Loading...
HomeMy WebLinkAboutSPI2003-00211 - SPI Inspections - 10/27/2003 MASON COUNTY Shelton (360)427-9670 DEPARTMENT OF COMMUNITY DEVELOPMENT Belfair (360) 275-4467 so Planning Mason County Bldg.1 411 N.5th Elma (360)482-5269 P.O.Box 279 Shelton,WA 98584 Martin Hicks 2115 Rocky Point RD NW#17 Bremerton, WA 98312 October 27,2003 Dear Mr. Hicks, This letter is a follow up to my site visit on October 23rd. The purpose of this letter is to outline the various steeps that will be required before your application for a Class IV General FPA and associated SEPA review can be approved by Mason County. In order for your application to be complete I need to have your DNR FPA application in my possession. On October 2401 I called Charlotte Bass at the Department of Natural Resources(DNR) and asked her to send me your paper work. She agreed to do that and I expect it to arrive any day. The above mentioned SEPA review is what I need to complete in order to ensure that your logging is consistent with the Mason County Resource Ordinance. The chapters that your application need to comply with are 17.01.090 (Land Slide Hazard) and 17.01.110 (Fish& Wildlife Habitat). GEO TECH REPORT To satisfy section 17.01.090 you will need to hire a qualified engineer to write a Geo- Technical Report consistent with the criteria found on 17.01.090.E.5. The scope of this report should be for all land within 300 feet of any clearing,road grading, or home construction planned—both for work that is planned as well as for work has already begun. I should note that the home construction is beyond the scope of my review,but such a document will be required for your eventual building permit so you might as well cover it in this report so that this will also be available to the County when it is needed. The scope of this report should also include recommendations for stabilizing the erosion problems that developed in last week's rainstorm. MASON ENVIRONMENTAL PERMIT As you know, you property boarders the Tahuya River. Per chapter 17.01.110 of the Mason County Resource Ordinance, no development shall occur within 150 feet of this river. As was observed during your site visit, a"Cat trail"was recently pushed towards the river and sections of the trail have encroached within 150 feet of the river. Before the SEPA can be issued this problem will have to be resolved. The permit required for resolving this situation is a Mason Environmental Permit(MEP)with a Habitat Management Plan(HMP). The HMP is required for activities within a Fish&Wildlife Habitat buffer and the HMP should be prepared by a qualified biologist (per 17.01.110.G.1). I am enclosing the following items for your convenience: Sections17.01.090 and 17.01.110 and a MEP application. COST There will be additional fees for your project beyond the $500 that you have already paid for the SEPA review. These fees are: Public Works review of Geo-Technical Report: $39.22/hr Mason Environmental Permit: $300 Habitat Management Plan review: $350 TIMELINE It is not always easy to predict how long a given permit will take to work its way through the system, so what follows should be considered an estimate. Geo-Tech Report review turn around: Approximately 1 week Review of MEP/FM': Approximately 4 weeks SEPA comment period: 2 weeks Some of these clocks can run simultaneously,but you should figure that approval of your various permits will be a minimum of six weeks from the date that the Geo-Tech Report and MEP/HMP are submitted. If you have any questions,please call me at ext 571. Thank you. Sincerely, Michael MacSems FPA Planner cc Rick Mraz 9� A MASON COUNTY PLANNING DEPT. PRE-INSPECTION APPLICATION PLEASE PRINT $200.00 Fee Required 1. Owner: J�J /C,�/,� Applicant: Site Address: _ Applicant Addres :` ) .'k b P,Ic Owner Add ressL-zl s )a- ,k. .'lam�j L.; 1`I City: City: sl [�Zip `/6Q zI 2 Phone:_ 2 ) �L 2—C,7 - day Phone:_ -[) `/" l - Y3 day Phone:_) evening 2. Parcel No.3;zZi Z _ 7 Parcel No. Legal Descriptio 7/ 2 Planner: GBM �M DMJ SAL .1 lZ Z IJ +k' aLa2e Yv\ ` SP`&vKaKi C Plan I pe of UsS Water Body i Ll 3. PUrnose of Pre-Inspection : rz J /UA)I- V CIS K 4. Use of Building: ha i-l'1 L�SL-C, 5. Do any of the following exist on or adjacent to property?: slope - saltwater❑ lake ❑ river pond ❑ wetland ❑ seasonal runoff❑ other❑ stream ❑ seasonal creek ❑ Directions to Site: y If the information is incomplete, then Mason Count must disclaim an errors resulting from deficiencies in the Y Y 9 original application. Pre-inspection reports remain valid only until development changes occur in the vicinity which affect the lot evaluated in this inspection, or the laws regulating development of the site change after the time of inspection. Applicant Signature: _ T .- ` Date;/ If you would like to be on site during inspection,please check here: Return application to: Department of Community Development, Planning Division P.O. Box279 RECEIVED Shelton, WA 98584 (360)427-9670 OCT 0 8 2003 Please include a $200.00 check or money order payable to Mason County Treasurer 426 W. CEDAR ST. When completed, this form becomes part of th parcel file. FOR OFFICE USE ONLY: Accepted by: _ Date: - Please illustrate below the proposed building sit In relation to water&property lines: SRG/WordWyDocwenls/ryDeoStuff/Pre4nspection MORE ON BACK SIDE r Please illustrate below t!ie proposed building site in relation to water and property lines: Departmental Review (For Office Use Only) Planning Department Findings: