April 14, 1999
Randy Neff, Planner
Mason County
Dept. of Community Development
P. O. BOX 578
Shelton, WA 98584
SUBJECT: HAMA HAMA COMPANY FILL PERMIT
Dear Sir:
This letter is being written as a result of our on-site meeting yesterday. We have
prepared the needed documentation necessary to begin the process of permitting the fill
site referenced above. Enclosed herewith please find the following:
• SEPA Checklist
• Site Map
• Conceptional Fill Plan w/Cross Sections
Written description of Filling and Grading Plan
W/Erosion and Sediment Control Requirements
We fully understand that fees are required for the SEPA Checklist as well as the Fill
Permit application still to be submitted. We ask that you proceed with the initial review
as soon as possible. If you will provide the forms for the Fill Permit Application and the
cost for that application as well as the SEPA Checklist fee we will forward a check to
Mason County for those fees.
We believe that yesterdays meeting of the concerned parties was productive and also
hope that it served to reach a common understanding of the fill permit requirements. We
request that consideration be given towards allowing us to proceed with a fill of up to
20,000 cubic yards as the permit process proceeds. We also believe that the public need
and necessity of reopening SR-101 as soon as possible provides ample justification for
the granting of our emergency request. If Mason County concurs the Washington State
Department of Transportation would like to begin almost immediately to haul fill to the
site so that the Ayock Slide Site can be reopened to at least one way traffic while the
larger project is bid.
itW,Uo
® We are a member of the
A.G.C. of Washington AN EQUAL OPPORTUNITY EMPLOYER
I S
CONTRACTOR REGISTRATION NO. QUIGGB1022RT
If you have questions or need additional information, please contact me at 360-533-1530.
If immediate payment of fees is required we will arrange for someone to deliver a check
to Shelton.
Very truly yours,
UIGG BROS. INC.
Tez. Ward
l�
SECT I oN A -A
STORM WATCR PoNDS _
�20 fri LA
90 `
-- - -- _— .
SQ 1V NTu R A L' -----
S COD GROUND
CD
O Sao boo _ . 9co�_ tzoo
1150
/ 5
rt
0 300 600 900
S� 5 E�T r orn 88
o°
44
MAMA HAMA COMPANY
0� FILL AND GRADING PERMIT
P
CONCEPTIONAL FILL PLAN
APPLICANT: QUIGG BROS. INC.
S 0 DATE: APRIL 13, 1999
Z? SCALE: V=300'
e=77777; 11NOT FOR CONSTRUCTION
�� � :• • � - :•� . • .'"'°`'per`� • �
is
rho 'mt—41.1
SOLD SOLD
LOT FILL AND I GRADING COMPANY
�
• 4
PP QUIG BROS.
7
D . 1999
f
HAMA HAMA COMPANY FILL PERMIT
FILLING AND GRADING PLAN
SITE LOCATION: Section 27, Township 24 North, Range 3 West, WM
PROPERTY OWNER: Dave Robbins
Hama Hama Company
N. 35959 Hwy. 101
Lilliwaup, WA 98555
APPLICANT: Quigg Bros. Inc.
P. O. Box 1707
819 West State St.
Aberdeen, WA 98520
Quigg Bros. Inc is proposing to construct a landslide debris fill on property owned by the
Hama Hama Company. The quantity of material to be placed is currently unknown, but
the site capacity is estimated to be more than 250,000 Cubic Yards. The fill material
consists of landslide soils to be removed from the Ayock(M.P. 322) and Lilliwaup (M.P.
326) Landslides on SR-101 south of the mouth of the Hama Hama River. No stumps or
wood waste will be placed into the fill constructed under this proposed project.
The site of the proposed landfill is in a forested valley. No storm water or other drainage
from the site enters the surface waters of the State as the fill site terminates at a natural
pothole at its north eastern boundary. The underlying soils in the area are sand and
gravel overlain by a thin layer of topsoil. The fill site currently infiltrates storm water
into the ground when rainfall intensities are such that onsite infiltration on the
surrounding hillsides cannot accept all of the rainfall.. The pothole shows evidence that
the water level sometimes reaches 5 or more feet in depth,however as the soils are free
draining and the duration of this inundation is not sufficient to sustain wetland type
plants. The area was dry during each of two recent visits.
