HomeMy WebLinkAboutGeo-Tech Report Review - BLD Engineering / Geo-tech Reports - 1/4/2002 MASON COUNTY
PUBLIC WORKS DIR.ECTOR/COUNTY ROAD ENGINEER
Shelton,Washington 98584
DATE: January 4t', 2002
INTER-DEPARTMENTAL COMMUNICATIONS
TO: Michael MacSems,DCD - Planner
FROM: Alan A. Tahja,P/W- Co. Hydr. Engr. DCD WON 2002-0002
SUBJ: Geo-Tech Report Review NAME: Fincher Class IV FPA nz�.,_A_,o
Parcel No. _____ - : ._
Michael, Zj4,'7003 f s -3,;L
The geotechnical reconnaissance (report)prepared by CONSOLIDATED ENGINEERING, for
the proposed Michael Finch timber harvest/Class IV conversion have been received and
reviewed by Public Works.
The reconnaissance report generally meets the requirements for a Mason County Geotechnical
Assessment, but lacks the necessary detail or information to be entertained as a Geotechnical
Report under Mason County's requirements. Though the reconnaissance report indicates timber
may be harvested within the limits of landslide hazard area buffers, the report lacks necessary
information and details to accept it for reducing the setbacks required in Mason County's Critical
Resource Ordinance.
Stormwater runoff issues have not been addressed, so this aspect of the proposal still needs to be
addressed by the applicant or their engineer.
In summary,the reconnaissance report has been reviewed, and appears to support the need for a
geotechnical report conforming to County reporting standards to be submitted for review and
approval. A Stormwater Site Plan still need to be developed for the proposed activities.
Please feel free to contact me at County extension 461 if you have any questions regarding these
comments, or if you feel any features need further discussion or attention.
Si Cre y,
—r��
Man A. Tahja
File: H:\WP\GEO\REVIEWS\Fincher.doc
705
P&WT M NtmtbeR'
Audwdzed ( !��n M Ode:_ ):1 Z 3 /a I
\ Type of Wodc
7
CHARGE TO:
NAME (P)n yo,7;.;,c, TJ, 4-
AGENCY/COMPANY
BILLING ADDRESS
PHONE
Pub, Works Person In Charge:
!NC!"'�. .:.�',:\���t\ \ t. ��. .-_ \YtR?1 % ' ..�'>.-�... .y.t•.,�ai::.::....:.::.:.xv.wat�CM•.f'fMK'p![n!4%RYA:NWIJY!'M^^COUCfv:CU(:�'M'/.w..:
act Project Time Une: (from-to dates) TO
p� O Pro}ect Start date: — -oz Esdms(6d Fk9sh Date:
W - KApprwimaw bs:oo ESTIMATED TOTAL=s:
. J
C` m COST ESTIMATE
1 4 Eillfgo5'M S RAIg Hows ;vb( ) Frinat TOTAL$
z
w 346 so
ty a �'
I Im IM TOTAL n
EQUIPMENT USED:
MATERIAL USED:
(F) Actual Cost S BARS: PROD P
DATE fnpioyea
WORKED Hours ;Vb(oW Frinoc% TOTAL$
EQUIPMENT USED: pale SJ314 at TOTAL VS
MATERIAL USED:
TOTAL ALL
(G) SUED DATE INN/ PAID DATE RECI CKX
,
MASON COUNTY
PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER
Shelton,Washington 98584
DATE: February 51h, 2002
INTER-DEPARTMENTAL COMMUNICATIONS
TO: Michael MacSems, Planning Dept. B Planner
FROM: Alan A. Tahja, P/W- Co. Hydr. Engr. 71J!9,�-0 Z-
SUBJ: Geo-Tech Report Review NAME: Fincher Class IV FPA
Parcel No 3-21 4 2^ nnnPll
Michael, 30 35 Zy qQO,3/- 3
Additional information pertaining to the Fincher Class IV FPA provided by Rolla Boughan, P.E.,
has been received and reviewed by Public Works. Though the report is scant of information, I
find it difficult to claim it does not meet the County's minimum requirements for geotechnical
reporting as promoted in Mason County's Resource Ordinance (Ord. No. 77-93, revised
8/29/00).
