HomeMy WebLinkAboutBLD2008-00318 Bridge and Compliance Emails - BLD Letters / Memos - 6/9/2008 -I
Ryan
—�, rater-2297 Tahuya River Rd - Neyhart Farm 1
-- - —_
From: Mindi Brock
To: Ryan Crater
Date: 8/1/2008 11:45 am
Subject: 2297 Tahuya River Rd- Neyhart Farm
Posted stop work notice and placed hold on BLD2008-00318. See photos attached. My enforcement
case is BCC2008-00245
Ryan Crat(:[ �297 T�. huya River Rd 4.-IPG
E.
r "
k iEw' ti +., i i.^
- w
b w
� W f
s
p
Ryan Crater- 2297 Tahuya River Rd_2 JPG 1
soft
�w
u
H.
v
"
Ryan Crater-2297 Tahuya River Rd_3.JPG 1
i
a
r
o. „
,
.:. C rzilci 121) i :` .;y River Rd 1 Jrl(C WO
Sk
o
gr�
� t
w
y a
✓ a
I
rt
Ryan Crater- Neyhart (Notification of Non-Compliance) 1
From: Ryan Crater
To: neyhart@msn.com; rhoss@hctc.com
Date: 7/23/2008 5:08:49 pm
Subject: Neyhart (Notification of Non-Compliance)
CC: Bennett„Cumming, Pam; Fink, Robert; ma...
Mr. Neyhart,
The Mason County Planning Department has made repeated request for specific
information regarding your bridge work and associated projects. Each time our
requests went unanswered or the information submitted was incomplete.
You will be receiving a Notification of Non-Compliance in the mail shortly. In addition, a
hearing will be scheduled in front of the Mason County Hearings Examiner (Amount of
fines yet to be determined).
Between now and the hearing the Planning Department would be more than happy to
accept the requested information for review as long as all fees are paid prior too. It is
possible to avoid the hearing if you fully comply with all requests at least 48 hours
before the scheduled hearing as approved by the Reviewing Authority. Any disputes
regarding final determinations made by the Reviewing Authority need to be appealed to
the Hearings Examiner.
Regards,
Ryan Crater
Land Use Planner / Code Enforcement
Mason County Department of Community Development
411 North 5th
PO BOX 279
Shelton, WA 98584
Phone # 360-427-9670 ext. 577
Fax # 360-427-8425
Ryan Crater Neyhart permit issues I
From: Pam Bennett-Cumming
To: Ryan Crater
Date: 7/14/2008 12:38 pm
Subject: Neyhart permit issues
Hi there,Take a look at this and see if you think this covers what you need...
Pam Bennett-Cumming, M.E.S
Senior Planner -Water Resource Planning
Mason County Department of Community Development
411 North 5th
PO Box 279
Shelton, WA 98584
phone: (360) 427-9670 x287
fax: (360) 427-8425
email: pambc@co.mason.wa.us
1
(7/14/2008) Pam Bennett-Cumming RE: Neyhart Page 1 j
From: "Gloria Rogers" <rogergsr@DFW.WA.GOV>
To: <rhoss@hctc.com>
Date: 7/11/2008 3:45 PM
Subject: RE: Neyhart
CC: <pambc@co.mason.wa.us>, <ryanc@co.mason.wa.us>, "Stephan Kalinowski" <ka...
Dear Mr. Hoss,
WDFW appreciates your and Mr. Neyhart's willingness to work with WDFW
to resolve issues and move forward on the remainder of his project.
On July 7th, I spoke with Mr. Neyhart requesting that he send/fax his
drawings for review. He has not done so. I was able to obtain copies
from the county and had them reviewed by Bob Barnard WDFW's Habitat
Technical Assistance Engineer which I will forward to you. He revised
one drawing with a suggested design change. Please review these
comments. If you have any questions, please feel free to contact me.
Again, Mr. Neyhart must comply with the county requirements. By law, I
can not issue a HPA without completion of the SEPA process required by
the county. Again, complete plans and descriptions are required so that
during construction Mr. Neyhart proceeds in a manner he says he will.
Complete plans assure what the finish structure is going to be. Both
the plans and descriptions provide the WDFW the opportunity to assist
Mr. Neyhart develop a structure that minimizes and mitigates project
impacts to fishery resources. It provides us the information to
provision the permit for the protection of the fishery resources.