The intent of the proponent and the property owner is that storm water ponds will be
established on each end of the fill. This will allow storm water to infiltrate into the
ground water which duplicates the existing systems function.. The proposed fill will
occur in stages beginning at the lower end of the valley. The fill will be delivered to the
site by dump trucks. The material will then be spread by bulldozer into lifts. Type 3
compaction will be provided. Greater densification will occur as time goes by, but is not
necessary as the site will be returned to forestry.
Erosion and Sediment Control Requirement #1
Ground cover will be reestablished as the fill proceeds to limit the exposed soils to meet
the requirements of Mason County Ordinance# 141-97. Exposed soils beyond the work
area will be covered within 7 days. No sediment will be allowed to leave the site.
Erosion and Sediment Control Requirement #2
Clearing limits will be clearly marked prior to any clearing of the site. No easements,
setbacks, sensitive/critical areas or their buffers are in the vicinity of this project.
Erosion and Sediment Control Requirement #3
No public or private properties exist within %2 mile of the subject site, therefore Erosion
and Sediment Control Requirement #3 does not apply. Silt fence will be installed along
the access road to insure what any mud or other debris from the trucks will not be washed
by rainfall to any surface water.
Erosion and Sediment Control Requirement#4
The nature of the existing topography does not allow sediment to leave the site.
Sediment ponds will be installed and maintained at both the upper and lower extent of the
fill.
Erosion and Sediment Control Requirement #5
No cut slopes will be constructed as part of this project. The fill will be placed in the
bottom of a natural draw. The only fill slopes to be created will be at the upstream and
downstream ends of the fill where it meets the natural ground level. We anticipate that
the fill will be slightly humped in the center to channel storm water to the edge of the fill
where it abuts the existing slope. A grass-lined swale will be established along both
edges of the fill as it proceeds down slope. This swale abutting the undisturbed soils of
the valley sides will allow most of the storm water from the top of the fill to infiltrate into
the ground in the same manner as is currently occurring. The down valley fill slope will
be limited to a 3:1 slope and the swales will be directed to discharge into rock lined
channels to protect the slopes. A rock check dam will be placed for each 2 feet of
vertical drop on the fill slope.
Erosion and Sediment Control Requirement #6
Not offsite erosion occurs from this site. No discharge of storm water offsite exists
except the discharge to ground water previously described. This plan will maintain that
condition.
Erosion and Sediment Control Requirement#7
The sites ability to infiltrate the 2-year, 24 hour storm will be maintained. Stabilization
as previously described will be provided to prevent erosion of drainage conduits or
outlets, slopes and downstream reaches and to protect the discharges from all onsite
conveyance systems.
Erosion and Sediment Control Requirement#8
The measures described above are intended to protect the ability of the overall site to
continue its function in the discharge of storm water to the ground water. Since this site
does not currently have a manmade storm water control system and since none is
proposed this requirement does not apply.
Erosion and Sediment Control Requirement #9
This requirement does not apply in this instance, as no underground utility construction is
included in this project.
Erosion and Sediment Control Requirement #10
Construction vehicles will access the site via an existing private gravel haul road. The
haul road is approximately 1/2 of a mile long and this will be adequate to limit the
tracking of mud from the fill site back onto SR-101. The loading site at the SR-101 slide
will require some attention. WSDOT will establish those procedures in their contract.
Silt fences will be provided where required along the haul road as previously described.
Erosion and Sediment Control Requirement #11
Any temporary erosion control BMP's will be removed within 30 days of final site
stabilization. Any sediments collected will be removed and stabilized on site. All
disturbed soils will be planted by hydroseeding and covered with mulch as required in
Erosion and Sediment Control Requirement 41. Final site stabilization will be
accomplished on a schedule while will allow the ground cover adequate time to estabilish
itself.
Erosion and Sediment Control Requirement #12
This requirement does not apply for this project.
Erosion and Sediment Control Requirement #13
Litter, fuel or lubricating oils or other possible pollutants will be closely monitored
during construction of this fill. All BMP's will be followed and any reports required by
Mason County or other agencies with jurisdiction will be filed.
Erosion and Sediment Control Requirement #14
All temporary erosion or sediment control features will be maintained during the life of
this project. Permanent erosion or sediment control features will be maintained as
required to maintain their intended functionality.
