HomeMy WebLinkAboutJARPA- Juvenile Steelhead Monitoring - SHX Application - 1/23/2012 i ------------------------------------
AGENCY USE ONLY
2 0 1 0M Date received: ;
O
WASHINGTON STATE US Army Corps
of Engineers• i � I
Seattle D'GIn Ct � �
I �
Joint Aquatic Resources Permit agency reference#:
1 Tax Parcel#(s): '
Application (DARPA) Form
USE BLACK OR BLUE INK TO ENTER ANSWERS IN WHITE SPACES BELOW.
------------------------------------
Part 1—Project Identification
1. Project Name (A name for your project that you create. Examples: Smith's Dock or Seabrook Lane Development) [hLlp]2
Hood Canal Steelhead Project: Juvenile Monitoring
��
Part 2—Applicant
The person or organization responsible for the project. [help]
2a. Name (Last, First, Middle)and Organization(if applicable)
Werner, Neil Hood Canal Salmon Enhancement Group
2b. Mailing Address (Street or PO Box)
PO Box 2169
2c. City, State, Zip
Belfair, WA 98528
2d. Phone(1) 2e. Phone(2) 2f. Fax 2 . E-mail
( 360 )275-3575 ( ) ( 360)275-0648 neil@hcseg.org; teresa@hcseg.org
Part 3—Authorized Agent or Contact
Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11b. of this
application.) [haiL)j
3a. Name (Last, First, Middle) and Organization (if applicable)
tAdditional forms may be required for the following permits:
• If your project may qualify for Department of the Army authorization through a Regional General Permit(RGP),contact the U.S.Army Corps of
Engineers for application information(206)764-3495.
• If your project might affect species listed under the Endangered Species Act,you will need to fill out a Specific Project Information Form(SPIF)or
prepare a Biological Evaluation. Forms can be found at
http://wvdw.nws.usace.army.rnii/PublicMenu/Menu.cfm?sitename=REG&pagename=mainpage_ESA
• If you are applying for an Aquatic Resources Use Authorization you will need to fill out and submit an Application for Authorization to Use State-
Owned Aquatic Lands form to DNR,which can be found at http://www.dnr.wa.gov/Publications/agr_use_auth app.doc
• Not all cities and counties accept the JARPA for their local Shoreline permits.If you think you will need a Shoreline permit,contact the appropriate
city or county government to make sure they will accept the JARPA.
2To access an online JARPA form with[help]screens,go to
http://www.epermitting.wa.gov/site/alias_resourcecenter/jarpa-jarpa_form/9984/jarpa_form.aspx.
i For other help,contact the Governor's Office of Regulatory Assistance at 1-800-917-0043 or help@ora.wa.gov.
JARPA 2010 v1 3/30/2010 Page 1 of 14
ij
3b. Mailing Address (street or PO Box)
i
3c. City, State, Zip
3d. Phone(1) 3e. Phone(2) 3f. Fax 3 . E-mail
Part 4—Property Owner(s)
Contact information for people or organizations owning the property(ies) where the project will occur. Lbeid
❑ Same as applicant. (Skip to Part 5.)
❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.)
X There are multiple property owners. Complete the section below and fill out JARPA Attachment A for each
additional property owner.
4a. Name (Last, First, Middle)and Organization (if applicable)
Manke, Kellen, Manke Timber Company Inc (property owner for Dewatto River trap site)
4b. Mailing Address (street or PO Box)
826 Fairmount Ave
4c. City, State, Zip
Shelton, WA 98584
4d. Phone(1) 4e. Phone(2) 4f. Fax 4 E-mail
( 360 ) 426-5536 ( ) ( )
Part 5—Project Location(s)
Identifying information about the property or properties where the project will occur. help]
X There are multiple project locations (e.g., linear projects). Complete the section below and use JARPA
Attachment B for each additional project location.
5a. Indicate the type of ownership of the property. (Check all that apply.) help
❑ State Owned Aquatic Land (if yes or maybe,contact the Department of Natural Resources(DNR)at(360)902-1100)
❑ Federal
❑ Other publicly owned (state,county,city,special districts like schools, ports, etc.)
❑ Tribal
X Private
5b. Street Address (Cannot be a PO Box. If there is no address,provide other location information in 5p.) hel
5c. City, State, Zip(If the project is not in a city or town, provide the name of the nearest city or town.) [Help]
Tahuya, Washington 98588 (location for Dewatto River trap site)
5d. County help]
IJARPA 2010 v1 3/30/2010 Page 2 of 14
I
Mason
5e. Provide the section, township, and range for the project location. [held
'/4 Section Section Township Range
W 1/2 26 23 N 03 W
5f. Provide the latitude and longitude of the project location.
