HomeMy WebLinkAboutSEP2020-00063 COM2022-00016-00028 Cancelled Self Storage - SEP Determinations - 10/20/2020 MASON COUNTY
Planning Division of Community
MASON COUNTY Development
COMMUNITY SERVICES 615 W.Alder St. Bldg.8, Shelton, WA 98584
360-427-9670 ext 352
QuAdira}Planning,Envircnmontal HaJth Community Ha,ahh
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-34)
SEP2020-00063
Description of Proposal: Construct self storage facility w/19 storage buildings. 11,500 cy cut/fill
Proponent: HOLLAND INVESTMENTS LLC
Location of Proposal: 3160 E Johns Prairie Rd
Parcel Number: 320044390025
Legal Description:
Lead Agency: Mason County
Planner.-
The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the
environment. An Environmental Impact Statement(EIS) is not required under RCW 43.21 C.030(2)(c). This decision was
made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This
information is available to the public upon request.
Please contact the planner at 360-427-9670 x352 with any questions. This DNS is issued under WAC 197-11-340(2).
The Lead Agency will not act on this proposal for 14 days from the date shown below, when the determination is final.
Comments must be submitted to the Dept. of Community Development, 615 W Alder St, Shelton WA 98584 by:
11/02/2020 Appeal of this determination must be filed with a 14-day period following this final determination
date, per Mason County Code Chapter 15.11 Appeals.
AAU
��1l�ti I�I2oI�L'
Autir�d Local Government Official -�_I Date
Page: 1
avAel -- -6vi-Ff",
{fall SKvc�h�w (A-oves, M�<�cctCc. (Cr reoih.5a ,
MASON COUNTY DCD SEPA Contact List
Sent SEPA 2p"— U 5 to(check all that apply) on
Skokomish Tribal Nation,Nat.Res.Dept. WA Department of Commerce
ATTN:Julian Sammons reviewteam@commerce.wa.gov
N 541 Tribal Center Rd.,Skokomish Nation,98584 U.S.Army Corps of Engineers
jsammons@skokomish.org SEPA Reviewer-Samantha Stanford
dsarff@skokomiosh.org PO Box C-3755,Seattle,98124
Skokomish Tribal Historic Preservation Officer Samantha.M.Stanford@usace.army.mil
ATTN:Kris Miller WA Dept of Fish and Wildlife
80 N Tribal Center Rd,Skokomish Nation,98584 SEPAdesk@dfw.wa.gov
shlanay1@skokomish.org WA Dept.of Fish and Wildlife
Quinault Indian Nation ATTN: Chris Waldbillig
ATTN: Mark Mobbs 450 Port Orchard Blvd,Suite 290
PO Box 189,Tahola,98587 Port Orchard,WA 98366
mmobbs@quinault.org Chris.waldbillig@dfw.wa.gov
Squaxin Tribal Nation,Natural Res.Dept. WA Dept,of Fish and Wildlife
2952 SE Old Olympic HWY,Shelton 98584 ATTN:Noll Steinweg
jdickison@squaxin.us Habitat Biologist
emarbet@squaxin.us noll.steinweg@dfw.wa.gov
szaniewski@squaxin.us WA Dept.of Fish and Wildlife
sdinubilo@squaxin.us ATTN: Darrin Masters
The Confederated Tribe of the Chehalis 450 Port Orchard Blvd,Suite 290
ATTN:SEPA Reviewer-Glen Connelly Port Orchard,WA 98366
420 Howanut Rd.,Oakville,98568 Darrin.Masters@dfw.wa.gov
gconnelly@chehalistribe.org WA Dept of Fish and Wildlife
WA DNR,South Puget Sound Region ATTN: Allison Cook
950 Farman Avenue N, Enumclaw,98022-9282 ,(Habitat Biologist-S Puget Sound Watershed)
southpuget.region@dnr.wa.gov 1111 Washington St SE,Olympia WA,98501
WA DNR,Aquatic Resources allison.cook@dfw.wa.gov
PO BOX 47027,Olympia,98504-7027
and@dnr.wa.gov WA Dept.of Fish and Wildlife
WA DNR,SEPA Center ATTN: Adam Brown
ATTN: External Coordinator Habitat Biologist
PO BOX 47015,Olympia,98504-7015 450 Port Orchard Blvd,Suite 290
sepacenter@dnr.wa.gov adam.brown@dfw.wa.gov
Olympic Region Clean Air Agency
ATTN: Lauren Whybrew Q WA Dept of Transportation
2940-B Limited Ln. NW,Olympia.98502 ATTN: Dale Severson
lauren.whybrew@orcaa.org P.O.Box 47440, Olympia 98504-7440
M Mason County Transit OR-SEPA-REVIEW@wsdot.wa.gov
ATTN: Danette Brannin City of Shelton
790 E Johns Prairie Rd,Shelton,98584 ATTN:Jason Dose
dbrannin@masontransit.org 525 West Cota St.,Shelton 98584
Mason County PUD#1 jasond@ci.-shelton.wa.us
ATTN: Darin Hall 0 Port of Shelton
N 21971 Hwy 101,Shelton,98584 ATTN: Brandon Palmer
darinh@mason-pud1.org 21 West Sanderson Way,Shelton 98584
Mason County PUD#3 BrandonP@portofshelton.com
- -- -
ATTN: Kristin French Dep't of Archaeology&Historic Preservation
kristin.french@masonpud3.org P.O. Box 48343,Olympia,98504-8343