STATE ENVIRONMENTAL POLICY ACT
ENVIRONMENTAL CHECKLIST
Purpose of Checklist:
The State Environmental Policy Act (SEPA), chapter 43.21C RCW,
requires all governmental agencies to consider the environmental
impacts of a proposal before making decisions. An environmental impact
statement (EIS) must be prepared for all proposals with probable
significant adverse impacts on the quality of the environment. The
purpose of this checklist is to provide information to help you and the
agency identify impacts from your proposal (and to reduce or avoid
impacts from the proposal, if it can be done) and to help the agency
decide whether an EIS is required.
Instructions to Applicants:
This environmental checklist asks you to describe some basic
information about your proposal. Governmental agencies use this
checklist to determine whether the environmental impacts of your
proposal are significant, requiring preparation of an EIS. Answer the
questions briefly, with the most precise information known, or give the
best description you can.
You must answer each question accurately and carefully, to the best of
your knowledge. In most cases, you should be able to answer the
questions from your own observations or project plans without the need
to hire experts. If you really do not know the answer, or if a question
does not apply to your proposal, write "do not know" or "does not apply."
Complete answers to the questions now may avoid unnecessary delays
later.
Some questions ask about governmental regulations, such as zoning,
shoreline, and landmark designations. Answer these questions if you
can. If you have problems, the governmental agencies can assist you.
The checklist questions apply to all parts of your proposal, even if you
plan to do them over a period of time or on difference parcels of land.
Attach any additional information that will help describe your proposal
or its environmental effects. The agency to which you submit this
checklist may ask you to explain your answers or provide additional
information reasonably related to determining if there may be significant
adverse impact.
A. BACKGROUND
1. Name of proposed project, if applicable:
Dave Robbins
Hama Hama Company
N. 35959 Hwy. 101
Lilliwaup, WA 98555
Fill and Grading Permit Application
2. Name of applicant:
Quigg Brothers Incorporated
3. Address and phone number of applicant and contact person:
Applicant:
Quigg Brothers Incorporated
P. O. Box 1707
819 West State
Aberdeen, WA 98520
Contract Person: Mr. Tim Quigg
360-533-1530
4. Date checklist prepared:
April 13, 1999
5. Agency requesting checklist:
Mason County Planning and Building Departments
6. Proposed timing or schedule (including phasing, if applicable):
Proposed fill to begin during late April or early May 1999
weather permitting. The applicant proposes a 2 year term for
the permit due to the uncertainty of weather and difficulty of
working on landslides.
7. Do you have any plans for future additions, expansion, or further
activity related to or connected with this proposal?
Nothing beyond a secondary desire on the part of the property
owner and the applicant to make this site available for other
projects so long as permitted capacity is available. Ultimate
capacity of the site will be determined as this project proceeds
through the permit process.
8. List any environmental information you know about that has
been prepared, or will be prepared, directly relating to this
proposal.
None.
9. Do you know whether applications are pending for government
approvals of other proposals directly affecting the property
covered by your proposal? If yes, explain.
None known at this time.
10. List any government approvals or permits that will be needed for
your proposal, if known.
None known at this time.
11. Give brief, complete description of your proposal, including
proposed uses and the size of the project and site. There are
several questions later in this checklist that ask you to describe
certain aspects of your proposal. You do not need to repeat those
answers on this page. (Lead agencies may modify this form to
include additional specific information on project description.)
This project will provide for disposal of landslide debris from
the Lilliwaup M.P. 326 and Ayock M.P. 322 landslides, which
have blocked SR-101. The proposed fill site has no natural
discharge except to ground water through infiltration. The site
is very lightly timbered with non-merchantable trees that are
suffering from root rot. The property owner wants to remove
the few small trees and then cover the site with fill material.
The land will be replanted with ground cover and trees
following completion of the filling process. Provision will be
made at both the upslope and downslope ends of the proposed
fill to allow storm water to infiltrate into the pervious sands
and gravels which underlay the site. This method of storm
water control duplicates the existing condition.
