Loading...
HomeMy WebLinkAboutBLD2006-01091 Final Steel Roof - BLD Permit / Conditions - 3/15/2007 Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton,WA 98584 P10 RESIDENTIAL BUILDING PERMIT BLD2006-01091 OWNER: MICHAEL O'DAY RECEIVED: 6/21/2006 CONTRACTOR: LICENSE: EXP: ISSUED: 8/7/2006 SITE ADDRESS: 4771 E STATE ROUTE 3 SHELTON EXPIRES: 2/7/2007 PARCEL NUMBER: 321353300000 LEGAL DESCRIPTION: SW SW TR 2 OF SURVEY 18/9 PROJECT DESCRIPTION: DIRECTIONS TO SITE: PRE-ENGINEERED STEEL ROOF ONLY RIDING ARENA NORTH ON SR 3 TO MILEPOST 7.4 LEFT ON GRAVEL ROAD. STAY LEFT UP HILL General Information Construction &Occupancy Information Square Footage Information No.of Bedrooms: Type of Constr.: II-B Type of Use: SF Insp.Area: No.of Bathrooms: Occ. Group: U-1 Lot Size: Deck: Type of Work: ACC Fire Dist.: 5 No.of Stories: 1 Occ. Load: Building: Valuation: Building Height: 17 Occ. Status: Primary Basement: arena 17,600 Manufactured Home Information Setback Information Shoreline&Planning Information Make: Length: Ft. Front: Ft. Shoreline: Ft. Water Body: NONE Rear: N 140.0 Ft. Slope: Ft. SEPA?: No Model: Width: Ft. Side 1: Ft. Shoreline Desig.: Not Applicable Year: Serial No.: Side 2: Ft. Comp. Plan Desig.: Rural Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Plan Check Fee KS 6/21/2006 $1,341.18 S12006000 Planning Review Fee KS 6/21/2006 $155.00 S12006000 EH Plan Review ADR 7/3/2006 $35.00 S22006000 Building State Fee RTB 7/11/2006 $4.50 S22006000 Building Permit Fee RTB 7/12/2006 $1,273.75 S22006000 ADJUST--Plan Check Fee RTB 7/12/2006 -$513.24 S22006000 Public Works Review JES 7/27/2006 $73.10 S22006000 Total $2,369.29 BLD2006-01091 Please referto the following pages for conditions of this permit. 1 of 4 8) This structure is approved as un-heated space. If at any time this building is to be used for anything other than what it is approved for, a change of use permi/�II be applied for, reviewed and approved prior to the change. X IF 9) Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2). X�s��' 10) This structure is limited to U-occupancy use only(private garages, carports, sheds, and agricultural buildings.) Any other use will be in violation of the international codes and Mason County Regulations unless a"Change of Use" permit is applied for, reviewed and approved. X-4/ _) 11) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be X charged d shall be collected by the Building Department prior to any further inspections being performed or approvals granted. 7 12) International Building Code. In addition to the inspections required by Chapter 1 of the International Building Code, the owner or the engineer or architect of record acting as the owner's agent shall employ one or more special inspectors who shall provide inspections during construction on the types of work listed under IBC, section 1704. The special inspectors'duties & responsibilities shall be as specified in Chapter 17. X/ZL" D 13) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. Xd 14) All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. X A�L� 15) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. X�� 16) All property lines shall be clearly identified at the time of foundation inspection. XyfJ BLD2006-01091 Please refer to the following pages for conditions of this permit. 3 of 4 CASE NOTES FOR BLD2006-01091 CONDITIONS FOR BLD20 0 6-01 091 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-8007647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 2) The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a count maintained public road. PP Y X 3) Applipation acknowledges that the structure is only permitted for a use consistent with the current zoning of the parcel. Zoning is RR5 X 4) Appr 9ved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. X 5) Water quality is not to be degraded to the detriment of the aquatic environment as a result of this project. Xtj 6) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. X 7) In accordance with international codes and Title 14, Mason County Building Code, "Standards for Fire Apparatus Access Roads," all new structures that require an address shall have approved numbers or addresses located at the beginning of long driveways when the address is not clearly visible from the access road. The numbers shall also be plainly visible and legible from the street or road fronting the property and shall contrast with their background. Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the international codes will be assessed if the owner and/or contractor fail to post the address on site prior to requesting inspec46ns. X BLD2006-01091 Please refer to the following pages for conditions of this permit. 