HomeMy WebLinkAboutBLD2003-00950 Cancelled Propane - BLD Permit / Conditions - 8/30/2006 Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352
Mason County Bldg. 3 426 W. Cedar P.O. Box 186
Shelton, WA 98584
MECHANICAL PERMIT BLD2003-00950
OWNER: MARY ANN, WEAVER RECEIVED: 7/11/2003
CONTRACTOR: LICENSE: EXP:
SITE ADDRESS: 2291 NE TAHUYA RIVER RD TAHUYA ISSUED: 7/11/2003EXPIRES: 1/11/2004
PARCEL NUMBER: 322132300080
LEGAL DESCRIPTION: W 320' OF S1/2 SW NW S OF R/W 2291 NE TAHUYA RIVER RD TAHUYA
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
INSTALL PROPANE TAHUYA RIVER RD
PERMIT
47
NUS VOICE BY EXPIRATION
f "" BY �.
General Information Mechanical Fixtures �"2ES"—
3
Type Qty. Type By Date Amount Receipt
Type of Work: MEC Fire Dist.: 3
Type of Use: MH Insp. Area: Gas Outlets 1 Mechanical Base Fee NJP 7/11/2003 $23.50 S22003
Propane Tank 1 Mechanical Fee NJP 7/11/2003 $21.30 S22003
Total $44.80
BLD2003-00950 Please referto the following pages for conditions of this permit. 1 of 3
CASE NOTES FOR
BLD2003-00950
CONDITIONS FOR
BLD2003-00950
1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance
Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
X 800-647-0982. The
e n signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
/ 1-4
2) In accordance with the Uniform Building Code, all sites shall have approved numbers or addresses located in such a position as to be plainly visible and
legible from the street or road fronting the property. Mason County Building Department requires that this be completed prior to calling for any site
inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the Uniform Building Code will be assessed if the owner and/or
contractor fail to ost the ad ress on site prior to requesting inspections.
3) ,All construction must meet or exceed all local ordinances and the 1997 Uniform Building Code requirements as adopted and amended by Mason County
and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would
result in permit revocati n.
4) The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the Uniform Codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
Inspector shall be made prior to requesting additional inspections.
5) All propane tanks must be installed in accordance with the Uniform Fire Code and all applicable Mason County ordinances. All propane tanks filled on
site must be located a minimum of 10'from any possible source of ignition (electrical outlets, electrical fixtures, compressors, etc), mechanical system
air intake (direct vent appliance,ventilation air intake, etc), and/or any weeds, grass, brush, trash or any other similar combustible materials. Propane
tanks less than 125 gallons must also be located a minimum of 5'from any building opening (foundation vents, windows, doors etc), property line or
X easement.��r�e tank is exposed to probable vehicular damage, protective bollards must be installed.
6) All propane tanks must be installed in accordance with the Uniform Fire Code and all applicable Mason County ordinances. All Propane tanks between
125 and 500 gallons must be located a minimum of 10'from any building, property line, public way, possible source of ignition (electrical outlets,
electrical fixtures, compressors, etc), and/or any weeds, grass, brush, trash or any other similar combustible materials. If a propane tank is exposed to
probable vehicular damage, protective bollards must be installed.
X :�i
BLD2003-00950 Please refer to the following pages for conditions of this permit. 2 of 3
7) 'Fuel piping shall be inspected after the installation of gas piping is complete, and before the attachment of fixtures, appliances, or shut-off valves. At the
time of inspection the test pressure shall be no less than 10 psi held for no less than 15 minutes. Appliances to be attached to the fuel piping system
shall not be used un it a final inspection has been performed and approved by a Mason County building inspector.
X 41
8) The placement of small propane tanks are not normally subject to a permit review by the Planning Department; however, propane tanks are subject to
Planning Department regulations. Such regulations primarily consist of setbacks from shorelines and features considered to be critical areas (streams,
wetlands, slopes, etc.) If you think such features exist on or near your property, please cohtact the Planning Department so that exact setback
requirements can be determined. X
9) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason County ordinances and b 'ding regulations.
X
10) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder have prevented action fr m being taken. No more than one extension may be granted.
X_ �z2u i
This pen-aft becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of continuation of wo is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied.
