HomeMy WebLinkAboutFIR2011-00046 - FIR Permit / Conditions - 11/2/2011 4 &
pMASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line (360)427-7262
Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670, ext. 352
Shelton, WA 98584
FIRE PROTECTION PERMIT FIR2011-00046
APPLICANT: SAFEWAY#1571
CONTRACTOR: LICENSE: EXP: RECEIVED: 10/18/2011ISSUED: 11/2/2011
SITE ADDRESS: 23961 NE STATE ROUTE 3 SUITE A BELFAIR EXPIRES: 5l2/2012
PARCEL NUMBER: 123294100010
LEGAL DESCRIPTION: PCL 3 OF BLA#98-58 PTN NE SE SURVEY 32/67
PROJECT DESCRIPTION: PROJECT, ADD 1 ADDITIONAL HEAD,RELOCATE OR REPLACE 7 HEADS, REMOVE 2 DRY PENDENT HEADS SEE
COM2011-00057
GENERAL INFORMATION System Information
Type of Use: COMM
Fire District: 2 Sprinkler Heads: Audible Switches: Pull Stations:
Hood & Duct t: Flow Switches: Visual Devices: Door Releases:
Dry Chemical?: Pressure Switches:: Smoke Detectors: Duct Detectors:
Wet Chemical?: Zones: Heat Detectors:
Sprinkler?: Y
Standpipe?: SQUARE FOOTAGE FEES
Monitoring Company: First Floor: Type Amount Due Amount Paid
Monitoring Phone No.:() - Second Floor: Sprinkler System Permit FE $168.50 $168.50
Auto Fire Alarm?: Third Floor;: p y
Sprinkler System Plan Che $109.20 $109.20
Total: $277.70 $277.70
FIR2011-00046 Please refer to the following pages for conditions of this permit. Page 1 of 3
I
CASE NOTES
FIR2011-00046
i
CONDITIONS FOR
FIR2011-00046
1.) The work is su RNctions and corrections as deemed necessary by the Mason Coubty Fire inspector to Insure the minimum requirements of the
2ob9�ht rnatio and NFhA 13 are met.
2.) Per sbction 901.2,1 f the 2009 International Fire code, Statement of Compliance.
Before requesting final approval of the installation,the installing contractor shall furnish a written statement to the fire code official that the subject fire
protect' system has been installed in accordance with the approved plans and has been tested in accordance with the manufactures specifications and
thq appr opriate 19 stal on,s ard.Any deviations from the design standards shall be noted and copies of the approvals for such deviations shall be
att ch p the `tte at t.y
1X
This permit ec mes null and vol Of work or construction authorized is not commenced within 180 days,or If construction or work is suspended for a period of 180 days at any time
after work is commenced.,,,E-Vence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied,
Proof of continuation of work�by means of a p ogress Inspection.The owner or the agent on the owners behalf,represents that the Information provided is accurate and grants
employees of Mason Co my ccess to t abo d s i ed property and structure for review and Inspection.
OWNER OR AGENT. � "` DATE:
i
i
FIR2011-00046 Please refer to the following pages for conditions of this permit. Page 2 of 3
. A
C i _
s ,---
� 4'-a'� ! tJ w� �-�}�ry C�.-�� �-` - Tom•--C:? 11"�
W66�C:� 6>Wrr-&��rL OT2.
