Loading...
HomeMy WebLinkAboutCOM2011-00006 Maintenance Operation Manual - COM Engineering / Geo-Tech Reports - 10/11/2010 a , TO BE KEPT IN THE PARCEL FILE Maintenance and Operation Manual For South Shore Enterprises Commercial Buildings 750 E Dalby Road q Lot 3 of Parcel 32232 43 000103 Union, Mason County, Washington October 11, 2010 Project#1027 Prepared For: South Shore Enterprises, LLC PO Box 249 Union, Washington 98592 tiL CLYDE S CAP OF WAS�j� Jy? Prepared By: 4 Envirotech Engineering 74 NE Hurd Road 43045 w� Belfair, Washington 98528 °��f'FCfS.�gtiOG��t Phone: 360-275-9374 SIDNALti� Fax: 360-275-4789 # -- �s � � . ...�. .. , i i i d Introduction Envirotech Engineering (Envirotech) has completed this maintenance report for a proposed commercial redevelopment. The property is located at 750 East Dalby Road (Lot 3 of Parcel 32232 43 00010)in Union, Mason County, Washington(Project). Manual Purpose The purpose of this manual is to provide the property owner with a general maintenance plan in order to ensure the continued proper operation of all stormwater management facilities associated with this project. Lack of maintenance could lead to local flooding, water damage, excess pollution, and/ or costly repairs or replacements of property or drainage systems. Maintenance Responsibilities Facility maintenance is ultimately the responsibility of the property owner. Currently, stormwater maintenance responsibility for this property belongs to: South Shore Enterprises, LLC PO Box 249 Union, Washington 98592 360-898-2481 Maintenance Requirements The following stormwater management facilities include provisions for inspection procedures and necessary maintenance: Permanent Vegetation Permanent vegetation within the drainage swale shall be inspected regularly to insure establishment and healthy growth. Vegetation shall be re-established, where necessary. Vegetation may need to be periodically fertilized for continuous growth. Fertilization shall be applied per manufacturers recommendations. Envirotech Engineering Operation and Maintenance Manual Ph. 360-27i-9,74 Paec 1 of 7 7 0 E Dalb- Road, Union. NVashingnon Fax:360-275-4789 Lot 3 of Parcel 3,2212 4100010 October 11. 2010 r i Drain Pipes Drain pipes, including roof gutters should be inspected 3 times per year, and cleaned as necessary. Overflowing gutters or catch basins are an indication of drain pipe or gutter clogging. Drain pipes that become separated from the catch basins shall be repaired immediately. Energy Dissipation #7-t'.laintenance ChecUst for Energy Dissipators atE Freq'.reney Cra rage 1 Plro:tr Caritior.s to Check For Cor•crtions That Shan c Exist sys:em Feat_ire Ex:ema: Rcck Pad Nissirg or 'Ay ore eye,w rack exists abare Rock pad rep aced to oe•sgn i o,.,ed Rock ra&-e rail r area Five s uare feet 5:311.daro5 ar aryer.or arry er:aosve o'na:'+e soil. ck rosion .poi eros or n or aojaccrit to mck Rock pad rep aced to 6"gn aad. s:anoams spersion Pfae Fl4gec wrn ACcumUlattc seoinertthat P.re ceoned fushec so tat it. Trench Sedin•ert exceecs 2-%of the cesim depth. ratchet des�;r. spersion iJ_t Ciccha-gir, isual evvzerce cf water Trench rececigned or rebu t to Trench View Property oischargirg at corcentrwed;ems starters a ong;ranch irorrral cor'dition:s a 'sheet 9a•S"'W Water acrg Tenchi Irtert is:o arevent erosor.carnage. Ll Cis tNor. Ferfor3t!ons Plu;;ed Over 1:2 of Perforations in wipe are Perforated p pe c Caned or Trench r uaged kith debris and sedlmert. re;.la ec sptrsian -Na:er Pow.Odd lop of irahner3rde nersor,observer or Fac:ity rebut t or rases Bred o Trerctr DisTib roe'Catch Bar-in receives zre3iae report of water s ancaras foam;out duM any stom•less tar the desigr scorn or i:s taus rg or appearsIiker . ake accl Cispersien Receiving Area Over- 'hater in recefvrg area is causing No danger of ends ices. Trench Sa urated or has paternal of eausir.;,la idslice probe'ra'. Hemet b'arho etC Structure rea acea to resign her^.her ivorr.or Dama^ed?ost Strucse d ssipat rg flaw s anzarzs 5alfles.S ce ay Marnt>er deteriorates to'r of origin s_e or any corcentraxc worn spot axceecing one square foot v.