The new material dated 1/16/02 is cryptic in Mr. Boughan's typical style, but with the material
contained in the addendum material and the original report, I feel Mr. Boughan's report addresses
the issues required by the County in a Geotechnical Report.
The site plan submitted contains very little useful information. The site plan appears to be drawn
to scale, gives an indication of where north lies, and indicates where on the property the top of
slope(T.O.S.) is. Mr. Boughan has also drawn a profile through the length of the property, and it
might be surmised that a creek lies at the northerly end of the property. It appears that in Mr.
Boughan's opinion, the only important development or geological feature on the property is
where the top of slope is.
Mr. Boughan indicates hand dug holes were opened near the East property line. I must assume
Mr. Boughan explored enough to feel confident in describing the soil horizon(s) as he did, and
that he felt his description was adequate to cover the entire property.
For a slope stability analysis, Mr. Boughan relies on his observation of the trees on the property. I
cannot dispute Mr. Boughan's analysis based on his observations and experience.
Mr. Boughan indicates that stormwater runoff will not be changed but improved in time.... With
the 125' timber harvest setback required from the creek(Sec. 17.01.070), and no other activity
being promoted other than the timber harvest, I cannot dispute the claim.
File: E:\Prdy-CutOff\Documents\CMP-rec.doc
In summary,the materials submitted by Mr. Boughan appear to meet the minimum requirements
of the County's Resource Ordinance Section 17.01.100.
Future development of the property following the timber removal, should be required to be
investigated for potential stability impacts from those proposals as they are developed, as well as
potential stormwater runoff impacts.
Please feel free to contact me County extension 461 if you have any questions pertaining to these
comments, or if you feel additional concerns need further attention.
Si c rely,
1.
Aldn A. Tahja
File: E:\Prdy-Cutoff\Documents\CMP-rec.doc
qualified by Mason County. The Geotechnical Report shall be prepared at the discretion of the
Director by a licensed civil engineer with specialized knowledge of geotechnical/geological
engineering. The Geotechnical Report may also be prepared by a practicing engineering geologist
with special knowledge of the local conditions, provided the work is performed under the
supervision of a licensed civil engineer who will stamp the report and attest to the competency of
the engineering geologist to perform landslide evaluations in accordance with the prevailing
standard of practice.
4. Content of the Geological Assessment W&L. Ncv A C S Je PA,%n
A Geological Assessment shall include but not be limited to the following:
(1) A discussion of geologic conditions in the general vicinity of the project, and specific soil
types at the project site. Soil type identifications shall be consistent with terminology
used in the Coastal Zone Atlas (Washington Department of Natural Resources, 1980) or
in applicable U.S. Geologic Survey maps (e.g. Geological Map of North Central Mason
County, by R.J. Carson, 1976, U.S. Geologic Survey OFR 76-2). Use of Soil Conservation
Service soil layer terminology is considered inappropriate for this assessment.
(2) A discussion of the ground water conditions at the site, including the depth to water and
the quantity of surface seepage.
(3) The approximate depth to hard or dense competent soil, e.g. glacial till or outwash sand.
(4) A discussion of the history of landslide activity in the vicinity, as available in the Coastal
Zone Atlas, the map of "Relative Slope Stability of the Southern Hood Canal Area,
Washington" by M. Smith and R.J. Carson, 1977; and the landslide records on file with
the Mason County Department of Community Development.
(5) An opinion on the potential for landslide activity at the site in light of the proposed
development.
5. Content of a Geotechnical Report
A Geotechnical Report shall include but not be limited to the following:
-' (1) A discussion of general geologic conditions, specific soil types, ground water conditions
and history of landslide activity in the vicinity as required for the Geologic Assessment
described above.
