Loading...
HomeMy WebLinkAboutDepartment of the Army Corps Engineers - PLN General - 9/9/2009 DEPARTMENT OF THE ARMY SEATTLE DISTRICT,CORPS OF ENGINEERS P.O.BOX 3755 SEATTLE,WASHINGTONON 981243755 REPLY TO ATTENTION OF Regulatory Branch Mr. Neil Werner Hood Canal Salmon Enhancement Group Post Office Box 2169 Belfair, Washington 98528 Reference: NWS-2010-604 Hood Canal Salmon Enhancement Group Dear Mr. Werner: We have reviewed your application to install a maximum of 3 engineered logjams, 3 habitat logjams, and 2 Y-log structures that are associated with the restoration of a 3 acre salt marsh, removal of a 30" fish blocking culvert, removal of an access road and the associated grading. In addition, in order to complete the work, a 350-foot by 30 foot section of the Hama Hama River would be diverted into a temporary diversion channel, in the Hama Hama River at Eldon, Mason County, Washington. Based on the information you provided to us,Nationwide Permit (NWP)27,Aquatic Habitat Restoration, Establishment, and Enhancement Activities (Federal Register, March 12, 2007 Vol. 72,No. 47), authorizes your proposal as depicted on the enclosed drawings dated September 9, 2009. In order for this NWP authorization to be valid, you must ensure the work is performed in accordance with the enclosed Nationwide Permit 27, Terms and Conditions and the following special conditions: a. You must implement and abide by the Endangered Species Act (ESA) requirements and/or agreements set forth in the Appendix G, Programmatic Biological Assessment Consistency Form for USFWS Restoration Activities, dated August 17, 2009 in its entirety. The National Marine Fisheries Service (NMFS) concurred with a finding of"may affect, not likely to adversely affect"based on the 4 (d)Rule, Limit 8 form dated July 2, 2009. Both agencies will be informed of this permit issuance. Failure to comply with the commitments made in this document constitutes non-compliance with the ESA and your Corps permit. The USFWS/NMFS is the appropriate authority to determine compliance with ESA. b. In order to meet the requirements of the ESA and for the protection of Puget Sound Chinook, Puget Sound steelhead, Summer-run Chum, and Puget Sound Coastal bull trout, the permittee may conduct the authorized activities from July 16 through February 15 in any year this permit is valid. The permittee shall not conduct work authorized by this permit from February 16 through July 15 in any year this permit is valid. -2- c. If human remains, historic resources, or archaeological resources are encountered during construction, all ground disturbing activities shall cease in the immediate area and the permittee shall immediately(within one business day of discovery) notify the U.S. Army Corps of Engineers (Corps), Seattle District,Regulatory Branch. The permittee shall perform any work required by the Corps in accordance with Section 106 of the National Historic Preservation Act and Corps regulations. The authorized work complies with the Washington State Department of Ecology's (Ecology) Water Quality Certification and the Coastal Zone Management Act requirements for this NWP. No further coordination with Ecology is required. For this project,the U. S. Fish and Wildlife Service is the Federal lead agency responsible for compliance with Section 7 of the ESA, the Magnuson-Stevens Fishery Conservation and Management Act, and Section 106 of the National Historic Preservation Act. For the purpose of this Department of the Army authorization, the Corps has determined that this project will comply with the requirements of the above laws provided you comply with special conditions "a"through"c"listed above. We have determined that the Hama Hama River is a water of the U.S. in the project area. We have completed an approved jurisdictional determination for your project area dated May 18, 2010, which can be found on our website at http://www.nws.usace.ariny.mil/click on Regulatory, Regulatory/Permits, Approved Jurisdictional Determinations. If you object to this determination, you may request an administrative appeal under our regulations (33 CFR 331) as described in the enclosed Appeal Process Fact Shedt and the Notification ofAdministrative Appeal Options and Process and Request for Appeal form. Upon completing the authorized work, you must fill out and return the enclosed Certificate of Compliance with Department of the Army Permit form. Thank you for your cooperation during the permit process. We are interested in your experience with our Regulatory Program and encourage you to complete a customer service survey form. This form and information about our program is available on our website at http://www.nws.usace.army.mil/. A copy of this letter without enclosures will be furnished to Mr. Pat McCullough of ESA Inc. 210 Northeast Cherokee Beach Road, Belfair,Washington 98528. If you have any questions about this letter,please contact me at(206) 764-6883 or via email at Darren.Habel(a,usace.army.mil. Sincerely, Mt*/ 4�Q Darren Habel, Project Manager Regulatory Branch Enclosures