HomeMy WebLinkAboutBLD2006-01091 Final Steel Roof - BLD Permit / Conditions - 3/15/2007 Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352
Mason County Bldg. III 426 W. Cedar P.O. Box 186
Shelton,WA 98584
P10
RESIDENTIAL BUILDING PERMIT BLD2006-01091
OWNER: MICHAEL O'DAY RECEIVED: 6/21/2006
CONTRACTOR: LICENSE: EXP: ISSUED: 8/7/2006
SITE ADDRESS: 4771 E STATE ROUTE 3 SHELTON EXPIRES: 2/7/2007
PARCEL NUMBER: 321353300000
LEGAL DESCRIPTION: SW SW TR 2 OF SURVEY 18/9
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
PRE-ENGINEERED STEEL ROOF ONLY RIDING ARENA NORTH ON SR 3 TO MILEPOST 7.4 LEFT ON GRAVEL ROAD. STAY LEFT
UP HILL
General Information Construction &Occupancy Information Square Footage Information
No.of Bedrooms: Type of Constr.: II-B
Type of Use: SF Insp.Area: No.of Bathrooms: Occ. Group: U-1 Lot Size: Deck:
Type of Work: ACC Fire Dist.: 5 No.of Stories: 1 Occ. Load: Building:
Valuation: Building Height: 17 Occ. Status: Primary Basement: arena 17,600
Manufactured Home Information Setback Information Shoreline&Planning Information
Make: Length: Ft. Front: Ft. Shoreline: Ft. Water Body: NONE
Rear: N 140.0 Ft. Slope: Ft. SEPA?: No
Model: Width: Ft. Side 1: Ft. Shoreline Desig.: Not Applicable
Year: Serial No.: Side 2: Ft. Comp. Plan Desig.: Rural
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Plan Check Fee KS 6/21/2006 $1,341.18 S12006000
Planning Review Fee KS 6/21/2006 $155.00 S12006000
EH Plan Review ADR 7/3/2006 $35.00 S22006000
Building State Fee RTB 7/11/2006 $4.50 S22006000
Building Permit Fee RTB 7/12/2006 $1,273.75 S22006000
ADJUST--Plan Check Fee RTB 7/12/2006 -$513.24 S22006000
Public Works Review JES 7/27/2006 $73.10 S22006000
Total $2,369.29
BLD2006-01091 Please referto the following pages for conditions of this permit. 1 of 4
8) This structure is approved as un-heated space. If at any time this building is to be used for anything other than what it is approved for, a change of use
permi/�II be applied for, reviewed and approved prior to the change.
X IF
9) Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other
vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2).
X�s��'
10) This structure is limited to U-occupancy use only(private garages, carports, sheds, and agricultural buildings.) Any other use will be in violation of the
international codes and Mason County Regulations unless a"Change of Use" permit is applied for, reviewed and approved.
X-4/ _)
11) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building
Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached
thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be
X charged d shall be collected by the Building Department prior to any further inspections being performed or approvals granted.
7 12) International Building Code. In addition to the inspections required by Chapter 1 of the International Building Code, the owner or the engineer or architect
of record acting as the owner's agent shall employ one or more special inspectors who shall provide inspections during construction on the types of work
listed under IBC, section 1704. The special inspectors'duties & responsibilities shall be as specified in Chapter 17.
X/ZL" D
13) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
permit revocation.
Xd
14) All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County
ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
X A�L�
15) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED
BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
Inspector shall be made prior to requesting additional inspections.
X��
16) All property lines shall be clearly identified at the time of foundation inspection. XyfJ
BLD2006-01091 Please refer to the following pages for conditions of this permit. 3 of 4
CASE NOTES FOR
BLD2006-01091
CONDITIONS FOR
BLD20 0 6-01 091
1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-8007647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X
2) The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved
access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where
such roads connect with a county maintained public road or to another fire apparatus access road which connects to a count maintained public road.
PP Y
X
3) Applipation acknowledges that the structure is only permitted for a use consistent with the current zoning of the parcel. Zoning is RR5
X
4) Appr 9ved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure.
X
5) Water quality is not to be degraded to the detriment of the aquatic environment as a result of this project.
Xtj
6) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will
not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building
Department prior to any further inspections being performed or approvals granted.
X
7) In accordance with international codes and Title 14, Mason County Building Code, "Standards for Fire Apparatus Access Roads," all new structures that
require an address shall have approved numbers or addresses located at the beginning of long driveways when the address is not clearly visible from the
access road. The numbers shall also be plainly visible and legible from the street or road fronting the property and shall contrast with their background.
Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted
by the jurisdiction and the international codes will be assessed if the owner and/or contractor fail to post the address on site prior to requesting
inspec46ns.
X
BLD2006-01091 Please refer to the following pages for conditions of this permit. 2 of 4
17) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mas99 County ordinances and building regulations.
X
18) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder h e prevented action from being taken. No more than one extension may be granted.
X
19) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners,
conpectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material.
XO
20) This parcel is located in a smoke management zone. Please contact a fire warden at(360)427-9670 ext. 459 for further information.
