Loading...
HomeMy WebLinkAboutSEP94-00141 Rip Rap Bulkhead - SEP Determinations - 8/15/1994 STATg 0 4. �y�IB89 a0 STATE OF WASHINGTON AUG 1 8 1994 M4SJ�V CO. FL;fJ�ilvG DEBT. DEPARTMENT OF ECOLOGY P.O.Box 47600 • Olympia, Washington 98504-7600 • (206)407-6000 • TDD Only(Hearing Impaired)(206)407-6006 August 15, 1994 Mr. Gary Yando Mason County PO Box 578 Shelton WA 98584 Dear Mr. Yando: Thank you for the opportunity to comment on the determination of nonsignificance for the construction of a 50 foot long riprap bulkhead along the Tahuya River, as proposed by patrick Berry (#94-141) . We reviewed the environmental checklist and have the following comments. The project proponent should be encouraged to seek alternatives to hardening the bank of the river. Bioengineering techniques provide better stabilization over the long term than bulkheads, which require constant rebuilding. We suggest the proponent seek 14 engineering assistance in this matter. If you have any questions, please call Mr. Bill Young with our Water Quality Program at (206) 407-6399. Sincerely, /dlqt� / 4-v� Rebecca J. Inman 1 Environmental Review Section RI: 94-6051 cc: Carey Grunenfelder, SWRO Bill Young, SWRO .40- ILI