• Example:47.03922 N lat./-122.89142 W long.(NAD 83)
47.45390 N lat. / 123.03663 W long. (NAD 83)
5g. List the tax parcel number(s) for the project location. [neip]
• The local county assessor's office can provide this information.
323260002000
5h. Contact information for all adjoining property owners. (If you need more space, use DARPA Attachment C.) MIA
Name Mailing Address Tax Parcel #(if known)
Impey, Thomas & Stacy PO Box 152 323262300010
Belfair, WA 98528
Manke Timber Company Inc 826 Fairmount Ave. 323274100010
Shelton, WA 98584
5i. List all wetlands on or adjacent to the project location. neLpl
5j. List all waterbodies (other than wetlands) on or adjacent to the project location. neir,
Dewatto River
5k. Is any part of the project area within a 100-year flood plain? help]
X Yes ❑ No ❑ Don't know
51. Briefly describe the vegetation and habitat conditions on the property.
JARPA 2010 v1 3/30/2010 Page 3 of 14
The property consists of natural stream and riparian habitats with conifer and deciduous trees and shrubs. It is
undeveloped land with the exception of Dewatto Road which passes through the property.
5m. Describe how the property is currently used. L,ipl
Undeveloped land with the exception of Dewatto Road which passes through the property. Land use is
designated forest land.
5n. Describe how the adjacent properties are currently used. L_ejp]
Undeveloped land and forest land.
5o. Describe the structures (above and below ground) on the property, including their purpose(s). n ini
Dewatto Road (a county road)
5p. Provide driving directions from the closest highway to the project location, and attach a map. help
JARPA 2010 v1 3/30/2010 Page 4 of 14
From Belfair, take NE WA-300/N Shore Rd. Turn R onto NE Belfair Tahuya Rd. Turn R onto NE Dewatto Rd.
Drive past the Dewatto Campground. The trap site is located just upstream of the point at which the road meets
the river.
Part 6—Project Description
6a. Summarize the overall project. You can provide more detail in 6d. h( eM
Evaluate the effects of a steelhead supplementation project using rotary screw traps to quantify steelhead
smolt abundance and juvenile salmonid abundance.
6b. Indicate the project category. (check all that apply) [hc!pj
❑ Commercial ❑ Residential ❑ Institutional ❑ Transportation ❑ Recreational
❑ Maintenance X Environmental Enhancement
6c. Indicate the major elements of your project. (Check all that apply) [help]
❑ Aquaculture ❑ Culvert ❑ Float ❑ Road
❑ Bank Stabilization ❑ Dam /Weir ❑ Geotechnical Survey X Scientific Measurement
❑ Boat House ❑ Dike/ Levee/Jetty ❑ Land Clearing Device
❑ Boat Launch ❑ Ditch ❑ Marina/ Moorage ❑ Stairs
❑ Boat Lift ❑ Dock/ Pier ❑ Mining ❑ Stormwater facility
❑ Bridge ❑ Dredging ❑ Outfall Structure ❑ Swimming Pool
❑ Bulkhead ❑ Fence ❑ Piling ❑ Utility Line
❑ Buoy ❑ Ferry Terminal ❑ Retaining Wall
❑ Channel Modification ❑ Fishway (upland)
❑ Other:
6d. Describe how you plan to construct each project element checked in 6c. Include specific construction
methods and equipment to be used. [i,e!rA
• Identify where each element will occur in relation to the nearest waterbody.
• Indicate which activities are within the 100-year flood plain.
JARPA 2010 v1 3/30/2010 Page 5 of 14
I
Temporary screw traps will be installed in the rivers to enumerate the number of migrating salmonid
juveniles. Traps will be installed on a seasonal basis for this multi-year project, to be completed in 2022.
1. The Tahuya and Dewatto traps each consist of 2 pontoons and a 5-ft diameter cone. The traps are 10 ft
wide x 17 ft 4 in long.
2. Fish traps will be assembled and installed by hand labor and hand tools.
3. Traps will be installed, operated, and removed with minimal disturbance to streambed, banks, and
adjacent riparian area. Screw traps will be anchored to the shore with cable running from the traps to trees,
as shown on the site drawings. When wrapping cable around trees, nylon material will be used to protect the
trees.