Again, Mr. Neyhart shall apply for and obtain a separate and new HPA for
ANY work on the banks or bed of the stream. This includes removing the
blocks from under the bridge. If Mr. Neyhart intends to remove the
blocks during the bank/bridge protection work, a description of how this
is going to be accomplished needs to be in that JARPA.
I am required to forward violations to the enforcement division. WDFW
has provided more than several opportunities to comply.
Sincerely,
Gloria Rogers
Area Habitat Biologist
Washington Department of Fish and Wildlife
48 Devonshire Rd
Montesano, WA 98563
360-249-4628 x 249
>>>"Rick Hoss" <rhoss@hctc.com> 7/8/2008 2:04:51 PM >>>
Gloria,
I have been trying to assist Neyhart Farms in complying with the
County's
requirements. I requested permission to attend the closed meeting last
week
so I could better help the farm comply. For example, I don't have any
idea
what you mean by: "Mr. Neyhart has not complied with the provisions of
(7/14/2008) Pam Bennett-Cumming RE: Neyhart Page 2
HPA
Control #112510-1" When I look at the HPA 20 points and I compare with
what
I observed I can't tell what you think is out of compliance. When I
look at
the first HPA issued in December, there is a section about placing
the
cement blocks back to their original position, but with the change in
river
bed that would be in the river and in violation of some other sections.
I
think the farm thought it was doing the correct thing by removing the
cement
from the river and placing them above the high water mark.
Neyhart Farm is ready and anxious to comply. They paid their engineer
for
additional design work, and will obtain and perform additional work as
necessary. I have emailed Ryan Crated about a dozen times seeking
clarification and assistance, and his response has been less than
helpful.
For example, only yesterday, after a dozen or so requests, did Ryan
mention
wanting a revised site plan.
Gloria, I will give all my numbers below and I strongly request you
hold off
on any action until Neyhart Farms gets a clear statement of what they
need
to correct, then a fair opportunity to correct it. I know a judge can
sort
through all this, but at great expense of time and energy to all that
could
instead be spent addressing and correcting any violations of law.
am unable to understand why there has been a refusal by the
participants
to include Neyhart Farms or I in your discussions or plans. This seems
to be
the worst possible strategy to address a unique situation brought about
by a
1000 year flood event.
May I suggest you and I try harder to (1) identify(you)and understand
(me)
the precise issue of concern, then (2)come up with a satisfactory plan
to
address the concern?
My home is 360 877-0700
My cell is 360 490-0550
Sincerely,
RICHARD T. HOSS
rhoss@hctc.com
HOSS &WILSON-HOSS, LLP
236 W. Birch St., Shelton, WA 98584
Off: (360)426-2999; Fax: (360)426-6715
_.. _..
(7/14/2008) Pam Bennett-Cumming - RE Neyhart Page 3
NOTICES
CONFIDENTIAL & PRIVILEGED: This email message may contain legally
privileged and/or confidential information. If you have received this
email
in error, please notify the sender immediately and delete all copies of
this
e-mail message and any attachment.
IRS CIRCULAR 230 DISCLOSURE: In compliance with requirements imposed by
the
IRS, we hereby notify you that, to the extent that this written
communication addresses tax matters, it is not intended and cannot be
used
to avoid tax-related penalties under federal, state or local law.
-----Original Message-----
From: Gloria Rogers [mailto:rogergsr@DFW.WA.GOV]
Sent: Tuesday, July 08, 2008 1:42 PM
To: ryanc@co.mason.wa.us
Cc: pambc@co.mason.wa.us; kvan461@ecy.wa.gov; rhoss@hctc.com; Marty
Ereth
Subject: Neyhart
Ryan,
With regards to your letter to Neyhart Tahuya Farms dated June 5,
2008,
Mr. Neyhart has not complied with the provisions of HPA Control
#112510-1 by the county's deadline of July 7, 2008. Last week, I
contacted Mr. Neyhart to inquire if he had a strategy for removing the
blocks and to make sure he had a active HPA. He said he would request
a
time extension of the HPA but he never did so.
Mr. Neyhart called me yesterday and told me the blocks still were in
place. I will be forwarding the files to WDFW Enforcement Division.