WA Department of Ecology SEPA@dahp.wa.gov
Environmental Review Section Q Tacoma Public Utilities-Real Property Services
PO BOX 47703,Olympia,98504-7703 ATTN: Dave Letterman
separegister@ecy.wa.gov 3628 S 35th St,Tacoma, 98409-3192
dletterm@cityoftacoma.org
WA Department of Health
Mason Cty P.W.ATTN: ATTN:Joe Laxson
joe.laxson@doh.wa.gov
0 Mason Cty E.H.ATTN:
Other:
0 Mason Cty Bldg ATTN: Agent:
Applicant: 4n hair}a')W}Sh,Lox
School District:
MC DCD last updated on 3/17/20
11/3/2020 Mail-Gbm@co.mason.wa.us
Fw: ECY SEPA 202005413 - Holland Self-Storage Facilities - Comments
Grace Miller
Tue 11/3/2020 9:23 AM
Inbox
ToJ imjhol land@ msn.com <jimjholland@msn.com>;
c(Trish Woolett <tw@co.mason.wa.us>; Fred Perryman <FredP@co.mason.wa.us>;
Importance: High
1 attachments(40 KB)
202005413 ECY Comments.pdf;
Hello Jim,
Attached please find the State Dept of Ecology comments regarding the County's SEPA Determination of
Nonsignificance for your project. I do not have an email for Chris Merritt or I would have forwarded it to him
also.
We also received comments from the Squaxin tribe Cultural resources Dept. Their comment will be added as a
condition to your Land Modification Permit. This is a routine condition stating that if any archaeological or cultural
resources are uncovered during implementation, please halt work in area of discovery and contact the State and
the Tribe.
This concludes the SEPA comment period and the Planning Department will be conditionally approving the permit
application. Thank you.
Memo-wCow,&y PewwtitAYSd,Sta IL Center avw�L3 avicL��
Depa,rtm ,v s,cwelcc,wrent dov-,dl to-th.4e,/pc Ixtic/ Staff a-elcavttuv tt"iq,to-wovkl f),-
yo-uw e i t�froiiv i w th el 6eU ov i w the/o f f>,ce-1. To-6+W11 o-t t h.o w we/arel
opewatbnql TODAY, plP,awl v4.%t http://www.ca way ws/ y_
" �phb
Sincerely, Cracel
From: ECY RE SWRO SEPA COORDINATOR<swrosepacoordinator@ECY.WA.GOV>
Sent: Monday, November 2, 2020 9:53 AM
To: Grace Miller
Cc: Rockett, Derek (ECY); Maupin, Morgan (ECY)
Subject: ECY SEPA 202005413 - Holland Self-Storage Facilities - Comments
Grace Miller, Planner:
https://owa.co.mason.wa.us/owa/#path=/attachmentlightbox 1!2
11/3/2020 Mail-Gbm@co.mason.wa.us
Thank you for the opportunity to comment on the Holland Self-Storage Facilities Project (Lead Agency File No(s).
SEP2020-00063). Ecology's comments are attached. Please ensure the applicant receives a copy.
[ Statewide SEPA Register No. 202005413 ]
Have a great day,
Garret Peck
Backup SEPA Coordinator I Southwest Regional Office
Desk: 360-407-6300 1 Cell: 360-480-3300
imDEPARTMENT OF
ECOLOGY
st.« -Vw%hinpc--
https://owa.co.mason.wa.us/owa/#path=/attachmentlightbox 2/2
STATE
R� OA
O �
; S
�yl IAK�d
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
PO Box 47775 •Olympia, Washington 98504-7775 •(360) 407-6300
711 for Washington Relay Service •Persons with a speech disability can call 877-833-6341
November 2, 2020
Grace Miller, Planner
Mason County
Department of Community Services
Planning Division
PO Box 279
Shelton, WA 98584
Dear Grace Miller:
Thank you for the opportunity to comment on the determination of nonsignificance for the
Holland Self-Storage Facilities Project (SEP2020-00063) located at 3160 East Johns Prairie
Road as proposed by Holland Investments, LLC. The Department of Ecology(Ecology)
reviewed the environmental checklist and has the following comment(s):
SOLID WASTE MANAGEMENT: Derek Rockett (360) 407-6287
All grading and filling of land must utilize only clean fill. All other materials may be
considered solid waste and permit approval may be required from the local jurisdictional
health department prior to filling. All removed debris resulting from this project must be
disposed of at an approved site. Contact the local jurisdictional health department for proper
management of these materials.
WATER QUALITY/WATERSHED RESOURCES UNIT:
Morgan Maupin (360) 407-7320
The Construction Stormwater General Permit (CSWGP) is not listed under required permits
in question A.10 of the SEPA checklist. Information in the SEPA checklist and/or supporting
documents suggest that this project meets the CSWGP coverage requirements, as described
below.
