EXEMPTION FROM SHORELINE MANAGEMENT ACT
SUBSTANTIAL DEVELOPMENT PERMIT REQUIREMENT
The proposal by Alpine Evergreen Co. Inc. - Paul Reid
/124 State Highway 3 S.W.
Port rc ar a. 98366
to undertake the following development: Placement of earthen
f berm adjacent to_Tahuya River set back minimum of 5 ft, 8-10 ft wide,
34 ft. high, 85-10OFt long to s a i ize an .
upon the following property: S.E. of the N.W. section of
Section 13, Township 22N, Range 3WWM.
within Tahuy River
and/or its associated wetlands is exempt from the requirement of
a substantial development because the development is development not
exceeding $2500.00; no material interference w/publ i c use WAC 173-14-040( a) .
Corps Public Notice Reference N/A
The proposed development is consistent or inconsistent within:
Consistent Inconsistent
X Policies of Shoreline
Management Act
X Mason County
Shoreline Master Program
August 19, 1991 August 19, 1993
Date of Approval Date of Expiration
This exemption authorizing construction shall be valid for two (2)
years provided construction has begun within two (2) years of
approval date. Xhis exemption may be extended to five (5) years
upon eque t pr o to expiration.
Authorized Local Gov rnment Official
XC: Applicant USACOE
WDOE CMMRS
WDF
WDW
f
MASON COUNTY
DEPARTMENT of GENERAL SERVICES
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
(206) 427-9670
building environmental health fire marshal) parks & recreation fair/convention center planning
November 2, 1990
Alpine Evergreen Co. Inc.
7124 State Highway 3 S. W.
Port Orchard, Wa. 98366
To Whom It May Concern;
It has come to the attention of Mason County Planning staff
that a road has been opened up leading from Mr. Doug Neyhart 's farm
into your property in the N. E. of the S. W. of Section 13, Township
22N, Range 3W near the Tahuya River. We would like to comment on
some factors relating to this road construction.
A side channel to the Tahuya River exists in this area. It
carries water on a perennial basis and supports anadromous fish
species ( per Washington Department of Fisheries inspections) . This
channel has been determined to be an "associated" water body to the
Tahuya River ( Department of Ecology inspection) . The Tahuya is a
designated "shoreline of the state", and as such, falls under
Shoreline Management. Pertinent regulations include:
-Construction of a bridge or installation of a culvert
requires the obtainment of a Conditional Use Shoreline permit.
Dept. of Fisheries approval is also necessary.
-Landfills shall not disrupt normal surface water drainage.
The Dept. of Fisheries has regulations regarding vehicular
crossing of stream channels.
It should be noted that there is currently major restoration
work being required on Mr. Neyhart's property as a result of
illegally filling this channel. We encourage you to contact us if
you have any questions or plan any future work in this area.
Lastly, a Forest Practice Act must be obtained for any timber
harvesting taking place within the state of Washington. This
F. P. A. will also be evaluated in terms of that logging 's effect on
the Tahuya River and its associated channels.
Thank you very much for your concern in this matter.
Respectfully,
Don Brush, Planner
Mason County General Services
A
1pine
EVERGREEN CO., INC.
7124 St. Hwy. 3 S.W. Producer of "Alpine Brand", World's Finest Christmas Trees
Port Orchard, WA 98366
(206) 674-2303
November 6, 1990
Don Brush, Planner
Mason County Dept. of General Services
P.O. Box 186
Shelton, WA 98584
Dear Mr. Brush:
Thank you for your letter of November 2nd. Yes, we are aware
of the old channel and were very careful to leave it undisturbed. It
remains dry in summer months.
Alpine Evergreen Co. , Inc. has been thinning their own timber land
now for over 20 years. We plan to apply for a crossing (bridge) next
summer. This crossing is the only feasible access to our timber in that
area - SE NW Sec. 13-22-3W.
This stand of large 2nd growth fir lies at the base of a rather
steep hill. We also understand that before obtaining our cutting permit
we might have to promise removal of the bridge when we finish.
Sincerely yours,
L/z1�1a
Paul E. Reid, Chairman
Alpine Evergreen Co. , Inc.