V
Oil
34 S
' �tin•p
F-I
f2�L J=A �z—) \,�,/A
4�P ro$peak 5�S b
'"�k�D4Y6 Doce9bbt
- FIRE Y a T7E ZE-41� 1 �-LT`j
MARSHAL
-C--rI6r �l4 v
FIRE
Fire & Building
Products
Technical Services:Tel:(800)381-9312/Fax:(800)791-5500
Series RFII — 5.6 K-factor
"Royal Flush fill Pendent Concealed Sprinklers
Quick & Standard Response, Standard Coverage
Cap.The Protective Cap is temporarily
General
removed for installation, and then it
can be replaced to help protect the
Description sprinkler while the ceiling is being in-
stalled or finished. The tip of the Pro-
The Series RFII Quick Response tective Cap can also be used to mark
(3 mm bulb) & Standard Response (5 the center of the ceiling hole into plas-
mm bulb), 5.6 K-Factor, "Royal Flush ter board, ceiling tiles, etc. by gently
II" Concealed Pendent Sprinklers are pushing the ceiling product against the
decorative sprinklers featuring a flat Protective Cap. When the ceiling in-
cover plate designed to conceal the stallation is complete the Protective
sprinkler.It is the best choice for archi- Cap is removed and the Cover Plate
tecturally sensitive areas such as hotel Assembly installed.
lobbies, office buildings, churches, As an option,the Series RFII Standard
and restaurants. Response(5 mm bulb)"Royal Flush ll"
Each unit includes a Cover Plate As- Concealed Pendent Sprinklers may be
sembly that conceals the sprinkler op- fitted with a silicone Air and Dust Seal UL, C-UL, and NYC. Maximum 175
erating components above the ceiling. (Ref. Fig. 5). The Air and Dust Seal is psi (12,1 bar) by FM.
The separable two-piece design of the intended for sensitive areas where it is
Cover Plate and Support Cup Assem- desirable to stop air and dust travel Technical
blies allows installation of the sprin- through the cover plate from the area
klers and pressure testing of the fire above the ceiling. Data
protection system prior to installation WARNINGS
of a suspended ceiling or application of the finish coating to a fixed ceiling. The Series RFII Concealed Pendent Approvals for Series RFII
They also permit removal of sus- Sprinklers described herein must be UL and C-UL Listed. FM Approved.
pended ceiling panels for access to installed and maintained in compli- NYC under MEA 353-01-E.LPCB(Ref.
building service equipment without ante with this document, as well as No.094a/09 for TY3551 & 094a/10 for
having to first shut down the fire pro- with the applicable standards of the TY3531) Approved.
tection system and remove sprinklers. National Fire Protection Association, The approvals apply only to the serv-
so, the separable two-piece design m addition to the standards of any ice conditions indicated in the Design
Also,
the the Sprinkler provides for 1/2 other authorities having jurisdiction. Criteria section and maximum pres-
of m Sprinkler
of vertical adjustment, Failure to do so may impair the per- sure ratings indicated in the
inch th
to reduce the accuracy which the formance of these devices. Model/Sprinkler Identification Num-
length of fixed pipe drops to the sprin The owner is responsible for maintain tiers section.
klers must be cut. ing their fire protection system and de- Approvals for Air & Dust Seal
The Series RFII Sprinklers are vices in proper operating condition. (part#10908100)
shipped with a Disposable Protective The installing contractor or sprinkler UL and C-UL Listed for use with the
manufacturer should be contacted RFII(TY3551 &TY3504)Standard Re-
with any questions. sponse Concealed Sprinkler.
IMPORTANT Temperature Ratings
Always refer to Technical Data Model/Sprinkler 155F/68C Sprinkler - 135F/57C Plate
Sheet TFP700 for the "INSTALLER 200F/93C Sprinkler - 165F/74C Plate
WARNING" that provides cautions Identification Discharge Coeffigient
with respect to handling and instal- K= 5.6 GPM/psis (80,6 LPM/bar112)
lation of sprinkler systems and com- Numbers Adjustment
ponents. Improper handling and in- 1/2 inch (12,7 mm)
stallation can permanently damage TY3551 (5mm bulb) & TY3531 (3 mm Finishes
a sprinkler system or its compo- bulb): maximum 175 psi (12,1 bar) by Cover Plate: Chrome Plated, Brass
nents and cause the sprinkler to fail UL, C-UL, FM, LPCB and NYC. Plated,or White Painted(Custom paint
to operate in a fire situation or cause TY3504 (5 mm bulb) &TY3505 (3 mm matches and colors other than white
it to operate prematurely. bulb): maximum 250 psi (17,3 bar) by are available on request.)
