Loading...
HomeMy WebLinkAboutBLD2003-00353 Final SFR, Deck and Garage - BLD Permit / Conditions - 8/16/2004 Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 � Shelton,WA 98584 RESIDENTIAL BUILDING PERMIT BLD2003-00353 OWNER: ROLLIN BINION RECEIVED: 4/1/2003 CONTRACTOR: LUMBERMENS HOMES LICENSE: LUMBEH*011JK EXP: 5/1/2004 ISSUED: 4/25/2003 SITE ADDRESS: 97 E SPENCER LAKE RD SHELTON EXPIRES: 10/25/2003 PARCEL NUMBER: 3213643901PO LEGAL DESCRIPTION: TR 1 OF SP#2390 PROJECT DESCRIPTION: DIRECTIONS TO SITE: RESIDENCE, DECK AND GARAGE HWY 3 N RIGHT ONTO AGATE, LEFT ONTO SPENCER LAKE RD, FIRST DRIVEWAY, ACROSS FROM SCHOOL. General Information Construction &Occupancy Information Square Footage Information No.of Bedrooms: 3 Type of Constr.: V-N Type of Use: SF Insp.Area: No.of Bathrooms: 3 Occ. Group: R-3, U-1 Lot Size: Deck: 284 Type of Work: NEW Fire Dist.: 5 No.of Stories: 2 Occ. Load: Building:1,644 Carport-Detached 447 Valuation: Building Height: Occ. Status: Primary Basement: cov. deck 54 Manufactured Home Information Setback Information Shoreline&Planning Information Make: Length: Ft. Front: E 180.0 Ft. Shoreline: Ft. Water Body: Rear: W 140.0 Ft. Slope: Ft. SEPA?: No Model: Width: Ft. Side 1: N 20.0 Ft. Shoreline Desig.: Not Applicable Year: Serial No.: Side 2: S 210.0 Ft. Comp. Plan Desig.: Rural Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Dishwasher 1 Exhaust Hood 1 Plan Check Fee KLW 4/1/2003 $500.00 62387 Hosebibs 3 Furnace<100K 1 Planning Review Fee KLW 4/1/2003 $150.00 62387 Lavatories 4 Ventilation Fan 4 EH Plan Review CEW 4/2/2003 $75.00 S12003 Showers 1 Woodstove 1 Adjust Plan Check Fee JRN 4/18/2003 $226.02 S12003 Kitchen Sink, w/disposal 1 Heat Pump 1 Building State Fee JRN 4/18/2003 $4.50 S12003 Water Closets (Toilets) 3 Dryer Vent 1 Building Permit Fee JRN 4/18/2003$1,116.95 si2oos Water Heaters 1 Mechanical Fee JRN 4/18/2003 $124.65 S12003 Bath Tubs 1 Mechanical Base Fee JRN 4/18/2003 $23.50 S12003 Clothes Washer 1 Plumbing Fee JRN 4/18/2003 $91.00 S12003 Plumbing Base Fee JRN 4/18/2003 $20.00 S12003 Total $2,331.62 BLD2003-00353 Please refer to the following pages for conditions of this permit. 1 of 4 CASE NOTES FOR • - BLD2003-00353 CONDITIONS FOR BLD2003-00353 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X YC. 2) The use, handling and storage of hazardous materials or flammable and combustible liquids in excess of 10 gallons is not allowed without the approval of the Mason County Fire Marshal. 3) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. x '-�c 4) OWNER SHOW PROOF OF SATISFACTORY WATER SAMPLE PRIOR TO TEMPORARY/PERMANENT OCCUPANCY OF THE RESIDENCE. 5) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. X 6) In accordance with the Uniform Building Code, all sites shall have approved numbers or addresses located in such a position as to be plainly visible and legible from the street or road fronting the property. Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the Uniform Building Code will be assessed if the owner and/or contractor fail to post the address on site prior to requesting inspections. X BLD2003-00353 Please refer to the following pages for conditions of this permit. 2 of 4 7) The plan review check list and corrections, along with the Energy Compliance Worksheet (when applicable)are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans o��he duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. 8) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X 9) The"approved" plot plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" plot plan is not on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the BuildingDepartment epartment prior to any further inspections being performed or approvals granted. X / -"1_- 10) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged ands all be collected by the Building Department prior to any further inspections being performed or approvals granted. X 11) All construction must meet or exceed all local ordinances and the 1997 Uniform Building Code requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. X 12) All changes to"approved" building plans that effect compliance with the Uniform Codes as amended and adopted, or any other Mason County ordinance or X regulation, reviewed and approved by Mason County prior to construction. 13) The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the Uniform Codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. X 14) All property lines shall be clearly identified at the time of foundation inspection. X 15) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. X - _ Y 16) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have pr vented action from being taken. No more than one extension may be granted. X �BLD2003-00353 Please referto the following pages for conditions of this permit. 3 of 4 17) All upland areas disturbed or newt cre ted by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). X This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. OWNER OR AGENT: i � DATE: 2 BLD2003-00353 Please referto the following pages for conditions of this permit. 4 of 4 R � ca r , 0 ^' 0 CONCRETE MECHANICAL MANUFACTURED HOME 0 �O Footings /Setbacks Date ,3 -/S`o�f By —2 Ribbons w �Date /�j e, By —/ Gas Piping Date By w Foundation Walls Date B y Set-up Date By INSULATION Date By B G 1 Slab Insulation Floors Final Date By Date By Date By FRAMaING .�,--M" Walls FIRE DEPT Date By Data, 2-& t-V B y 7?�' Date B y PLUMBING Attic OTHER Groundwork Date By Date By WALLBOARD NAILING D.W.V. Date 4Yk By W)L. Date By FINAL INSPECTION Water Line Date �''"d�j By Date By W ry :K. 3' Date By CD 0. 0 ��Ss cr�s�� l,✓�Ci c C /�/�i/��'y �'i✓ Gaya �j�c��_ y Vass ('0 K, � � /G -v yi�9� )0W/L/- :5� O w o O w � 0