Gloria Rogers
Area Habitat Biologist
Washington Department of Fish and Wildlife
48 Devonshire Rd
Montesano, WA 98563
360-249-4628 x 249
Ryan Crater- RE: Neyhart 1
1
From: Ryan Crater
To: Hoss, Rick
Date: 7/7/2008 1:12:58 pm
Subject: RE: Neyhart
CC: Bennett„Cumming, Pam; Born', 'Vicki; E...
Rick,
I am confused as to why Mr. Neyhart is finding this difficult? Mr. Neyhart was given specific guidance(many times)as to
what was needed in order to further review the project(s)for final permit coverage. What has been submitted was rejected
as it didn't provide the reviewing planner with sufficient information. At that point Mr. Neyhart was notified that the site
plans needed to be updated. The Planning Department has not received any updated plans as of yet. Once the updated
plans are submitted they will be reviewed and if additional updates are needed we will be specific with our request.
Once Mr. Neyhart has submitted all requested items we will be better able to assist him with the Permitting process. Until
sufficient site plans and permit packets are submitted we are unable to provide Mr. Neyhart with the proper planning
assistance.
Until such time the Planning Departments requests have been met it is difficult for us to provide you with specific permitting
information related to the project.
An emergency permit from the County does not give a green light to do work outside of what would normally not be
allowed/permitted. I would highly suggest that Mr. Neyhart provide sufficient site plans ASAP before he finalizes his bridge
approach work. It is possible that portions of the approach may have to be removed or modified if they do not meet
current regulation standards. All other work not associated with the bridge approach is not authorized at this time.
Remove of the ecology blocks from the flood way can proceed forward so long as that no additional grading work is
completed within the shoreline for their removal.
In no way shape or form is the County requiring Mr. Neyhart to modify or limit agricultural activities occurring on his lands.
In fact any requirements that we are requesting compliance with will further protect Mr. Neyhart from having his bridge
wash away in the future...although this is not guaranteed.
The information that was discussed during the meeting between the co-managers was mostly for our use as it pertained to
getting everyone on the same page. A list of possible items that would come into play when reviewing the project for final
permit review was created. I will provide that to you shortly.
As stated many times before...once Mr. Neyhart submits sufficient site plans,engineering,and the requested permit packets
we will be better able to assist him.
Looking forward to brining this to a close,
Ryan Crater
Land Use Planner/Code Enforcement
Mason County Department of Community Development
411 North 5th
PO BOX 279
Shelton,WA 98584
Phone# 360-427-9670 ext. 577
Fax# 360-427-8425
>>> "Rick Hoss" <rhoss@hctc.com> 7/7/2008 9:28 am >>>
Ryan,
I am going to submit what I think is required today for Neyhart Farms. I
have done public record requests for both the Public Works bridge
replacement also on the Tahuya River and for notes from the private,closed
meeting you had last week that Neyhart and I were not allowed to attend.
Ryan Crater- RE: Neyhart 21
1
This information may be very helpful to our overall understanding,and our
submissions are without the benefit of this information. Please inspect the
project today,as you have required. Please confirm that you have spoken
with Gloria Rogers from WFW and that Neyhart is in compliance with his HPAs.
He has received no notice from WDF of noncompliance,and my review of the
HPA and site suggests full or substantial compliance. But we were not
allowed to attend the private meeting,so I don't know if I am aware of all
WDF concerns. Neyhart and Gloria Rogers spoke last week and she told him she
would grant an extension on the HPA for additional work to remove certain
ecology blocks. It is very difficult for us to know if this is sufficient
for the reasons I've stated.
This seems an odd approach to problem solving, but you are in total control
of the process.We simply request,for all future matters,due and fair
process be given Neyhart Farms and compliance with the Shoreline Management
Act,especially RCW 90.58.065.
Sincerely,
RICHARD T. HOSS
rhoss@hctc.com
HOSS&WILSON-HOSS, LLP
236 W. Birch St.,Shelton,WA 98584
Off: (360)426-2999; Fax: (360)426-6715
NOTICES
CONFIDENTIAL&PRIVILEGED: This email message may contain legally
privileged and/or confidential information. If you have received this email
in error,please notify the sender immediately and delete all copies of this
e-mail message and any attachment.
IRS CIRCULAR 230 DISCLOSURE: In compliance with requirements imposed by the
IRS,we hereby notify you that,to the extent that this written
communication addresses tax matters, it is not intended and cannot be used
to avoid tax-related penalties under federal,state or local law.