Construction Stormwater General Permit:
The following construction activities require coverage under the Construction Stormwater
General Permit:
1. Clearing, grading and/or excavation that results in the disturbance of one or more
acres and discharges stormwater to surface waters of the State; and
2. Clearing, grading and/or excavation on sites smaller than one acre that are part of a
larger common plan of development or sale, if the common plan of development or
sale will ultimately disturb one acre or more and discharge stormwater to surface
waters of the State.
Grace Miller
November 2, 2020
Page 2
a) This includes forest practices (including, but not limited to, class IV conversions)
that are part of a construction activity that will result in the disturbance of one or
more acres, and discharge to surface waters of the State; and
3. Any size construction activity discharging stormwater to waters of the State that
Ecology:
a) Determines to be a significant contributor of pollutants to waters of the State of
Washington.
b) Reasonably expects to cause a violation of any water quality standard.
If there are known soil/ground water contaminants present on-site, additional information
(including, but not limited to: temporary erosion and sediment control plans; stormwater
pollution prevention plan; list of known contaminants with concentrations and depths found;
a site map depicting the sample location(s); and additional studies/reports regarding
contaminant(s)) will be required to be submitted. For additional information on contaminated
construction sites, please contact Carol Serdar at Carol.Serdar@ecy.wa.g_ov, or by phone at
(360) 742-9751.
Additionally, sites that discharge to segments of waterbodies listed as impaired by the State
of Washington under Section 303(d) of the Clean Water Act for turbidity, fine sediment, high
pH, or phosphorous, or to waterbodies covered by a TMDL may need to meet additional
sampling and record keeping requirements. See condition S8 of the Construction Stormwater
General Permit for a description of these requirements. To see if your site discharges to a
TMDL or 303(d)-listed waterbody, use Ecology's Water Quality Atlas at:
https:Hfortress.wa. og v/ecy/waterguafityatlas/StartPaae.aspx.
The applicant may apply online or obtain an application from Ecology's website at:
htip://www.ecy.wa.szovL/programs/Wq/stonnwater/construction/- Application. Construction
site operators must apply for a permit at least 60 days prior to discharging stormwater from
construction activities and must submit it on or before the date of the first public notice.
Ecology's comments are based upon information provided by the lead agency. As such, they
may not constitute an exhaustive list of the various authorizations that must be obtained or legal
requirements that must be fulfilled in order to carry out the proposed action.
If you have any questions or would like to respond to these comments, please contact the
appropriate reviewing staff listed above.
Department of Ecology
Southwest Regional Office
(GMP:202005413)
cc: Derek Rockett, SWM
Morgan Maupin, WQ
10/23/2020 Mail-Gbm@co.mason.wa.us
FW: SEP2020-00063
Mariah Frazier
Thu 10/22/2020 4:22 PM
To Grace Miller <Gbm@co.mason.wa.us>;
From: Shaun Dinubilo <sdinubilo@squaxin.us>
Sent: Thursday, October 22, 2020 1:04 PM
To: Mariah Frazier<MFrazier@co.mason.wa.us>
Subject: RE: SEP2020-00063
Hi Mariah,
Thank you for contacting the Squaxin Island Tribe Cultural Resources Department regarding the above listed
project for our review and comment. We have no specific cultural resource concerns for this project. However, if
DAHP recommends a survey, or any other additional recommendations, we concur with DAHP's
recommendations. We would prefer to receive an electronic copy by email once completed. If any archaeological
or cultural resources are uncovered during implementation, please halt work in the area of discovery and contact
DAHP and the Squaxin Island Tribe's Archaeologist, Shaun Dinubilo via email at sdinubilo@squaxin.us. Please do
note that this department only conducts a cultural resources review of the proposed project area.
Shaun Dinubilo
Archaeologist
Cultural Resource Department
Squaxin Island Tribe
200 S.E. Billy Frank Jr. Way
Shelton, WA 98584
Office Phone: 360-432-3998
Cell Phone: 360-870-6324
Email: sdinubilo@squaxin.us
As per 43 CFR 7.18[a][11) of the Archaeological Resource Protection Act, Section 304 of the National Historic Preservation
Act, and RCW 42.56.300 of the Washington State Public Records Act-Archaeological Sites, all information concerning the
location, character, and ownership of any cultural resource must be withheld from public disclosure.
From: Mariah Frazier<MFrazier@co.mason.wa.us>
Sent:Tuesday, October 20, 2020 2:39 PM
To:Jeff Dickison <jdickison@squaxin.us>; Erica Marbet<emarbet@squaxin.us>; Sarah Zaniewski <szaniewski@squaxin.us>;
Shaun Dinubilo <sdinui ilo@squaxin.us>; separegister@ecy.wa.gQv;jasond@ci.shelton.wa.us
httos://owa.co.mason.wa.us/owa/#Dath=/mail 1/2
10/23/2020 Mail-Gbm@co.mason.wa.us
Cc: Grace Miller<Gbm@ co.mason.wa.us>;jimholland@msn.com
Subject: SEP2020-00063
Good Afternoon,
Please see attached documents regarding SEP2020-00063
Proponent: Holland Investments LLC
Parcel: 3 2004-43-90025
If you have any questions, please direct them to Planner Grace Miller at gbm@co.mason.wa.us .