4. Traps will be monitored and maintained daily to prevent undue stress, injury, or migration delays to both
upstream and downstream migrating adult and juvenile fish, and to insure proper, safe operation of trapping
gear and to minimize any possible disturbance to the adjacent landscape.
5. The project sites will be restored to pre-existing natural conditions and configuration upon trap removal.
6. Monitoring, sampling and enumeration techniques shall be in accordance with established protocols
developed by WDFW's Fish Program and NOAA's Hood Canal Steelhead Project. All data and findings shall
be available to the Science Division in Olympia.
6e. What are the start and end dates for project construction? (month/year) Held
• If the project will be constructed in phases or stages, use DARPA Attachment D to list the start and end dates of each phase or
stage.
Start date: March 2012 End date: June 2022 ❑ See JARPA Attachment D
Each year the traps will be installed no earlier than January and will be removed no later than June.
6f. Describe the purpose of the project and why you want or need to perform it. nel
The proposed work is for research and management purposes and encompasses juvenile fish composition,
population and production measurements, and monitoring and evaluation of supplementation efforts. The
Hood Canal Steelhead Project aims to restore indigenous steelhead runs to the Skokomish River, Dewatto
River, and Duckabush River. Supplementation of wild populations with native stocks of juvenile and adult fish
has been shown to be a viable option for augmenting small populations in a conservation context. A vital part
of determining its effectiveness involves monitoring baseline, treatment, and post-treatment smolt abundance.
Rotary screw traps will be used in treatment and control streams to capture juvenile salmonids during
outmigration periods.
6g. Fair market value of the project, including materials, labor, machine rentals, etc. [neln)
$43,000 material cost
$20,000 per year operational cost
6h. Will any portion of the project receive federal funding? [bei�j
• If yes, list each agency providing funds.
X Yes ❑ No ❑ Don't know
NOAA
Part 7—Wetlands: Impacts and Mitigation
JARPA 2010 v1 3/30/2010 Page 6 of 14
X Check here if there are wetlands or wetland buffers on or adjacent to the project area.
(If there are none, skip to Part 8.) heio
7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. [nelh]
❑ Not applicable
The traps will not affect wetlands because they are designed to float within river channels and are held in place
by cables anchored to trees.
7b. Will the project impact wetlands? hei
❑ Yes X No ❑ Don't know
7c. Will the project impact wetland buffers? [Lii
❑ Yes X No ❑ Don't know
7d. Has a wetland delineation report been prepared? r,e
• If yes,submit the report,including data sheets,with the JARPA package.
❑ Yes X No
7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating
System? heip
• If yes,submit the wetland rating forms and figures with the JARPA package.
❑ Yes ❑ No X Don't know
7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? [help]
• If yes,submit the plan with the JARPA package and answer 7g.
• If No,or Not applicable,explain below why a mitigation plan should not be required.
❑ Yes ❑ No X Not applicable
7g. Summarize what the mitigation plan is meant to accomplish, and describe how a watershed approach was
used to design the plan.
N/A
i
7h. Use the table below to list the type and rating of each wetland impacted; the extent and duration of the
impact; and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a
JARPA 2010 v1 3/30/2010 Page 7 of 14
similar table, you can state (below) where we can find this information in the plan. [nelo]
Activity(fill, Wetland Wetland Impact Duration Proposed Wetland
drain, excavate, Name' type and area (sq. of impact3 mitigation mitigation area
flood, etc.) rating ft. or type Acres)
(sq. ft. or
category2 Acres) acres)
If no official name for the wetland exists,create a unique name(such as"wetland V). The name should be consistent with other project documents,such
as a wetland delineation report.
2 Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System.Provide the wetland
rating forms with the JARPA package.
3Indicate the days,months or years the wetland will be measurably impacted by the activity.Enter"permanent'if applicable.
"Creation(C),Re-establishment/Rehabilitation(R),Enhancement(E),Preservation(P),Mitigation Bank/In-lieu fee(B)
Page number(s) for similar information in the mitigation plan, if available:
7i. For all filling activities identified in 7h., describe the source and nature of the fill material, the amount in cubic
yards that will be used, and how and where it will be placed into the wetland. [hr�]
N/A
7j. For all excavating activities identified in 7h., describe the excavation method, type and amount of material in
cubic yards you will remove, and where the material will be disposed. t:elu]
N/A
Part 8-Waterbodies (other than wetlands): Impacts and Mitigation
In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.)
