Loading...
HomeMy WebLinkAboutBLD2024-01372 Roof Solar - BLD Inspections - 1/24/2025 INSPECTION CARD Mason County 615 W. Alder St. Building 8, Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov PERMIT# BLD2024-01372 PROJECT ADDRESS 30 E Fairway Dr Allyn, WA 98524 PARCEL# 122205500028 PROJECT DESCRIPTION 11.890kW PV Roof Mount-Solar and Services OWNER MCKENNEY MICHAEL F ADDRESS 30 E FAIRWAY DR PHONE 360-917-4261 CONTRACTOR FREEDOM FOREVER WASHINGTON LLC ADDRESS 43445 Business Park Drive, Suite 110 PHONE CONTRACTOR LICENSE FREEDFW794Q9 LENDER INSPECTION INSP DATE Comments INSPECTION INSP DATE Comments BLD-Final Inspection71 - Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov B DD2024-01372 ROOF MOUNT SOLAR PANEL- RESIDENTIAL PROJECT DESCRIPTION: 11.890KW PV ROOF MOUNT- SOLAR AND ISSUED: 11/25/2024 SERVICES SITE ADDRESS: 30 E FAIRWAY DR ALLYN EXPIRES: 05/24/2025 PARCEL: 122205500028 APPLICANT: MCKENNEY MICHAEL F OWNER: MCKENNEY MICHAEL F 30 E FAIRWAY DR 30 E FAIRWAY DR ALLYN,WA 98524 ALLYN, WA 98524 360-917-4261 CONTRACTOR: Freedom Forever WA 22257 68th Ave S Kent,WA 98032 971-808-7776 GENERAL CONTRACTOR'S LICENSE: FREEDOM FOREVER WASHINGTON LLC License: FREEDFW794Q9 43445 Business Park Drive, Suite 110 Expires: 05/25/2025 TEMECULA, CA 92590 FEES: Paid Due Technology Surcharge $1.94 $0.00 Solar/PV Base Fee $30.00 $0.00 Solar/PV Fee $551.00 $0.00 Final Inspection $97.00 $0.00 State Fee-Residential $6.50 $0.00 Totals : $686.44 $0.00 REQUIRED INSPECTIONS BLD-Final Inspection CONDITIONS Printed by:Brittany King on:11/26/2024 08:30 AM Page 1 of 3 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov ROOF MOUNT SOLAR PANEL-RESIDENTIAL BLD2024-01372 " Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * The installation of solar(thermal or photovoltaic)energy systems to provide space heating or cooling, hot water and swimming pool heating shall conform to Chapter 23 of the International Residential Code, Chapter 14 of the International Mechanical Code, Uniform Plumbing Code, the International Fire Code, and be shall be listed and labeled in accordance with UL1703. Roof mounted panels shall weigh no more than 4 Ibs per square foot. Supports for solar panels are to be installed to spread the dead load across as many roof-framing members as needed to ensure that no point loads in excess of 50-Ibs are created. Panels may be installed on roof assemblies with a single layer of roofing material. Roof assemblies with more than one roofing material layer shall require an engineered analysis demonstrating that the roof will support the additional load of the solar panel system. Attachment to the roof shall be in accordance with manufacturer specifications provided during the inspection by the Mason County Building Inspector. Roof mounted equipment shall comply with the International Fire Code Section 605.11, including signage and access pathways. Roof access points shall not be located in areas where access ladders would block window or doors openings. Not less than two- 3-foot wide access pathways shall be provided from the eave to ridge. Ground-mounted panels and modules, installation must be in accordance with the manufacturer's instructions and be available at time of inspection. Inverters shall be listed and labeled in accordance with UL 1741. Systems connected to the utility grid shall use invertors listed for the utility interaction Collectors and thermal storage units shall be listed and labeled to show manufacturer's name, model number, serial number, collector weight, collector maximum allowable temperatures and pressures, and the type of heat transfer fluids that are compatible with the collector. Connections to potable water supplies shall be provided with backflow protection in accordance with the Uniform Plumbing Code. Solar energy systems containing pressurized fluids shall be protected with a temperature and pressure relief valve and be protected from freeze damage. Systems shall be equipped with means to limit the maximum water temperature of the system fluid entering or exchanging heat with any pressurized vessel inside the dwelling to 180 degrees Fahrenheit. Solar energy collectors, controls, dampers, fans, blowers and pumps shall be accessible for inspection, maintenance, repair and replacement. The roof shall be constructed to support the loads imposed by roof-mounted solar collectors and shall be constructed of noncombustible materials, flashed and sealed to prevent entry of water, rodents, and insects. The building inspector may require additional information, including an engineered design, to verify that existing roof or floor construction are adequate to support the additional load of the solar energy equipment. When required provide an engineered design for inspection. OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED. Printed by:Brittany King on:11/26/2024 08:30 AM Page 2 of 3 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov ROOF MOUNT SOLAR PANEL-RESIDENTIAL BLD2024-01372 " The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency (ORCAA). It is unlawful for any person to cause or allow the demolition (or major renovation) of any structure unless all asbestos containing materials have been identified and removed from the area to be demolished. Work shall not commence on an asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org " All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: Contractor or Authorized Agent: Date: Printed by:Brittany King on:11/26/2024 08:30 AM Page 3 of 3 Docusign Envelope ID:F8D04CDC-79F6-4D39-952A-A58A1F5D4113 Date RmP E I E D MASON COUNTY NOV 2 5 202'1 COMMUNITY DEVELOPMENT 615 W. Alder S1rei5t Permit Assistance Center,Building,Planning Per„nit#:LLD -0137 Property Owner's Authorization Letter Name Michael Mckenney Mailing Address 30 E Fairway Dr City Allyn State WA ZIP 98524 Phone (360) 917-4261 Email mike.mckenney@hotmaiI .com Parcel Number 1-22-20-55-00028 Site Address 30 E Fairway Dr City Allyn State WA ZIP 98524 j(We): Michael Mckenney (Property Oivners Name) Hereby Authorize: Freedom Forever WA, LLC (Name of Person/Contractor to Sign Permit) To apply for, sign, and pick-up building permits for the following proposed work: 11.890kW PV Roof Mount-Solar and Services (Brief Description of Work to be Done) As property owner(s),I(we)hereby grant permission to the applicant referenced above to apply for,sign,and pick- up the building permit for the work as indicated above. All work performed must meet all provisions of the Building Codes and the Laws of Mason County and the State of Washington, as applicable,whether specified or not.Residential Contractors are required to have a current State of Washington Contractors License(RCW 18.27). Signed by: gsj.�; n � 11/22/2024 1 4:16 PM PST gggg� �i� r,.Signature) (Date)