-----Original Message-----
From: Ryan Crater[mailto:RyanC0)co.mason.wa.us1
Sent:Tuesday,July 01, 2008 4:56 PM
To: Rick Hoss
Cc: 'Vicki Born'; 'DOUGLAS J. NEYHART'
Subject: RE: Neyhart
Rick,
You would need to fill out a public request before I can release any
information.
Regards,
Ryan Crater
Land Use Planner/Code Enforcement
Mason County Department of Community Development
411 North 5th
PO BOX 279
Shelton,WA 98584
Ryan Crater RE: Neyhart J,
r I
Phone#360-427-9670 ext. 577
Fax# 360-427-8425
>>> "Rick Hoss" <rhossC&hctc.com> 6/30/2008 11:51 am >>>
Ryan,
One thing you could help me check on, if you don't mind. I've drafted a
public records request but the County is typically slow in responding to
these requests.
Mason Co. Public Works department installed a temporary bridge across the
Tahuya Ricer in Dec. 2007 through early 2008.According to Dept of Ecology,
the Flows from the Lake Tahuya dam were in the 1000 year event range.This
is the same even that destroyed Neyhart Farm's agricultural bridge.
Can you check and see what permits the Public Works Dept.applied for and
received?I would like a copy of the applications and permits,and I think
these will be useful to compare.I want to have a full response by July 7,
and I can meet that if I can get these documents by Wednesday.Otherwise I
will request a few extra days until Becky at the County can get my Public
Record Request ready.
I just thought since both of these bridges were destroyed in the same event
it will be useful to see what process Mason County followed.
Thank you for your kind assistance with my request.
Sincerely,
Rick
RICHARD T. HOSS
rhossC@hctc.com
HOSS&WILSON-HOSS, LLP
236 W. Birch St.,Shelton,WA 98584
Off: (360)426-2999; Fax: (360)426-6715
NOTICES
CONFIDENTIAL&PRIVILEGED: This email message may contain legally
privileged and/or confidential information. If you have received this email
in error, please notify the sender immediately and delete all copies of this
e-mail message and any attachment.
IRS CIRCULAR 230 DISCLOSURE: In compliance with requirements imposed by the
IRS,we hereby notify you that,to the extent that this written
communication addresses tax matters, it is not intended and cannot be used
to avoid tax-related penalties under federal,state or local law.
-----Original Message-----
From: Ryan Crater fmailto:RyanC@co.mason.wa.usl
Sent: Friday,June 27,2008 11:49 AM
To: rhoss@hctc.com; nevhart@msn.com
Subject: Neyhart
FYI-
I have coordinated a meeting between WDFW(Gloria Rogers),Skok Tribe(Marty
Ereth
Habitat Biologist),Ecology(Kim Van Zwalenburg),and Pam Bennet Cumming
(Planning).
Ryan Crater- RE: Neyhart 4
The intent of the meeting is to review the case for applicable regulations
as well as to bring together all the co-managers regarding the projects. It
seems a few of us...specifically Gloria and myself have been getting
conflicting information regarding the proposed work i.g. Mr. Neyhart has
indicated to Gloria that he doesn't have to go through the County regarding
the SEPA for the bulkhead.
Once the meeting is over, I will be in contact regarding the outcome.
Regards,
Ryan Crater
Land Use Planner/Code Enforcement
Mason County Department of Community Development
411 North 5th
PO BOX 279
Shelton,WA 98584
Phone# 360-427-9670 ext. 577
Fax #360-427-8425
(6/13/2008) Pam Bennett-Cumming -Re: Neyhart (Bridge Work on the Tahuya River) Page 1
From: "Gloria Rogers" <rogergsr@DFW.WA.GOV>
To: <RyanC@co.mason.wa.us>
Date: 6/13/2008 1:06 PM
Subject: Re: Neyhart(Bridge Work on the Tahuya River)
Attachments: 112510-1 NeyhartBridge.pdf; Ecology Blocks.doc
CC: <BarbarR@co.mason.wa.us>, <PamBC.mail.Mason@co.mason.wa.us>,
<Rdf@co.mas...
Ryan,
Just to let you know, Mr. Neyhart did not receive permission to"store"
eco blocks under the bridge.
During a phone call and a phone message, Mr. Neyhart stated the eco
blocks under the bridge were the failed blocks and were placed as bridge
protection. He made no mention of it being temporary, not that it
matters.