X &L)
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to
the above described property a71Z�l
ctture for eview and inspection. p
OWN ER OR AGENT: __ DATE: O—7" ZZ6Cp
BLD2006-01091 Please refer to the following pages for conditions of this permit. 4 of 4
I�
Hawk Hill LLC
z
Michael N. O'Day
Janis Snoey
4771 E SR 3
Shelton WA 98584
360-426-8431
360-426-2855 fax
360-791-3636 cell
HawkHillWA(&earthlink.net
Terry Vosler
Building Department Official
Mason County Department of Community Development
Shelton,WA 98584
July 10,2006
Re: BLD2006-01091
Dear Terry,
I would like to thank you for reducing the square footage valuation amount on the riding arena I
am planning to construct from the agricultural building rate of$23.95 psf to the covered deck rate
of$16.50 psf.
As you may recall this is a roof only pre-engineered steel structure that measures 80' x 220' or
17,600 sf.The cost of the building itself is approximately $84,000.I expect the total cost to
construct is going to be around$130,000. I know the permit fee schedule attempts to approximate
a market value for the purpose of determining the cost of the permit.It seems to me that a more
reasonable estimate of the fair value of this project might be around$150,000 rather than the
$290,400 produced by the rate we are currently using.
In consideration of these facts,I would appreciate anything you may be able to do to reduce the
total valuation being used to calculate the permit cost for this project.
Thank you for your help on this. 1, 11' D lA
Sincerely, AP"'OvEo \\j t-tSE AS i r►
e04s-nWCTioA Cost -1;fE
STA:rSX> )4-►�e o F .449 15o coo,m�
?ichael N. O'Day
MASON COUNTY PERMIT NO.
BUILDING PERMIT APPLICATION
426 W. Cedar• P.O. Box 186, Shelton, WA 98584
Shelton (360) 427-9670 • Belfair (360) 275-4467 • Elma (360) 482-5269
On the web www.co.mason.wa.us
APPLICANT INFORMATION CONTRACTOR INFORMATION
Owner M'C4-0, t O ' iS SNo Company Name J _ $ .�
Mailing Address 4-17 1 C R 3 Mailing Address
City 5;I+6LTVy\ State WA Zip Code 96'S(A-1 City State Zip Code
Phone 3&Q-ilZ` -8' J Other Ph.5W -"19 1-3403V Phone Other Ph.
Lien/Title Holder'"MAA -,t A,&^ &A..W. Contractor Reg. # Exp.
E mail address 1.4Aww"oL&_v1A 06 E Mail Address
Drivers Lic.# n!q7$ DOB i Drivers Lic.# DOB
SEPTIC /WATER SYSTEM INFORMATION - Connect to New Septic Existing Septic
Connect to Water System Name of Water System
Well Sewer System Name of Sewer System
PARCEL INFORMATION - 12 Digit Parcel No. 'Jiz 1 3 S 3-2, 00eoa Fire District
Legal Description SW -C6---fro A 3S -r Z/ N A-
Site Address (Please include street name, street number and city) e4—n i E S A- 3
Directions to site ' #4 0--6. sue- 3 rA, -7, `f /_d-{—r- ,rn 6;;pA a-c-.-C-c.-
1a.o I— t.
Will timber be cut ands Id in parcel preparation?Yes o
Is property within 200' of Saltwater �_Lake River/Creek Pond N U
Wetland L 0 Seasonal Runoff�Stream�Slopes or Bluffs 15 0 /�j
Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes/No
TYPE OF JOB - New-,)C Add Alt Repair Other PRIMARY RESIDENCE SEASONAL ❑
Use of Building /Zi0 '"c. Describe Work �```�� �" ` 004
No. of Bedrooms No. of Bathrooms Square Footage- 1 st Floor N 4,0
3rd Floor Basement Deck Covered Deck Other __-- e Sq. ft. 1-7L 00
Garage Attached Detached Carport Attached Detached
MANUFACTURED HOME INFORMATION - Make Model Year
Length Width Serial No. No. of Bedrooms No. of Bathrooms
Type of Heat Purchase Price $ Replacement Unit? Yes/ No
Installer Name Certification No.
OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.
Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative,or the contractor. I further declare
that I am entitled to receive this permit and to do the work as proposed in the application. I declare that I have obtained the permission from all
the necessary parties. If permission is required from any easement holder or any other party in interest regarding this application or the work
proposed in the application, I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or
agent on owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above
described property and structure for review and inspection. This permit/application becomes null &void if work or authorized construction is
not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY
MEANS OFAPRO SS INSPEC ION.INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
X Date: &-7 r'Ze�
O r rowners Represent ive ontractor (indicate which one)
FOR OF ICIAL USE BEY ND THIS POINT Accepted by: Date
DEPARTMENTAL REVIEW APPROVED DENIED NOTES
Building Department
Planning Department
Environmental Health Department
Fire Marshal
FEE
Building Permit Fee _ �7 Site Inspection
Plan Review Fee �aZ°/ EH Review Fee
Plumbing & Base Fee Planning Review Fee
Mechanical & Base fee Other
Wood /Gas/ Pellet Stove Fee State Fee SO'
Violation Fee
-4 Pre-Paid at Submittal
P �'"
Valuation $ TOTAL FEES