�I' �'tt i♦ l? S 1 ..a° Ja ; {{ :r ��'-�r_�� 1.�. '..."'...�--•...�-_��rrr/// r� f / ��'.�tt/�'rPG+QY _ � JOB9$ lo'f� �VH ':.'rJlfz R..:MSv Cr..l cl OY 1 r l� ti.',:•.1 �"e�'7 S // e/o5OJ�5 rl� f It �,1� = f1miq U , '. 1V np L !`��. jf:w•�.ay� oC':�cP. j F „1. un ri'S somiaad• M ® '- wN IMI leant )S s]i� -.. •.. '�..." Y r Ro0Mla� PG%Lw"1 wmpa 5 :rAMOS oat o omos WAIS — • ycog iPlo'J a ulna ! } oiou;!X"dV ono t^ ! t c suopo"I Puo euolsua++hd aION ram../ �•�.-�dl:'.5 .�� i � 950�.^.la i — ��"%�.-,•^" ""' � '� f vtN�'ti ��^ j �._ ✓ � +siinr�S � ti � i; 1 i ray.5-.;�gjo ! { � r _ a�3+� GC't i»;i � � � ri li•`J��} ; � � (`1 L ti�;1 J�jGt Fula 40 � j t f � ��T1 i �:ut.•i �-----`,air Aolh oar+ r , ,` ��� Sott B:ri==.?S 'i j c �. . � �"•l / a5cs75 1 \ r ���� � pry f LT' )1) itooq U ocxt; 7 fj u",ols urywA 1 5 1,0/09/1996 18:54 3603527638 DELSON LUMBER CO PAGE 02 Sec. 24 Twp. 19 N. R. 4 w. County of MASON sc.ir i omc"-eoo iccr i .............................................. . �.................... .......... . ....Q;....,................. / Private access r ad _..__...... _.. ,r .. .00, i. ... f T; to Northern Pacific ai Private cess _ ............. ... l ................... _.. _..... '14cCleary - Kamil :he Road Little Skookui Creek ............................. ....................... ........../r --�+ +--- "---� Sknokt= Imlhear Cenpany - mill site lease area^ a�v�✓��1�' Z S ( c�,c.: ..�-�c 1 yt �S 1/44 oar l { ice+�H O Z Id n „9. L05 c �+ wt r"O e3 �ql OWUI . L tZl a�l!^'ie0aeprJ rind*;UWA UUi o �' .ny 1 I 4a,luww+xw c 6+ad Zl • ,{ tpunovi 2I I ci ' zoc w AKL� a w I Japod s�., ca s 1 ( � k �- �I !! I lgt '�� ` - 4..v.£ K U v `�""3 woos I s r g •ewe dogesNj • 13 pJN . g, L05 ej \� l�od oar A -- -- --• . l 41+Q 8 5 •rev g 4 u �, 1�:: .��� Sot zl i .'`+' ate-.- (auuVI o r L -k Z7 ( I r u r_ dnileArr .o: wom • � '`` 9 � njb1�, Nam"• % I c � � ;s� 'iF �. - :'•i•; .. �+�'.;•�::.a>�i.'f:+Yfpv'f;,: 8 \ o ( wo r.'x y�• )PopeW I > d i.S !i 90L A d zO •A•! S `3 W tz £ 9 O S v ICI I ;� ' I �� r i U.1 n 4M�eH�!� " t� L sy,r� got v� a. v V /� /; � ;, v6yy �u°ijn '� J .�+ t.sa a o.e i �a J�;ua� ' SauioyyJ i�_ g 01•-zoe p�; e(nye .! yo7ep�od I ivrtoi'tv)A wiw M 01 _ V �puewio o I 01 *A * la s :i„Lw;.,� as �i'u„AvI J >4Ua n N ^/ 00£ +` dnewll!1 —ri Vi iw� ss3t ti'n'� i7 pow �V+ 1� /�\ r"^.���.-�• 21 •Z. \e; !^^�I 1. n eu 'I � •rn X:, v,•r: 1 ' i l�"fS`TN7L1i1111M { I -". ). ;•�r`4, IOoH uoPl3 „s�isoyn�f it .y i ® 06 svoo In IlaiNO�SU ) 9l ?RS MOdy gib+•j.S' 1 ue I1 t'*P-^ s w 9 ^^S �liuosoa fsANCA0011AA -SIB11 N1 'y'e'tr_4 41ek S-*w .1610 Area q S!arogt Mar. Yard ;a;At:s 1-Uld '40c flog Fuel eafive Are, Ok Ou M'�n P d Pand 4 Oriing Kin I WeL, Dom, )L tit=gl Arno W-at Log Yl;fd iil!r :um!w it Lvinbvr c eek Note: Dimensions and Locations are Approximate Catch Bosin Storm Sewer CAAV*rt 0 120 0 t Sure.: Walker and Aj"cefej. 1992 Scale in Feet S%ookum Cu;ebcr C-7%9-y _ ®� Wost Nil A(" Figure SR* Eton - r.