Loading...
HomeMy WebLinkAboutGeo-Tech Report - BLD Engineering / Geo-tech Reports - 6/9/1997 MASON COUNTY PUBLIC WORKS COMMENTS REGARDING THE GEO-TECH _REPORT DONE BY ROLLA B. BOUGHAN FOR DON J=DSEN Our meeting this afternoon with Mr. Knudsen and Mr. Nye concerning the Knudsen FPA/Short Plat located-near Catfish Lake resulted in the following conditions; _ - (1)The geo-technical assessment done by Mr. Rolla Boughan, P.E., determines that additional - geo-technical analysis is not necessary. - - (2)Mr. Knudsen has agreed to flag the approximate access route through the property for our inspection. Mr. Knudsen agreed to incorporate drainage ditches into his road construction, and install rock check dams on no greater than 50'intervals. The drainage ditches designed by Mr. Bou han were desigaed with 3:1 slopes, with a two foot wide bottom. If-a"V" ditch 'configuration is constructed instead of a flat bottomed ditch, it is requested that the 3:1 criteria be retained. Additional ditch depth greater than 1'is encouraged. - - - (3)Mr. Knudsen has agreed to provide a means of delivering collected runoff from the road _ ditches to the lower elevation of the stream/canyon that traverses-the site. ne drainage channel from the road elevation to the ravine-bottomwill be protected from erosion either by employing a _ - pipe to "tightline-the water to the lower elevation, or by armoring the channel-with riprap or some other durable armoring treatment. Energy dissipatren of water delivered to the ravine bottom elevation should be-provided for by-means of a durable splash pad constructed of rock, or- other durable materials - - - (4) Sidecasting of soils should be avoided during logging road and landing site construction. m Areas receiving fill material should be prepared by first reoving-all organic material. If fill material is to be placed on sloping surfaces exceeding 20% slope, a receiving bench should be cut at the lower end of the-fill embankment, and the fill constructed up from that elevation in level layers. - (S)Ecology, under the Puget Sound Water Quality-Authority is requiring permanent stabilization of denuded soils within 7 days-during-the "dry" season. The landing/building sites, and road ditch slopes should be permanently stabilized by hydroseeding or hand broadcast seeding as soon as possible after completion of construction/logging activities. _ (6)Recommendations contained in Mr. Bou 's report pertaining to nvi umizing understory damage, and stump preservation should be; served. rii*t H.-\MP\PLA73\SHRT\KHUD-CAT.FP2 [orector of Cormmunity Developm:nt ... . - , FR I,- EX Conditions of-this-Case are listed below: Zt,ort Sui)6ivision -2911 Case No.:SEP96-0029F - - - - - Ok ctor of Community Development 1 L MITIGATED CONDITION #1: The following conditions are from-the Mason County Shoreline Master Program (MCSMP), Chapter 7.16.030 and are to be followed: THIS SITE THAT IS IDENTIFIED IN THE - - - - CUTTING PROPOSAL HAS BEEN DESIGNATED AS CONSERVANCY PER THE MCSMP _ a) No logs-shall be yarded through streams or rivers. b) No - - slash or debris shall be intentionally allowed to enter the stream. Accidentally-injected slash shall be removed. c) All - - trees located within 50 feet-of the stream or river shall-be felled away from the water's edge. -da No-equipment shall be _ - abandoned in the area oflurisdiction. e) All slash shall) be - _ - cleaned-up or burned in areas where the buffer-strip-is not - sufficient to trap the debris from reaching-the stream in a heavy _ - storm or wind. rrThe accumulation of slash and other debris-in - waterways covered by this Act is not permitted. In addition to the above, the following shall apply in Rural and Conservancy Environments: a) Vegetation along the water's edge shall be left with minimum disturbance except for construction of bridges and -large-culverts. _b) Reforestation shall occur within-18 months after completion of harvesting unless land is intended for other use. Density of planting shall be 350 trees per acre of a - - commercial species. AA) This condition must be followed since your site is-identified in the MCSMP as Conservancy Designation:In a Conservancy Environment, for streams of less than 15 feet in width, no more than 25 percent of the lineal