Page 1 of 4 JULY, 2004 TFP181
w
Page 2 of 4 TFP181
Physical Characteristics 1/2"NPT SEALING
Frame . . . . . . . Bronze ASSEMBLY
Support Cup . Chrome Plated Steel
Guide Pins . . . . . . Stainless Steel
Deflector . . . . . . . . . . . Bronze FRAME
Compression Screw . . . . . . Brass CAP
Bulb . . . . . . . . . . . . . . . Glass
Cap . . . . . . . . Bronze or Copper SUPPORT
Sealing Assembly CUP WITH BULB
. Beryllium Nickel w/Teflon' ROLLFORMED
Cover Plate . . . . . . . . . . . Brass THREADS
Retainer . . . . . . . . . . . . Brass COMPRESSION
Ejection Spring . . . . Stainless Steel SCREW
GUIDE
Patents PINS(2)
U.S.A.4,014,388
DEFLECTOR
(DROPPED
Operation
DEFLECTOR I � J LJ- �' POSITION)
When exposed to heat from a fire,the SPRINKLER/SUPPORT CUP
Cover Plate, which is normally sol- I ASSEMBLY
dered to the Retainer at three points,
falls away to expose the Sprinkler As- THREAD INTO RETAINER
sembl .At this Dint the Deflector sup- SUPPORT CUP WITH THREAD
Y P P UNTILMOUNTINGCD CD DIMPLES
ported by the Guide Pins drops down SURFACE IS
to Its operational position. FLUSH WITH EJECTION
The glass Bulb contains a fluid that CEILING SPRING
expands when exposed to heat.When
the rated temperature is reached, the
fluid expands sufficiently to shatter the
glass Bulb,activating the sprinkler and
allowing water to flow. SOLDER COVER
TABS(3) COVER PLATE/RETAINER PLATE
D ASSEMBLY
Design
FIGURE 1
Criteria SERIES RFII CONCEALED SPRINKLER
ASSEMBLY
The RFII (TY3551 & TY3504), 5 mm
Bulb Type, Concealed Pendent Sprin- Step 1. The sprinkler must only be
klers are UL and C-UL Listed as stand- Installation installed in the pendent position and
and response - standard spray sprin- with the centerline of the sprinkler per-
klers for use in accordance with the The Series RFII must be installed in pendicular to the mounting surface.
current NFPA standard. They are FM accordance with the following instruc Step 2. Remove the Protective Cap.
Approved as standard response - tions: Ste pipe standard spray sprinklers for use in P 3. With PiP thread sealant a P-
accordance with the current FM Loss NOTES plied to the pipe threads, hand tighten
Prevention Data Sheets. Do not install any bulb type sprinkler if the sprinkler into the sprinkler fitting.
The RFII (TY3531 & TY3505) 3 mm the bulb is cracked or there is a loss of Step 4. Wrench tighten the sprinkler
Bulb T e, Concealed Pendent S rin- liquid from the bulb. With the sprinkler using only the RFII Sprinkler Wrench
YP P- and held horizontally, a small air bubble Ref. Figure 3 The RFII Sprinkler
keeps are should be present. The diameter of the )' P
response - standaardnd Listed spray sprinklers quick ( gure air bubble is approximately 1/16 inch Wrench is to be applied to the Sprin-
for use in accordance with the current (1,6 mm) for the 155°F/68°C and 3/32 kler as shown in Figure 3.