Thank you,
Iv(AN 60JV Fral3�
Mason County Community Services
Planning Clerical & Addressing Technician
mfrazier@co.mason.wa.us
(360)427-9670 x365
Mason County Permit Assistance Center and Building and Planning Departments are currently closed to the
public. Staff are continuing to work for you either from home, in the field or in the office. To find out how we are
operating TODAY, please visit: http://www.co.mason.wa.us/community-services/building index.php.
https://owa.co.mason.wa.us/owa/#path=/mail 2/2
A. Background
1. Name of proposed project, if applicable:
Holland Self-Storage Facilities
2. Name of applicant:
Holland Investments,LLC
3. Address and phone number of applicant and contact person:
Holland Investments, LLC
Attn: Jim Holland
PO Box 581,Wauna, WA 98395
(253)884-4008
4. Date checklist prepared:
July 25,2020
5. Agency requesting checklist:
Mason County, WA
6. Proposed timing or schedule(including phasing, if applicable):
The project will more than likely be constructed in two phases and will be dependent on market
conditions. It is anticipated that construction for Phase I will begin in Fall/Winter 2020 and that
both Phases will be completed within 5-years.
7. Do you have any plans for future additions, expansion, or further activity related to or
connected with this proposal? If yes, explain.
None at this time
8. List any environmental information you know about that has been prepared, or will be
prepared, directly related to this proposal.
None
9. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes, explain.
None known
10. List any government approvals or permits that will be needed for your proposal, if known.
SEPA Determination; Site Plan Review; Land Modification Permit;Building Permits
11. Give brief, complete description of your proposal, including the proposed uses and the size
of the project and site.
Construct a self-storage facility with 19 storage buildings(71,600 sf total),a 400 sf office;and
storm drainage, access,private utility,water service,septic system,and vehicle circulation
improvements.
12. Location of the proposal. Give sufficient information for a person to understand the precise
location of your proposed project, including a street address, if any, and section, township, and
range, if known.
3160&3290 E.Johns Prairie Rd.,Shelton,WA 98584
Section 4,Township 20N,Range 3W,W.M.
Parcel No. 32004-43-90025, 32004-43-90026,32004-43-90027,32004-43-00030
SEPA Environmental checklist(WAC 197-11-960) Page 2 of 10
B. ENVIRONMENTAL ELEMENTS
1. Earth
a. General description of the site:
(circle one) Flat, rolling, hilly teep slopes, mountainous, other
b. What is the steepest slope on the site (approximate percent slope)?
Approximately 40%
c. What general types of soils are found on the site (for example, clay, sand, gravel, peat,
muck)? If you know the classification of agricultural soils, specify them and note any
agricultural land of long-term commercial significance and whether the proposal results in
removing any of these soils.
Carstairs Gravelly Loam per the USDA Natural Resources Conservation Service(MRCS)
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so,
describe.
None known
e. Describe the purpose, type, total area, and approximate quantities and total affected area of
any filling, excavation, and grading proposed. Indicate source of fill.
Approximately 11,500 cubic yards of grading will be required to construct the proposed
improvements.
f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe.
Erosion can occur during clearing and construction of the site improvements.
g. About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)?
Approximately 79%on Phase I and 33%on Phase II(buildings and pavement)
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any:
An erosion and sedimentation control plan will be prepared meeting Mason County requirements
and Best Management Practices(BMP's)will be implemented during and after construction to
prevent and control erosion.
2.Air
a. What types of emissions to the air would result from the proposal during construction,
operation, and maintenance when the project is completed? If any, generally describe and
give approximate quantities if known.
Emissions from typical construction equipment and dust during contruction;emissions from
vehicles after the project is completed. Quantities are unkown.
b. Are there any off-site sources of emissions or odor that may affect your proposal? If so,
generally describe.
None known
c. Proposed measures to reduce or control emissions or other impacts to air, if any:
None
3. Water
a. Surface Water:
SEPA Environmental checklist(WAC 197-11-960) Page 3 of 10
1) Is there any surface water body on or in the immediate vicinity of the site (including
year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe
type and provide names. If appropriate, state what stream or river it flows into.
No
2)Will the project require any work over, in, or adjacent to (within 200 feet) the described
waters? If yes, please describe and attach available plans.
Not applicable
3) Estimate the amount of fill and dredge material that would be placed in or removed
from surface water or wetlands and indicate the area of the site that would be affected.
Indicate the source of fill material.
Not applicable
4) Will the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate quantities if known.
No
5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan.
No, per FEMA FIRM 53045CO605E&53045C0625E,dated June 20,2019
6) Does the proposal involve any discharges of waste materials to surface waters? If so,
describe the type of waste and anticipated volume of discharge.