%ralmage Features A � �y� u' lU/UW 1�7o 10:04 JOUJJL(IJ JIJ u� +v• ��•• -- LEGAL DESCRIPTION The Southeast quarter (SE 3/4) of the Northeast quarter (NW 1/4) ; pND, all those portions of the South half (E 1/2) of the Nort2]aast quarter (NE 1/4) , the Northeast quarter (NE 1/4). of the Southwest quarter (SW 1/4) and the Northwest quarter (NV2 1/4) of the Korthwest quarter (NW 1/4) of the Southeast quert.er (SE 1/4) which lie Northerly of the Northwest boundary of the • Northern Pacific Railroad company (now Burlington Northern Railroad Company) right- of-way, all •in Section twentyfour (24) , Township nineteci: (19) North, Range four (4) nest, W.M. TOGETHER WITH a zion-exclusive easement, 30 feet iri width, for road and utility purposes, the centerline of which is -the centerline of an existing road which runs in a Northwesterly direction from Secondary State HighVmy No. 108 (formerly Highway NQ. 9-D) to the above described land, over and across that portion of Section twentyfour (24) , Township nineteen (19) North, Range four (4) West, W.M. , lying Northerly of said Highway No. 108 atd Southerly of the Northern Pacific Railroad (now Burlington Northern Railroad company) right-of-way, as described in instrument recorded August 11, 1-072, Ax:Ldltorls File No. 27le95, and as amended by instrument recorded September 23, 1975, Auditor's File No. 306640. AI,SO, TOGETHER WITH and SM&JBCT TO a non-exclusive easement for ingress, egress and public utilities, over, under and across an existing road as now established and in use over and across the south half (S 1/2) of the Northeast quarter (NE 1/4) of Section twentyfour (24) , Tosrnship nineteen (19) North, Range four (4) West, N.M. , AND over and across all that portion of the Northwest quarter (NW I f 4) of section nineeteen (19) , Township nineteen (19) North, Range three (3) West, N.M. , lying Northerly and Westerly of state Highway No. log, EXCEPTING therefrom the North 1100 feet thereof. i ,t l Vtl*ic�n f Station Z O" L j Hasa peek 1 n Crelt Arita YVI Storage Area r�� f SCt:t'r g Etas fmodA rea Crook 5tartge i LLJ Fs 1 ' Siarrge t P d Dalurt€cr i y_ f 9v3dl+t=, I { Pond t e ortibn l:ltr t 1 j t !:rrt er i [ ! ( ; Y:vE tog Ycic"sofzrf y kao pry y R2r ' ' S it J, d l- •� f i Stcuugi tyrrbw. t Arear•- t i 8u3eir� ! I .xt`,d �' --•- `� Note pimsnaioea and loeotlons x'rnate a Catch 9e1ln 1 �y:a ✓e=' J / ___.— Storm Sever p 120 Scole in Feet t ��'�'.•fa;=rf; „i Sown: lfolker a nd 1992 S%,.kwn limber C-""y FiSur! im ..i' ='�'� 2u•4 Wut Mal Nye « ® sit* ten •feetoraf • r i r`,,� ^:T.+�'� — tXul�a �I 117/13W 1J7b lb:04 Sec. 24 -Twp. 19 N. �. 4 W- County of MASON fGwL:[ t lftC"-$0 Fl2T i .................... . j. ................... .......... . ....oi•••.�...:.. ....... Privateja ad r ............_....... f J i Northern Pacific ai Private cess ................ _ ............. ... .. .......,.,..... .t ..... , ,.. ... .---. _.... McClea - Kamilche Road Little Skooku Creek site lease area Sknoknn IAnter daany mill ___ L co awLLIP5 1L tJ F Y,i e 1 - -yr c I" H. NAR E z In ,cT G l!� Ij( . BU S 4 yJ IL ZZ ! <t0>L 37 � O[ Lor.RTSW 7 V 00 Q� �5 40.I3 o ° DELTA K � SlnnpsoN TBR. MPSON TIMBER. \\CO. i.0�^!