HomeMy WebLinkAboutBLD2015-00141 Final Ductless HP - BLD Permit / Conditions - 4/3/2015 Inspection Line tst)u)4u-izb/_
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352
Mason County Bldg. 3 426 W. Cedar P.O. Box 279
Not Shelton, WA 98584
MECHANICAL PERMIT BLD2015-00141
OWNER: GREGORY CARPENTER RECEIVED: 3/2/2015
CONTRACTOR: BRENNAN HEATING &A/C 1.206.248.7900 LICENSE: BRENNHA962DU EXP: 12/29/2015 ISSUED: 3/3/2015
SITE ADDRESS: 720 NE TAHUYA RIVER RD TAHUYA EXPIRES: 9/3/2015
PARCEL NUMBER: 322127600030
LEGAL DESCRIPTION: TR 3 OF SURVEY 2/134 NW1/4
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
DUCTLESS HEATPUMP INSTALLATION ST RT 3 N,
TURN LEFT ONTO WA-300 W IN BELFAIR,
CONTINUE ONTO NE NORTH SHORE RD,
TURN RIGHT ONTO NE BELFAIR TAHUYA RD,
SLIGHT L FT()NTnGeneral Information SITE ON Setback Information
Type of Use: SF Insp.Area: Front: Ft. Shoreline: Ft.
Type of Work: MEC Fire Dist.: 8 Rear: Ft. Slope: Ft.Side 1: Ft.
Valuation:
Side 2: Ft.
Mechanical Fixtures FEES
Type Qty. Type By Date Amount Receipt
Heat Pump 1 Final Inspection Fee JBN 3/2/2015 $73.00 S120150000C
Mechanical Permit Fee JBN 3/2/2015 $18.20 S120150000(
Mechanical Base Fee JBN 3/2/2015 $28.50 S120150000(
Total $119.70
BLD2015-00141 Please refer to the following pages for conditions of this permit. Page 1 of 4
CASE NOTES FOR
BLD2015-00141
CONDITIONS FOR
BLD2015-00141
1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance
Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
x MIC1�
2) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28.
x M Llk
3) ALL FURNACE INSTALLATIONS SHALL MEET THE MINIMUM EFFICIENCIES SET FORTH IN THE CURENT EDITION OF THE WASHINGTON
STATE ENERGY CODE (WSEC). ANY PORTION OF THE MECHANICAL SYSTEM THAT IS ALTERED OR REPLACED SHALL MEET THE MINIMUM
STANDARDS SET FORTH IN THE WSEC AND INTERNATIONAL MECHANICAL CODE.
x Mkt k
4) To perform an inspection the Mason County Building Inspector will need to access the interior of the structure. An electrical permit completed and
approved by Washington State Labor& Industries must be available on-site during the inspection.
The Mason County Building Inspector will inspect the following:
Verify that the system is installed in accordance with manufacturer specifications;
The inspector will check to make sure that the exterior unit is permanently installed and supported,
the exterior unit complies with required setbacks to property lines,
fuel tanks are located at least 10-ft from the system, a source of ignition,
all exterior penetrations are properly sealed,
condensate lines are installed and are properly supported, including proper material, slope, and that the condensate line terminates to a proper location
outside of the foundation,
copper refrigerant lines are insulated with '/" thick continuous closed-cell foam insulation or better,
indoor units are located at least 3-ft from smoke and carbon monoxide alarms,
and that modifications made to the structure, to install the unit, does not affect existing structural members.
x Itik-N
BLD2015-00141 Please refer to the following pages for conditions of this permit. Page 2 of 4
• 5) Carbon monoxide alarms, listed as complying with UL 2075 shall be installed in accordance with manutacturer speatications ana in accoraance with iNu
Section R315.
Alarms shall be installed outside of each separate sleeping area in the immediate vicinity of the bedrooms and on each level of the dwelling.
EXISTING DWELLINGS shall be equipped with carbon monoxide alarms when alterations (including addition or alteration of fuel burning appliances),
repairs, or additions requiring a permit occur, or when one or more sleeping rooms are added or created.
x H.LI�
6) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
permit revocation.
x MLI k
7) The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency(ORCAA).
It is unlawful for any person to cause or allow the demolition (or major renovation) of any structure unless all asbestos containing materials have been
identified and removed from the area to be demolished. Work shall not commence on an asbestos project or demolition project unless the owner or
operator has obtained written approval from ORCCA.2490 B Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org
X
8) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED
BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
Inspector shall be made prior to requesting additional inspections.
X Mi _,A4
9) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason County ordinances and building regulations.
X WZ_la
10) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder have prevented action from being taken. No more than one extension may be granted.
X MLIA
11) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to ensure
these structures meet the setback conditions listed.
X
BLD2015-00141 Please refer to the following pages for conditions of this permit. Page 3 of 4
ti
OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by
signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the
work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property
and structure(s)for review and inspection. This permit/application becomes null &void if work or authorized construction is not commenced within 180 days or if
construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS
PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
DWI
►��-� 3 - 3 - 20 s
Signature Date
D OWNER - REPRESENTATIVE - CONTRACTOR
Print Name' (Circle one to indicate)
BLD2015-00141 Please refer to the following pages for conditions of this permit. Page 4 of 4
G
o CONCRETE Gas Piping MANUFACTURED HOME D
o Interbr-Date By W
U, Footings 1 Setbacks Extern_Date gyCD Ribbons
m
Date ByINSULATION Date By �
Foundation walls BG/SLAB INSULATION Set-up m
X
Da to By Date By Date By G7
FRAMING Floors FIRE DEPARTMENT M
Date By Date Date By
walls DECKS O
PLUMBING Date ' _m _- ate sy X
Groundwork Vault TANKS
Date By
Date By D$te
ABC By
..__..
D.w.v Date BY OTHER
Date By DRYWALL Type.
Date BY
Water Line Date By Typo.
Date By Int.Brace Wall Date By W
BY
CD rey MECHANICAL ° Sep tian FINAL INSPECTION o
CD
-D Date By Date By Date 3 /� BY140�
o
° Pass or Request Inspect. c
M Type of Insp. Fail Date Date Done By Comments 46
o �
W
UD
CD
W
0
°
a
_
° _
Ch
U
!D
3
N
0