Part 1—Project Identification
1. Project Name (A name for your project that you create. Examples: Smith's Dock or Seabrook Lane Development) h[ elp]
Hood Canal Steelhead Supplementation Project: Juvenile Monitoring
Part 2—Applicant
The person and/or organization responsible for the project. heel ]
2a. Name (Last, First, Middle)
Gray, Cynthia L.
2b. Organization (If applicable)
Skokomish Tribe DNR
2c. Mailing Address (Street or Po Box)
North 541 Tribal Center Rd
2d. City, State, Zip
Shelton, WA 98584
2e. Phone (1) 2f. Phone (2) 2g. Fax 2h. E-mail
360-877-5213 360-490-8467 cgray@skokomish.org
f Additional forms may be required for the following permits:
• If your project may qualify for Department of the Army authorization through a Regional General Permit(RGP),contact the U.S.Army
Corps of Engineers for application information(206)764-3495.
• If your project might affect species listed under the Endangered Species Act,you will need to fill out a Specific Project Information Form
(SPIF)or prepare a Biological Evaluation. Forms can be found at
http://www.nws.usace.army.mil/Missions/CivilWorks/Regulatory/PermitGuidebook/EndangeredSr)ecies.asi)
• Not all cities and counties accept the JARPA for their local Shoreline permits.If you need a Shoreline permit,contact the appropriate city or
county government to make sure they accept the JARPA.
2To access an online JARPA form with[help]screens,go to
http://www.ei)ermitting.wa.gov/site/alias resourcecenter/lama iarpa form/9984/iarpa form.aspx.
For other help,contact the Governor's Office for Regulatory Innovation and Assistance at(800)917-0043 or help _oria.wa.gov.
ORIA-16-011 Page I of 22
Part 3—Authorized Agent or Contact
Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b of this
application.) h[heel
3a. Name (Last, First, Middle)
Gray, Cynthia L.
3b. Organization (If applicable)
Skokomish Tribe DNR
3c. Mailing Address (Street or Po Box)
North 541 Tribal Center Rd
3d. City, State, Zip
Shelton, WA 98584
3e. Phone (1) 3f. Phone (2) 3g. Fax 3h. E-mail
360-877-5213 360-490-8467 cgray@skokomish.org
Part 4—Property Owner(s)
Contact information for people or organizations owning the property(ies) where the project will occur. Consider both
upland and aquatic ownership because the upland owners may not own the adjacent aquatic land. hf eM
❑ Same as applicant. (Skip to Part 5.)
❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part5.)
❑ There are multiple upland property owners. Complete the section below and fill out JARPA Attachment A for
each additional property owner.
❑ Your project is on Department of Natural Resources (DNR)-managed aquatic lands. If you don't know,contact
the DNR at(360) 902-1100 to determine aquatic land ownership. If yes, complete JARPA Attachment E to
apply for the Aquatic Use Authorization. -
4a. Name (Last, First, Middle)
Toals, Charles
4b. Organization (if applicable)
N/A
4c. Mailing Address (Street or Po Box)
W 5040 Skokomish Valley Road No 150
4d. City, State, Zip
Shelton, WA 98584
4e. Phone (1) 4f. Phone (2) 4g. Fax 4h. E-mail
360-427-7308
ORIA-16-011 Page 2 of 22
Part 5—Project Location(s)
Identifying information about the property or properties where the project will occur. heel ]
❑ There are multiple project locations (e.g. linear projects). Complete the section below and use JARPA
Attachment B for each additional project location.
5a. Indicate the type of ownership of the property. (check all that apply.)[help]
■Private
❑ Federal
❑ Publicly owned (state,county,city,special districts like schools, ports,etc.)
❑ Tribal
❑ Department of Natural Resources (DNR) —managed aquatic lands (Complete JARPA Attachment E)
5b. Street Address (Cannot be a PO Box. If there is no address,provide other location information in 5p.) hel
5040 W. Skokomish Valley Rd, #150
5c. City, State, Zip (If the project is not in a city or town, provide the name of the nearest city or town.)[help]
Shelton, WA 98584
5d. County hel
Mason
5e. Provide the section, township, and range for the project location. [help]
'/4 Section Section Township Range
SW 12 T21 N R5W
5f. Provide the latitude and longitude of the project location. heI ]
• Example: 47.03922 N lat. /-122.89142 W long. (Use decimal degrees-NAD83)
N 47.32188 /W 123.26058
5g. List the tax parcel number(s)for the project location. heel ]
• The local county assessor's office can provide this information.
