Loading...
HomeMy WebLinkAboutPlacement of Earthern Berm HPA - SHX Permit / Conditions - 8/19/1991 q1 e�0 MASON COUNTY DEPARTMENT of GENERAL SERVICES Mason County Bldg. III 426 W.Cedar P.O. Box 186 Shelton, Washington 9SS84 (206) 427-9670 building environmental health fire marshall parks & recreation fair/convention center planning EXEMPTION FROM SHORELINE MANAGEMENT ACT SUBSTANTIAL DEVELOPMENT PERMIT REQUIREMENT The proposal by Alpine Evergreen Co. Inc. - Paul Reid /124 State Highway 3 S.W. Port rc ar a. 98366 to undertake the following development: Placement of earthen f berm adjacent to_Tahuya River set back minimum of 5 ft, 8-10 ft wide, 34 ft. high, 85-10OFt long to s a i ize an . upon the following property: S.E. of the N.W. section of Section 13, Township 22N, Range 3WWM. within Tahuy River and/or its associated wetlands is exempt from the requirement of a substantial development because the development is development not exceeding $2500.00; no material interference w/publ i c use WAC 173-14-040( a) . Corps Public Notice Reference N/A The proposed development is consistent or inconsistent within: Consistent Inconsistent X Policies of Shoreline Management Act X Mason County Shoreline Master Program August 19, 1991 August 19, 1993 Date of Approval Date of Expiration This exemption authorizing construction shall be valid for two (2) years provided construction has begun within two (2) years of approval date. Xhis exemption may be extended to five (5) years upon eque t pr o to expiration. Authorized Local Gov rnment Official XC: Applicant USACOE WDOE CMMRS WDF WDW f MASON COUNTY DEPARTMENT of GENERAL SERVICES Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 (206) 427-9670 building environmental health fire marshal) parks & recreation fair/convention center planning November 2, 1990 Alpine Evergreen Co. Inc. 7124 State Highway 3 S. W. Port Orchard, Wa. 98366 To Whom It May Concern; It has come to the attention of Mason County Planning staff that a road has been opened up leading from Mr. Doug Neyhart 's farm into your property in the N. E. of the S. W. of Section 13, Township 22N, Range 3W near the Tahuya River. We would like to comment on some factors relating to this road construction. A side channel to the Tahuya River exists in this area. It carries water on a perennial basis and supports anadromous fish species ( per Washington Department of Fisheries inspections) . This channel has been determined to be an "associated" water body to the Tahuya River ( Department of Ecology inspection) . The Tahuya is a designated "shoreline of the state", and as such, falls under Shoreline Management. Pertinent regulations include: -Construction of a bridge or installation of a culvert requires the obtainment of a Conditional Use Shoreline permit. Dept. of Fisheries approval is also necessary. -Landfills shall not disrupt normal surface water drainage. The Dept. of Fisheries has regulations regarding vehicular crossing of stream channels. It should be noted that there is currently major restoration work being required on Mr. Neyhart's property as a result of illegally filling this channel. We encourage you to contact us if you have any questions or plan any future work in this area. Lastly, a Forest Practice Act must be obtained for any timber harvesting taking place within the state of Washington. This F. P. A. will also be evaluated in terms of that logging 's effect on the Tahuya River and its associated channels. Thank you very much for your concern in this matter. Respectfully, Don Brush, Planner Mason County General Services A 1pine EVERGREEN CO., INC. 7124 St. Hwy. 3 S.W. Producer of "Alpine Brand", World's Finest Christmas Trees Port Orchard, WA 98366 (206) 674-2303 November 6, 1990 Don Brush, Planner Mason County Dept. of General Services P.O. Box 186 Shelton, WA 98584 Dear Mr. Brush: Thank you for your letter of November 2nd. Yes, we are aware of the old channel and were very careful to leave it undisturbed. It remains dry in summer months. Alpine Evergreen Co. , Inc. has