X Check here if there are waterbodies on or adjacent to the project area. (if there are none, skip to Part 9.)
8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment.
LELIal
❑ Not applicable
JARPA 2010 v1 3/30/2010 Page 8 of 14
i
The traps are designed to be installed, operated, and removed with very little disturbance to the streambed,
banks, and adjacent riparian areas. Protocols to minimize impacts to fish and the aquatic environment include
1) removing the trap from fishing operations in high stream flow events, 2) monitoring the trap consistently
throughout operation for debris and functionality, 3) sampling and releasing captured fish at least once per day,
and 4) minimizing handling of captured fish.
i�
i
8b. Will your project impact a waterbody or the area around a waterbody? [ne!o]
❑ Yes X No
8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland
waterbodies? [tlelL]
• If yes,submit the plan with the JARPA package and answer 8d.
• If No,or Not applicable,explain below why a mitigation plan should not be required.
❑ Yes ❑ No X Not applicable
The traps float on pontoons and are not in contact with the streambed. The traps are held in place using
cables anchored to large trees and do not disturb riparian areas. The traps are completely temporary;
project sites are restored to pre-existing natural conditions upon trap removal.
8d. Summarize what the mitigation plan is meant to accomplish. Describe how a watershed approach was
used to design the plan.
• If you already completed 7g.,you do not need to restate your answer here. iielhJ
N/A
8e. Summarize impact(s) to each waterbody in the table below. hcla
Activity(clear, Waterbody Impact Duration Amount of material Area(sq. ft. or
dredge, fill, pile name' location2 of impact3 to be placed in or linear ft.) of
drive, etc.) removed from waterbody
waterbody directly affected
If no official name for the waterbody exists,create a unique name(such as"Stream 1")The name should be consistent with other documents provided.
2Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent,provide the distance between the impact and the waterbody and
indicate whether the impact will occur within the 100-year flood plain.
3Indicate the days,months or years the waterbody will be measurably impacted by the work. Enter"permanent"if applicable.
JARPA 2010 v1 3/30/2010 Page 9 of 14
8f. For all activities identified in 8e., describe the source and nature of the fill material, amount (in cubic yards)
you will use, and how and where it will be placed into the waterbody. [h-tpJ
N/A
8g. For all excavating or dredging activities identified in 8e., describe the method for excavating or dredging,
type and amount of material you will remove, and where the material will be disposed.
N/A
Part 9-Additional Information
Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of
this section as you can. It is ok if you cannot answer a question.
9a. If you have already worked with any government agencies on this project, list them below. [h 1
Agency Name Contact Name Phone Most Recent
Date of Contact
WDFW Gloria Rogers ( )
Mason County Rebecca �wr (ka
9b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 on the Washington Department of
Ecology's 303(d) List? hel
• If yes,list the parameter(s)below.
• If you don't know,use Washington Department of Ecology's Water Quality Assessment tools at:
http://www.ecy.wa.gov/programs/wg/303d/.
❑ Yes X No
JARPA 2010 v1 3/30/2010 Page 10 of 14
9c. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in?
• Go to littp://cfpub.epa.gov/surfilocate/index.cfm to help identify the HUC.
Hood Canal
17110018
9d. What Water Resource Inventory Area Number (WRIA#) is the project in? [k.,dad
• Go to http://www.ecy.wa.aov/services/gis/maps/wria/wria.hti,i_to find the WRIA 4.
15.0420(Dewatto)
15.0446(Tahuya)
9e. Will the in-water construction work comply with the State of Washington water quality standards for
turbidity? hel
• Go to http://www.ecy.wa.gov/programs/wg/swgs/criteria.html for the standards.
❑ Yes ❑ No X Not applicable
9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline
environment designation? help 1
• If you don't know,contact the local planning department.
• For more information, go to:htti):Hvjww.ecV.wa.gov/programs/sea/sma/laws rules/173-26/211 designations.html.
❑ Rural X(Tahuya) Urban ❑ Natural ❑ Aquatic X (Dewatto) Conservancy
❑ Other
9g. What is the Washington Department of Natural Resources Water Type? [held
• Go to http://www.dnr.wa.gov/BusinessPermits/Topics/ForestPracticesApplications/Pages/fp watertyping.aspx for the Forest
Practices Water Typing System.
X Shoreline ❑ Fish ❑ Non-Fish Perennial ❑ Non-Fish Seasonal
9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater
manual? [Lei
• If no,provide the name of the manual your project is designed to meet.