(2) A site plan which identifies the important development and geologic features.
(3) Locations and logs of exploratory holes or probes.
(4) A minimum of one cross section at a scale which adequately depicts the subsurface
profile, and which incorporates the details of proposed grade changes.
(5) A description and results of slope stability analyses performed for both static and seismic
loading conditions.
7 (6) Appropriate restrictions on placement of drainage features, septic drain fields and
compacted fills and footings, including recommended setbacks from shoreline bluffs and
the tops of other slopes on the property.
? (7) A detailed clearing and grading plan which specifically identifies vegetation to be removed,
a schedule for vegetation removal and replanting, and the method of vegetation removal.
(8) A detailed temporary erosion control plan which identifies the specific mitigating measures
to be implemented during construction to protect the slope from erosion, landslides and
harmful construction methods.
(9) An analysis of both on-site and off-site impacts of the proposed development.
(10) Specifications of final development conditions such as, vegetative management, drainage,
erosion control, and buffer widths.
6. Applicable Standards
Geological Assessments and Geotechnical Reports shall be prepared using terminology,
descriptions, evaluation methods and mitigation approaches that reflect the current standard of
care for practitioners in the field of geologic hazards. The standard of care shall be considered to
be represented by , but not limited to, Turner, A.K. and Schuster, R.L. (1996; "Landslides,
Investigation and Mitigation", Transportation Research Board Special Report 247, National
Mason County Resource Ordinance Revised 8129100
48
CONSOLIDATED ENGINEE
RING
- CIVIL - STRUCTURAL - SOILS - PLANNING -
January 16, 2002
MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT
Michael MacSems, Planning
Mason County Bldg. I, 411 N. 5th
P. 0. Box 279
Shelton, WA 98528
RE: Michael Fincher, Timber Harvest Geo-technical Report
Dear Mr. MacSems:
Reference is made to Inter-Dept. Communications from Taja. Please
note, encl. 1, stating my Geo-technical Hazards Specialist qualifications,
enclosed, herein. I am the most experienced Geo-technical Engineer in
Washington.
REFERENCE MASON COUNTY RESOURCE ORDINANCE, P. 47, AS FOLLOWS:
E. GEOTECHNICAL REPORT
1- Applicability
a) Slopes are greater than 40% therefor a geo-technical report is
required.
b) No slides were observed- This is a Geo-technical Report.
c) Not applicable
d) Not applicable
2- No waiver is requested
3- Qualifications of preparer--See Encl. 1.
5/(1)- See report dated December 26th.
(2) Profile sketch added--See Encl. 2
(3) Hand-dug test holes were opened near the East property line of
tract. Soil found was 6 in. of forest humous underlain by
sandy-silty glacial till.
PO, Box 2321 • Bremerton, WA 98310 • (360) 479-5598 • Fax (360) 377-1376
MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT
Michael Mac Sems, Planning
Page 2
January 16, 2002
(4) See Encl. 2
(5) The slope stability of this parcel is excellent as deter-
mined by vertical tree trunks.
(6) , (7) , (8) , (9) , & (10) Not applicable
STORMWATER SITE PLAN There will be little change as the removal of
trees will improve growing conditions for ground cover and thus further
restrict water flow.
GEO-TECHNICAL ASSESSMENT (This letter report and the original letter
report dated Dec. 26th are GEO-TECHNICAL REPORTS. )
CRANBERRY CREEK The land features and the set-back from the T. 0. S.
exceeds 125 ft. from the edge of this creek.
Reference is made to Tahja's comments:
Stormwater run-off will not be changed but improved in time with addi-
tional ground cover developed naturally from the clearing of overhead tree
branches.
Yours truly,
R. B. Boughan, P. E.
GEO-TECHNICAL ENGINEER
Encls- ROLLA B. BOUGHAN, P. E. - GEO-TECHNICAL HAZARDS SPECIALIST
Report Dated December 26th
cc: Eric Herd, Michael Fincher (w/ bill for add'l) w/ Encls.
