HomeMy WebLinkAboutBLD2024-01473 DEMO - BLD Inspections - 1/8/2025 INSPECTION CARD
Mason County
615 W. Alder St.
Building 8, Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
PERMIT# BLD2024-01473 PROJECT ADDRESS 180 E BARNSBY PL SHELTON, WA 98584
PARCEL# 321275300015 PROJECT DESCRIPTION DEMO OF DEBRIS REMAINING FROM FIRE.
OWNER RONALD LANSING ADDRESS 180 BARNSBY PL PHONE 360-874-4659
CONTRACTOR ADDRESS PHONE
CONTRACTOR LICENSE LENDER
INSPECTION INSP DATE Comments INSPECTION INSP DATE Comments
Connection is to be verified by sW _Qj_ Demolition Final Inspection
INSPECTION RESULTS Page
MASON COUNTY Department of Community Development
COMMUNITY DEVELOPMENT 615 W Alder St, Shelton,WA 98584
Peintit Assistance Center,Building,Planning (360) 427-9670 ext. 352
Application# BLD2024-01473 Application Type DEMO Owner RONALD LANSING
Parcel# 321275300015 Site Address 180 E BARNSBY PL SHELTON, WA 98584
Inspector Inspection Type Date Status Comments
1-3-24 DEC
Drew Carlson BLD-DEMO FINAL 01/03/2025 FAIL ALL DEBRIS MUST BE REMOVED FROM SITE. ALL PROPANE TANKS, CONST
INSPECTION DEBRIS, TIRES, WOOD, CAR PARTS AND HOSES.
REMOVE REMAINING DEBRIS AND CALL FOR REINSPECTION
y
AV f
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
B DD2024-01473 DEMO
PROJECT DESCRIPTION: DEMO OF DEBRIS REMAINING FROM FIRE. ISSUED: 12/13/2024
SITE ADDRESS: 180 E BARNSBY PL SHELTON
EXPIRES: 06/11/2025
PARCEL: 321275300015
APPLICANT: BOLIVIA ET AL HOLLIS B OWNER: RONALD LANSING
JUL]ANN BROTEN 180 BARNSBY PL
SHELTON,WA 98584 SHELTON,WA 98584
FEES: Paid Due
State Fee-Residential $6.50 $0.00
Demolition Fee $131.00 $0.00
Technology Flat Convenience $5.00 $0.00
Fee
Totals : $142.50 $0.00
REQUIRED INSPECTIONS
Connection is to be verified by Health or Utilities Demolition Final Inspection
CONDITIONS
All construction debris must be removed from the site after project completion to an approved location. Proper disposal of
construction debris must be on land in such a manner that debris cannot enter or cause water quality degradation of aquatic
environments.
* The Washington State Clean Air Act prohibits the burning of any construction or demolition debris in an outdoor fire.
" All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
Printed by:Anna Schaffran on:12/13/2024 01:55 PM Page 1 of 2
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
DEMO BLD2024-01473
* The demolition and disposal of demolition debris must meet requirements as per Mason County regulations. it is unlawful
for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos containing
materials have been removed from the area to be demolished.work shall not commence on an asbestos project or
demolition unless the owner or operator has obtained written approval from ORCAA @ 2490 B Limited Lane NW, Olympia
WA 98502, 360-586-1044, 800-422-5623, www.orcaa.org
----------------___________________.
Proper erosion and sediment control practices must be used on the construction site and adjacent areas to prevent upland
sediments from entering the aquatic environment. Erosion control measures must be in place prior to any clearing, grading,
or construction. These control measures must be effective to prevent soil from being carried into surface water by
stormwater runoff. Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of state
regulations. Any work in or adjacent to waterways that will adversely affect water quality must receive specific prior
authorization from the Department of Ecology. Silt fencing, straw matting, etc. must be installed and maintained until seeding
or upland vegetation has become established around all areas disturbed or newly created by construction activities.
For public safety, it is the responsibility of the applicant to confirm through written verification all utility services (electric,
gas, water, sewer, ...) have been terminated prior to demolishing a structure.
OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/appIication becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED.
All other necessary permits from Mason County, Washington State, Federal Agencies, and/or other agencies/groups that
are required for this proposed development and construction must be obtained PRIOR TO DEVELOPMENT AND
CONSTRUCTION.
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By: Q,J
f
Contractor or Authorized Agent: '! Date: t
Printed by:Anna Schaffran on:12/13/2024 01:55 PM
Page 2 of 2
DPC ENV ED
MASON COUNTY PERMIT L172.02-1- 01�1s��j
y COMMUNITY SERVICES DEPARTMENT
BUILDING•PLANNING•FIRE MARSHAL DEC 13 2024
WWW.CO.MASON.WA.US (360)427-9670 Shelton ext.352
} Mason County Bldg.#8,615 W.Alder St (360)275 7, fair 35 t
eau Shelton,WA 98584 (360)482- a 2
DEMOLITION PERMIT APPLICATION
OWNER INFORMATION: CONTRACTOR INFORMATION:
NAME. I L •rS1l NAME:
MAILING ADDRESS: i r bj MAILING ADDRESS:
CITY75 Q I Nc,n STATE:_Z :cJ CITY: STATE: ZIP:
PHONQ (4- ELL: PHONE: CELL:
EMAIL L EMAIL :
L&I REG# EXP.
PARCEL INFORMATION:
PARCEL NUMBER (12 DIGIT NUMBER) 32121 - S3-o0o15 FIRE DISTRICT
LEGAL DESCRIPTION (ABBREVIATED) LAKE LiMrdR�GK 4 �.tYC 15
SITEADDRESS 1q0 BAIZNSF34 PL. CITY SHELTON
DIRECTIONS TO SITE ADDRESS:
IS PROPERTY WITHIN 200 FT:N�A
SALTWATER[] LAKE❑ RIVE CREEK❑ POND[] WETLAND❑ SEASONAL RUNOFF❑ STREAM
DOES PROPERTY HAVE SLOPE(S)WITHIN 300 FT OF THE PROJECT-GREATER THAN 14% YES
IF YOUR PROJECT IS LOCATED ADJACENT TO OR WITHINANAREA THAT IS LISTED ABOVE,PLEASE
CONTACT THE PLANNING DIVISION OF COMMUNITY DEVELOPMENT PRIOR TO DEMOLITION TO
ENSURE REDEVELOPMENT.
USE OF STRUCTURE BEING DEMOLISHED(RESIDENCE,GARAGE ETC.),1
HOW WILL THE DEBRIS BE DISPOSED OF?:
T* L .
PROVIDE A PLOT PLAN INDICATING LOCATION OF STRUCTURE TO B E L SHED
OWNER/CONTRACTOR acknowledges submission of inaccurate information may result in a stop work order or permit revocation.
Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative,or contractor. I further
declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary
parties, including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the
information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for
review and inspection.This permit/application becomes null&void if work or authorized construction is not commenced within 180
days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF
INSCTION. IN VITY OF THIS PERMIT APPLICATION OF 180 DAYS�ILq IN,VALy l-` APPLICATION.
CT
Si na ur of li n Date ) ��
X Q g t pp r — }OWNER/[�REPRESENTATIVONTRACTOR
Print Name
DEPARTMENTAL REVIEW APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS
BUILDING DEPARTMENT
PLANNING DEPARTMENT