521123100260
5h. Contact information for all adjoining property owners. (If you need more space, use JARPA Attachment C.) [help]
Name Mailing Address Tax Parcel # (if known)
ORIA-16-011 Page 3 of 22
5i. List all wetlands on or adjacent to the project location. [help]
N/A
5j. List all waterbodies (other than wetlands) on or adjacent to the project location. [help]
South Fork Skokomish River
5k. Is any part of the project area within a 100-year floodplain? h( eV
■Yes ❑ No ❑ Don't know
51. Briefly describe the vegetation and habitat conditions on the property. hel
The property is a riparian zone dominated by grasses and mature trees
5m. Describe how the property is currently used. fheipj
(a) Residential
(b) Single family home, abandoned house, storage building
(c) Natural environmental conditions
I
5n. Describe how the adjacent properties are currently used. hel
Single family residential homes
5o. Describe the structures (above and below ground) on the property, including their purpose(s) and current
condition. hel
(a) Single family home, abandoned house, used as a storage building
(b) A single story storage building
5p. Provide driving directions from the closest highway to the project location, and attach a map. [help]
ORIA-16-011 Page 4 of 22
(a) Turn West off Highway 101 onto W Skokomish Valley Road.
(b) Turn left after 5.0 miles onto shared driveway.
(c) Turn left after 0.1 miles and follow until end. Property will be behind the gate.
Part 6—Project Description
6a. Briefly summarize the overall project. You can provide more detail in 6b. h[ elpl
The Hood Canal Steelhead Supplementation Project aims to restore indigenous steelhead runs to the
Skokomish River, Dewatto River, and Duckabush River. Supplementation of the wild population with native
stocks of juvenile and adult fish has been proven as a viable option for augmenting a small population in a
conservation context. A vital part of determining its effectiveness involves monitoring baseline, treatment and
post treatment smolt abundance.
6b. Describe the purpose of the project and why you want or need to perform it. h[M
The proposed work is for research and management purposes and encompasses juvenile fish composition,
population and productions measurements, evaluation of fish passage improvements, and evaluations of
habitat modifications, as well as monitoring and evaluating supplementation efforts.
6c. Indicate the project category. (Check all that apply)[tpm
❑ Commercial ❑ Residential ❑ Institutional ❑ Transportation ❑ Recreational
❑ Maintenance ■Environmental Enhancement
6d. Indicate the major elements of your project. (Check all that apply)[help]
❑ Aquaculture ❑ Culvert ■Float ❑ Retaining Wall
❑ Bank Stabilization ❑ Dam /Weir ❑ Floating Home (upland)
❑ Boat House ❑ Dike/ Levee /Jetty ❑ Geotechnical Survey ❑ Road
❑ Boat Launch ❑ Ditch ❑ Land Clearing ❑ Scientific
Measurement Device
❑ Boat Lift ❑ Dock/ Pier ❑ Marina / Moorage ❑ Stairs
❑ Bridge ❑ Dredging ❑ Mining
❑ Stormwater facility
❑ Bulkhead ❑ Fence ElOutfall Structure
❑ Buoy ❑ Ferry Terminal ❑ Swimming Pool
rY ❑ Piling/Dolphin
El Utility Line
❑ Channel Modification ❑ Fishway ❑ Raft
ORIA-16-011 Page 5 of 22
■Other: Screw trap for monitoring juvenile salmonid outmigrants
ORIA-16-011 Page 6 of 22
6e. Describe how you plan to construct each project element checked in 6d. Include specific construction
methods and equipment to be used. [help]
• Identify where each element will occur in relation to the nearestwaterbody.
• Indicate which activities are within the 100-yearfloodplain.
(a) The screw trap will be assembled and installed primarily by hand labor and tools.
(b) On-shore cranes may be employed to set the floating traps or their components into the stream.
(c) Cable will be used to attach screw traps to a large winch on one side of the river.
(d) The winch will be staked into the ground and strapped to a large tree or group of trees with a
protective nylon strap (see drawings).
All activities will take place streamside within the 100-year floodplain.
6f. What are the anticipated start and end dates for project construction? (Month/Year) [help]
• If the project will be constructed in phases or stages, use JARPA Attachment D to list the start and end dates of each phase
or stage.
Start Date: March 2017 End Date: June 2022 ❑ See JARPA Attachment D
6g. Fair market value of the project, including materials, labor, machine rentals, etc. hel
6h. Will any portion of the project receive federal funding? [help]
• If yes, list each agency providing funds.