NFPA standard. They are FM Ap- inch(2,4 mm)for the 200°F/930C tem- Step 5. Replace the Protective Cap
proved as standard response - stand- perature ratings. (Ref. Figure 4) by pushing it upwards
and spray sprinklers for use in accord- until it bottoms out against the Support
ance with the current FM Loss A leak tight 112 inch NPTsprinklerjoint Cup.The Protective Cap helps prevent
Prevention Data Sheets. should be obtained with a torque of 7 damage to the Deflector and Arms dur-
The Series RFII Concealed Pendent to 14 ft.lbs. (9,5 to 19,0 Nm). A maxi- ing ceiling installation and/or during
Sprinklers are one listed and a mum of 21 ft.lbs. (28,5 Nm) of torque application of the finish coating of the
P Y P- is to be used to install sprinklers. ceiling. It may also be used to locate
proved with the Series RFII Concealed Higher levels of torque may distort the Y
Cover Plates having a metallic or white sprinkler inlet with consequent leak- the center of the clearance hole by
painted finish. gently pushing the ceiling material up
age or impairment of the sprinkler. against the center point of the Protec-
The Series RFII must not be used in Do not attempt to compensate for in- tive Cap.
applications where the air pressure sufficient adjustment in the Sprinkler
above the ceiling is greater than that Assembly by under-orover-tightening NOTE
below. Down drafts through the Sup- the Sprinkler/Support Cup Assembly. As long as the Protective Cap remains
port Cup could delay sprinkler opera- Readjust the position of the sprinkler in place, the system is considered to
tion in a fire situation. fitting to suit. be "Out of Service".
Registered Trademark of DuPont
TFP181 Page 3 of 4
FACE OF CLEARANCE HOLE CLEARANCE
SPRINKLER DIAMETER HOLE
FITTING DIMENSION C
SPRINKLER
SUPPORT CUP -
ASSEMBLY
1/2"(12,7 mm)
THREADED
D ADJUSTMENT --
FACE OF CEILING, —
RETAINING RING FIGURE 4
MOUNTING DISPOSABLE PROTECTIVE CAP
SURFACE
\ / Step 6.After the ceiling has been com-
pleted with the 2-1/2 inch (63,5 mm)
diameter clearance hole and in prepa-
ration for installing the Cover Plate As-
sembly, remove and discard the Pro-
`- - ---T----r-� tective Cap, and verify that the
3/16"to 11/16" MANUFACTURER DEFLECTOR COVER PLATE Deflector moves up and down freely. If
(4,8 to 17,5 mm) PRESET GAP IN DROPPED RETAINER the Sprinkler has been damaged and
REFERENCE 3/32"(2,4 mm) POSITION ASSEMBLY the Deflector does not move up and
down freely, replace the entire Sprin-
COVER PLATE COVER PLATE kler assembly. Do not attempt to mod-
PROFILE DEPTH - — DIAMETER - - ify or repair a damaged sprinkler.
DIMENSION B DIMENSION A Step 7. When installing an Air and
Dust Seal, refer to Figure 5,otherwise
proceed to Step 8.To attach the Air and
A:3-1/4"(82,6 mm) C:2-3/8"to 2-5/8"(60,3 to 66,7 mm) Dust Seal, verify the angle of the out-
B:3/16"(4,8 mm) D: 1-3/4"to 2-1/4"(44,5 to 57,2 mm) side edge of the seal is oriented ac-
cording to Figure 5. Start the edge of
FIGURE the Retainer in the grooved slot of the
SERIES RFII CONCEALED SPRINKLER Air and Dust Seal and continue around
INSTALLATION DIMENSIONS the retainer until the entire Air and
Dust Seal is engaged.
NOTE
The Air and Dust Seal is only to be
installed on the periphery of the Re-
tainer.
FRAME Step 8. Screw on the Cover Plate/Re-
ARM tainer Assembly until the Retainer -
Figure 2 (or Air and Dust Seal - Figure
SUPPORT 5) contacts with the ceiling. Do not
CUP continue to screw on the Cover
Plate/Retainer Assembly such that it
lifts a ceiling panel out of its normal
position. If the Cover Plate/Retainer
Assembly cannot be engaged with the
Support Cup or the Cover Plate/Re-
7/e"(23 mm) tainer Assembly cannot be engaged
SQUARE sufficiently to contact the ceiling, the
Sprinkler Fitting must be repositioned.