12. Location of the proposal. Give sufficient information for a person
to understand the precise location of your proposed project,
including street address, if any, and section, township, and
range, if known. If a proposal would occur over a range of area,
provide the range or boundaries of the site(s). Provide a legal
description, site plan, vicinity map, and topographic map, if
reasonably available. While you should submit any plans
required by the agency, you are not required to duplicate maps or
detailed plans submitted with any permit applications related to
this checklist.
All of the work to be undertaken as part of this project is
located within the South 1/2 of Section 27, Township 24 North,
Range 3 West WM. Parcel # 32427-00-04000
B. ENVIRONMENTAL ELEMENTS
1. EARTH:
a. General description of the site (circle one): Flat, rolling, hill
steep slopes, mountainous, other
What is the steepest sloe on the site (approximate percent
b• P P ( PP
slope)?
Maximum slopes are in the 31% range in the area to be filled.
This project will reduce cross slopes in the area of the fill and
will leave the lower valleyslope at near current grades, but at a
P
somewhat higher elevation. The down slope end of the
proposed fill will be limited to a 3:1 slope. Provisions will be
made to control erosion from the fill.
C. What general types of soils are found on the site (for example,
clay, gravel, sand, peat, muck)? If you know the classification of
agricultural soils, specify them and note any prime farmland.
The soil within the project area generally consists of sand and
gravel with shallow topsoil or forest duff on or near the surface.
The existing soils can be described as free draining.
d. Are there surface indications or history of unstable soils in the
immediate vicinity? If so, describe.
No
e. Describe the purpose, type, and approximate quantities of any
filling or grading proposed. Indicate source of fill.
Exact quantities of the proposed fill are not currently known,
but the site has a capacity of more than 250,000 cubic yards.
f. Could erosion occur as a result of clearing, construction, or use?
If so generally describe.
No. Construction work will include protective measures for the
possible minor erosion problems.
g. About what percent of the site will be covered with impervious
surfaces after project construction (for example, asphalt or
buildings)?
No impervious surfaces will be created as a result of this
proposed project.
h. Proposed measures to reduce or control erosion, or other impacts
to the earth, if any:
Erosion control features will be constructed as the fill proceeds.
The intent is to leave the site in a condition which will allow
storm water to infiltrate into the ground in the same manner as
currently exists. Straw bales, rock check dams and silt control
fences will all be used. Silt fences and straw bails will be used
along the existing haul road from SR-101 to the fill site.
2. AIR:
a. What types of emissions to the air would result from the proposal
(i.e. dust, automobile, odors, and industrial wood smoke) during
construction and when the project is completed? If any,
generally describe and give approximate quantities if known.
Dust and equipment exhaust, during construction. A water
truck will be used if necessary to control dust generated by the
trucks delivering material to the fill site.
b. Are there any off-site sources of emissions or odor that may
affect your proposal? If so, generally describe.
The materials transport to the fill site by truck is also a
potential source to emissions consisting of dust and exhaust
emissions, but these are subject to other environmental
regulation. Dust control on site will be provided as needed to
limit offsite dust.
C. Proposed measures to reduce or control emissions or other
impacts to air, if any:
None. Contractor's equipment is controlled by current
regulations.
3. WATER:
a. Surface:
1) Is there any surface water body on or in the immediate
vicinity of the site (including year-round and seasonal
streams, saltwater, lakes, ponds, wetlands)? If yes,
describe type and provide names. If appropriate, state what
stream or river it flows into.
Yes, the Hama Hama River is approximately 1/2 mile away
and Hood Canal is approximately 5/8 mile away, however
no drainage from the proposed fill site directly enters
either body of water. All stromwater from the site enters
the groundwater. This project will leave that system
intact.
2) Will the project require any work over, in, or adjacent to
(within 200 feet) the described waters? If yes, please
describe and attach available plans.
No
3) Estimate the amount of fill and dredge material that would
be placed in or removed from surface water or wetlands and
indicate the area of the site that would be affected. Indicate
the source of fill material.
None
4) Will the proposal require surface water withdrawals or
diversions? Give general description, purpose, and
approximate quantities if known.
No.
5) Does the proposal lie within the 100-year flood plain? If so,
note location on the site plan.
No work is proposed within the 100 year floodplain.
6) Does the proposal involve any discharges of waste
materials to surface waters? If so, describe the type of
waste and anticipated volume of discharge.