•hich ,.wu d make structure urscurc .arino eti Trash&Debris No:rash or deer s:r the catch han•ber Tres,ardecre:h the basin:tta: basin exceecs 3 percent ate snip depth as measured from the bo:torn of basr to:Firer.of the oxast pig rro or out of Ce basin o.r.in no case leas than a nirimiT of s inches clearance from the dec-r:3 surface tc the in:art o'the!ones W. F.`anho e, Tr W&debris Inlet arc out at pipes free a' harrber Tras,ordetxsr any inlet oroutle: tnshordewis pipe a ocking n•ore than t:3-fir d'tla'it. kf '•anho e- Trash&Debris No dead ariria s or vegetanar han-ber Dead arena s or vegetation is Present:v thir the catch iascn. cou d generate odors that could cause con;,lasts or danbercus -oses i`. riehaY-i. k4aMo ev Sedimart Seciment yin^Fie oasinr:fat No ssoirrent in*ie catch basin harr ber exceecs K percent of tie sum r ae 35 r'eaLUfed fro'r the bottom Envirotech Engineering Operation and Maintenance?Manual Ph. 360-27i-9374 Page 2 of 7 7,;0 E Dolby Road. Union. Washington Fax: 360-275-4789 Lot 3 of Parcel 32232 43 00010 October 11. 2010 ate Frequent{ Cra page o:em Condors to Check For Corcitions That Mold Exist S''y'sIe'll Feature of b-cs r o m: o'the lowest pipe into or out of the basin.Cs in no case less than a rndrim.rn of E inches clearance ttom the sedirrert surface to the irvert of the loAles: .air ho e+C Structure Cartage to Top slat:has hoes a—,er than 2 Top s ab is free or he es arc han,ber Frame andlorTw Saab square inches or crack-lit,cer than cracks. tt4 inch drtent is to make sure ro material is rmring rto basin:. ar io e C Strucr i-e Camage to Frame nut sitting rush or top cab. h 3rrber Frame anoFor-oo S ab i.e.separation of more than 514 Frame is sittitg'4.sh-•r the inch of the`-ame from the top s ab riser rin;s or top sla:an Frame net secure,y attached firm Ir W.acted. .ar o e,'- Fractures or Cracks in M3itterance persor judges:hat Basin rep aced or reps red to h3mber Basin'Aa1WBottom sTucture snsound. design standards. Vat o e Fractures or Cracks In ::rout 8 bt has separated or P pe is re;routec and secure harrber Basin'1.'a9 r Bottom cracker xider than 1�_inch and at basin longer than 1 foot at tee joist of ant ini tloutlet pipe or any evidence of soi`part cles enterrg catch basin thrott^h cracks. .ar o e SettiemenC If fai ure of basin his created a Basin rep aced or reps re c t_ han-ber Wisal-gnment We y,fur ction.or design V,ott*M design standards. Warhoe?C Contamination Aryevidence efol,yaso ine, o cor Iran s er zo r.3r ts hamber and Po l.r on coh:ani nants or other pot L ants present. itoordirate removarceanuo wth oc a 'A-a:er qua ky response avercv:. Catch Cover Not in Place Corer is miss r4 or only pa tia.ly h !sty'open catc-i::3s r re;ui-e; basin place. mairterance. -_a'c-Lcsn Cc;er ccver is c ose C3teh Locking Mechanism htsctwrism cannot re ape> a ci Necharism opens vitn prooer Basin Not Work rig one rnainterance person wraith too s Cover proper too s.Bolt irto fr3hre ha•re ess than VZ inch of thread. C 3tt1 Cover CirNeut One mairrenance persor carnet Cover car.be removed by ore- Basin to I2ernove remove lid a'.er a--o!ying normal maintenance person. Cove- i'tino:/essure. +Intent is keep cover'ram sealing off access to rraintar3rce.:� If you are unsure whether a problem exists, please contact a Professional Engineer. XG (M) Monthly from November through April. (A) Once in late summer(preferable September) (S) After any major storm(use 1-inch in 24 hours as a guideline). EnA irotech Engineering Operation and Maintenance Manual Ph. 360-2 7;-9374 Page 3 of 7 750 E Dalb}-Road. Union.Washington Fax: 360-27 -4789 Lot 3 of Parcel 32232 43 000 10 October 11.2010 Dispersion Trenches Date