Loading...
HomeMy WebLinkAboutBLD2010-01175 Cancelled Wood Stove - BLD Permit / Conditions - 6/30/2011 ~ Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Shelton,WA 98584 r MECHANICAL PERMIT BLD2010-01175 OWNER: JEFF, OSBERG RECEIVED: 12/30/2010 CONTRACTOR: PETERSON'S STOVES &CHIMNEY 1.360.426.3670 LICENSE: PETERSCO98P1 EXP: ISSUED: 12/30/2010 SITE ADDRESS: 80 E MARJORIE LN SHELTON EXPIRES: 6/30/2011 PARCEL NUMBER: 321347590102 LEGAL DESCRIPTION: TR 10-B OF SURVEY 2/98 LOT: B OF SP#2659#616761 PROJECT DESCRIPTION: DIRECTIONS TO SITE: WOOD STOVE ST RT 3, L ON MASON LAKE RD, R ON CATFISH LAKE RD, L ON CATFISH LN L ON MARJO I LN TO SITE ADDRESS ON THE RIGHT General Information Setback Information Type of Use: SF Insp. Area: ron Ft. Shoreline: Ft.Ft. Slope: Ft. R Type of Work: ME Fire Dist.: 5 1: Ft. Valuation: Side 2: Ft. Mecha ical Fixtures FEES Type 1. Type By Date Amount Receipt Fireplace 1 Mechanical Permit Fee GMM 12/30/201 $73.00 S120100000 Mechanical Base Fee GMM 12/30/201 $28.50 S120100000 Total $101.50 BLD2010-01175 Please refer to the following pages for conditions of this permit. 1 of 3 CASE NOTES FOR BLD2010-01175 CONDITIONS FOR B LD2010-01175 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.T re potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800 D982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 2) Owe f A nt is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X 3) ALL FURNACE INSTALLATIONS SHALL MEET THE MINIMUM EFFICIENCIES SET FORTH IN THE CURENT EDITION OF THE WASHINGTON STATE RGY CODE (WSEC). ANY PORTION OF THE MECHANICAL SYSTEM THAT IS ALTERED OR REPLACED SHALL MEET THE MINI M,STANDARDS SET FORTH IN THE WSEC AND INTERNATIONAL MECHANICAL CODE. X ' / 4) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Was i gton. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in per voca n. X /,i 5) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspepf all be made prior to requesting additional inspections. X 6) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Ma s unty ordinances and building regulations. X 7) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action f period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit hol a prevented action from being taken. No more than one extension may be granted. X BLD2010-01175 Please refer to the following pages for conditions of this permit. 2 of 3 This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at anytime after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a prcgr ection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described props ucture for review and inspection. ) OWN ER OR AGE DATE: / V t BLD2010-01175 Please referto the following pages for conditions of this permit. 3 of 3 CIO o CONCRETE Gas p'pi"9 MANUFACTURED HOME Cn o _ Interior-Date By03 o Footings I Setbacks Fxterxr-Date By Ribbons M CD Date By INSULATION Date By X cCn Foundation Walls BG I SLAB INSULATION Setup m Date By Date By Date By -n FRAMING Floors FIRE DEPARTMENT Date By Date By Date By Walls DECKS PLUMBING Date By Date By Groundwork Vault TANKS Date By Date By Date By Attic D.W.V Date By OTHER Date By DRYWALL Typo. Date Dy Water Line Date BY Type. Date By int.Brace Wall Date By W -0 ate MECHANICAL °lreseperati«, �' FINAL INSPECTION o Date By Oate Ch By aFe By O m O s Pass or Request Inspect. 5 Type of Insp. Fail Date Date Done By Comments CD 0 0 N O 8 a 0 CA O CD (D 4 O --w Ilk MASON COUNTY PERMIT N010 24 10 - 01 t q PLUMBING/MECHANICAL PERMIT APPLICATION 426 W.Cedar- P.O. Box 186, Shelton,WA 98584 Shelton (360) 427-9670-Belfair(360) 275-4467- Elma(360) 482-5269 On the web www.co.mason.wa.us APPLICANT INFORMATION CONTRACTOR INFORMATION Owner = Company Name Mailing Address tf� Mailin Address City- tate (,-4,_)Zip Code City ' tate Zip Code Phone ,3�- r� Other Ph. Phone Other Ph - Lien/Title Holder Contractor Reg. y Exp. 4 E mail address E Mail Address Drivers Lic.# DOB Drivers Lic.# DOB SEPTIC INFORMATION - Connect to New Septic Existing Septic Connect to Sewer System Name of Sewer System PARCEL INFOR TION - 12 DiVi Parcel No. Fire District Legal Descr iption tion I - •F YV ci 8 9 P Site Address (Please include street name, street num er an ity Dire ns to site a (_ f o iT C, ' A t Is property within 200'of Saltwater Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs > 15% TYPE OF JOB - New Add Alt Repair Other Use of Building Location of Fixtures/Units - 1 st Floor. 2nd Floor Basement Garage Closet PLUMBING FIXTURES (Show Number of each) MECHANICAL UNITS Type of Fixture No. of Fixtures Fees Fuel Type:Electric_ LPC-L _ Natural Gas_ Heat Pump_ Toilets Type of Unit No. of Units Fees Bathroom Sink Furnace Bath Tubs Heatpumps Showers Spot Vent Fan Water Heater Propane Tank Clothes Washer Ga Outlets Kithen Sinks /Gas/Pellet Stove f Dishwasher hen Exhaust Hood Hosebibs Dryer Vent Other Other Base Fee Base Fee 8• TOTAL PLUMBING TOTAL MECHANICAL CMINER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parties.If permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application,I have obtained permissiol m to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information provides is accurate d grants employees of Mason County access to the above described property and structure for review and inspection. PROOF ATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. Date: /;?a�ga - ICE ner/Owners Representative/Contractor (indicate which one) FOR OFFICIAL USE BEYON TH S POINT Accepted b Planning Pd Ck# Date 30 Bld Pd Receipt No. DEPARTM NTAL REVIEW APPROVED DENIED NOTES Building Department Occ Group-Type Constr.- Planning Constr.- Planning Department Environmental Health Department FEES Plumbing & Base Fee Site Inspection Mechanical & Base fee UFC Plan Review Fee Wood/Gas/Pellet Stove Fee Other Violation Fee TOTAL FEES REGISTERED AS PROVIDED BY LAW AS CONST CONT GENERAL REGISTRATION NUMBER CCO1 CENTEC* 054C1 10/21/1998 EFFECTIVE DATE 02/21/1995 CENTERFIELD CONSTRUCTION 3331 79TH AVE NW OLYMPIA WA 98502 IsSuCci by DEPARTNIENT OF LABOR AND INDUSTRIES I