No
b. Ground Water:
1)Will groundwater be withdrawn from a well for drinking water or other purposes? If so,
give a general description of the well, proposed uses and approximate quantities
withdrawn from the well. Will water be discharged to groundwater? Give general
description, purpose, and approximate quantities if known.
Yes. Groundwater will be withdrawn from an existing off-site domestic well for the proposed
office on Phase I. Quantities are unknown.
2) Describe waste material that will be discharged into the ground from septic tanks or
other sources, if any(for example: Domestic sewage; industrial, containing the
following chemicals. . . ; agricultural; etc.). Describe the general size of the system, the
number of such systems, the number of houses to be served (if applicable), or the
number of animals or humans the system(s) are expected to serve.
An existing on-site septic system will be improved and utilized to provide for sanitary sewer
disposal from the proposed office on Phase I.
c. Water runoff(including stormwater):
1) Describe the source of runoff(including storm water) and method of collection
and disposal, if any (include quantities, if known). Where will this water flow?
Will this water flow into other waters? If so, describe.
With the exception of the main north-south private roadway associated with Phase II,all
drive aisles and parking areas will be constructed of permeable pavement. Stormwater runoff
from the roof areas will discharge onto the permeable pavement surface. Stormwater runoff
from the proposed main north-south private roadway on Phase II will be collected and routed
to a stormwater treatment and detention/infiltration system for 100%infiltration of
stormwater runoff.
2) Could waste materials enter ground or surface waters? If so, generally describe.
Not likely. A pollution source control plan will be a part of a storm drainage maintenance
agreement that is recorded on the titles of the lots. This plan will outline the Best
SEPA Environmental checklist(WAC 197.11-960) Page 4 of 10
Management Practices to help reduce the potential for any anticipated waste materials to
enter ground water. Storage of waste materials(fuel,oil,etc.)will be prohibited.
3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If
so, describe.
No..
d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage
pattern impacts, if any:
Stormwater runoff from the proposed improvements will be collected and infiltrated(100%)
on-site(see c.I above). Stormwater runoff will not be directed towards adjacent parcels.
4. Plants
a. Check the types of vegetation found on the site:
deciduous tree:
X evergreen tree: fir
shrubs
_grass
pasture
crop or grain
Orchards, vineyards or other permanent crops.
wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
water plants: water lily, eelgrass, milfoil, other
other types of vegetation
b. What kind and amount of vegetation will be removed or altered?
The proposed areas to be developed contain little to no vegetation.
c. List threatened and endangered species known to be on or near the site.
None known
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance
vegetation on the site, if any:
A minimum 5-foot wide perimeter landscape buffer and a minimum 10' landscape buffer along
Johns Prairie Rd. will be provided and landscaping will meet Mason County requirements.
Existing vegetation south of the proposed improvements on Phase II is currently proposed to
remain.
e. List all noxious weeds and invasive species known to be on or near the site.
None known
5. Animals
a. List any birds and other animals which have been observed on or near the site or are known
to be on or near the site.
Examples include:
birds: aw eron, a le, songbird other:
mammals deer ear, a c, eaver, other:
fish: bass, sa mon, trout, herring, shellfish, other
SEPA Environmental checklist(WAC 197-11-960) Page 5 of 10
b. List any threatened and endangered species known to be on or near the site.
None known
c. Is the site part of a migration route? If so, explain.
Unknown
d. Proposed measures to preserve or enhance wildlife, if any:
None
e. List any invasive animal species known to be on or near the site.
None known
6. Energy and Natural Resources
a. What kinds of energy (electric, natural gas, oil, wood stove, solar)will be used to meet
the completed project's energy needs? Describe whether it will be used for heating,
manufacturing, etc.
Electricity and/or natural gas will be used for heating and general electrical needs
b. Would your project affect the potential use of solar energy by adjacent properties?
If so, generally describe.
Not likely
c. What kinds of energy conservation features are included in the plans of this proposal?
List other proposed measures to reduce or control energy impacts, if any:
None at this time
7. Environmental Health
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk
of fire and explosion, spill, or hazardous waste,that could occur as a result of this proposal?
If so, describe.
None known
1) Describe any known or possible contamination at the site from present or past uses.
None known
2) Describe existing hazardous chemicals/conditions that might affect project development
and design. This includes underground hazardous liquid and gas transmission pipelines
located within the project area and in the vicinity.
None known
3) Describe any toxic or hazardous chemicals that might be stored, used, or produced
during the project's development or construction, or at any time during the operating
life of the project.
None. The storage of hazardous materials will be prohibited.
4) Describe special emergency services that might be required.
None
5) Proposed measures to reduce or control environmental health hazards, if any:
None
b. Noise
1) What types of noise exist in the area which may affect your project(for example:
traffic, equipment, operation, other)?
Traffic noise from E.Johns Prairie Rd.and existing nearby uses will not affect the proposed
project.
SEPA Environmental checklist(WAC 197-11-960) Page 6 of 10
2)What types and levels of noise would be created by or associated with the project on a
short-term or a long-term basis (for example: traffic, construction, operation, other)? Indi-
cate what hours noise would come from the site.