■Yes ❑ No ❑ Don't know
NOAA Fisheries
Part 7—Wetlands: Impacts and Mitigation
❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area.
(If there are none, skip to Part 8.)[help]
7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. [help]
❑ Not applicable
7b. Will the project impact wetlands? [help]
❑ Yes No Don't know
ORIA-16-011 Page 7 of 22
7c. Will the project impact wetland buffers? [help]
❑ Yes ❑ No ❑ Don't know
7d. Has a wetland delineation report been prepared? [help]
• If Yes,submit the report, including data sheets, with the JARPA package.
❑ Yes ❑ No
7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating
System? [help]
• If Yes, submit the wetland rating forms and figures with the JARPA package.
❑ Yes ❑ No ❑ Don't know
7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? help]
• If Yes, submit the plan with the JARPA package and answer7g.
• If No, or Not applicable, explain below why a mitigation plan should not berequired.
❑ Yes ❑ No ❑ Don't know
7g. Summarize what the mitigation plan is meant to accomplish, and describe how a watershed approach was
used to design the plan. [heipi
7h. Use the table below to list the type and rating of each wetland impacted, the extent and duration of the
impact, and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a
similar table, you can state (below) where we can find this information in the plan. [help]
Activity (fill, Wetland Wetland Impact Duration Proposed Wetland
drain, excavate, Name' type and area (sq. of impact3 mitigation mitigation
flood, etc.) rating ft. or type° area (sq. ft. or
category2 Acres) acres)
If no official name for the wetland exists,create a unique name(such as"Wetland 1").The name should be consistent with other project documents,
ORIA-16-011 Page 8 of 22
such as a wetland delineation report.
2 Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System.Provide the wetland rating forms
with the JARPA package.
3Indicate the days,months or years the wetland will be measurably impacted by the activity.Enter"permanent'if applicable.
°Creation C, Re-establishment/Rehabilitation R,Enhancement E ,Preservation P , Mitigation Bank/In-lieu fee B
Page number(s)for similar information in the mitigation plan, if available:
7L For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in
cubic yards that will be used, and how and where it will be placed into the wetland. [help]
7j. For all excavating activities identified in 7h, describe the excavation method, type and amount of material
in cubic yards you will remove, and where the material will be disposed. [help]
Part 8—Waterbodies (other than wetlands): Impacts and Mitigation
In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) h[ eM
■Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.)
8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment.
hel
❑ Not applicable
WDFW protocols will be implemented and WDFW will be available to offer on-going guidance.
a) Fish: There will be no adverse impacts on adult salmonids as a result of the screw trap, and mortality
is typically less than 1% for juvenile salmonids. protocols for trap operation include 1) removing the
trap from fishing operations in high streamflow events, 2) monitoring the trap consistently throughout
operation for debris and functionality, and 3) minimal handling of entrained fish.
b) Aquatic life: No impact
c) Water quality: No impact
d) Water supply: No impact
e) Recreational (Kayak, rafts, etc.): Effects will be minimized by 1) positioning the trap close to the bank,
2) installing appropriate sighs upstream that would indicate the presence of the water hazards, and
would describe the location of the trap, and 3) installation of a buoy that will warn and divert
recreational ists. Signs and flashing lights will be placed on the trap, itself.
8b. Will your project impact a waterbody or the area around a waterbody? hei ]
ORIA-16-011 Page 9 of 22
❑ Yes ■No
ORIA-16-011 Page 10 of 22
8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland
waterbodies? [help]
• If Yes, submit the plan with the JARPA package and answer8d.
• If No, or Not applicable, explain below why a mitigation plan should not berequired.
❑ Yes ❑ No ❑ Don't know
Not applicable, as this project does not significantly interrupt streamflow, ecosystem function, or recreational
opportunities in the relevant waterbody.
8d. Summarize what the mitigation plan is meant to accomplish. Describe how a watershed approach was
used to design the plan.
• If you already completed 7g you do not need to restate your answer here. hf elpl
N/A
�I
8e. Summarize impact(s) to each waterbody in the table below. [help]
Activity (clear, Waterbody Impact Duration Amount of material Area (sq. ft. or
dredge, fill, pile name' location2 of impact' (cubic yards) to be linear ft.) of
drive, etc.) placed in or removed waterbody
from waterbody directly affected
If no official name for the waterbody exists,create a unique name(such as"Stream 1")The name should be consistent with other documents
provided.
2Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent,provide the distance between the impact and the waterbody and
indicate whether the impact will occur within the 100-year flood plain.
3Indicate the days,months or years the waterbody will be measurably impacted by the work.Enter"permanent'if applicable.
8f. For all activities identified in 8e, describe the source and nature of the fill material, amount (in cubic yards)
you will use, and how and where it will be placed into the waterbody. heI
ORIA-16-011 Page I I of 2 2
N/A
8g. For all excavating or dredging activities identified in 8e, describe the method for excavating or dredging,
type and amount of material you will remove, and where the material will be disposed. [help]
N/A
Part 9—Additional Information
Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of
this section as you can. It is ok if you cannot answer a question.
9a. If you have already worked with any government agencies on this project, list them below. h[�el
Agency Name Contact Name Phone Most Recent
Date of Contact
WDFW Joshua Benton (360) 602-0364 12/12/2016
NOAA Fisheries Katy Doctor-Shelby (360) 871-8303 12/12/2016
9b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 of this JARPA on the Washington
Department of Ecology's 303(d) List? [help]
• If Yes, list the parameter(s)below.
• If you don't know, use Washington Department of Ecology's Water Quality Assessmenttools at:
http://www.ecV.wa.gov/programs/wq/303d .
■Yes ❑ No
ORIA-16-011 Page 12 of 22
Temperature and fecal coliform
9c. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? [help]
• Go to http://cfpub.epa.gov/surf/locate/index.cfm to help identify the HUC.
17110017
9d. What Water Resource Inventory Area Number (WRIA#) is the project in? [help]
• Go to http://www.ecy.wa.gov/water/wria/index.html to find the WRIA#.
16
9e. Will the in-water construction work comply with the State of Washington water quality standards for
turbidity? [heel ]
• Go to http://www.ecy.wa.gov/programs/wq/swgs/criteria.html for the standards.
■Yes L! No ❑ Not applicable
9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline
environment designation? [help]
• If you don't know, contact the local planning department.
• For more information,go to:http://www.ecy.wa.gov/programs/sea/sma/laws rules/173-26/211 designations.html.
❑ Urban ❑ Natural ❑ Aquatic ❑ Conservancy ■Other: Rural
9g. What is the Washington Department of Natural Resources Water Type? [help]
• Go to http://www.dnr.wa.gov/forest-practices-water-typingfor the Forest Practices Water Typing System.
❑ Shoreline ■Fish ❑ Non-Fish Perennial ❑ Non-Fish Seasonal
9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater
manual? [help]
• If No, provide the name of the manual your project is designed to meet.
■Yes ❑ No
Name of manual:
9i. Does the project site have known contaminated sediment? [help]
• If Yes, please describe below.
❑ Yes ■No
ORIA-16-011 Page I ') of?2
9j. If you know what the property was used for in the past, describe below. [help]
9k. Has a cultural resource (archaeological) survey been performed on the project area? [help]
• If Yes, attach it to your JARPA package.
❑ Yes ■No
ORIA-16-011 Page 14 of 22
91. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the
project area or might be affected by the proposed work. [help]
Chinook salmon
Steelhead
Bull trout
9m. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and
Species List that might be affected by the proposed work. [help]
Pacific lamprey
Coastal/searun cutthroat
Chum salmon
Pink salmon
I
Coho salmon
Part 10—SEPA Compliance and Permits
Use the resources and checklist below to identify the permits you are applying for.
• Online Project Questionnaire at http://apps.oria.wa.gov/opas/.
• Governor's Office for Regulatory Innovation and Assistance at (800) 917-0043 orhelp(aboria.wa.gov.
• For a list of addresses to send your JARPA to, click on agency addresses for completed JARPA.
10a. Compliance with the State Environmental Policy Act (SEPA). (check all that apply.)[help]
• For more information about SEPA,go towww.ecy.wa.00v/programs/sea/sepa/e-review.html.
■A copy of the SEPA determination or letter of exemption is included with this application.
❑ A SEPA determination is pending with (lead agency). The expected decision date
is
❑ 1 am applying for a Fish Habitat Enhancement Exemption. (Check the box below in 10b.)[help]
❑ This project is exempt (choose type of exemption below).
❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is itexempt?
❑ Other:
ORIA-16-011 Page 15 of 22
❑ SEPA is pre-empted by federal law.