been thinning their own timber land now for over 20 years. We plan to apply for a crossing (bridge) next summer. This crossing is the only feasible access to our timber in that area - SE NW Sec. 13-22-3W. This stand of large 2nd growth fir lies at the base of a rather steep hill. We also understand that before obtaining our cutting permit we might have to promise removal of the bridge when we finish. Sincerely yours, L/z1�1a Paul E. Reid, Chairman Alpine Evergreen Co. , Inc. PER:nk MASON COUNTY DEPARTMENT of GENERAL SERVICES Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 (206) 427-9670 building environmental health fire marshall parks & recreation fair/convention center planning April 18, 1991 Alpine Evergreen Co. , Inc. Paul E. Reid 7124 St. Hwy. 3 S. W. Port Orchard, Wa. 98366 Dear Mr. Reid: Planning staff had the opportunity to site inspect portions of your road constructed within the SE NW of Section 13, Township 22N, Range 3W adjacent to the Tahuya River last week. We have the following comments : - A Forest Practice Application will be required from the Department of Natural Resources (DNR) for the removal of timber. -DNR will evaluate your proposal and may require that any roads leading in to the timber harvesting area maintain specific distances from the river in the form of a riparian management zone. -Your road has eliminated the vegetation adjacent to the river which previously aided its stabilization. Should the bank of the river begin sloughing off to any great degree in this area, this department will consider your actions tantamount to landfilling. The placement of fill into a shoreline of the state is prohibited without the obtainment of a Conditional Use shoreline permit. To obtain such a permit it would be necessary for you to prove that : 1 ) Extraordinary or unique circumstances relating to the property exist which require the proposed shoreline location. 2) No viable alternative using a different method or, structural solution exists. -Landfills are not permitted in floodplains unless it can be clearly demonstrated that the geohydraulic and floodplain storage capacity will not be altered to increase flood hazard or other damage to life or property. Please contact this office when you decide to perform more work in this area. Keep in mind that bridge crossings may require shoreline permits and that any work within 200 feet of a designated shoreline may require a permit and, if no permit is required, will minimally require a statement of exemption. 4 Thanks for your cooperation. Feel free to call anytime. Sincerely,/ / on Erush, Planner Mason County General Services H TON HYDRAULIC PROJECT APPLICATION �� MFNT F (R.C.W. 75.20.100) OP DEPARTMENT OF WILDLIFE (R.C.W. 75.20.103) DEPARTMENT OF FISHERIES 600 Capitol Way North PLEASE PRINT OR TYPE General Admin. Bldg. Olympia, Washington 98504 Olympia, Washington 98504 (206) 753-5897 h DO NOT WRITE IN SHADED AREA (206) 753-6650 AST NAME 10 L ��/� FIRST��� CONTACT PHONE(S) "� ': Ci 19 STREET OR RURAL ROUTE y $ 9 W#tIA CITY STA, e£ TRIBUTARY TO 1P WATER 11 TYPE OF PROJECT 13 SEA ��SECTI0 TOWNSHIP RANGE (E-W) COUNTY - -- ----- - -`-- -- _ l3 a L ley ..... ........... ................................................ ... .. .. ............. ................................... _......._........ ..............._.............. ............................................... ........................... ................................................................................................................................................-.....................................................................................I....................... .r .. fL ... . ..... � %�C ................ . ........... ....... ... ....... .... .. ............................. . PROPOSED STARTING DATE PROPOSED FIN HING DATE 20 SEPA AGENCY/DATE OF DET RMINATION .k_ . 21 OTHER PERMITS _ 91, IT IS UNDERSTOOD THAT NO WORK WILL SI U a DATE�BE STARTED UNTIL A SIGNED APPROVAL t7s / /I /J IS RECEIVED !