PER:nk
MASON COUNTY
DEPARTMENT of GENERAL SERVICES
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
(206) 427-9670
building environmental health fire marshall parks & recreation fair/convention center planning
April 18, 1991
Alpine Evergreen Co. , Inc.
Paul E. Reid
7124 St. Hwy. 3 S. W.
Port Orchard, Wa. 98366
Dear Mr. Reid:
Planning staff had the opportunity to site inspect portions of your
road constructed within the SE NW of Section 13, Township 22N,
Range 3W adjacent to the Tahuya River last week. We have the
following comments :
- A Forest Practice Application will be required from the
Department of Natural Resources (DNR) for the removal of timber.
-DNR will evaluate your proposal and may require that any roads
leading in to the timber harvesting area maintain specific
distances from the river in the form of a riparian management zone.
-Your road has eliminated the vegetation adjacent to the river
which previously aided its stabilization. Should the bank of the
river begin sloughing off to any great degree in this area, this
department will consider your actions tantamount to landfilling.
The placement of fill into a shoreline of the state is prohibited
without the obtainment of a Conditional Use shoreline permit. To
obtain such a permit it would be necessary for you to prove that :
1 ) Extraordinary or unique circumstances relating to the
property exist which require the proposed shoreline location.
2) No viable alternative using a different method or,
structural solution exists.
-Landfills are not permitted in floodplains unless it can be
clearly demonstrated that the geohydraulic and floodplain storage
capacity will not be altered to increase flood hazard or other
damage to life or property.
Please contact this office when you decide to perform more work in
this area. Keep in mind that bridge crossings may require
shoreline permits and that any work within 200 feet of a designated
shoreline may require a permit and, if no permit is required, will
minimally require a statement of exemption.
4
Thanks for your cooperation. Feel free to call anytime.
Sincerely,/ /
on Erush, Planner
Mason County General Services
H TON
HYDRAULIC PROJECT
APPLICATION ��
MFNT F
(R.C.W. 75.20.100) OP
DEPARTMENT OF WILDLIFE (R.C.W. 75.20.103) DEPARTMENT OF FISHERIES
600 Capitol Way North PLEASE PRINT OR TYPE General Admin. Bldg.
Olympia, Washington 98504 Olympia, Washington 98504
(206) 753-5897 h DO NOT WRITE IN SHADED AREA (206) 753-6650
AST NAME
10 L ��/� FIRST��� CONTACT
PHONE(S)
"� ':
Ci
19 STREET OR RURAL ROUTE y $ 9 W#tIA
CITY STA, e£
TRIBUTARY TO
1P WATER 11 TYPE OF PROJECT
13 SEA ��SECTI0 TOWNSHIP RANGE (E-W) COUNTY - -- ----- - -`-- --
_ l3 a L ley
..... ........... ................................................
...
.. .. ............. ................................... _......._........ ..............._.............. ............................................... ...........................
................................................................................................................................................-.....................................................................................I.......................
.r .. fL ... . ..... � %�C ................ . ........... ....... ... ....... .... .. ............................. .
PROPOSED STARTING DATE PROPOSED FIN HING DATE
20 SEPA AGENCY/DATE OF DET RMINATION
.k_ .
21 OTHER PERMITS _ 91,
IT IS UNDERSTOOD THAT NO WORK WILL SI U a DATE�BE STARTED UNTIL A SIGNED APPROVAL t7s / /I /J
IS RECEIVED !�•('IL li/ /(i/l(/ 1� 7
rlal >~II �ArIOw : s sss,"M%, ' '
a
i
.,ri ... .... .: ::
.. ;. :�..
IR
n
GAM 111 (Rev. 10/87) -771- "9
` Dan
9 to
<QDV Loyy-)
oj
14
<gg
rah,�S
q 1"
MASON COUNTY
DEPARTMENT of GENERAL SERVICES
Mason County Bldg. III 426 W.Cedar
P.O. Box 186 Shelton, Washington 98584
(206) 427-9670
building environmental health fire marshall parks & recreation fair/convention center planning
September 13 , 1991
Alpine Evergreen Co. , Inc.