My email dated 4/28/2008 clearly stated that no eco blocks would be
"placed in front/waterward of the new abutments". The finished project
refers to the bridge installation and not future proposals for bank or
bridge protection work.
The HPA specifically states in the project description and in Provision
#2 that any bank or bridge protection work shall be applied for and
receive a separate Hydraulic Project Approval. Provision#6
specifically addressed the failed eco blocks.
My guess is that Mr. Neyhart may be trying to install piers to support
the bridge deck. Prior to installation of the bridge deck, he had
"stored"eco blocks waterward of the right bank abutment. He had built
what looked like a retaining walls up to his old abutment. The left
bank eco blocks under the bridge are configured the same way. Whatever
Mr. Neyhart's intent, WDFW's goal is to provide a large cross sectional
area for the river. Clearly, this structure reduces it.
An officer has been assigned to the violation but will not be available
until June 25th.
I appreciate the excellent work you and Pam Bennett-Cumming have done
regarding this difficult and complex situation. Thanks for all of your
hard work and help.
Sincerely,
Gloria Rogers
Area Habitat Biologist
Washington Department of Fish and Wildlife
48 Devonshire Rd
Montesano, WA 98563
360-249-4628 x 249
>>>"Ryan Crater" <RyanC@co.mason.wa.us> 6/11/2008 6:03 PM >>>
1 (6/13/2008) Pam Bennett-Cumming - Re: Neyhart(Bridge Work on the Tahuya River) Page 2
I spoke with Mr. Neyhart this morning regarding my most recent letter.
He has indicated that the ecology blocks in question are only being
stored in their current location under the bridge and are scheduled for
relocation. He also indicated Gloria Rodgers (WDFW)gave her approval
for the storage of the ecology blocks (This statement does not indicate
approval was giving). Mr. Neyhart has indicated that he plans on
completing some additional work, which seems to have not been shown on
the site plans given to the County. The additional work proposed by Mr.
Neyhart is not covered under any permits issued by the County nor is it
covered under a SEPA exemption or emergency permit.
Based on my understanding of the project as described by Mr. Neyhart it
appears that additional permits may be needed, such as review under a
Mason Environmental Permit with HMP, Shoreline Permit(Substantial
Development/Conditional Use). In addition, the work already completed
appears to be beyond normal repair and should be considered new and
reviewed as such. A SEPA exemption was originally giving based on the
information provided to the County, but it appears that the additional
work that has been completed and the work proposed is not SEPA exempt or
covered under an emergency permit.
In order for the County to further assist Mr. Neyhart we need full
disclosure of the proposed project(s) and an updated site plan(s)
showing final build out. Without these items the County can only
speculate as to what it is Mr. Neyhart would like to do as well as
properly reviewing the project(s)for appropriate permit coverage.
Once Mr. Neyhart provides the County with the correct and final site
plan(s)/scope of work we will review the project(s)for permit coverage
and a SEPA determination(s). A Stop Work Notification is now being
issued for the bridgework and any associated work within shoreline
jurisdiction until a proper review can be completed. At this time the
County has no choice, but to consider Mr. Neyharts bridgework out of
compliance with current regulations.
Originally, Mr. Neyhart was given verbal approval for emergency repairs
to his bridge. The emergency permit was issued based on information
provided by Mr. Neyhart at the time. I have been told that Mr. Neyhart
understood that once the emergency work was completed the project was to
undergo a complete review using current regulations for permit coverage.
At this time, it appears that Mr. Neyharts original description of the
emergency repairs is in conflict with what has been completed already.
The additional work proposed by Mr. Neyhart is also in conflict with
what was originally agreed upon, as I understand it. The County is more
than willing to work with Mr. Neyhart, but it is important to note that
the proposed project(s)are consistent with what current
code/regulations allow. Work completed outside of what is approved is
considered a violation and will be addressed through enforcement
action.
The County looks forward to assisting Mr. Neyhart, but as stated above
there are too many unknowns, which is making things very difficult for
the County.
(6/13/2008) Pam Bennett-Cumming - Re: Neyhart (Bridge Work on the Tahuya River) Page 31
y
Regards,
Ryan Crater
Land Use Planner/Code Enforcement
Mason County Department of Community Development
411 North 5th
PO BOX 279
Shelton, WA 98584
Phone#360-427-9670 ext. 577
Fax#360-427-8425
(6/13/2008) Pam Bennett-Cumming - RE: 25-blocks sticking out, right bank looking downstream Page 1 a
From: Ryan Crater
To: Bennett-Cumming, Pam; Ereth, Marty; kvan461@ecy.wa.gov; neyhart@msn.c...
