Loading...
HomeMy WebLinkAboutFPA2008-00010 - FPA Application - 5/8/2009 PgoN Copes MASON COUNTY � rp Shelton (360) 427-9670 DEPARTMENT OF COMMUNITY DEVELOPMENT Belfair (360) 275-4467 Planning Mason County Bldg.1 411 N.5th Elma (360) 482-5269 P.O.Box 279 Shelton,WA 98584 1854 Gregg Paisley 4919 Lakeridge Drive East Lake Tapps, WA 98391 May 8, 2009 Re: 32135-34-00000 et. al. Dear Mr. Paisley, This letter is in follow up to my site visit to the above referenced property back in October and to Pam Bennett-Cumming's letter of 4/16/09. Last Fall you submitted a Forest Practices Application (FPA 2008-00010)to selectively log portions of your property. During that visit we identified critical areas and their buffers but agreed to hold off of further review of the application until other permits that had been combined under the same SEPA application were ready for a threshold determination. I am now of the understanding that you have withdrawn your MHP application and that any other permits reliant on the SEPA have since expired. Can you confirm that this is also you understanding. If so, your next step is to submit a fresh SEPA checklist that is written with the focus on the activities that will occur under the FPA. It would be advisable to explain in the checklist that this FPA is only the first phase of a larger project and that successive phases will be reviewed under SEPA at a later date (if and when necessary). Once I have a checklist that is focused on the FPA review, I will be able to make a threshold determination. Assuming that no substantive comments are received, I would be able to issue the FPA shortly after the conclusion of the comment period. I am enclosing a fresh SEPA checklist for your use, and should be returned directly to my attention. If you have any questions I can be reached at ext. 571 or by e-mail at mms(2co.mason.wa.us. Thank you. Sincerely, r Michael Mac ems FPA Reviewer f'0 CO° MASON COUNTY Shelton (360) 427-9670 DEPARTMENT OF COMMUNITY DEVELOPMENT Belfair (360) 275-4467 Planning _ Mason County Bldg. 1 411 N.5th Elma (360) 482-5269 P.O.Box 279 Shelton,WA 98584 1854 Gregg Paisley 4919 Lakeridge Drive Lake Tapps, WA 98391 October 6, 2008 Re: 32135-34-00000 et al Dear Mr. Paisley, This letter is follow up to our on-site meeting regarding your application for a Forest Practice Application on your above referenced parcels. The intention here is to memorialize the issues that we discussed relative to your FPA application. The only critical area I identified on your property is a spring feed stream that I understand to be classified as a Np which has a 100' buffer and an additional 15' building setback. There is also what appears to be a non jurisdictional wetland in the SW corner of your We also discussed a Pileated woodpecker snag that I flagged and the Eagle Tree that-you have been working with WSF&W on (staying out of a 400' radius). I measured the slopes on your property in several locations and came up with a slope of 13%. There is however a much steeper slope NE of your property above Cranberry Creek,but that is over 600' north of your property line. As we discussed, you are not looking to have this FPA issued prior to other permits that you already have under review. Here is a list of the items that will need to happen before I can sign off on the FPA. SEPA(SEP 2008-00060)needs to be issued(I will add condition relevant to the FPA). A stormwater and erosion control plan needs to be approved by Mason County Public Works. The Eagle Tree radius should be shown on your site plan. A Pileated Woodpecker snag was observed on site. It is my understanding that most of this site will remain undisturbed. Pileated Woodpeckers are protected by chapter 17.01.110 of the Mason County Critical Areas Ordinance. Disturbance of snags showing the distinctive characteristics of Pileated foraging are to be