HomeMy WebLinkAboutSEP2007-00017, SEP2007-00017 Updated SHX2017-00005 - MEP Permit / Conditions - 1/26/2007 PERMIT NO.:
MASON COUNTY DATE RECEIVED:
DEPARTMENT OF COMMUNITY DEVELOPMENT
RESOURCE ORDINANCE (Chapter 17.01 MCC)
411 N. 5TH Street/P.O. Box 279, Shelton, WA 98584
ENVIRONMENTAL PERMIT APPLICATION
MASON ENVIRONMENTAL PERMIT ❑ CONDITIONAL USE ❑ VARIANCE 0
The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical
areas and is under the authority of Chapters 36.32, 36.70A, 39.34, 58.17, 76.09, 84.33, 84.34 and 90.58
RCW.
PLEASE PRINT
Owner:_�w1�t5��[►���{, Owner Mailing Address:
N S9-1 Trib�
Site Address:
9 ypyyaSVA R.,G� (D�hL_*� 6LtN+f4 City: 90"W L. L► State: WA Zip: 8�-
City: yLm,6Vt State WA Zip:JUg L Lien/Title Holder
'
Phone:Daim e( � 8��-- 5213 ���Ir ►se�s1 �r t�v
d
Address: N GAA I v4sn�
Fire District#• �.
City: S�I�o h.�.a'1.� �-IVr h.b�L State: (AJ f� Zip: �QS"�•
(:2AIi
Signature:
2• Parcel Number: ZI - 9--�2- - 0of D Legal description: cgy+-, -- a F
Parcel Size: T2_1 rQ A-"
3. Directions to site:
khan-uJ A_j 10 U, 4 ti�A c o tA-+V\�}ZVI�� k�T
— fa `411R 4�d 4--61M 0&1 —T-1,��lVt1.-.I , 4L.1057 I
State what sections require a permit: In-Holding Lands,Chapter 17.01.062 ❑
4' Long-Term Commercial Forest,Chapter 17.10.060 0 Wetlands,Chapter 17.01.070 0
Mineral Resource Lands,Chapter 17.01.066 ❑ Frequently Flooded Areas,Chapter 17.01.090 ❑
Aquifer Recharge Areas,Chapter 17.01.080 ❑ Landslide Hazard Areas,Chapter 17.01.100 ❑
Erosion Hazard Areas,Chapter 17.01.104, ❑ Seismic Hazard Areas,Chapter 17.01.102 ❑
Fish and Wildlife Habitat Conservation Areas,Chapter 17.01.110 0
5.
Identify current use of property with existing improvements:
_lilz �f o ,' v�o. r�T�iy GiSPG� lout rZmac?vle� G?lld fj y►t r�bwf l� .
6.
Identify and describe the proposed project,including the type of materials to be used,construction methods,principle
dimensions and other pertinent information(Attach additional sheets if
needed):
7. Will there be an alteration of a wetland and/or wetland vegetation area? Yes 0 No
8. Any water on or adjacent to property:
Saltwater ❑ Lake ❑ River�( Pond 0 Wetland ❑ Seasonal Runoff ❑
Other
9. If septic is located on project site,include records.
Connect to septic? ❑ Community Septic? ❑ Public Water Supply? ❑ Well? ❑
10.
Type of Job: New P<Add ❑ Alt ❑ Repair ❑ Demolition ❑ Other
This permit is granted pursuant to the Resource Ordinance (Chapter 17.01 MCC) and nothing in this permit
shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or
regulations applicable to this project, but not inconsistent with the Resource Ordinance. The permit may be
rescinded pursuant to the event the permittee fails to comply with the conditions of this ordinance.
MASON ENVIRONMENTAL PERMIT: $510.00/$305.00(with another permit)
MASON CONDITIONAL USE ENVIR.PERMIT: $1,225.00
MASON RESOURCE ORDINANCE VARIANCE: $1,225,00
HEARINGS EXAMINER: $490.00
1:1PLANNING\R&GPACIENVIRONMENTAL REVISED 01-04-05
Show the followinq on the site plan
Lot Dimensions Flood Zones
Existing Structures Fences
Water Lines Driveways
Drainage Plans Shorelines
Septic System Topography Indicate Directional by(N,S,E,W,etc.)