Short-term: Construction equipment noise during construction
Long-term: Passenger and moving vehicles accessing the self-storage facilities. It is anticipated
that the hours of operation will be from 8 a.m. to 6 p.m. but this may change depending on the
demand.
3) Proposed measures to reduce or control noise impacts, if any:
Construction hours will be limited to county approved hours. No measures are proposed after
construction completion.
8. Land and Shoreline Use
a. What is the current use of the site and adjacent properties?Will the proposal affect current
land uses on nearby or adjacent properties? If so, describe.
The parcels are currently vacant/undeveloped. Nearby uses consist mainly of
commercial/industrial services,including self-storage. The proposal is consistent with and will
not negatively affect nearby/adjacent uses.
b. Has the project site been used as working farmlands or working forest lands? If so, describe.
How much agricultural or forest land of long-term commercial significance will be converted to
other uses as a result of the proposal, if any? If resource lands have not been designated,
how many acres in farmland or forest land tax status will be converted to nonfarm or
nonforest use?
No
1)Will the proposal affect or be affected by surrounding working farm or forest land normal
business operations, such as oversize equipment access, the application of pesticides,
tilling, and harvesting? If so, how:
No
c. Describe any structures on the site.
None
d. Will any structures be demolished? If so, what?
N/A
e. What is the current zoning classification of the site?
Industrial(Shelton Urban Growth Area)
f. What is the current comprehensive plan designation of the site?
Industrial
g. If applicable, what is the current shoreline master program designation of the site?
Not applicable
h. Has any part of the site been classified as a critical area by the city or county? If so, specify.
Unknown
i. Approximately how many people would reside or work in the completed project?
It is anticipated that one person would be working.
j. Approximately how many people would the completed project displace?
None
k. Proposed measures to avoid or reduce displacement impacts, if any:
None
L. Proposed measures to ensure the proposal is compatible with existing and projected land
uses and plans, if any:
SEPA Environmental checklist(WAC 197.11-960) Page 7 of 10
The project will meet Mason County zoning code requirements.
m. Proposed measures to ensure the proposal is compatible with nearby agricultural and forest
lands of long-term commercial significance, if any:
None
9. Housing
a. Approximately how many units would be provided, if any? Indicate whether high, mid-
dle, or low-income housing.
Not applicable
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low-income housing.
None
c. Proposed measures to reduce or control housing impacts, if any:
None
10. Aesthetics
a. What is the tallest height of any proposed structure(s), not including antennas; what is
the principal exterior building material(s) proposed?
Approximately 10-foot building height. Metal siding.
b. What views in the immediate vicinity would be altered or obstructed?
None
b. Proposed measures to reduce or control aesthetic impacts, if any:
None
11. Light and Glare
a. What type of light or glare will the proposal produce? What time of day would it mainly
occur?
Building mounted lighting
b. Could light or glare from the finished project be a safety hazard or interfere with views?
Not likely. Light fixtures will be shielded.
c. What existing off-site sources of light or glare may affect your proposal?
None known
d. Proposed measures to reduce or control light and glare impacts, if any:
Light fixtures will be shielded.
12. Recreation
a. What designated and informal recreational opportunities are in the immediate vicinity?
A Mason County park is located approximately 1 mile west of the parcel,off E.Johns Prairie Rd.
b. Would the proposed project displace any existing recreational uses? If so, describe.
No
c. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any:
None
SEPA Environmental checklist(WAC 197-11-960) Page 8 of 10
13. Historic and cultural preservation
a. Are there any buildings, structures,or sites, located on or near the site that are over 45 years
old listed in or eligible for listing in national, state, or local preservation registers located on or
near the site? If so, specifically describe.
None known
b. Are there any landmarks, features,or other evidence of Indian or historic use or occupation?
This may include human burials or old cemeteries. Are there any material evidence, artifacts,
or areas of cultural importance on or near the site? Please list any professional studies
conducted at the site to identify such resources.
None known
c. Describe the methods used to assess the potential impacts to cultural and historic resources
on or near the project site. Examples include consultation with tribes and the department of
archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc.
Review of Washington State Department of Archaeology&Historic Preservation website
(WISAARD database).
d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance
to resources. Please include plans for the above and any permits that may be required.
None at this time.
14. Transportation
a. Identify public streets and highways serving the site or affected geographic area and
describe proposed access to the existing street system. Show on site plans, if any.
A new private access will be extended into the site from E.Johns Praire Rd.
b. Is the site or affected geographic area currently served by public transit? If so, generally
describe. If not, what is the approximate distance to the nearest transit stop?
A Mason County Tranist stop is located at the Shelton Walmart,approximately 3.7 miles
west/southwest from the subject parcel.
c. How many additional parking spaces would the completed project or non-project proposal
have? How many would the project or proposal eliminate?
Approximately 10 designated off-street parking spaces will be provided for temporary parking;
none will be eliminated
d. Will the proposal require any new or improvements to existing roads, streets, pedestrian,
bicycle or state transportation facilities, not including driveways? If so, generally describe
(indicate whether public or private).
No
e. Will the project or proposal use (or occur in the immediate vicinity of)water, rail, or air
transportation? If so, generally describe.