❑ Yes ❑ No
Name of manual:
9i. If you know what the property was used for in the past, describe below. [iie!]
JARPA 2010 v1 3/30/2010 Page 11 of 14
9j. Has a cultural resource (archaeological) survey been performed on the project area? [r,=iuj
• If yes,attach it to your JARPA package.
❑ Yes X No
9k. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project
area or might be affected by the proposed work. need
Steelhead
Summer Chum
Chinook
91. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and
Species List that might be affected by the proposed work. [L,eLm]
Steelhead
Chum
Coho
Chinook
Coastal Cutthroat
Pacific Lamprey
River Lamprey
Part 10—SEPA Compliance and Permits
Use the resources and checklist below to identify the permits you are applying for.
• Online Project Questionnaire at littp://apps.ecV.wa.gov/opas/.
v/opas/.
• Governor's Office of Regulatory Assistance at (800) 917-0043 or help@ora.wa.gov.
• For a list of agency addresses to send your application, click on the"where to send your completed
JARPA" at littp://www.epermitting.wa.gov.
1 Oa. Compliance with the State Environmental Policy Act (SEPA). (Check all that apply.) [help]
• For more information about SEPA, gotowviw.ecv.wa.aov/r)roaranis/sea/sepa/e-review.html.
X A copy of the SEPA determination or letter of exemption is included with this application.
❑ A SEPA determination is pending with (lead agency). The expected decision date is
❑ I am applying for a Fish Habitat Enhancement Exemption. (Check the box below in 10b.) [nFu]
❑ This project is exempt (choose type of exemption below).
❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt?
JARPA 2010 v1 3/30/2010 Page 12 of 14
❑ Other:
I
❑ SEPA is pre-empted by federal law.
10b. Indicate the permits you are applying for. (Check all that apply.) [h. i]
LOCAL GOVERNMENT
Local Government Shoreline permits:
❑ Substantial Development ❑ Conditional Use ❑ Variance
❑ Shoreline Exemption Type (explain):
Other city/county permits:
❑ Floodplain Development Permit ❑ Critical Areas Ordinance
STATE GOVERNMENT
Washington Department of Fish and Wildlife:
X Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption
Washington Department of Ecology:
❑ Section 401 Water Quality Certification
Washington Department of Natural Resources:
❑ Aquatic Resources Use Authorization
FEDERAL GOVERNMENT
United States Department of the Army permits (U.S. Army Corps of Engineers):
❑ Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters)
United States Coast Guard permits:
❑ General Bridge Act Permit ❑ Private Aids to Navigation (for non-bridge projects)
Part 11—Authorizing Signatures
Signatures are required before submitting the JARPA package. The JARPA package includes the JARPA form,
project plans, photos, etc. [Ieip]
u
11a. Applicant Signature (required) hei
I certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work
only after I have received all necessary permits.
I hereby authorize the agent named in Part 3 of this application to act on my behalf in matters related to this
application. (initial)
JARPA 2010 v1 3/30/2010 Page 13 of 14
By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the
permitting agencies entering the property where the prod ct is located to inspect the project site or any work
related to the project. (initial)
Aj I \Al 46 I It/201E
Applicant Printed Name Ap6liJ66YSignature We
11 b. Authorized Agent Signature [i1�el�j
I certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work
only after all necessary permits have been issued.
Authorized Agent Printed Name Authorized Agent Signature Date
11 c. Property Owner Signature (if not applicant). [iieij>
Not required if project is on existing rights-of-way or easements.
I consent to the permitting agencies entering the property where the project is located to inspect the project site
or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the
landowner.
Property Owner Printed Name Property Owner Si nature Date
18 U.S.0§1001 provides that:Whoever,in any manner within the jurisdiction of any department or agency of the United States knowingly
falsifies,conceals, or covers up by any trick,scheme, or device a material fact or makes any false,fictitious,or fraudulent statements or
representations or makes or uses any false writing or document knowing same to contain any false,fictitious, or fraudulent statement or
entry,shall be fined not more than$10,000 or imprisoned not more than 5 years or both.
If you require this document in another format,contact The Governor's Office of Regulatory Assistance(ORA). People with hearing loss
can call 711 for Washington Relay Service. People with a speech disability can call (877)833-6341.
ORA publication number: ENV-019-09
JARPA 2010 v1 3/30/2010 Page 14 of 14