ORIA-16-011 Page 16 of 22
10b. Indicate the permits you are applying for. (Check all that apply.) hf elpl
LOCAL GOVERNMENT
Local Government Shoreline permits:
❑ Substantial Development ❑ Conditional Use ❑ Variance
❑ Shoreline Exemption Type(explain):
Other City/County permits:
❑ Floodplain Development Permit ❑ Critical Areas Ordinance
STATE GOVERNMENT
Washington Department of Fish and Wildlife:
■Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption —Attach Exemption Form
You must submit a check for$150 to Washington Department of Fish and Wildlife, unless your project
qualifies for an exemption or alternative payment method below. Do not send cash.
Check the appropriate boxes
❑ $150 check enclosed. Check#
Attach check made payable to Washington Department of Fish and Wildlife.
■My project is exempt from the application fee. (Check appropriate exemption):
❑ HPA processing is conducted by applicant funded WDFW staff.
Agreement#
❑ Mineral prospecting and mining
❑ Project occurs on farm and agricultural land.
(Attach a copy of current land use classification recorded with the county auditor, or other proof of current land use)
■Project is modification of an existing HPA originally applied for, prior to July 10,2012.
HPA#
Washington Department of Natural Resources:
❑ Aquatic Use Authorization
Complete JARPA Attachment E and submit a check for$25 payable to the Washington Department of Natural Resources.
Do not send cash.
Washington Department of Ecology:
❑ Section 401 Water Quality Certification
FEDERAL GOVERNMENT
United States Department of the Army permits (U.S. Army Corps of Engineers):
❑ Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters)
United States Coast Guard permits:
❑ Private Aids to Navigation (for non-bridge projects)
ORIA-16-011 Page 17 of 22
If you require this document in another format,contact the Govemor's Office for Regulatory Innovation and Assistance(ORIA)at(800)
917-0043. People with hearing loss can call 711 for Washington Relay Service. People with a speech disability can call(877)833-
6341. ORIA publication number: ORIA-16-011 rev. 09/2016
ORIA-16-011 Page 19 of 22
Part 11—Authorizing Signatures
Signatures are required before submitting the JARPA package. The JARPA package includes the JARPA form,
project plans, photos, etc. hell
1la. Applicant Signature (required) Leel
I certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work
only after I have received all necessary permits.
I hereby authorize the agent named in Part 3 of this application to act on my behalf in matters related to this
application. (initial)
By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the
permitting agencies entering the property where the project is located to inspect the project site or any work
related to the project. (initial)
&00;rI"A*1'4 • /Lt�l�V Zvi Z
Applicarif Printed Name ApplicantSignature Date
11 b. Authorized Agent Signature hf eM
I certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work
only after all necessary permits have been issued.
Authoriz,6d Agent Printed Name Aut zed Agent Sin re Date
9 9 9
11 c. Property Owner Signature (if not applicant) hf eM
Not required if project is on existing rights-of-way or easements (provide copy of easement with JARPA).
I consent to the permitting agencies entering the property where the project is located to inspect the project site
or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the
landowner.
/ / f
C' d4r�/QS �! %u�t f /�
Property Owner Printed Name Property Owner Signature Date
18 U.S.0§1001 provides that:Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly
falsifies,conceals,or covers up by any trick, scheme,or device a material fact or makes any false,fictitious,or fraudulent statements or
representations or makes or uses any false writing or document knowing same to contain any false,fictitious,or fraudulent statement or
entry,shall be fined not more than$10,000 or imprisoned not more than 5 years or both.
ORIA-16-011 Page 21 of 22
I
i
f 4
A r
Oebda dsfbClDOt
Additional pan toOtMs
Main
pontoons
Rectangular
f me
Cone
Additional
pontoons
primary
IKPOIX
Paddbwheel X
Rotating drum
Auxiliary liveboxes
Figure 2: Schematic Diagram of Rotary Screw Trap
South Fork Skokomish River Smolt Trap Location
fJ '�" P ° y e i� 1✓''
t;.: °
%
y •
?jr a .+ t'� Or LNG 4,
4 e n r
i
,
r
_
41
M F R V A i l U Y I �
ems:
,
Screw 'trap Site
>
•* A .. J'T .. .il��� Anarott tS:
Mot
r J�,.,i-� Vcrnrnoo
a, Port Mary st7/1�
'' ..
5
OLW IPIA
T , 7
1 2 4 Miles 25 50 100 Miles'
ffi
rb
r 1�1� , ;.
67
-51
r