stream frontage of - any single ownership may be clear cut in any calendar year. No clear cut shall be longer than longer than 1,500 stream feet. 2) MITIGATED CONDITION #2: Per-Mason County Critical_Area Resource Ordinance #77-93, your site meets the criteria for the land slide - _section 17.01.100. Per this section you are required to have a geo-tech assessment conducted. This geo-tech assessment can _ - either be done by licensed engineer in the State of Washington or _ - - bya geologist with experience in the study of land slide hazards. This geo-tech assessment must be submitted and approved prior to this forest practice application being approved. 3) MITIGATED CONDITION #3:-This condition is being stated to - identify that this site can be short plat as long as it meets- State and County Standards for Environmental Health and Engineering Standards. The following condition is that the _ - portion of the parcel that touches Cranberry Creek must be 5 acres _ in size, and-that the rest of the parel an be short platted, if it - -meets State and County Standards for-short- platting. 4) MITIGATED CONDITION #4: A drainage/siltation c o ntrol/sto rm water plan will be created and implemented prior to development, clearing, grading, or-construction of any portion of the proposed - - - If segregation. --------------- - - - - 3' PH 7 7 Ir Ft? It 7 5) MITIGATED CONDITION #4: Fire apparatus access roads serving more than two (2) building !ots shall be a minimum of 20' wide from the existing county road to within 150' of the building sites. Maximum grade is 14% up to nine (9) lots; 12% for ten (10) lots or more. 6) MITIGATED CONDITION #5: Fire apparatus access roads serving no more than two (2) building lots shall be a minimum of 12' wide- from the existing county road to within 150' of the building sites. Maximum grade is 14%. 7) MITIGATED CONDITION #6: If the fire apparatus access road is longer than 150', pullouts for fire apparatus may be required. Contact the Mason County Fire Marshal and/or the local fire protection district. 8) MITIGATED CONDITION #7: The wetland that exist in the Northeaster) portion of the site needs to be delineated per Mason Y P i County Interim Resource Ordinance. This delineation will need to be done prior to the cutting of timber on the site. The following buffers have been established on the site: There is a fifty(50') foot no cut buffer and a sixty-five(65') foot building set-back from the delineated wetland edge. These buffers are part of a one-hundred(100') foot management area around the wetland. At the time short platting the delineated line must be surveyed into the short plat. This delineation must be done prior to the forest practice application being approved. 9) MITIGATED CONDITION #8: The type 4 stream that runs from the SW portion of the site to NE portion will have the following buffers placed on it: Per Mason County Interim Resource Ordinance #77-93, there is a twenty-five(25') foot no-cut buffer and a forty(40') foot building set-back from the streams edge. These buffers are part of a fifty(50') foot management area that exists on this both sides of this stream. 10) INFORMATIONAL ONLY: Residential development on shorelines and -wetlands should be planned with minimum adverse environmental and visual impact. Structures should be and located to not significantly block views of adjacent residences. X 11) INFORMATIONAL ONLY: Residential development along shorelines should be designated and sited to make shore protection measures unnecessary. X 12) INFORMATIONAL ONLY: Landfill for residential development which results in the creation of new dry land waterward of OHWM or in biological wetlands is prohibited. X - ApN��(i:1:001 04rc�tor d Community- Developm,r?t 13) INFORMATIONAL ONLY: Storm drainage facilities shall be separate from sewage disposal transport facilities and include provisions to prevent uncontrolled and untreated direct entry of surface water runoff into receiving waters. Storm drainage facilities shall include, but not be restricted to vegetated swales, retention ponds and artificial and natural wetlands PROVIDED no adverse impacts to the receiving wetlands would occur and shall be subject to Mason County approval. X - 14) INFORMATIONAL ONLY: Residential developers and individuals shall be required to control erosion during construction. Removal of vegetation should be minimized and any areas disturbed should be restored to prevent erosion and other environmental impacts. X 15) INFORMATIONAL ONLY: Water quality is not to be degraded to the detriment of the aquatic environment as a result of this project. X - 16) INFORMATIONAL ONLY: The applicant/agent will create a pump out plan. This plan will set up the tank(s) of the septic system(s) will be pumped and inspected every 3 years. The report generated from the pump out and inspection will be submitted to and acted upon by Mason County Heath Services, Environmental Health Department. If the segregation becomes part of an established district or is hooked up to a Wastewater Treatment Facility, the above statement will be voided. X - 17) INFORMATIONAL ONLY: Sewage disposal facilities, as well as water supply facilities, should be provided in accordance with appropriate state and local health regulations. Storm drainage facilities should be separated, not combined with sewage disposal systems. X 18) INFORMATIONAL ONLY: Residential development in shoreline areas should be designed to preserve natural drainage courses. X Nv�-tcx of Cr"Mvirrrty.Dsvelopww., , CONSOLIDATED GINEERING' - CIVIL - STRUCTURAL - SOILS - PLANNING - - February 26, 1996 - Short Subdivision �� - - - Appro 0 4 KNUTSON TIMBER CO. - d omrrx�rtity DevelOQ�11lt1t - P.O.- Box -K _ - - Shelton, WA 98584 Subj: GEO-TECHNICAL EVALUATION OF A 9 ACRE TRACT FOR CLEAR-CUTTING. Legal;-- A portion of the E 1/2 of the E 1/2 of the SW 1/4 of-the NW 1/4 of Section 35, Township 21 N. , Range 3 W.W.M. Dear- Sir: - - _ -- We made a walk-over soils reconnaissance and-geo-t-echnical evaluation of the subject parcel on February 23rd-. The parcel is well covered with Douglas-Fir and Cedar timber of a size that is marketable. Tree cover is +; primarily mixed conifers with some maples. I - I - A forest floor humus covers the ground but the soils noted were varied and of glacial till origin. _Slopes were- gent-le (about 8%) except at the _ descent to__Cranbe-rry Creek and the interior canyon. Generally, the land- stability of this track is good. - A review of the literature for the backround on geology an&slope - stability revealed no previous_major- landslides in the near vicinity of the parcel. Photographs of features of the parcel were taken for our file and - record. - - inion a clear-cut timber removal fro m this track In m professional o � y p p - should not create any geo-technical problems with the land stability. Leave the stumps in-place. - Yours truly, ,47 ('27 _ - \� P, B ova _ R.B. BOUG iP-.E. Geo-technical Engineer _ Encl - Forest Base Map p o00313 EXP1RESJf=Z!= - 77-7556 -P.O.-Box-2321 • Bremerton, WA 98310 • (2-06)-479-5598 • FAX (206) 3 s } IF , I ... + I... _....... ....;.. — _. .. . _ _..__............................: ...._ # �.».. ...j.... s _.........__._ ._ _ ._ _�. _..... 1.._ ..._�._.........j......_....°....._ .. ..�..__... ... F I t t s , $, : Ji:T. - I BO ....... 4FG STEP �` .. ....... • I `S�ON AL E .... ... ' __ __ _ .......... ....... ..... n t i ...... ..... ....... ' I � ' ....... ...... .... .....'`... .... _ L•D ..... F. _ ! L.do _ —i FAG ri-s4bdWislon —T Ap d: y_ • vmiriln ty pevelopMent'-• _ CONSOLIDATED ENGINEERING - ,,,d Pay Milo 30A HE 1! 1 a P.O. Box 2321 - Z BREMERTON, WASHINGTON 98311 SHEET NO.--�-- °f ----_-_- -(360) 479.5598 CAICULAILUUY C601 - UAIT-._? ? s CI ILCKLU BY - fl�Vfi"Ln/° Od -'r. s7"12/1 w 9X I fc 1 S•",u/n,/.� �•' %" .lvv �''•.o [ ofAi/a, -1 Fv,r Sli�.�� 6�9i.C� it�'/ D�✓ Jii/,, S 1/. /'.•'r. 6hort uwivi5+un �,2$ APeliod.. f— Dh'ect Community Development 1 _ _ IM CONSOLIDATED ENGINEERING- - ,<,� p�iy i+�ZA� i+-FR {' ►'q. - - — P.O. Box 2321 — — BREMERTON, WASHINGTON 983-11 — So ILL NO. �,_-11__ —__ Of— . (360) 479.5598 CALCUTAFEUOY_S.�S'1 _______ _ DAU--- /tEf. S,F6c YE - C.F. pFSlfs�-v DAr,4 - - - P� ov - - Til4 B.rl Fog,*QZA - - V Q ` C '4 - - Q' —RIFI&M/ZEp - - - 2 . 6 - - - GfrmoJ�c P 072 C - - - A — ^c Al Arll Fait/1 Ut 2, Z ��r - VS l G—�, �t 7/�4��".+�w /3 - oZ ' NeAi;4 o� - - %a RAiN►rrr,c S — /2— �- CQ': 7.6 .CFs toc 7-1 71 Short Subdivision .2611 Approv - - OWector of C munity Development