HomeMy WebLinkAboutPAR2008-00075 - PAR Letters / Memos - 11/20/2008 Case Activity Listing 1o/7/2011
1:30:42PM
Case #: PAR2008-00075
t
Assigned Done
Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By
PARB50 Public Works Review 11/20/2008 None DONE FJP FJP 12/17/2008 FJP
An engineered stormwater plan will be needed due to the fact thay land disturbing activiy is greater than 1 acre.Applicant was given a copy of the stormwater checklist.
Applicant will need to contact WSDOT concerning any access issues.
Vegetative Buf fers are already being left around outside edge of parcel
PARA10 Application Received 11/19/2008 None DONE CMH 11/20/2008 CMH
PARA910 Meeting 11/20/2008 None DONE CMH CMH 1/7/2009 CMH
APPLICANT: Hama Hama Company
MEETING DATE/TIME: December 17,2008- 10:45/11:00-12:00
PARCEL NO.:32427-00-4000
SITE ADDRESS: Milepost 320,US Highway 101
PROJECT DESCRIPTION: New proposal for expansion of pit site.
MEETING LOCATION: Building III
PLANNER: Tammi Wright,extn. 295
EH: Cindy Waite,extn.353
PARB40 Environ.Health Review 11/20/2008 12/17/2008 None DONE CEW 12/17/2008 CEW
WILL USE PORTA POTTY,NO BUILDING OR RUNNING WATER ON SITE.
PARB20 Building Plan Review 11/20/2008 12/18/2008 None DONE DLC 12/18/2008 DLC
Based upon information provided structures are not proposed. Building permits shall be required if plans change and structures are needed to house staff,equipment,or materials,etc.
All structures shall comply with current codes adopted by Mason County at the time the project is proposed. Contact Mason County building dept.to discuss the project and compliance requirements. d
coker(360)427-9670 ext.510- 12/18/2008
PARB60 Fire Marshal Review 11/20/2008 12/18/2008 None DONE LAW LAW 12/18/2008 LAW
A copy of the fire apparatus access road standards,ordinance 31-04 title 14 chapter 14.17 of the mason county code was given to the applicant.This road will need to be maintained at all times.If a gate is
installed a knox box will be needed.
Pagel of 3 CaseActivity-rpt
Case Activity Listing 10/7/2011
1:30:42PM
Case #: PAR2008-00075
Assigned Done
Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By
PARB10 Planning Review 11/20/2008 12/29/2008 None DONE TSW TSW 12/29/2008 TSW
PlanningDepartment notes for the Pre-Submission Conference for Hama Hama Company on 12/17/08 PAR2008-00075 .
P P Y ( )
PROPOSAL:The applicant is proposing to expand an existing gravel mine to a 183-acre permit boundary.Hama Hama River,a Type 1 stream,and associated wetlands are located to the north.Hood Canal is
to the east.Any proposed mining within 200 feet of the Hood Canal Shoreline and/or Hama Hama River and associated wetlands would fall under Shoreline Master Program jurisdiction.
ZONING:This parcel is designated as Long Term Commercial Forest land(LTCF)with a Mineral Resource Land(MRL)overlay.The expanded gravel mining operation may be permitted as an unspecified
conditional use in LTCF and conditional use in MRL through a Mason Conditional Environmental Permit(MCEP).This requires public notice and a public hearing with a decision made by a Hearing
Examiner.An application was provided.If the MCEP is approved and the mining operation continues as an ongoing operation,the MCEP will be valid for the life of the operation(this time frame shall be
spelled out in the original proposal and will be made a condition of the MCEP).If mining operations cease for a period of more than two years or extends beyond the time limit of the original proposal,then a
new MCEP will be required.
FOREST PRACTICES:If cutting or removing trees to convert forest land to a non-forestry use and the practice is not a Class 1 activity you will need a Class IV General Forest Practices Application.A Class
IV General application requires a SEPA determination and a Mason Conditional Environmental Permit(in Mineral Resource Lands).A Forest Practice Application and Environmental Checklist was
provided.
SHORELINES/STREAMS:Although there is a Type 1 (Hama Hama River)and Hood Canal shoreline near the proposed mining operation,it does appear that the proposed development is outside of the
established buffers.The setbacks will need to be shown on a site plan.If work is proposed within 200 feet of Hood Canal or Hama Hama River then shoreline permits will be required(i.e.Substantial
Development/Conditional Use Permit)and would need to meet the Shoreline Master Program Policies and Use Regulations for commercial development,forest management practices,mining,and landfill.
WETLANDS:There is a wetland associated with the Hama Hama River to the north.A Wetland Delineation and Categorization has already been completed.There is a 250-foot buffer from the wetland.It
appears that the proposed mining will take place outside of the wetland buffer.It does appear there will be some reclamation that will take place within the buffer from the previous mining activity.This
work/mitigation will be reviewed under the MCEP.
SLOPES:There are existing slopes within 300 feet of the proposed mining operation that are greater than 40 percent and therefore will require a geotechnical report.The requirements for a geotechnical
report are outlined in the Mason County Resource Ordinance 17.01.100 Landslide Hazard Areas.
SEPA:This proposal will require SEPA review.A Mason Environmental Checklist was given to the applicant's representative.
EAGLE MANAGEMENT PLAN:The parcel is tagged as Eagle Territory.An eagle management plan may be required through WDFW(Greg Schirato).A plan was written by Greg Schirato,WDFW,in 1997
and signed by David Robbins in 1999.WDFW should review the new proposal and determine if the current plan is acceptable.
Page 2 of 3 CaseActivity-rpt
10/7/2011
Case Activity Listing 1:30:42PM
Case #: PAR2008-00075
P44
Assigned Done
Activity Description Date I Date 2 Date 3 Hold Disp To By Updated Updated By
PARB10 Planning Review 12/29/2008 12/29/2008 None DONE MMS MMS 12/29/2008 MMS
Notes by Michael MacSems,FPA Reviewer:
Questions were raised in the meeting as to whether or not the kind of logging involved in this 50-year mining plan was really a'conversion"under state law,as the forest land will be reclaimed after the gravel
is removed?
A seconded question,assuming that a Class IV G is required,is how to fit a two-year FPA permit with a 50-year mining operation,which will only require the logging of a few acres at a time?
The answer to the first question can be found in WAC 222-16-010(which was modified in 2008),in which the definition of conversion activities(those needing a Class IV G)reads as follows:
"Conversion activities"means activities associated with conversions of forest land to land uses other than commercial timber operation.These activities may be occurring during or after timber harvest on
forest land.They may include but are not limited to the following:
o Preparation for,or installation of,utilities on the forest practices activity site.The development or maintenance of existing rights of way providing utilities exclusively for other ownerships shall not be
considered conversions of forest land(see WAC 222-20-010(5)).
o Any of,or any combination of,the following activities in preparation for nonforestry use of the land:Grading,filling,or stump removal.
o Preparation for,or construction of,any structure requiring local government approval.
o Construction of,or improvement of,roads to a standard greater than needed to conduct forest practices activities.
o Clearing for,or expansion of,rock pits for nonforest practices uses or developing surface mines.
The answer to the second question was provided by Planning Manager Bob Fink.He said that only one MEP would be required,but clarified that a series of Class IV G FPAs would be required over the
lifetime of the mine.
PARA20 Pre-Application Reiew Complete 1/7/2009 None DONE CMH 1/7/2009 CMH
PARA900 Telephone Call 9/l/2009 None DONE MMS 9/1/2009 MMS
Talked to Bonnie Prang on 9/1/09:Told her about 11.05.140.(a).(1).
Page 3 of 3 CaseActivity..rpt