No
f. How many vehicular trips per day would be generated by the completed project or proposal?
If known, indicate when peak volumes would occur and what percentage of the volume would
be trucks (such as commercial and nonpassenger vehicles). What data or transportation
models were used to make these estimates?
Approximately 68 average daily trips for Phase I and 42 daily trips for Phase II,at full build-out,
per ITE Trip Generation Manual, 101 Edition
SEPA Environmental checklist(WAC 197-11-960) Page 9 of 10
g. Will the proposal interfere with, affect or be affected by the movement of agricultural and
forest products on roads or streets in the area? If so, generally describe.
No
h. Proposed measures to reduce or control transportation impacts, if any:
Mitigation fees will be paid if required
15. Public Services
a. Would the project result in an increased need for public services (for example: fire protection,
police protection, public transit, health care, schools, other)? If so, generally describe.
No new public service facilties are proposed;however,the project will increase the need on
existing public services(fire,police,etc.).
b. Proposed measures to reduce or control direct impacts on public services, if any.
Mitigation fees will be paid as required by any existing regulations.
16. Utilities
a. tilities currently av
electrici atural ga water, refuse service, telephon sanitary sewe septic system
o er
b. Describe the utilities that are proposed for the project, the utility providing the service,
and the general construction activities on the site or in the immediate vicinity which might
be needed.
Existing private on-site septic system;existing public off-site domestic well;telecommunications
from CenturyLink/Comcast;solid waste service from Mason County;electricity from Mason
County PUD No.3
C. Signature
The above answers are true and complete to the best of my knowledge. I understand that the
lead agency is relying on them to make its decision.
Signature: �
Name of signee Chris Merritt
Position and Agency/Organization Olympic Engineering
Date Submitted: July 25, 2020
SEPA Environmental checklist(WAC 197-11-960) Page 10 of 10
20 - co0(03
RECE�V
PLANNING EQ
�J � 3 � z0zo
SEPA ENVIRONMENTAL CHECKLIST 615 JUL
31 lder Street
Purpose of checklist:
Governmental agencies use this checklist to help determine whether the environmental impacts of your
proposal are significant. This information is also helpful to determine if available avoidance, minimization
or compensatory mitigation measures will address the probable significant impacts or if an environmental
impact statement will be prepared to further analyze the proposal.
Instructions for applicants:
This environmental checklist asks you to describe some basic information about your proposal. Please
answer each question accurately and carefully, to the best of your knowledge. You may need to consult
with an agency specialist or private consultant for some questions. You may use "not applicable" or
"does not apply" only when you can explain why it does not apply and not when the answer is unknown.
You may also attach or incorporate by reference additional studies reports. Complete and accurate
answers to these questions often avoid delays with the SEPA process as well as later in the decision-
making process.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of
time or on different parcels of land. Attach any additional information that will help describe your proposal
or its environmental effects. The agency to which you submit this checklist may ask you to explain your
answers or provide additional information reasonably related to determining if there may be significant
adverse impact.
Instructions for Lead Agencies:
Please adjust the format of this template as needed. Additional information may be necessary to
evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse
impacts. The checklist is considered the first but not necessarily the only source of information needed to
make an adequate threshold determination. Once a threshold determination is made, the lead agency is
responsible for the completeness and accuracy of the checklist and other supporting documents.
The help links in this checklist are intended to assist users in accessing guidance on the checklist
questions. Links are provided to the specific sections of the guidance applicable to the questions.
However, the links may not work correctly on all devices. If the links do not work on your device, open the
guidance at www.ec .wa.gov/programs/sea/sepa/apquide/EnvChecklistGuidance.html and navigate to
the appropriate section.
Use of checklist for nonproject proposals:
For nonproject proposals (such as ordinances, regulations, plans and programs), complete the applicable
parts of sections A and B plus the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). Please
completely answer all questions that apply and note that the words "project," "applicant," and "property or
site" should be read as "proposal," "proponent," and "affected geographic area," respectively. The lead
agency may exclude (for non-projects)questions in Part B - Environmental Elements—that do not
contribute meaningfully to the analysis of the proposal.
SEPA Environmental checklist(WAC 197-11-960) Page 1 of 10
RECEIVED
JUL 3 12020
615 W. Alder Street
SITE CROSS-SECTION
STA. 1+00.00 STA. 4+82.69
WEST PROPERTY LINE EAST PROPERTY LINE
'FINISHED GRADE AT
STATION LINE
210 ..............
210
--VEXISTING GRADE AT
STATION
LINE
205 i205
200 . 200
1 +00 2+00 3+ 00 4+00
HORIZONTAL SCALE: 1"=40 FEET
VERTICAL SCALE: 1"=5.00 FEET
RECEIVED
HOLLAND SELF STORAGE FACILITY VICINITY MAP
JUL 3 12020 SEC 04, TWP 20N, RGE 3W, W.M.