No.
b. Ground:
1) Will ground water be withdrawn, or will water be
discharged to ground water? Give general description,
purpose, and approximate quantities if known.
No.
2) Describe waste material that will be discharged into the
ground from septic tanks or other sources, if any (for
example, Domestic sewage; industrial, containing the
following chemicals...; agricultural; etc..). Describe the
general size of the system, the number of such systems, the
number of houses to be served (if applicable), or the number
of animals or humans the system(s) are expected to serve.
None.
C. Water Runoff(including storm water):
1) Describe the source of runoff (including storm water) and
methods of collection and disposal, if any (include
quantities, if known). Where will this water flow? Will this
water flow into other waters? If so, describe.
No significant change in existing storm water drainage
patterns will occur as a result of this project. See Section
B, Article 1, Paragraph b for additional information.
2) Could waste materials enter ground or surface waters? if
so, generally describe.
No
d. Proposed measures to reduce or control surface, ground and
runoff water impacts, if any:
Erosion control features will be constructed as the fill proceeds.
The intent is to leave the existing pothole as the primary storm
water control mechanism. The amount of open unrestored
earth will be kept to a minimum to reduce the potential of
plugging the underlying sands and gravel with fines. Straw
bales, rock check dams and silt control fences will all be used.
4. PLANTS:
a. Check or circle types of vegetation found on the site:
Deciduous tree: alder, maple, aspen, other
evergreen tree: fir, cedar, pine, other
shrubs
grass
pasture
crop or grain - None Known
wet soil plants: cattail, buttercup, bulrush, skunk cabbage, other
Water plants: water lily, eelgrass, Milfoil, other types of
vegetation
b. What kind and amount of vegetation will be removed or altered?
Existing non-merchantable trees will be removed prior to the
fill operation. The site will be replanted to forest after the fill
process is complete. The existing trees in this area have root
rot and the land owner believes the fill will provide better
conditions for the replanting of the forest cover.
C. List threatened or endangered species known to be on or near
the site.
None known.
d. Proposed landscaping, use of native plants or other measures to
preserve or enhance vegetation on the site, if any:
Restoration of groundcover will be provided.
5. ANIMALS:
a. Circle any birds or animals which have been observed on or near
the site or are known to be on or near the site:
birds: hawk, heron, eagle, songbirds,
other. waterfowl
mammals: deer, bear, elk, beaver,
other.
fish: bass, salmon, trout, herring, shellfish,
other:
b. List any threatened or endangered species known to be on or
near the site.
None known.
C. Is the site part of a migration route? If so, explain.
Migratory birds use waterways in the general area, but nothing
related directly to the proposed improvements.
d. Proposed measures to preserve or enhance wildlife, if any:
None proposed. The project will not reduce existing habitat.
6. ENERGY AND NATURAL RESOURCES:
a. What kinds of energy (electric, natural gas, oil, wood stove, solar)
will be used to meet the completed project's energy needs?
Describe whether it will be used for heating, manufacturing, etc.
None
b. Would your project affect the potential use of solar energy by
adjacent properties? If so, generally describe.
No.
C. What kinds of energy conservation features are included in the
plans of this proposal? List other proposed measures to reduce
or control energy impacts, if any:
None proposed.
7. ENVIRONMENTAL HEALTH:
a. Are there any environmental health hazards, including exposure
to toxic chemicals, risk of fire and explosion, spill, or hazardous
waste, that could occur as a result of this proposal? If so,
describe.
No
I) Describe special emergency services that might be required.
Does not apply.
2) Proposed measures to reduce or control environmental
health hazards, if any:
Does not apply.
b. Noise:
1) What types of noise exist in the area which may affect your
project (for example, traffic, equipment, operation, other)?
None.
2) What types and levels of noise would be created by or
associated with the project on a short-term or a long-term
basis (for example, traffic, construction, operation, other)?
Indicate what hours noise would come from site.
Noise will be created during construction by
heavy equipment, during daylight hours. No
long-term noise sources will be created.
3) Proposed measures to reduce or control noise impacts, if
any:
None.
8. LAND AND SHORELINE USE:
a. What is the current use of the site and adjacent properties?
Tree Farming
b. Has the site been used for agriculture? If so, describe.
No.
C. Describe any structures on the site.
None
d. Will any structures be demolished? If so, what?