Paul Reid
7124 State Highway 3 , S .W.
Port Orchard, Wa. 98366
Re: Exemption from Shoreline Management Act for placement of berm
adjacent to Tahuya River, S .E. , N.W. , Section 13 , Township 22N,
Range 3WWM.
Dear Mr. Reid:
Enclosed please find a Statement of Exemption for the placement of
an earthen berm along the Tahuya River. I have spoken with Mr.
Otto Burden of David Evans and Associates . He seems satisfied that
the project will have minimal impact on floodplain dynamics .
I would ask that you set the berm back as per the distance he
recommends, i .e. , 1. 5 times the distance from the top of bank to
bottom of river. This would seem to be at least 10 feet back from
the top of the bank.
Also, as suggested, I would like to meet with you on the site prior
to construction of the berm. Our main concern is that the material
be pushed in not from immediately in front of the location of the
berm, but rather from some distance away. We want to avoid further
weakening of the bank in the immediate vicinity of the river.
I will be unavailable until September 23 . I can meet with you any
time during that week. Please call when you are nearing a
construction date. Thank you for your cooperation.
Respectfully,
Don Brush, Shoreline Planner
Department of Community Development
CC: Doris Small, W.D. F.
Stephen Kalinowski, W.D.W.
Otto Burden, David Evans and Associates, Inc.
MASON COUNTY
DEPARTMENT of GENERAL SERV1CSEf "
SEP 2 q
Mason County B 98584
ldg• Ill 426 W.Cedar i91
p.p. Box 186 Shelton, Washington O
(206) 427-9670s orwrlc ntion cen
arks & recreation
building
environmental health lire marshall p SEP 191991
September 13 , 1991 GENERAL SERVICES
Alpine Evergreen Co- , Inc.
Paul Reid hway 3 , S -W'
7124 State HigWa 98366
port Orchard, for placement of berm
ement Act 13 , township 22N,
Exemption from SRhverli S E an N•W• , Section
ad to Tahuya
adjacent
Range 3WWM-
Dear Mr. Reid: for the placement of
Exemption spoken with Mr.
Statement of I have
lease find a Tahuya River.
Enclosed P along the He seems satisfied that
earthen berm impact on floodplain dynamics •
an
Burden o David Evans and Associates •
Ottowill have minimal he
the project as per the distance to
the berm back top of bank
that you set distance from the from
I would ask i .e. ,
1 .5 times the to be at least 10 feet back
recommendsTiver. This would seem
bottom of bank. -prior
the top of the With you on the site
I would like to meet that the material
ested, location of the
Also as Bugg o f the be • Our main concern f the
in fron We want to avoid further
to construction from immediately river.
be pushed in not distance away• of the
the bank in the immediate vicinity
berm, but rather from some with you any
weakening of September 23 . I can u are nearing a
unavailable until ple se call when you
I will be eek. cooperation-
date.
time__�ug Thank you for Your
�constructlon
Respectfully,
Leg
Shoreline planner ment
Don Brush, of Community Develop
Department
Small, W.D.F.
CC: Doris W.D.W• Inc-
Otto
Kalinoows a' Evans and Associates,
Otto Burden,
0
0 _
97� � �
SEP 1 6 1991 0 t
REID0001 '
D
September 10, 1991 ,;,,, ON `0 PLANNING DEPT. SEP 6
Serial No. 2518 1 199]
G ENERAL SERVICEF
Mason County Department of General Services
Courthouse Bldg. III, 426 W. Cedar
P.O. Box 186
Shelton, WA 98584
Attn: Mr. Don Brush
CJ�IJUU
Subject: Placement of berm adjacent to Tahuya River, S.E., N.W.,
Section 13, Township 22 North, Range 3 West, Willamette
Meridian.
Dear Mr. Brush:
Thank you for meeting with me on Monday, September 9, 1991. As we discussed, I
am writing this letter to address your concerns in a letter dated August 20 to Paul
Reid.
On Thursday, September 5, 1 visited the site with Paul to observe the area he wanted
to do work in. It is my understanding that he would like to place a berm along the
bank of the Tahuya River. The berm would measure 8 - 10 feet wide, 80 - 100 feet
long and 3 - 4 feet deep.
