Loading...
HomeMy WebLinkAbout57-84 - Res. County Road Project No. 983 Mason Lake Road MASON COUNTY -0DN,lISSIONERS RESOLUTION NO, 5 7-8 4 COUNTY ROAD PRn= NO. 983 - Revised WHEREAS, on Mason County load No. 52210 known locally as the Mason Lake Road Road., and rrore specifically located in S. 13, T. 21N, R. 314, W.M. � M.P. 5.02 to M.P. 6.12 as "construction" in the—BARS Manual Page II-63 et. s work defined g eq, is determined to be neces- sary and proper, and WHEREAS, this project is identified as # 14 on the officially adopted County Annual Road Program. THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS that it is their intention to Perform preliminary Engineering for the purpose of securing right- of-way and perform road construction from Emerald Lake to Mason Lake Est. by contract. County forces to apply B.S.T. and that said work is to be performed by Day Labor & Contract in accordance with (day labor/contract) the Washington State Standard Specifications for load and Bridge Construction as adopted by Mason County. BE IT FURTHER RESOLVED that the above described County Poad Project is neces- sary and proper, and the estimated costs of said project are herewith set out as follows: Engineering $ 8,500 Right—of—Way $ 6,500 . Contract - 70,000 Road Construction Day Labor $ 20,000 (BST) Bridge Construction $ Engineer's Estimate in detail is on file in the office of the County Engineer. The County Road Project herein described is HEREBY DECLARED to be a public neces- sity, and the County Road Engineer is HEREBY ORDERID AND AUTHORIZED to report and pro- ceed thereon as by law, provided and in accordance with WAC 136-18. ADOPTED this _ 4th� day of June , 1984 BOARD OF COUNTY O M USSIONERS MASON COUNTY, WASHINCTON Chairman �— ATTEST: Member Clerk of the Board Member cc: Co. Commissioners Engineer JOURNAL: Publ. It. , 6/7/84 (Bill Rd. Dept.) (CRP Form No. 1)