of Inspection- Inspector: Maintenance Checklist for Dispersion Trenches Dlspemian Trenches are rock filled devices used to spread water from a collection source over a wide area to encourage gradual infiltration over a large area. Larger trenches may contain catch basins and boards to assist in spreading the water. Frequency Drairtage Conditions requiring Results Expected After Systems Maintenance (leaning) Maintenance Performed Feature Twice per Distribution Sediment"exceeds 10%of Sediment,trash and debris Year Catch Basin storage depth or it any at any cleaned out location the depth exceeds 15%of the storage depth Twice per Distribution Evidence that water fknm•s oul Clean system and contact year Catch Sasin of catch basin instead of design engineer to debermtne prpetlrench whether reCe5igr1 or rebm"d 15 necessary Twice per Pipe Over 7,of perforallo•is are Pope cleaned o-replacer] Year Perforalions Twice per Erosion Evidence of channe'ized Trench Redesignec or rehui,l is Year I discharge ruts at outlet,etc.l I produce srmet flow See a?sa Catch Basin Checklist if Trench design contains catch basir Emvirotech Engineering Operation and Maintenance Manual Ph. 360-275-9374 Pagc 4 of 7 70 E Dalb,,-Road.Union. Washington Fax: 360-27S-4799 Lot 3 of Parcel 32232 43 0ti010 October 11. 2010 Catch Basins *5-Pala r:ena:nce CheA istfor Caten Easins i ra C .-ons t_C-RA F'x „ondk-c s That Should c ysr;.-)-, Exist ene-a 'C. r.•-c p3 _:an-; ' Sc cr swnp should be 'A3 -ig s-'rs:e.g.. nJf v si;,ie and easilg read 'C.:ntp Uo Was -C=-s x _ St am'r shall:_paint or-nbos-sed cn or adjac-n--o all sprn da.- inlets. ene a -ras s -rasr or I--Ys whi:h is 13:a:e: No'ash or debts located _ m^,edia-ey in rrmt of the ca=h m•^ec:a*y in rout of casm opening or is blocking :ate^tasin or on graze n e:bng capactr cf a bas r by opening ^urethan tc%. 'ras^or c=,-s:n t^e basin; Vo-rash or debrs in the -,,at exceeds 5'j percent of the cater tasm. sump depth as measure:4�^. :he c•c•:L n•I casin:o -wen of s :Wes:pipe into or cu:c`:ne :.3sin,but in nc case less than a mnim im of six inches_ :Iealan:e from:he detrs surfa cE:J:he --den of t-e c%-es-.pipe I 'jenera. 7ras-b 7ras-Or Ccr 5 any Inlet or i^.'iel and c0et pipes free JEb^.s ou:';et o*e blcckmg"ere than o*:rasr or-*vs. S- :s heiaht. V 'oenera. 7ras^S -,sa_animals o :epeta:ian:hat No read arir4s cr JEG'.s ::)j)t genera:E odors-.hat couid vepeta:!3' '-se ccmD'.a'ts cr danper3us the cater tas'. ses ie._..r .hanei t3sl^':^.at Vo sedinen:in the ta:ch seeds dC percent c':hc sump casin cep:-as measured from:ne s:.tern&t:asin.o -•een of t-e coves:pipe irtc Dr cut c`:he z3v%but in nc case less than a rr nmun of 5 inches ciea•a :e from:he sed,men- ssf3ce'o:he -vertoft-a Cwes-.c ce -era Damage to -op slab-=s _s arger than lop slab s wee c=-_=s Fray-e and cr-x sc are inches cr:racks w:_ a d c-acks. Slab -tan':4 -:h'nt s m-take sure no na'e,i s running ir•tc Lasi^:i. cnc._�a slur-re-';F-3ge tc 'rara nol sa flu ng sh.en top Frame and cr sab•i.e,separa-o^c`rnore =rare is sang Push on q-ab Yar 2.4 nc'-_=:he�Ta^'e from - e-set rings or top s_'at -"is: p slab.F-ane -oc frrny=:hed sECurely 3-t3Cr E -_ •Cracks in btai-tenancepersD-;udges-hat 'as-rep ace:cr l a cm stmature s u^sound standares. Envirotech Engineering Operation and Maintenance Manual Ph. 360-27 -937-t Page of 7 750 E Dalby Road. Union"Washington Fax: 360-27i-4789 Lot 3 of Parcel 32232 43 00010 October 11" 2010 =repuency = --__e =%NZ,111 Unc-ions t:C-*.k F e Con*c,-s That Should is.e1. Exist enera rraaires or Graz ks m 3-au:filiet nas separa:ed or -ipe is reprauted a-_ 335m Y,alls:Belem cracked w._t-w 1 Z inar and secure at b3s-wa!! cnger than 1 root at the iD-t of any inle:•cu:let pipe or a , eviden:e of soil part 6es an:enn2 catch t3SIn thMU2r CM—Is. genera =:c=lent f fa'ure of basin has area.ed a 'asir,rep 3cec cr repai e: Sfs3;gnmrvni safe-y `unction,ordesk2n m casign standards. czt em. csenera vegeatcn ',.ege:atcn?raring a:ross a-: Vo vegetation blocking Necking mere than 1 Y' c`:ne cpen:ng tc basin =3sir c enin genera •.