HomeMy WebLinkAboutDDR2006-00033 BLD2006-00091 SFR - DDR Application - 2/7/2006 MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
411 No. Fifth Street//P.O. Box 186, Shelton WA. 98584
360.427.9670 ext. 352
Request for
Administrative reduction in the Required Setbacks ($90.00)
For administrative review, the minimum variance on a yard setback request is 5 feet
from the side lot lines and 10 feet front and rear lot lines or right of way. Request for
further reduction requires standard variance. Setbacks are measured from the furthest
projection of the structure.
Applicant/Owners: box) -P A(4 pr/ZA c# SiAhl a7 N
Mailing Address:
City: State: Zip:
Site Address: (�O L S }lAtY1RQc�L 2
Telephone No.: Z o 71 g , 7 L y�
Parcel Number(s): Zoning
Requested Variance: Front / Rear • Side Yard (please circle all that apply)
Requested setback variance: `j JAZ FT.
An illustrated site plan is required:
Your site plan must show the following: north arrow, abutting street or easements, set backs to
all property lines and existing buildings, slopes, surface water, wetlands, critical area, septic,
well and driveway. Show all proposed new development.
The following circumstances must apply.
Front and or Rear Yard requirements:
1) Existing lots of record as of March 5, 2002;
You must meet one of the following. (Please circle all that apply)
2) One of the following exists on the lot:
a) steep slopes, wetlands, or streams present;
b) soils that restrict building or septic development;
c) lot width at the front yard line of no more than 50 feet;
d) lot size of no more than one-fourth acre;
e) existing improvements of buildings, septic systems, and well areas.
Side yard requirements:
1) Existing lots of record as of March 5, 2002;
You must meet one of the following. (Please circle all that apply)
2) One of the following exists on the lot:
a) steep slopes, wetlands, or streams present;
b) soils that restrict building or septic development;
c) lot width at the front yard line of no more than 50 feet;
lot size of no more than one-half acre;
existing improvements of buildings, septic systems, and well areas
H:Aadministativevariance.doc (tw) February 05
Explain how these circumstances preclude a reasonable development proposal from
meeting the setback standard for Rural Residential 2.5, 5, 10, or 20 zones.
TL&5 , 0 AE 04.cs 4AF7' 13AcK- X:7rzan�
L:X Sr Tan!1< in Bis Xd'A/PIMKJ5-P NO0 fh0CT76►,1gj A
hl AF \J -t A Al 4 To -;Sir i 5-T,4
e
$A:T 40C4 To )�:piR.wAIf- sjaC -j--:>xro0Lwj'rY
A ITT'
Owner/Agent (please indicate)
Signature and date
Official Use Onl y
Approved- Date 7
Denied Date
Reason for denial:
H:Aadministativevariance.doc (tw) February 05