avoided. If the removal of 1 such a snag can not be avoided, then a Mason Environmental Permit(MEP) and a Habitat Management Plan(HMP)will be required for mitigation. If you have any questions, I can be reached at ext. 571 or at mms@co.mason.wa.us. Thank you. Sincerely, Michael MacSems FPA Reviewer cc: Pam Bennett-Cumming Fred Perryman I Co E TY 'l OF COMMUNITY DEVELOPMENT FPX:<00e-� Sa98n40 Bldg. III,426 West Cedar Street PO Box 186, Shelton,WA 98584 �Nu ASON COUNTY www.co.mason.wa.us (360)427-9670 Belfair(360)275-4467 Elma(360)482-5269 FOREST PRACTICES APPLICATION/NOTIFICATION Type IV General This application should be accompanied with an Environmental Checklist(SEPA)as well as an activity map/site plan which addresses items listed below. TYPE OR PRINT IN INK: 1. Landowner,Timber Owner and Operator information. �L-'egal Name of LANDOWNER Legal Name of TIMBER OWNER Legal Name of OPERATOR V2tc-/_, fA1SLr_Lt Sla►-tt sAM6 Mailing Address: Mailing Address: Sq H c Mailing Address: 4clta l.A�ela�ac�E Drt La�E ► APr's wa g83`11 City,State,Zip City,State,Zip City,State,Zip t_0_. _C TAf e> t3A R83g1 Phone( ) 2 5 3.'7 O a . i B(6-1 Phone( ) Phone( ) Email:Gam,PA i-m�t-s Email: Email: G "A cL. C-0,Lj 2. Contact person information. Contact Person Phone( ) Z 5 3• `7 D 9 . 1 Z pA VSt.r-i4 Email: G ir—�--6V PA lSt.-�t& G"A LL, C 001 �7 C1 GA2�.�V a-rvA,,v ooIAJL F02 13�^PCo�� �AOS , PI�f> i`►C,. �rL. T�HP�e �} SNaLL, i kZP,AI>L-t 3. If you are harvesting timber,enter the Forest Tax Reporting Account Number of;the Timber Owner: For tax reporting information or to receive a tax number,call the Department of Revenue at(800)548-8829. 4. Legal description where the forest practices will occur. Parcel Number Sub Division '/,%. Section Township Range E/W 3S -I! 00000 �3 31 oc�mop 3 t 1 Q�OoS l 000SO 5. Answer a ch question as it applies to your proposed forest practice. a. [ *o. [] Yes. Is the activity within an urban growth area? b. [ No. [] Yes. Is the activity within a public park? c. [00. [] Yes. Is the activity within 500 feet of a public park? Park name: d. [ No. [] Yes. Is the activity located on lands platted after January 1, 1960? e. []No. Yes. Is the activity within 200 feet of saltwater lake river/creek/stremn ✓ pond ✓ wetland seasonal runoff slopes which exceed 151/o? f. What is the expected duration of FPA? 20 O 9-- 20 0A I O CM- Proposed start date: 2('9pQ Proposed end date: 61, Page 1 of 4 6. Are you cutting r removing timber? []No. [ Yes. Complete the table below and identify all timber harvest and salvage activity boundaries on the activity map. Acres Volume to be Steepest Slope in Unit# Harvest Type Yarding Method net Harvested mb Harvest Unit ►r>r w o� eta C�rEK rtrJ P m 0<00 t 7. Are you constructing or abandoning roads? []No. [4J/Yes. Complete the table below. Show locations and identify all road activities on the activity map. Total Length Steepest Side Slope Abandonment Date Type of Activity feet % Mo/Yr Road Construction 2 r'ate tq OZO Does Not Apply Temporary Road Construction Road Abandonment Work in or over typed water may require a Hydraulic Project Approval(HPA)from the Washington Department of Fish and Wildlife (WDFW). If you have questions concerning the HPA,visit the WDFW website at www.wdfw.wa.gov/habitat.htm. 8. Are you installing or replacing water-crossings? []No. [ Yes. Complete the table below. Show locations and identify all proposed water-crossings on the activity map. Crossing Crossing Dimensions Crossing Crossing Dimensions Identifier Type x length) Identifier Type width x length) O+L►.��.., -) Z,. 1 1 x p' '7rC-%Ok-W-.A 2 �LUG Mr 1 is - 40 C:QL%3k-Q--r12„ r k 4C5 i 9. Mark the following activities that will be done in or over typed water. T-tp r t.