• I I
..---.__..._..-•-----r--r• -- -..-. - ------ --._ ._..._
I � ,
� I 1 ,
I
I
-
i
I
i
,
� II
ill
I , i
I
� � t
I I I I
, I
I
1
I �
-r
I i ,
,
I !
I
I
I
I
I I _
I
Encl. I I
F .
CONSOLIDATED ENGINEERING
r �
... - CIVIL - STRUCTURAL - SOILS - PLANNING -
:.........
ROLLA B. BOUGHAN, P. E. - GEO-TECHNICAL HAZARDS SPECIALIST
I, -Rolla B. Boughan, am a qualified geo-technical engineer licensed
as a civil engineer in the state of Washington with a minimum of twenty
years' experience in land slide evaluation.
The city of Portland, Oregon, adopted a Landslide Potential Evaluation
Form which I, as an experienced geo-technical civil engineer, used in
inspecting steep and soil hazardous property for construction. Previously,
I had been heavily experienced in designing retaining walls and soils
revetments.
At Purdue University, where I graduated as a civil engineer, I worked
as a student assistant in the soils testing laboratory and took courses in
soils and geology.
I have performed many geo-technical investigations and written reports
on soil hazards for construction in Kitsap, Jefferson and Mason Counties
during the past few years. Our firm has worked with other civil engineer
geologists on recent projects with excellent coordination and good overall
results with references available from these other professionals.
As a pile foundation design engineer, I am very experienced and much
in demand and have excellent references from jobs recently completed. I
am a member of the Pile Foundation Institute.
�$l,/^/ y9
co
Rolla B. Bougha , P. E.
Q 0D.-.913
GEO-TECHNICAL HAZARDS SPECIALIST
I1:ALE
EXPIRES
P.O. Box 2321 • Bremerton, WA 98310 9 (206) 479-5598 • FAX (206) 377-7556
O 1+ S LI DATED GhOEERh I
G
- CIVIL - STRUCTURAL - SOILS - PLANNING -
December 26, 2001
Mason County; P. 0. Box 186
Shelton, WA 98584
RE: GEO-TECHNICAL RECONNAISSANCE OF TIMBERED SLOPE PER LEGAL DESCRIPTION BELOW
ATTN: Michael McSins /`1acSQ W15
Dear Mr. McSins;
The undersigned Geo-technical Engineer, along with Sam Wilson, Soils. Technician
visited the site for a preliminary walk-over soils reconnaissance With Eric Hurd,
Logger on December 18th. The site was investigated to determine the stability
requirements for the harvesting of timber.
The property is covered with evergreen trees, all of which exhibited vertical
trunks. The older trees are tall, straight evergreens throughout the tract therefor
indicating no soil instability here in the recent past.
The tract measures 330 ft. X 1,320 ft. and has recently been surveyed.
The upper portion of the land slopes downward toward Cranberry Creek at an
angle of 120 to 150 as measured with a Smart Level. There is a distinct
break, Top of Slope (T. 0. S.) , some distance from the creek which is
estimated at 300 to 506 downward.
Timber to be cut should not be closer than 15 ft. from this steep T. 0. S. ;
stumps and roots are to be left in place.
The literature for a background on geology and slope stability shows no
previous instability on the South Side of Cranberry Creek in this vicinity.
MA22, Mason County - There are no nearby areas of poor slope stability
noted in the Coastal Zone Atlas of Washington.
In my professional opinion, timbering off the upper slope should not affect
the land stability of this tract.
Yours truly,
Rolla B. Boughan, P. E.
Civil & Geo-technical Engineer
LEGAL DESCRIPTION OF TRACT: Section •i5, Township 21 N, Range 3 W.