MASON COUNTY, WASHINGTON SITE
615 W. Alder Street
RD
G
c
c:
MIN.10'LANDSCAPE o BAYSHORE
COURSE
BUFFER 10 GOLF
J-0_HN 9:FFCAQff__it-
-NE
Ci
7
-Imm
-PIG PROPERTY I NE f BUFFER
SR-
--—--—--— CI w6Z.-
7 A, 86-2.0"e,E _f - ku
13
L BUILDING
PRO JECT INFORMATION
3.600 SF I
EMSTING SEPTIC I 1 1. \,-- BUILDING 'A"
-210.0 M 1
U00 0
L OWNER AP HOLLAND INVESTMENTS, LLC
To 13
SYSTEM E FF R25'
RE-DESIGNED k
R25' v ATTN: JIM HOLLAND
PO BOX 581
FIRE LANEi I, LL
IRE.LANE WAUNA, WA 98395 _j _j
if :R4W L
Lu 71
R25'-/' 22� PARCEL NO: 320044390025,320044390026,
------- 320044390027, 320044300030 Z
W
4v 0
LL
TRUCK
-25-i�L24!�-,-30'
A SITE ADDRESS: 3150/3290 E. JOHNS PRAIRIE RD. 0 o
Z. 24
SHELTON, WA 98584 cc z
MIN.V 06 o
PERIMETER 2,V ZONING: INDUSTRIAL, SHELTON UGA 0 V)
25!
LANDSCAPE
25' <
(TYP.)
N
N PARCEL AREAS: PHASE 1: ±4.083 ACRES(±177,836
LAND- a
PHASE 2: ±4.950 ACRES(±215,635
SCAPE
HIGH FL�IIER_
z FENCE(TYP.) I
PHASE 1
z 43
Z 135r": 3;2N a . I �:!
5 BUILDING AREA: 46,800 SF(INCL 400 SF OFFICE)
Z. 9R
PROPOSED 30'
INGRESS.EGRESSI
TOTAL
UTILITIES EASEMENT RE AISLES/PARKING: 94,202 SF
ti. 6�- I — , I . — 19 K-': - - . I HARD
to
15
SURFACE AREA:141,002 SF (79.3%COVERAGE)
DO . ; " i.
m
PHASE 2
z
P E
i HA BUILDING AREA: 25,200 SF
to:
TOTAL HARD SURFACE AREA:70,104 SF(32.5%COVERAGE)
IOU
W
uj
.20 FIRE -4
X, ME PROP�V 40' PARKING REQUIRED: 1/300 SF OFFICE= 2 STALLS
w ARKING PROVIDED: 10 STALLS PHASE 1
LANE(rep.)
MINE 2CI`FIFE IA�E INGRESS.IBIRESS�
ASE 'I
6, i Ic UTUTIES EASEMENT
-K mp')
zlaeII ov: aHy
SURVEY INFORMATIONoc; z
THE TOPOGRAPHIC, BOUNDARY, AND UTILITY INFORMATION
.'j
DEPICTED HEREON WAS PROVIDED BY HOLMAN & ASSOCIATES
_j PROFESSIONAL LAND SURVEYORS, THIS INFORMATION WAS NOT
2:0
cn q r3 VERIFIED BY OLYMPIC ENGINEERING AND OLYMPIC ENGINEERING
ASSUMES NO LIABILITY IN THE ACCURACY OF THIS
2C7 INFORMATION.
Z-&
z
130 -t=— :V1
. F=2,r, , Zvi 2 F'.
4 LANDSCAPING 5-- CD
-- ....- I 'I MIN-5'PERIMETER m i:
LANDSCAPE(TYP.), DID 5
in LANDSCAPING WILL MEET SECTION 17.07.860 OF THE MASON
L
COUNTY CODE.
T-1
LEGEND
-3�'Alt WELL
RW
77
STORM PIPE
14,
FIRS"HE
m CATCH BASIN
POWER POLE
N j JAN E(TYP. W WATER SERVICE
AR
%x
SPOT ELEVATION
iNRLFRATIOf(1!7J94 t t
ra+L 2 GATCH BASIN'11iIH BAWSAVER
BAYftM'CARTH?Gi WATER r.
Jik
F_ NO DEL TA RADIUS LEAG
,,pROPERT�UNL (TYP.) ------r It
i,
FUTURE PRIV.(1E CI 30:34.03: :70.0000 357.4474
C2 a 36,54 70.0000 100.7413
Lmlv PERIMETER
'4- 71 ROADWAY SION-,.,TO
C3 7*40'43' W.0000 85.7721
P11— I
PERIMETER EN-.ARK SOUILTH
_A_ IN •
BAR t
FENCE(TYP.) SET#5 IRON BAR W Rd/
1 1 '00'PROTErrlf�
CAP'7RAV 15653'26% i WELL RADIUS� -�\X SOUTHEAST F BUILDING NNN
PROTECTIVE k I CORNER ELEVATION- 'IN
cp
2
209.07
WELL RADIUS "ZiMp HOUSE
to
WR77CAL DATUM
ASSUMED JOB 076 NUMBER:
19
pLANNIN"- SCALE. 1'=80 FEET DRAWING NAME
19076 STE
0 40 80 160
SfEET, 1 OF 1