�•('IL li/ /(i/l(/ 1� 7 rlal >~II �ArIOw : s sss,"M%, ' ' a i .,ri ... .... .: :: .. ;. :�.. IR n GAM 111 (Rev. 10/87) -771- "9 ` Dan 9 to <QDV Loyy-) oj 14 <gg rah,�S q 1" MASON COUNTY DEPARTMENT of GENERAL SERVICES Mason County Bldg. III 426 W.Cedar P.O. Box 186 Shelton, Washington 98584 (206) 427-9670 building environmental health fire marshall parks & recreation fair/convention center planning September 13 , 1991 Alpine Evergreen Co. , Inc. Paul Reid 7124 State Highway 3 , S .W. Port Orchard, Wa. 98366 Re: Exemption from Shoreline Management Act for placement of berm adjacent to Tahuya River, S .E. , N.W. , Section 13 , Township 22N, Range 3WWM. Dear Mr. Reid: Enclosed please find a Statement of Exemption for the placement of an earthen berm along the Tahuya River. I have spoken with Mr. Otto Burden of David Evans and Associates . He seems satisfied that the project will have minimal impact on floodplain dynamics . I would ask that you set the berm back as per the distance he recommends, i .e. , 1. 5 times the distance from the top of bank to bottom of river. This would seem to be at least 10 feet back from the top of the bank. Also, as suggested, I would like to meet with you on the site prior to construction of the berm. Our main concern is that the material be pushed in not from immediately in front of the location of the berm, but rather from some distance away. We want to avoid further weakening of the bank in the immediate vicinity of the river. I will be unavailable until September 23 . I can meet with you any time during that week. Please call when you are nearing a construction date. Thank you for your cooperation. Respectfully, Don Brush, Shoreline Planner Department of Community Development CC: Doris Small, W.D. F. Stephen Kalinowski, W.D.W. Otto Burden, David Evans and Associates, Inc. MASON COUNTY DEPARTMENT of GENERAL SERV1CSEf " SEP 2 q Mason County B 98584 ldg• Ill 426 W.Cedar i91 p.p. Box 186 Shelton, Washington O (206) 427-9670s orwrlc ntion cen arks & recreation building environmental health lire marshall p SEP 191991 September 13 , 1991 GENERAL SERVICES Alpine Evergreen Co- , Inc. Paul Reid hway 3 , S -W' 7124 State HigWa 98366 port Orchard, for placement of berm ement Act 13 , township 22N, Exemption from SRhverli S E an N•W• , Section ad to Tahuya adjacent Range 3WWM- Dear Mr. Reid: for the placement of Exemption spoken with Mr. Statement of I have lease find a Tahuya River. Enclosed P along the He seems satisfied that earthen berm impact on floodplain dynamics • an Burden o David Evans and Associates • Ottowill have minimal he the project as per the distance to the berm back top of bank that you set distance from the from I would ask i .e. , 1 .5 times the to be at least 10 feet back recommendsTiver. This would seem bottom of bank. -prior the top of the With you on the site I would like to meet that the material ested, location of the Also as Bugg o f the be • Our main concern f the in fron We want to avoid further to construction from immediately river. be pushed in not distance away• of the the bank in the immediate vicinity berm, but rather from some with you any weakening of September 23 . I can u are nearing a unavailable until ple se call when you I will be eek. cooperation- date. time__�ug Thank you for Your �constructlon Respectfully, Leg Shoreline planner ment Don Brush, of Community Develop Department Small, W.D.F. CC: Doris W.D.W• Inc- Otto Kalinoows a' Evans and Associates, Otto Burden, 0 0 _ 97� � � SEP 1 6 1991 0 t REID0001 ' D September 10, 1991 ,;,,, ON `0 PLANNING DEPT. SEP 6 Serial No. 2518 1 199] G ENERAL SERVICEF Mason County Department of General Services Courthouse Bldg. III, 426 W. Cedar P.O. Box 186 Shelton, WA 98584 Attn: Mr. Don Brush CJ�IJUU Subject: Placement of berm adjacent to Tahuya River, S.E., N.W., Section 13, Township 22 North, Range 3 West, Willamette Meridian. Dear Mr. Brush: Thank you for meeting with me on Monday, September 9, 1991. As we discussed, I am writing this letter to address your concerns in a letter dated August 20 to Paul Reid. On