Parce \,# !.3213523. Owner Michael Fincher
cc: Eric Hurd, LoggeZ
PO, Box 2321 • Bremerton, WA 98310 • (360) 479-5598 • Fax (360) 377- 1376
MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
Planning
Mason County Bldg.1 411 N.5th
P.O.Box 279 Shelton,WA 98584
(360) 427-9670 Belfair (360) 275-4467 Elma (360) 482-5269 Seattle (206) 464-6968
Eric Herd
Hood Canal Logging
P.O. Box 1816
Belfair, WA 98528
January 7, 2002
Dear Mr. Herd,
This letter is in response the "Geo-Technical Reconnaissance" submitted by Rolla
Boughan (Consolidated Engineering) for the Michael Fincher FPA. This document
comes close to being a"Geo-Technical Assessment" as discribed in the Mason County
Resource Ordinance, section 17.01.100.E.4 (enclosed), but is no where near meeting the
standards for a"Geo-Technical Report" (section 17.01.1OO.E.5), which is what your
client needs in order to log west of Green View Lane. I did forward Mr. Boughan's
document to the County Engineer, Alan Tahja, for review (at a cost to the applicant of
$36.50) and am enclosing his response.
If Mr. Fincher wants to proceed with a Class IV General forestry permit, for that portion
of his land that lays west of the road, a complete geo-technical report will simply have to
be done. There is no way to avoid this under the County regulations. Withdrawing the
permit and applying instead for a Class III directly from the DNR is still an option, if Mr.
Fincher would prefer.
Please call me at ext 571 and advise me as to how your customer wishes to proceed.
Sincerely,
V
Michael MacSems
FPA Planner
cc: Michael Fincher
encl.- Mason County Resource Ordinance, section 17.01.100.E
IDC from Alan Tahja, County Engineer
Original conditions from SEPA 2001-00097
FOR EST PRACT I CE BAS E MAP
TOWNSHIP 21 NORTH , RANGE 03 WEST ( W . M SECTION 35
A P P L I C A I 1 0 N I
EB
i
0
_ v
r
ARE
6PN6� /� 3 87 385388 385
6 384ee7 384228
/
2
6 363 383068 83
SCALE
0 I m 2000 0 4000 5000 6000
FEET 1 We (5m y)
MAP DATE. November 26, 2001
r CONTOUR INTERVAL : 40 Fee , LEGEND: See Instructions
( NAD 27 DISCLAIMER: See Legend
Water/Wetlands including their location and class may be incorrectly displayed or not shown
on the Base Map. Applicants are responsible for verificatlon and correction of all streams.
wetlands, and possible water courses.
SCALE I " = 400
r:
2290030 i Z
2200040 Zoo,i IC41z gO013
, 700, 91, 2172
21 00010 21 00000
sP, 186.5
5 ZZ/o
2290031
S Z��t 51P
22 00000 22 00020
21 00020
22 .00030 L�°c
(
Op
23 q D
r23000210 2390000
1 �1
5 20/3I SP 2LS�S J�
' 1 3 0 2400030 2400020 2400010 2400000
2390030 i 341.W 23 %ooi/
2390 1 it 3q G/1rV
- - - - - - -
SP 1102 N 020
/ t\ - 11U
- 2390
�239004_O_- : 0 1 0 °� 01%
N H
344.51'
1379.OS'
4
32 00000 n 31 00000
i N
O N_
n S 8/60 n
FOREST PRACTICE BASE _ M AP
TOWNSHIP 21 NORTH , RANGE 03 W L S I ( W . 6f I10i� zj
A P F l I C A l 1 0 N
�� 11
i;
OIL ® �
CQPNB(t� 3 67 385386 4'1385
/Eil \
6 — �64L \ 384228
6 !� 383 383068 383
Sul
TE 2000 no aooa 5000 6000
_ --.,TTT
FEET 1 We (sao nl
MAP DATE. November 26, 2001
' CONTOUR INTERVAL : 40 Feet LEGEND: See Inslfuctions
NAD 21 DISCLAIMER: See Legend
Water/Wetlands including their location and class may be incorrectly displayed or not shown
on the Base Map. Applicants are responsible for verification and correction of all streams.
wetlands, and possible water courses.