�E� o- *A +� 0 5 O D C0 ' R. r' "so- RD. 3LtY Q VDSCN N � RYAN RO V i� 39.ss1, SIMP5ON R. CO. 3 I Au INC.. CLAIRENC KAOOUNEAEPTIO �,li CNKVNAN 1vC�'O CQ Lo 1TERS J �.5 C.L �O zw'sa Graver I �Q Q. CANPit � I ro r'7 5IMPl50 R. C'0. 54MPSON TIMBERYINERY CO. B ' C TBR GS g NLH W —� IDWEAU K-M-LCNIC 9.a r C TAYIOR .INV. CQ I K 0 um K.MILC oR c INV CQ 39. sorrow—A �� y�� p �' • o• F F DONAL r . 0ci F` RR_8r)1O 3bq va.e l F PO - BLAKELY a MILL C 4 13 3e. M. r 3 �` sIMF' TIMBER co. l MUN V) SI TIM6 CO. - —38.42I r. A La K o La 0 SWusxIN ISLAND z 1 T ` s 3 M TAY�V 0 AN F J d •� � AkI T-N D7=.L50N CO. CLEµY R~n JR. „ If 51MPSON Co. 'y loc J N W � � 1 Ylo o 38.36 O 7. P? INT d ►ITT O NC ' USTIN M. y. rlLAU _3 .� TAY LOR. V) PITT �J2 A.KCLLEY ]]]] F Ii. A. `VV S7T' STOHR 38.3R PORT BLA LY P LID KE.G6� D.iJ. ,yam- 0 GOM6>L MIL TBR. R. I Co. 1 -� GO. N. CARR MFI` tiv V0AGE9 Jo- wLj TRUSTEE .JP Gr' c� t' tr KRATCC.IIA *> 4 MANNE As If R N wICA c�•�x L LOVEGREEN ° SIMPSON Q aR LBR. NC ENE/t r�, TBR. t �• CO.I " RELLER c0. �I\ © N 'WAyDRF N. \t.SKOOKUM V'AL. cc 22 t F F' o LI TL 4� I ITnAYLO W R� , 9 � 55.�0 `i " (SIDING) P� SKOOKU 4r LD� C y` •a �' �'� W IILER VAl-(- yURIEY A I- J � 3eED.5 Q ry LONG O L. y UNIT ARNOLD STOENR 0 U, A, LOVEGREEN ING STOHR a s w ` cur°`� a ; 1yQ 3E.54I P NEIL M°DONALD 51mpsow STONR 0 tBR.CO" �' \ k NEIL M•DONALD 1 A. 39.74 I STDnR IrPaL. ? T Me LD — — 0f4Q- r 47.00 T. LAN CO 39.10I ,��tl` TAYLOR ur ' UNITED I I IW' i NAG. SC NOOL DIST. N0.309 Z —•���tE I / '� 4 TAYL� }Q e .•���fj. / / 388Z 31.461. ` �1�Ut�IIfiEDurnol ` �� MASON COUNTY ECEIVEE) ENVIRONMENTAL CHECKLIST OCT 9 — 1996 Purpose of Checklist: '?.�.►:�h<�+�"�� , �a ... f ,.�_. s�� ffRi1C TEChI�C1_CC�s�•':.,'` ��ornE,uias� The State Environmental Policy Act (SEPA), chapter 43.21 C RCW, requires all governmental agencies to consider the environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. Instructions for Applicants: This environmental checklist asks you to describe some basic information about your proposal. Governmental agencies use this checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best description you can. You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or if a question does not apply to your proposal, write "do not know" or "does not apply". Complete answers to the questions now may avoid unnecessary delays later. Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if you can. If you have problems, the governmental agencies can assist you. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Use of Checklist for Non-project Proposals: Complete this checklist for non-project proposals, even though questions may be answered "does not apply". IN ADDITION, complete the SUPPLEMENTAL ACTIONS (part D). There is a $105.00 fee required for the processing of the checklist. Please make your check payable to "Mason County Treasurer." MjQeC , 0TNFor non-project actions, the references in the checklist to the w� r "property ,. „p P , propgsb96 "applicant", andor site should be read as ro osal { affected geographic area", respectively. +r-AI TH �/IF