No.
e. What is the current zoning classification of the site?
Unknown
f. What is the current comprehensive plan designation for the site?
Unknown
g. If applicable, what is the current shoreline master program
designation for the site?
Does not apply.
Has any part of the site been classified as an "environmentally
sensitive" area? If so, specify.
No.
i. Approximately how many people would reside or work in the
completed project.
Does not apply.
j. Approximately how many people would the completed project
displace?
None.
k. Proposed measures to avoid or reduce displacement impacts, if
any:
Does not apply.
1. Proposed measures to ensure that the proposal is compatible
with existing and projected land uses and plans, if any:
The project will continue present uses.
9. HOUSING:
a. Approximately how many units would be provided, if any?
indicate whether high, middle, or low-income housing.
Does not apply.
b. Approximately how many units if any, would be eliminated?
Indicate whether high, middle, or low-income.
Does not apply.
C. Proposed measures to reduce or control housing impacts, if any:
Does not apply.
10. AESTHETICS:
a. What is the tallest height of any proposed structure(s), not
including antennas; what is the principle exterior building
material(s)proposed?
Does not apply.
b. What views in the immediate vicinity would be altered or
obstructed?
None
I
C. Proposed measures to reduce or control aesthetic impacts, if any:
None required.
11. LIGHT AND GLARE:
a. What type of light or glare will the proposal produce? What time
of day would it mainly occur?
None.
b. Could light or glare from the finished project be a safety hazard
or interfere with views?
No.
C. What existing off-site sources of light or glare may affect your
proposal?
None.
d. Proposed measures to reduce or control light and glare impacts, if
any:
Does not apply.
12. RECREATION:
a. What designated and informal recreational opportunities are in
the immediate vicinity?
None.
b. Would the proposed project displace any existing recreational
uses? If so, describe:
No.
C. Proposed measures to reduce or control impacts on recreation,
including recreational opportunities to be provided by the project
of applicant, if any:
Does not apply.
13. HISTORIC AND CULTURAL PRESERVATION:
a. Are there any places or objects listed on, or proposed for
national, state, or local preservation registers known to be on or
next to the site? If so, generally describe:
None known.
b. Generally describe any landmarks or evidence of historic,
archaeological importance know to be on or next to the site?
None known.
C. Proposed measures to reduce or control impacts, if any:
Does not apply.
14. TRANSPORTATION:
a. Identify public streets and highway serving the site, and
describe proposed access to existing street system. Show on site
plans, if any.
No public roads exist on the site.
b. Is site currently being served by public transit? If not, what is
the approximate distances to nearest transit stop?
Does not apply.
C. How many parking spaces would the completed project have?
How many would the project eliminate?
Does not apply.
d. Will the proposal require any new roads or streets, or
improvements to existing roads or streets, not including
driveways? If so, generally describe (indicate whether public or
private).
No.
e. Will the project use (or occur in the immediate vicinity of) water,
rail, or air transportation? If so, generally describe:
No.
f. How many vehicular trips per day would be generated by the
completed project? If known, indicate when peak volumes would
occur.
It is estimated that as many as 150-200 truck trips per day will
occur during construction. Most of these trips will occur before
the peak summer traffic season and will cease when the
highway is reopened to traffic, no conflicts with traffic are
expected
g. Proposed measures to reduce or control transportation impacts, if
any:
Silt fences along the private haul road to insure that mud
which may fall off of the trucks is not washed into any surface
water.
15. PUBLIC SERVICES:
a. Would the project result in an increased need for public services
(for example: fire protection, police protection, health care,
schools, other)? If so, generally describe.
No.
b. Proposed measures to reduce or control direct impacts upon
public services, if any.
Does not apply.
16. UTILITIES:
a. Circle utilities currently available at the site: electricity, natural
gas, water, refuse service, telephone, sanitary sewer, septic
system, other.
No utilities currently extend to the project site.
b. Describe the utilities that are proposed for the project, the utilities
providing the service, and the general construction activities on
the site or in the immediate vicinity which might be needed.
None are required or proposed.
C. SIGNATURE
The above answers are true and complete to the best of my knowledge. I
understand that the lead agency is relying on them to make its decision.
Signature �•
Terry and
Quigg B s. Inc.
Date Submitted: April 14, 1999
- - J