-ge:atcn ',;egeatcn groeoing - Na-.wgetaJor.cr root nle.^cutiet pipe jams iha: s Growth pre=_en:. -11ore titan six inches:al'.anc ess than six inches 3 a't Any vooen:e of oil,2asc one, .a r_";am:nan cr ?e^era PSI.I Cr. contarri er other oc ,Ian-7 Failu:ass preeer.. ;coordinate remcva'cgs-_; with W:a'eoaw auaiit2 R nse -vc, over Mc:in Piace Cover is missing or cn'y .any open ca»h basin =35 carialty in place. eauires maintenance. ;ale!'t3sin cover's aiased at•: c c4 rg t.tecran sm ` c:han:sm cannc:be opened `Ae:h3n sin opens mt- =as- :'hen g cy cne m3 merance person *,cper tools. •rrth Proper:oois Bohs ima game nave less than t:_in&c` ate :aver GficuB to Cne r-an 9ran:e oer=_cn Cover can be removec c•y _as ?eneve cannat remcvel,c af:r app pry one m3in:enante person tier ^•crma'liftng pressu•e. nten: s keep:over from ss aiin2 c'f a::ess to ra men ante'I _acce; w cce-?.rgs_"sa-e -adcer,s ursa`e due to ntssing -adaer r-ee.5 oes gn -ungs,not sec-,ely ata:hed to standards and aiio.n casir wall,m-sal 2r^ent.nst mairtenance person safe a:ks crs-arp edges a:oess _:es ate open rg Craz=-what_-;�tiderthan Craze open ng n•ees —a.= '4 nc^. :es,o,slanaares. ras-and:2:"a.hat is -r3:e'' c-:'ash a :+cek,ng mere than o c' acrs. 7e sJ^face In•-.e:fn :3 acd:'. :'.30ec Y .-raze missing cr otoken :raze s In p';a:e an:me—:, M°s.'..7. -1?^tlera,C-:ne'"3:E. :es: -Vindaras. got-are un&t.re• lhethe-a problen• e'�ists p ease con:3c*a =r:fessiona Engineer ;M1 Mwthly from Noveinberthrouah Aprl. iA. Once in late summer;preferable Septerniw'i fS; After any ma-or storm fuse 1-rch in 24 hours as u guidelile:. Envirotech Engincerino Operation and Maintenance Manual Ph. ',60-27i 9 374 Pagc 0 of 7 750 E Daltiv Road. Union.Washington Fax: 60-27i-4789 Lot of Parcel 32232.13 00010 October 11.2010 oil/Water Separators Date of Inspection: Inspector. Maintenance Checidist for 01I/Water Separators Definition: Separators are designed to remove oil and sediment from water before the water is discharge to the storm drainage or sewer system. It is an underground structure with above ground access for maintenance. It may have baffles (vertical plates)or absorbent pads to retain floating oil. You need to identify which type of oil water separator you have and if it discharges to stormwater or sanitary sewer. Frequency Drainage Conditions requiring Results Expected After Systems Maintenance(cleaning) Maintenance Performed Feature Quarterly Any o(w Structure is not separating oil Separator repaired or replaced and after separator from water or is ejecting oil so that oil is being removed each oils ill back into stormwater system from stormwater Quarterly Spill control After each spill Ali oil removed and after ofw each oils ill separator Quarterly Spill control When oil accumulation All oil removea and after o!w exceeds'/� inch in the first each oil spill separator chamber or any visible oil in the second or third chamber. Quarterly AN olw When oil accumulation All oil removed and after separator exceeds%inch in the first each oil spill chamber or any visible oil in the second or third chamber. Quarterly API o!w When the sediment level All sediment remove and after separator reaches 6 inches it should be each oil spill removed. Quarterly Coalescing When oil accumulation All oil removed and after plate exceeds %inch in the first each oil spill separator chamber or any visible oil in the second or third chamber Quarterly Coalescing When the sediment level All sediment removed and after plate reaches 6 inches it should be each oils ill I separator removed. Emvirotech Engineering Operation and Maintenance Manual Ph. 360-275-9374 Page 7 of 7 7i0 E Dalbv Road.Union. Washington Fax: 360-27 --47R9 Lot 3 of Parcel 32232-43 000 10 October 11. 2010