2 of 4 17) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mas99 County ordinances and building regulations. X 18) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder h e prevented action from being taken. No more than one extension may be granted. X 19) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, conpectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. XO 20) This parcel is located in a smoke management zone. Please contact a fire warden at(360)427-9670 ext. 459 for further information. X &L) This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described property a71Z�l ctture for eview and inspection. p OWN ER OR AGENT: __ DATE: O—7" ZZ6Cp BLD2006-01091 Please refer to the following pages for conditions of this permit. 4 of 4 I� Hawk Hill LLC z Michael N. O'Day Janis Snoey 4771 E SR 3 Shelton WA 98584 360-426-8431 360-426-2855 fax 360-791-3636 cell HawkHillWA(&earthlink.net Terry Vosler Building Department Official Mason County Department of Community Development Shelton,WA 98584 July 10,2006 Re: BLD2006-01091 Dear Terry, I would like to thank you for reducing the square footage valuation amount on the riding arena I am planning to construct from the agricultural building rate of$23.95 psf to the covered deck rate of$16.50 psf. As you may recall this is a roof only pre-engineered steel structure that measures 80' x 220' or 17,600 sf.The cost of the building itself is approximately $84,000.I expect the total cost to construct is going to be around$130,000. I know the permit fee schedule attempts to approximate a market value for the purpose of determining the cost of the permit.It seems to me that a more reasonable estimate of the fair value of this project might be around$150,000 rather than the $290,400 produced by the rate we are currently using. In consideration of these facts,I would appreciate anything you may be able to do to reduce the total valuation being used to calculate the permit cost for this project. Thank you for your help on this. 1, 11' D lA Sincerely, AP"'OvEo \\j t-tSE AS i r► e04s-nWCTioA Cost -1;fE STA:rSX> )4-►�e o F .449 15o coo,m� ?ichael N. O'Day MASON COUNTY PERMIT NO. BUILDING PERMIT APPLICATION 426 W. Cedar• P.O. Box 186, Shelton, WA 98584 Shelton (360) 427-9670 • Belfair (360) 275-4467 • Elma (360) 482-5269 On the web www.co.mason.wa.us APPLICANT INFORMATION CONTRACTOR INFORMATION Owner M'C4-0, t O ' iS SNo Company Name J _ $ .� Mailing Address 4-17 1 C R 3 Mailing Address City 5;I+6LTVy\ State WA Zip Code 96'S(A-1 City State Zip Code Phone 3&Q-ilZ` -8' J Other Ph.5W -"19 1-3403V Phone Other Ph. Lien/Title Holder'"MAA -,t A,&^ &A..W. Contractor Reg. # Exp. E mail address 1.4Aww"oL&_v1A 06 E Mail Address Drivers Lic.# n!q7$ DOB i Drivers Lic.# DOB SEPTIC /WATER SYSTEM INFORMATION - Connect to New Septic Existing Septic Connect to Water System Name of Water System Well Sewer System Name of Sewer System PARCEL INFORMATION - 12 Digit Parcel No. 'Jiz 1 3 S 3-2, 00eoa Fire District Legal Description SW -C6---fro A 3S -r Z/ N A- Site Address (Please include street name, street number and city) e4—n i E S A- 3 Directions to site ' #4 0--6. sue- 3 rA, -7, `f /_d-{—r- ,rn 6;;pA a-c-.-C-c.- 1a.o I— t. Will timber be cut ands Id in parcel preparation?Yes o Is property within 200' of Saltwater �_Lake River/Creek Pond N U Wetland L 0 Seasonal Runoff�Stream�Slopes or Bluffs 15 0 /�j Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes/No TYPE OF JOB - New-,)C Add Alt Repair Other PRIMARY RESIDENCE SEASONAL ❑ Use of Building /Zi0 '"c. Describe Work �```�� �" ` 004 No. of Bedrooms No. of Bathrooms Square Footage- 1 st Floor N 4,0 3rd Floor Basement Deck Covered Deck Other __-- e Sq. ft. 1-7L 00 Garage Attached Detached Carport Attached Detached MANUFACTURED HOME INFORMATION - Make Model Year Length Width Serial No. No. of Bedrooms No. of Bathrooms Type of Heat Purchase Price $ Replacement Unit? Yes/ No Installer Name Certification No. OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative,or the contractor. I further declare that I am entitled to receive this permit and to do the work as proposed in the application. I declare that I have obtained the permission from all the necessary parties. If permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application, I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. This permit/application becomes null &void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OFAPRO SS INSPEC ION.INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. X Date: &-7 r'Ze� O r rowners Represent ive ontractor (indicate which one) FOR OF ICIAL USE BEY ND THIS POINT Accepted by: Date DEPARTMENTAL REVIEW APPROVED DENIED NOTES Building Department Planning Department Environmental Health Department Fire Marshal FEE Building Permit Fee _ �7 Site Inspection Plan Review Fee �aZ°/ EH Review Fee Plumbing & Base Fee Planning Review Fee Mechanical & Base fee Other Wood /Gas/ Pellet Stove Fee State Fee SO' Violation Fee -4 Pre-Paid at Submittal P �'" Valuation $ TOTAL FEES