Loading...
HomeMy WebLinkAboutBLD2010-00120 Final Furnace and HP - BLD Permit / Conditions - 3/25/2010 Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Shelton,WA 98584 + MECHANICAL PERMIT BLD2010-00120 OWNER: MICHAEL, O'DAY RECEIVED: 2/24/2010 CONTRACTOR: OLYMPIC HEATING & COOLING 360-426-9945 LICENSE: OLYMPHC986BA EXP: 1/1201 ISSUED: 2/26/2010 SITE ADDRESS: 4771 E STATE ROUTE 3 SHELTON EXPIRES: 8/26/2010 PARCEL NUMBER: 321353300000 LEGAL DESCRIPTION: SW SW TR 2 OF SURVEY 18/9 PROJECT DESCRIPTION: DIRECTIONS TO SITE: FURNANCE & HEATPUMP General Information Setback Information Type of Use: SF Insp.Area: Front: Ft. Shoreline: Ft. Type of Work: MEC Fire Dist.: 5 Rear: Ft. Slope: Ft. Valuation: Side 1: Ft. Side 2: Ft. Mechanical Fixtures FEES Type Qty. Type By Date Amount Receipt Furnace<100K 1 Mechanical Permit Fee TW 2/24/2010 $36.50 S120100000 Heat Pump 1 Mechanical Base Fee TW 2/24/2010 $28.50 Si20i00000 Total $65.00 BLD2010-00120 Please refer to the following pages for conditions of this permit. 1 of 3 CASE NOTES FOR BLD2010-00120 CONDITIONS FOR BLD2010-00120 1) Contractor re .stration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. T er are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-64 -0 he person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X ' 2) Owner/Ag ponsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X _ �r 3) ALL FURNACE INSTALLATIONS SHALL MEET THE MINIMUM EFFICIENCIES SET FORTH IN THE CURENT EDITION OF THE WASHINGTON STATE ENER Y CODE (WSEC). ANY PORTION OF THE MECHANICAL SYSTEM THAT IS ALTERED OR REPLACED SHALL MEET THE MINIMUMS DS SET FORTH IN THE WSEC AND INTERNATIONAL MECHANICAL CODE. X 4) Washington State Energy Code Compliance has been approved using the following: Heat Type: Electric or other fuels, Compliance Method: Prescriptive option IV, Window(Max U-Factor):0.35, Skylight(Max U-Factor):0.58, Doors (Type/Max U-Factor):0.20 or less, Wall insulation R-21, Floor insulation R-30, Ceiling Insulation R-38, Vault Insulation R-38 (see exception), Slab Insulation R-10. Exception: insu ation may be installed, up to 500 sq. ft., in single rafter or joist vaulted ceilings where the distance of the top of the ceiling and the underside o th sheathing is less than 12-inches and there is 1-inch vented airspace above the insulation. X 5) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washin ton ccupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocati X 6) Owner/applicant must obtain a seperate per i o placement of any size propane tank serving a fixed appliance within a dwelling structure or unit prior to the placement of the tank. X 7) All property lines shall be clearly identified at the time of foundation inspection. X BLD2010-00120 Please referto the following pages for conditions of this permit. 2 of 3 $} • All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure ,s to request aftTal inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason Con nances and building regulations. X 9) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have p d action from being taken. No more than one extension may be granted. X This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described property structure for review and inspection. OWN ER OR AGENT: d DATE: 2 BLD2010-00120 Please refer to the following pages for conditions of this permit. 3 Of 3 00 o CONCRETE Gas Piping MANUFACTURED HOME No Interior-Date By ----- o Footings!Setbacks E dergr-Date By Ribbons o Date BY INSULATION Date BY ic o Foundation Wells BG!SLAB INSULATION Set-up = Date By Date By Date BY FRAMING F1OO� FIRE DEPARTMENT r Date By Date By Date By Walls PLUMBING Date By DECKS Dace BY Groundwork Vault TANKS Date By Date By date BY Attic D.w.V Date By OTHER —.Date BY DRYWALL Type: Date BY Water Line Date By Type: Dale By Int.Brace Wall Date By W By MECHANICAL Fire seperaticn FINAL INSPECTION o I6 Date By Date By Date By O m O a Pass or Request Inspect. Type of Insp. Fail Date Date Done By Comments c Cn EP 8 o. 0 0 v m O