Proposed Improvements Easements In relation to plot plan
Name if Flanking Street
APPLICANT TO DRAW SITE PLAN BELOW:
OD
k�
APPLICANT TO DRAW TOPOGRAPHY BELOW:
DEPARTMENTAL REVIEW
FOR OFFICE USE ONLY
COMMENTS
Planning:
Environmental
Health:
Building Plan
Review:
Occupancy
Group:
Fire Marshal:
Other:
Conditions: FEES
Total fees:
Accepted by: Date:
MASON COUNTY RESOURCE ORDINANCE July 2003
LIST OF ADJACENT PROPERTY OWNERS
WITHIN 300 FEET OF YOUR PROPERTY BOUNDARIES
FOR CONDITIONAL USE AND VARIANCE
Addresses are to be obtained from the Mason County Assessor's Office, Bldg. 1, Second Floor.
�oWvISLI 1 ,low
2 I16fo -ZAst �t, r-��ff ZZ�—D �.1 —�(�t,�c(D f 12�. N rtt,� 541 "T,-,&-� (--A
Qvu.,:w, UJA �gS9Z I�ruov� wA I$Sg2 SY�lu.r�s�� �S ; WA
lA,,c ��s `(
MASON COUNTY RESOURCE ORDINANCE July 2003
Publication cost is the responsibility of the applicant. Final permit processing will not occur until
advertising fees have been paid to the newspaper by the applicant. The Shelton-Mason County Journal
will bill the applicant directly.
I /WE understand that I /WE must sign and date the attached acknowledgment indicating and that I /
WE understand that is MY/OUR responsibility. I /WE must submit the signed page as part of
application in order for it to be considered as complete.
j/)-U "7
DATE
OWNER
cil
APPLICANT
Project Background: Salmon and steelhead hatcheries in the Pacific Northwest
primarily provide fish for harvest. In the past decade, hatcheries have developed new
programs(termed `supplementation programs')with different goals: to aid in the
conservation and rebuilding of depleted natural populations. Results of a small-scale
supplementation project in the Hamma Hamma River suggest that the strategy of
collecting natural-origin embryos and rearing them for release at two different life-history
stages (smolt and adult) has substantially increased the number of redds constructed in
the Hamma Hamma River. This approach contrasts markedly with hatchery programs
commonly implemented in the past,which released large numbers of out-of-basin fish in
Pacific NW rivers, with many negative consequences. Though the strategy of
supplementation has proved promising in theory and in small-scale or laboratory
situations, a large experimental approach has not been taken. NOAA Fisheries has
undertaken a collaborative project which will look at the large-scale effects of
supplementation, as measured through the comparison of four treatment(Hamma
Hamma, Skokomish, Duckabush, and Dewatto)with three control (Dosewallips, Tahuya,
and Big Beef Creek)streams located throughout the Hood Canal region(Figure 1). One
key component to evaluating the benefits and impacts of supplementation is to measure
the abundance of juvenile production within each of these streams before, during, and
after treatment.
Project Description: Within the context of this project,we propose that a rotary screw
trap be installed in the Skokomish, Dewatto, Tahuya, and Duckabush Rivers (see Figure
1). A similar trap is already in operation on the Hamma Hamma River, and plans are
underway to install a trap on the Dosewallips as well,though timing for this action is not
certain. The trap is prefabricated and will be trailered into each site. In some cases, a
small crane may be required to relocate the trap from the trailer to the river site. Twenty-
two foot aluminum pontoons will hold the trap on the surface of the water, and an
attached cone(diameter= 8 ft)uses the hydraulic energy of the current to revolve on a
central shaft(Figure 2). The cone is situated halfway beneath the surface of the water,
and guides migrating juvenile salmonids into a flow-through trap box that is located
downstream of the cone(Figure 3). In this way, a certain percentage of fish are
enumerated and access is gained so as to obtain biological and genetic samples. After
target fish(Steelhead and Cutthroat)are separated from non-target fish(Chinook, Chum
and Coho),they will be lightly anesthetized and sampled. Cutthroat will be used for trap
efficiency tests in the event that large enough numbers of steelhead are not encountered.
Non-target fish will be released after enumeration. The trap will be operational between
the approximate dates of April 1 and June 1 (2007-2022),but may be installed earlier in
the year or removed later in the year than the planned dates(January—June 30).
I
�'�:Ji '' rC`1`'t K .�•' �/ lt Apr• - L - g•R ! ti' if a" �y`-
'�' `yam �. '• 1 ��•-�.xa.., !, 3�.i�"s �sy� - ..+�'�k- ,l �.
Figure Photograph of rotary screw trap in place
1
Debris detieator
Additional pontoons
Main
pontoons
Reatang�¢r
ftrm
Cate
Additional
pontoons
Paddlewheel Primary
livebox
Rotating drum
Auxlltery liveboxes
Figure 2: Schematic Diagram of Rotary Screw Trap