The intent of the berm is to prevent the river from jumping its banks at that one
location. If it were to do so, it could cause severe erosion of the cleared area to the
south. The berm is not intended to prevent any area from flooding, but only to keep
the rive: from doing more damage than necessm},when it does flood. This shouldn't
have any significant impact on the floodplain or floodway due to the small berm and
large floodplain width.
To assure a properly constructed berm and minimal impact to the area, it is my
recommendation that:
1. The berm be set back a distance equal to 1.5 times the distance from
the top of bank to bottom of river.
2. Prior to construction, an onsite pre-con meeting be held with you, Paul
Reid and the individual constructing the berm. The intent of this
meeting would be to address method of construction and source of
materials.
DAVID EVANS ANDASSOCIATES,INC.
ENGINEERS,SURVEYORS,PLANNERS,LANDSCAPE ARCHITECTS,SCIENTISTS
OFFICES IN OREGON,WASHINGTON AND CALIFORNIA
3100 N.W.BUCKLIN HILL ROAD,SUITE 105/P.O.BOX 3070
SILVERDALE,WASHINGTON 98383.3070
(206)698.1661 FAX(206)698.0745
REID0001
September 10, 1991
Serial No. 2518
Page -2-
I trust that this letter has adequately addressed your concerns and Mr. Reid will be
allowed to proceed with this project.
Respectfully,
DAVID EVANS AND ASSOCIATES, INC. +����>.�►�r\
WA
Otto L. Burden, P.E.
Project Manager 0e*OLBJco
� *�
r � • 198t9 i
���SS�ONA1 �-
cc: Mr. Paul Reid
DAVID SANS AND ASSOCIATES,INC.
ENGINEERS,SURVEYORS,PLANNERS,LANDSCAPE ARCHITECTS
RECEIVE®
1pine AUG 16 1991
EVERGREEN CO., INC.
7124 St. Hwy. 3 S.W. Producer of "Alpine Brand'; World's Finest Christmas Trees
Port Orchard, WA 98366
(206) 674-2303 G
August 13 , 1991 AUG 161991
GENERAL SERVICES
MASON COUNTY DEPARTMENT OF GENERAL SERVICES
P. 0. Box 186
Shelton, Wa 98584
ATTN: Planning Department - Don Brush
Dear Mr. Brush,
Enclosed please find the sketch of the Tahuya River
in need of the berm. Also is shown the Gravel-Bar
possibly causing more trouble in cases of extremely
heavy flow as in the winter of 1991 .
For this summer we wish to put only the berm.
Sincerely,
L A '`�JaLz,V
Paul Reid
ALPINE EVERGREEN CO. , INC.
PR:bb
MASON COUNTY
DEPARTMENT of GENERAL SERVICES
Mason County Bldg. III 426 W.Cedar
P.O. Box 186 Shelton, Washington 98584
(206) 427-9670
building environmental health fire marshall parks & recreation fair/convention center planning
August 20, 1991
Alpine Evergreen co. , Inc.
Paul Reid
7124 State Highway 3, S .W.
Port Orchard, Wa. 98366
Re: Placement of berm adjacent to Tahuya River, S.E. , N.W. ,
Section 13 , Township 22N, Range 3WWM.
Dear Mr. Reid:
After consideration of your proposal, I must inform you that the
above referenced work would be in violation of the Mason County
Flood Damage Prevention Ordinance #59-91. This recently enacted
regulatory act states the following regarding floodway development:
-Encroachments are prohibited including fill, new
construction, substantial improvements, and other development
unless certification by a registered professional engineer or
architect is provided demonstrating that encroachments shall
not result in any increase in flood levels during the
occurrence of the base flood discharge.
If the engineering stipulation is met, Mason County could issue a
Statement of Exemption for the berm work. Otherwise, your options
include obtaining a Shoreline Substantial Development permit for
the placement of rip-rap (large rock) along the bank for
stabilization purposes. This permitting process takes about three
months to complete and requires approval from the County
Commissioners.
Please contact this office if I can be of assistance in this
matter. Thank you very much.
Respectfully,
Do, Brush, Shoreline Planner
Department of General Services