HomeMy WebLinkAboutBLD2008-00815 Final Gas Outlet - BLD Permit / Conditions - 9/3/2008 Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352
Mason County Bldg. 3 426 W. Cedar P.O. Box 186
Shelton, WA 98584
Soto
MECHANICAL PERMIT BLD2008-00815
OWNER: LINDA, WRIGHT RECEIVED: 7/2/2008
CONTRACTOR: LICENSE: EXP: ISSUED: 7/2/2008
SITE ADDRESS: 110 E LAVENDER LN SHELTON EXPIRES: 1/2/2009
PARCEL NUMBER: 321367590061
LEGAL DESCRIPTION: LOT: A OF SP#1658 PTN TR 6 S 2/49
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
GAS OUTLET E Lavender LN, enter 110, driveway to left.
General Information Setback Information
Type of Use: MH Insp.Area: Front: Ft. Shoreline: Ft.
Type of Work: MEC Fire Dist.: 5 Rear: Ft. Slope: Ft.
Valuation: Side 1: Ft.
Side 2: Ft.
Mechanical Fixtures FEES
Type Qty. Type By Date Amount Receipt
Gas Outlets 1 Mechanical Fee KS 7/2/2008 $5.75 S120080000
Mechanical Base Fee KS 7/2/2008 $26.60 S120080000
Total $32.35
BLD2008-00815 Please referto the following pages for conditions of this permit. 1 of 2
f
s' ,r CASE NOTES FOR
BLD2008-00815
CONDITIONS FOR
BLD2008-00815
1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance
Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X 17
2) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28.
X I
3) Fuel piping shall be inspected after the installation of fuel piping is complete, and before the attachment of fixtures, appliances, or shut-off valves. At the
time of inspection the test pressure shall be no less than 10 psi held for no less than 15 minutes. Appliances to be attached to the fuel piping system
shall not be used until the final inspection has been performed and approved by a Mason County building inspector.
X :�z
4) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason County ordinances and building regulations.
X
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to
the above described property and structure for review and inspection.
OWNER OR AGENT: DATE: 0
BLD2008-00815 Please referto the following pages for conditions of this permit. 2 of 2
o CONCRETE Gas Piping . MANUFACTURED HOME
o I11terinr-Date E3y -- --
C) Footings f Setbacks ExterKv-Date By Ribbons
CD Date INSULATION Date By
cn Foundation Waft BG/SLAB INSULATION Set-up r
Z
Date By Date By Date By D
FRAMING Floors FIRE DEPARTMENT
Date By Date By
Date By yyatis
PLUMBING Date By DECKS
torte By
Groundwork Vault TANKS
Date By Date By Date By
Att Ic
By OTHER
Date o.W.v
Date By DRYWALL
Date BY
Water Line Date By Typo,
Date By int.Brace Wall Date By W
MECHANICAL Date BYFINAL INSPECTION N
Fire Separation ` O
Date By Date Ely Date q' 3—O� By L� pp
O
a Pass or Request Inspect. ono
5 Type of Insp. Fail Date Date Done By Comments
CD
Cn
a
0
_
N
O
-w
5
0