ALIGN J
ARROWS WITH i \ Care and
FRAME ARMS al
Maintenance
_L_j_ ACCEPTS ` r ' The Series RFII must be maintained
112"SOCKET — and serviced in accordance with the
DRIVE following instructions:
NOTES
FIGURE 3 Absence of the Cover Plate Assembly
RFII SPRINKLER WRENCH may delay sprinkler operation in a fire
situation.
Page 4 of 4 TFP181
When properly installed, there is a SUPPORT SPRINKLER FACE OF ORIENT
nominal 3132 inch (2,4 mm) air gap CUP CEILING SEAL
between the lip of the Cover Plate and BEVEL AS
the ceiling, as shown in Figure 2. This COVER SHOWN
air gap is necessary for proper opera- PLATE
tion of the sprinkler. If the ceiling is to RETAINER
be repainted after the installation of ASSEMBLY
the Sprinkler, care must be exercised
to ensure that the new paint does NOT
seal off any of the air gap. CLEAN
Factory painted Cover Plates MUST ROOM
LIP OF COVER SEAL
NOT be repainted. They should be re- RETAINER PLATE
placed, if necessary, by factory
painted units. FIGURE 5
Do not pull the Cover Plate relative to OPTIONAL AIR AND DUST SEAL FOR SERIES RFII(TY3551 & TY3504)
the Enclosure. Separation may result.
Before closing fire protection system Inspection Service in accordance with DAMAGES, AND IN NO EVENT
main control valve for maintenance local requirements and/or national SHALL TYCO FIRE PRODUCTS' Lk
work on the fire protection system that codes. ABILITY EXCEED AN AMOUNT
it controls,permission to shutdown the EQUAL TO THE SALES PRICE.
affected fire protection system must be
obtained from the proper authorities Limited THE FOREGOING WARRANTY I
MADE IN LIEU OF ANY AND ALL
and all personnel who maybe affected OTHER WARRANTIES EXPRESS OR
by this action must be notified. Warranty /MPLIED.INCLUDING WARRANTIES
Sprinklers that are found to be leaking OF MERCHANTABILITY AND FIT-
or exhibiting visible signs of corrosion Products manufactured by Tyco Fire NESS FOR A PARTICULAR PUR-
must be replaced. Products are warranted solely to the POSE
Automatic sprinklers must never be original Buyer for ten (10) years
painted, plated, coated or Otherwise wise against defects in material and work-
altered after leaving the factory. manship when paid for and properly Ordering
Pied sprinklers must be replaced. installed and maintained under normal
Sprinklers that have been exposed to use and service.This warranty will - Procedure
pire ten (10) years from date of shipip-
corrosive products of combustion, but ment by Tyco Fire Products. No war- When placing an order,indicate the full
have not operated,should be replaced ranty is given for products or rodu t name.Contact our local dis-
if they cannot be completely cleaned components manufactured by compa tibutor for availability. Y
by wiping the sprinkler with a cloth or nies not affiliated by ownership with
by brushing it with a soft bristle brush. Tyco Fire Products or for products and Sprinkler Assembly:
Care must be exercised to avoid dam- components which have been subject Specify: (SIN), (specify temperature
age to the sprinklers - before, during, to misuse,improper installation,corro- rating) Series RFII Concealed Pen-
and after installation. Sprinklers dam- sion,or which have not been installed, dent Sprinkler, P/N (specify).
