HomeMy WebLinkAboutEH Review - BLD Plot / Site Plans - 12/9/2024 446
Sad
io
—21
3d3ad-y3~Cp000 4(411 -4,A R�
7.s u 1r i
„
F
v f / EH APPROVED
F Rhonda Thompson 1 210 9/2 0 2 4
4�
f / EH Setbacks
Drainfieltand/Reserve requires 10'setback from f0otlng/foun0ations
B.)Septic k(s)requires 5'setbeck from all looting/foundations
C.)No fountlatioNPedmeter Drains within 30fl,tlownpratlient of
Dreinfield/Reserve area
D.)No Cut Bank(s)(greater than sit and over 45 degrees)within
50f4 down gradient of DrainfielNReserve area
Ts.
T f /
Vw �
R
SX
!Y
f
l ,
- � r
rya s Ames-
---------------
�a
----