OWNER OR AGENT�� ' DATE: ? -/ —,::5'
BLD2003-00950 Please referto the following pages for conditions of this permit. 3 of 3
W "
r
o CONCRETE MECHANICAL MANUFACTURED HOME
o Footings / Setbacks Date B y Ribbons
CD
0 Date By Gas Piping Date By
to
o Foundation Walls Date B y Set-up
Date By INSULATION Date By
B G / Slab Insulation Floors Final
Date By Date By Date By
FRAMING Walls FIRE DEPT
Date By Date By Date By
PLUMBING Attic OTHER
Groundwork Date By
Date By WALLBOARD NAILING
D.W.V. Date By
Date By FINAL INSPECTION
Water Line Date By
o Date By mmmmmmE2= Date By
G Z-27- 69f-'
A G lD c , C r s Lc
0
2• I G_ I C�(xfr NG e r S r PCi [ `r Y]c Tc✓G 2/1 �� t� U r n 5 5
� I /
cn 1 n C ti �25
cu
,z�3v�UN — ►���/�f - P��nu�-e. ,�f �C,..w, ,� � h,s�wtt-s�Jt �i�l
CL
CD
0
d �
0
� w �
o "iti
o y
0
FORM MUST BE COMPLETED IN INK
PLEASE PRESS HARD PERMIT NO.:
MASON COUNTY 66 /0'7
PLUMBING/MECHANICAL PERMIT APPLICATION
426 W.Cedar/P.O.Box 601 Shelton,WA 98584
Shelton(360)427-9670 Belfair(360)'1754467 Elma(360)482-5269
APPLICANT INFORMATION CONTRACTOR INFORMATION
Owner Contractor Name
Mailing Address /,v / Mailing Address
City T42Add4 4— StateA,,�Zif Code a k,4— City State Zip Code
Phone(i Other P Ph.( Other Ph.0
Lien/Title Holder S Contractor Reg. #
Address Expiration
SEPTIC INFORMATION-Connect to New Septic Existing Septic Connect to Sewer System Name of
Sewer System
PARCEL INFORM T O 12 ig)t Tax Parcc / / 0 Fire District
Legal Description
Site Address(Please include street nb6e,street number and city
Directions to site ��� a,�., {_ �j•Ly 5 ���,�� C�+� y�_ L, j�
'j-vrN-e v ti
Is your pro,k3erty within 200'of the follgwing: Body of Water(Name) 1 Saltwater _
Lake River/Creek -"5 Pond IVQ Wetland 2-91"Seasonal Runoff_ Z Stream_
Slopes or Bluffs
TYPE OF JOB New Add Alt Repair Other Use of Building
Location of Fixtures/Units 1st Floor 2nd Floor Basement Garage Closet
PLUMBING FIXTURES (Show Number of each) MECHANICAL UNITS Fuel Type: Electric
Type of Fixture No.of Fixtures Fees LPG Natural Gas Heatpump
Toilets Type of Unit No.of Units Fees
Bathroom Sink Furnace
Bath Tubs Heatpumps
Showers Spot Vent Fan
Water Heater Propane Tank CZ
Clothes Washer Gas Outlets
Kitchen Sinks Wood/Gas/Pellet Stove
Dishwasher Kitchen Exhaust Hood
Hosebibs Dryer Vent
Other Other
Base Fee Base Fee
TOTAL PLUMBING TOTAL MECHANICAL
A FLOOR PLAN AND PLOT PLAN MAY BE REQUIRED DEPENDING ON THE TYPE OF FIXTURE/UNIT.
NOTICE: THIS PERMIT BECOMES NULL&VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF
CONSTRUCTION WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER THE WORK IS COMMENCED.
PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. The owner or agent on owner's behalf,represents that the
information provided is accurate and grants employees of Mason County access to the above described property and structures for review and
inspection of this project. Acknowledgment of such is by signature below:
OWNER AFFIDAVIT-I certify that I am exempt from the requirements of the CONTRACTOR'S AFFIDAVIT-I certify that I am currently registered as a
Contractor Registration Law RCW 18.27 and am aware of the ordinance contractor in the State of Washington and that I am aware of the ordinance
requirements for which this permit is issued and that all work will be done in requirements regulating the work for which this permit is issued and all work
conformance therewith. No changes hall be made without first obtaining shall be done in conformance therewith. No changes shall be made without
approval. �S first obtaining approval.
Date 7�//
X �� ✓ X Date
FOR OFFICIAL USE BEYOND THIS POINT
Accepted by / Date ubmittal Amount Due 40 Receipt N —3
F3EPAtZ7HEENTA) #2 [ VV RPPROVED DENIEI} COM1IDIJIf?Nt:Ot?E5
Building Department _O 0
Occ GroupType Constr.
077
Planning Department
Other
Other
.. .. ..
Fl_ES...
Permit Fee Site Inspection
Plan Review Fee UFC Plan Review Fee L
Plumbing&Base Fee Other 42
Mechanical&Base Fee Other AR ST
Wood/Gas/Pellet Stove Fee Pre-Paid at Submittal ( )
Violation Fee TOTAL FEES
l
For O U D3-
427-9670 MASON COUNTY 000-72
BUILDING DEPARTMENT
ALL PERSONS ARE HEREBY ORDERED TO AT ONCE
TOP WORK
On these Premises at
This order is issued because
A.M.
Posted P.M. 19 By
The failure to stop work, the resuming of work without permission from the
WARNING
Building Official, or the removal, mutilation, destruction or concealment of this
Notice is punishable by fine and imprisonment.
FI
„3 zG o3 zLy/ T,gHUfv'4 Iflvcie
•� i" '4.Y , r�� �� • (may�Il-w
4 ll