Thursday, September 5, 1 visited the site with Paul to observe the area he wanted to do work in. It is my understanding that he would like to place a berm along the bank of the Tahuya River. The berm would measure 8 - 10 feet wide, 80 - 100 feet long and 3 - 4 feet deep. The intent of the berm is to prevent the river from jumping its banks at that one location. If it were to do so, it could cause severe erosion of the cleared area to the south. The berm is not intended to prevent any area from flooding, but only to keep the rive: from doing more damage than necessm},when it does flood. This shouldn't have any significant impact on the floodplain or floodway due to the small berm and large floodplain width. To assure a properly constructed berm and minimal impact to the area, it is my recommendation that: 1. The berm be set back a distance equal to 1.5 times the distance from the top of bank to bottom of river. 2. Prior to construction, an onsite pre-con meeting be held with you, Paul Reid and the individual constructing the berm. The intent of this meeting would be to address method of construction and source of materials. DAVID EVANS ANDASSOCIATES,INC. ENGINEERS,SURVEYORS,PLANNERS,LANDSCAPE ARCHITECTS,SCIENTISTS OFFICES IN OREGON,WASHINGTON AND CALIFORNIA 3100 N.W.BUCKLIN HILL ROAD,SUITE 105/P.O.BOX 3070 SILVERDALE,WASHINGTON 98383.3070 (206)698.1661 FAX(206)698.0745 REID0001 September 10, 1991 Serial No. 2518 Page -2- I trust that this letter has adequately addressed your concerns and Mr. Reid will be allowed to proceed with this project. Respectfully, DAVID EVANS AND ASSOCIATES, INC. +����>.�►�r\ WA Otto L. Burden, P.E. Project Manager 0e*OLBJco � *� r � • 198t9 i ���SS�ONA1 �- cc: Mr. Paul Reid DAVID SANS AND ASSOCIATES,INC. ENGINEERS,SURVEYORS,PLANNERS,LANDSCAPE ARCHITECTS RECEIVE® 1pine AUG 16 1991 EVERGREEN CO., INC. 7124 St. Hwy. 3 S.W. Producer of "Alpine Brand'; World's Finest Christmas Trees Port Orchard, WA 98366 (206) 674-2303 G August 13 , 1991 AUG 161991 GENERAL SERVICES MASON COUNTY DEPARTMENT OF GENERAL SERVICES P. 0. Box 186 Shelton, Wa 98584 ATTN: Planning Department - Don Brush Dear Mr. Brush, Enclosed please find the sketch of the Tahuya River in need of the berm. Also is shown the Gravel-Bar possibly causing more trouble in cases of extremely heavy flow as in the winter of 1991 . For this summer we wish to put only the berm. Sincerely, L A '`�JaLz,V Paul Reid ALPINE EVERGREEN CO. , INC. PR:bb MASON COUNTY DEPARTMENT of GENERAL SERVICES Mason County Bldg. III 426 W.Cedar P.O. Box 186 Shelton, Washington 98584 (206) 427-9670 building environmental health fire marshall parks & recreation fair/convention center planning August 20, 1991 Alpine Evergreen co. , Inc. Paul Reid 7124 State Highway 3, S .W. Port Orchard, Wa. 98366 Re: Placement of berm adjacent to Tahuya River, S.E. , N.W. , Section 13 , Township 22N, Range 3WWM. Dear Mr. Reid: After consideration of your proposal, I must inform you that the above referenced work would be in violation of the Mason County Flood Damage Prevention Ordinance #59-91. This recently enacted regulatory act states the following regarding floodway development: -Encroachments are prohibited including fill, new construction, substantial improvements, and other development unless certification by a registered professional engineer or architect is provided demonstrating that encroachments shall not result in any increase in flood levels during the occurrence of the base flood discharge. If the engineering stipulation is met, Mason County could issue a Statement of Exemption for the berm work. Otherwise, your options include obtaining a Shoreline Substantial Development permit for the placement of rip-rap (large rock) along the bank for stabilization purposes. This permitting process takes about three months to complete and requires approval from the County Commissioners. Please contact this office if I can be of assistance in this matter. Thank you very much. Respectfully, Do, Brush, Shoreline Planner Department of General Services Gc S