aged by dropping, striking, wrench maintained,modified or repaired in ac-
twist/slippage, or the like, must be re- cordance with a licable Standards of 155F/68C 20oF/93C
Iaced.Also,re lace an sprinkler PP TY35s1 51-796-1-155 51-796-1-200
P P Y P the National Fire Protection Associa- TY3504 s1-7ss-1-lss s1-7ss-l-zoo
has a cracked bulb or that has lost tion,and/or the standards of any other TY3531 51-792-1-155 51-792-1-200
liquid from its bulb. (Ref. Installation Authorities Having Jurisdiction. Mate- TY3505 51-797-1-155 51-797-1-200
Section). rials found by Tyco Fire Products to be
If a sprinkler must be removed, do not defective shall be either repaired or Separately Ordered Cover Plate:
reinstall it or a replacement without replaced, at Tyco Fire Products' sole Specify: (specify temperature rating)
reinstalling the Cover Plate Assembly. option.Tyco Fire Products neither as- Series RFII Concealed Cover Plate
If a Cover Plate Assembly becomes sumes, nor authorizes any person to with (specify finish), P/N (specify).
dislodged during service,replace it im- assume for it, any other obligation in
mediately. connection with the sale of products or Brass 56 782-1C1(35 ss5i 74C16))
parts of products. Tyco Fire Products Bright Brass 56-792-2-135 56-792-2-165
The owner is responsible for the in- shall not be responsible for sprinkler Chrome 56-792-9-135 56-792-9-165
spection, testing, and maintenance of system design errors or inaccurate or Brushed Chrome 56-792-8-135 56-792-8-165
their fire protection system and de- incomplete information supplied b White 56-792-0-135 56-792-0-165
P Y P PP Y White(RAL9010)' 56-792-3-135 56-792-3-165
vices in compliance with this docu- Buyer or Buyer's representatives. Bright white 56-792-4-135 56-792-4-165
ment, as well as with the applicable IN NO EVENT SHALL TYCO FIRE Off White 56-792-5-135 56-792-5-165
standards of the National Fire Protec- PRODUCTS BE LIABLE, IN CON- Black 56-792-6-135 56-792-6-165
Custom 56-792-X-I
tion Association (e.g., NFPA 25), in TRACT,TORT,STRICT LIABILITY OR ss-7s2-x-lss
addition to the standards of any other UNDER ANY OTHER LEGAL THE- (a)For use with 155E/68C sprinnkk lers.
authorities havingjurisdiction.The in (b)For use with Hemisphere
al sprinklers.
1 ORY, FOR INCIDENTAL, INDIRECT, Eastern Hemisphere sales only
stalling contractor or sprinkler manu- SPECIAL OR CONSEQUENTIAL
facturer should be contacted relative to DAMAGES, INCLUDING BUT NOT Sprinkler Wrench:
any questions. LIMITED TO LABOR CHARGES, RE- Specify: RFII Sprinkler Wrench,
It is recommended that automatic GARDLESS OF WHETHER TYCO P/N 56-000-1-075.
sprinkler systems be inspected, FIRE PRODUCTS WAS INFORMED Air and Dust Seal:
tested, and maintained by a qualified ABOUT THE POSSIBILITY OF SUCH Specify:Air and Dust Seal,
P/N 56-908-1-001.
TYCO FIRE PRODUCTS,451 North Cannon Avenue,Lansdale,Pennsylvania 19446
q+�` tit C 6-f J4 N Cc
lJ
1 � r
qt?
Lo
C� pot C, —7
mac( c ANGES °
FOR APPROVAL 39 e g
SUBMIT CHAPEL ORMING WORK °
PRIOR TO sico.,W.-
`
dip spli
-- t�j
�- FIRE
MARSHAL.