�P I'-tpt' a P Activity in or over: TyPtAl Stream- Type III Stream Type IV Stream Type V Stream Removing culverts of bridges Equipment crossing f ✓ Ground skidding Suspending cables Cable yarding Falling and bucking Other 10. Isry activity in a wetland or wetland buffer? No. [] Yes. Complete the table below. Show locations and identify all wetlands and buffers on the activity map. —WcdQd Wetland Type Activity Type in Activity Type in Total Wetland Total Area Total Area Identifier (I,II,III,IV, Wetland Buffer Area(acres) Drained(acres) Filled(acres) er 11. Describe how the following are identified on the ground. • Harvest boundaries/unit comers: • Right-of-way limits and centerlines for road work,culverts and bridges: S—A • Critical areas and critical area buffer boundaries: � , S.I-A P'k— Page 2 of 4 r ,k 2 a , 12. Have you reviewed this fo/lest practices activity area to determine whether it may involve historic sites and/or Native American cultural resources? V No. [I Yes. 13. We affirm that the information contained herein is true,and understand that this proposed forest practice is subject to the Forest Practices Act and Rules and Mason County Forest Practices Conversion Ordinance as well as all other federal,state or local regulations. Compliance with the Forest Practices Act and Rules and the Mason County Forest Practices Conversion Ordinance does not ensure compliance with the Endangered Species Act or other federal state or local laws. Signature of LANDOWNER Signature of TIMBER OWNER Signature of OPERATOR (if different than landowner) (If different that landowner) Print name:�' � � PA Print name: / Print name: l Date: 9 - -t - Date: Date: Additional information: (Optional) Per Mason County Ordinance 11.05, Section 11.05.120,a site map shall accompany this application which includes the following information. I Harvest boundaries and tree retention areas. II The approximate location of any structures. III The location of all existing and proposed streets,right-of-ways,easements,skid roads,haul roads,and landings ✓ within the proposal. IV The location of future land development including stormwater management facilities and vegetation to be retuned ��� for site landscaping,open space,wildlife habitat,screening,and/or buffers. j rc,7" �e 15 V/ Site topography at contour intervals of 40 feet. ���Lrt61 �/ PoF p Y t r'414-^L"� � 1��41-«z l��v. 5 J VI Critical areas and critical area buffers regulated pursuant to the Critical Areas Ordinance. L9P-- l � VII Drainage ways and culverts. ✓ VIII Site area targeted for further harvest including proposed timing. V IX North arrow and scale shall be shown on all site plans.The scale shall be no smaller than one inch to 200 feet. ✓ Staff asks that,at a minimum,the corners of the harvest unit(s)be flagged for clear identification. Page 3 of 4 i NOTE: Copies of all FPA Applications will be forwarded to Mason County Public Works for stormwater and erosion control review.Projects which disturb more than one acre(regardless of total lot size)will require an engineered stormwater plan consistent with the Mason County Stormwater Ordinance(Chapter 14.48.)and the 1992 WSDOE Stormwater Manual(2005 in Belfair&Allyn UGA's).Applicants will be charged for Public Works staff time to review these plans and applications. Property owners should also be aware that the Washington State Department of Ecology(WSDOE)might ask for a NPDES(National Pollution Discharge Elimination System)Permit.The threshold for such a permit is equivalent to Mason County's threshold.WSDOE will notify applicants through SEPA review if a NPDES is required.An NPDES is not a perquisite for FPA approval.It is the responsibility of the applicant to obtain this permit when required. FPA FEE: $240.00 with SEPA SEPA FEE: 0-9.99 Acres$590 $350.00 without SEPA 10 to 20 Acres$705 Over 20 Acres$885 EIS(DS)$2,360+65/hr Departmental Review (For Office Use Only) Site visit: Date approved: Mason County Community Development ITLANNINGTACTPA.DOC 1/16/2008 Page 4 of 4