I 6r [,L�Z_ \vA"
B
z-3
� 23z � 4-1locD1O v
k••' opv
haAv jti�s
REVIEWED FOR THESE PLANS MUST BE
CODE COMPLIANCE ON THE JOB SITE
MASON COUNTY FOR INSPECTION,
BUILDING DEPARTMENT
Date
-n to
56 N CONCRETE MECHANICAL MANUFACTURED HOME >
Footings 1 Sethadm Date By Ribbons M
Gas Piping
CIntenof Date By interior-Date By Date By
CExter.o Date By Exterior-Date B Set-up �
rn Point toad t Isolated Footings INSULATION N Date By v,
BG/SLAB INSULATION y
Date By Data By FIRE DEPARTMENT
Foundation Walls Floors Date By
Date By Data By DECKS
FRAMING watts Date By
Date By Data By PROPANE TANKS
PLUMBING Vault Date By
Date By OTHER
Groundwork Attic
[late By Type.
Date By .._,.- Data By
DRYWALL
o.w.rr Type:
InL Brace Wall Date 6y T
Date By
— Date By FINAL INSPECTION c
Water Line Fire Sepe ration
Date By Data By Late By �
o Pass or Request ` Inspect. c
:r Type of insp. Fail Date Date Done By Comments
I
CID
CD
N
0
O
n
O
7
fl.
O
7
to
O
0
a
m
3
r:
b
v
co
m
w
0
w
t
MASON COUNTY FIRE MARSHAL CO 2,811 - �OD�
`1
tWL Mason County Bldg.III 426 W Cedar St
PO BOX 186 Shelton,WA 98584
(360)427-9670 Ext.273 ��'' ,I
Permit#T(t� a0 I i - n�`t(Q
Mason County Fire Protection System Permit Application
Incomplete application will not be accepted
Owner: ct G Phone #: 'f a 5-�20 I- to 4Q0
Mailing Address: �Z Al e /a q—'�k Q/I ity: ,Qe e✓u.f- State: A Zip: 9900-5
Site Address: 3�(0 /u� �t�f City: Be State: W A Zip: R
Parce al Description:
Lien/Title Holder:
Address: -24""� `L c;-S A—b City: — State: Zip:
Contractor: 5 k, eA � 1- -v (�, Phone#: Z- S 3 _X 7 1-�3
Address: bk �Z 3 s q City: Z-'ck�c r State: �A) Zip: g 33.5
Contractor Registration#: Z t o'�� G�D Expiration Date: ----) ha Li a Ol
Building Square Footage (existing& proposed): 1 st / 2nd 3rd /
Building Use: Q Occupancy Classification: Construction Type:
S 6.) C) jr-
Type of System: Type of Work:
Sprinkler: Wet ✓Dry ✓ New System:
Standpipe: Wet Dry S Modification:co �
Hood & Duct: —f Dry Chem: 2)R,j o c-4,o [o 0-e. -7 WeA-4
Wet Chem: 3) RertiotjL wry Ver" ��-e
Fire Pump:
UL certified Monitoring company: Phone#:
00
Contractors Bid Price: $ l �!
FIRE
MARSHAL
Plan Submittal Requirements
Your plan submittal shall include the following:
• Plans shall be on standard 24"x 36"paper, drawn to scale with dimensions and north arrow.
• Site and Floor plan with cross sectional and exterior elevations.
• Location of occupancy and/or area separation walls,partitions, stairway enclosures, concealed spaces, etc.
• Cut sheets and/or references for all new devices.
• Location/description of all new and existing devices.
• Battery calculations.
• Wiring diagrams per floor or zone overlaid on an accurate floor plan.
• Electrical riser diagram showing all zones,circuits, devices, and end—of—line resistors.
• Hydraulic calculations.
• Copy of Contractors bid.
Fees
The permit fee will be assessed based on the submitted contractor bid for the project or a minimum of$168.50.
A plan review fee will be calculated at 65%of the permit fee(minimum$109.50)and is due upon submittal of permit application.
Contractor's Affidavit
I certify that I am a currently registered contractor in the State of Washington. I am aware of the ordinance requirements regulating
the wo which the permit is issued and certify that all work will be in compliance with this ordinance. No changes will be made
witho t first btaini approval fro the Mason County Fire Marshal.
By: Date: JI L
kobert a r e-lj ) V-P
WA ZI(,Lte—