Date: 6/13/2008 9:26 AM
Subject: RE: 25 - blocks sticking out, right bank looking downstream
Marty
After reviewing the parcel file I see that there are no permits or approvals from Mason County on file for the wall in
question. I do see that sometime around 3-27-97 a JARPA was submitted for some wall work along with permits from the
County. In the files it shows a site plan for a wall, but it is very different from what is on site now and its placed in a
different location. Changes to site plans can only occur upon approval from the County,which in this case none was given.
If Mr. Neyhart wants to keep the current wall he shall obtain permits or remove it. Unless Mr. Neyhart can provide
evidence of permit approval for the wall or specifically show where no permit review was needed from the County the wall
is a violation subject to enforcement action.
With regards to the new bridgework, it is still under review for permit coverage. A emergency approval and SEPA
exemption was originally given for the work described by Mr. Neyhart to the County, but what we see on the ground and
the work still in the planning stages is far outside any approval or exemptions given by the County. Mr. Neyhart has yet to
provide the County with any firm site plans or the required permit(s)/SEPA applications we have requested. Unless Mr.
Neyhart complies by July 7,2008 with what has been requested, I will be forwarding his case to the Hearings Examiner and
recommending fines.
Regards,
Ryan Crater
Land Use Planner/Code Enforcement
Mason County Department of Community Development
411 North 5th
PO BOX 279
Shelton,WA 98584
Phone #360-427-9670 ext. 577
Fax#360-427-8425
>>> "Marty Ereth" <martyCcbSkokomish.org> 6/12/2008 5:09 pm >>>
When did Doug put in the huge Eco block wall?
Marty
-----Original Message-----
From: Gloria Rogers[mailto:rogergsr@DFW.WA.GOVI
Sent: Monday,June 09,2008 9:08 AM
To: ryancC�co.mason.wa.us
Subject: 25-blocks sticking out, right bank looking downstream
25- blocks sticking out, right bank looking downstream
28&30- blocks under bridge, left bank,wall is to be removed or
modified during the fish window-Neyhart must apply and receive a new
HPA for this
(6/13/2008) Pam Bennett-Cumming - Neyhart (Bridge Work on the Tahuya River) Page 1
From: Ryan Crater
To: neyhart@msn.com; rhoss@hctc.com
Date: 6/11/2008 6:03 PM
Subject: Neyhart (Bridge Work on the Tahuya River)
CC: Bennett-Cumming, Pam; Fink, Robert; kvan461@ecy.wa.gov; Robinson, Bar...
For All,
I spoke with Mr. Neyhart this morning regarding my most recent letter. He has
indicated that the ecology blocks in question are only being stored in their current
location under the bridge and are scheduled for relocation. He also indicated Gloria
Rodgers (WDFW) gave her approval for the storage of the ecology blocks (This
statement does not indicate approval was giving). Mr. Neyhart has indicated that he
plans on completing some additional work, which seems to have not been shown on the
site plans given to the County. The additional work proposed by Mr. Neyhart is not
covered under any permits issued by the County nor is it covered under a SEPA
exemption or emergency permit.
Based on my understanding of the project as described by Mr. Neyhart it appears that
additional permits may be needed, such as review under a Mason Environmental Permit
with HMP, Shoreline Permit (Substantial Development/Conditional Use). In addition,
the work already completed appears to be beyond normal repair and should be
considered new and reviewed as such. A SEPA exemption was originally giving based
on the information provided to the County, but it appears that the additional work that
has been completed and the work proposed is not SEPA exempt or covered under an
emergency permit.
In order for the County to further assist Mr. Neyhart we need full disclosure of the
proposed project(s) and an updated site plan(s) showing final build out. Without these
items the County can only speculate as to what it is Mr. Neyhart would like to do as well
as properly reviewing the project(s) for appropriate permit coverage.
Once Mr. Neyhart provides the County with the correct and final site plan(s)/scope of
work we will review the project(s) for permit coverage and a SEPA determination(s). A
Stop Work Notification is now being issued for the bridgework and any associated work
within shoreline jurisdiction until a proper review can be completed. At this time the
County has no choice, but to consider Mr. Neyharts bridgework out of compliance with
current regulations.
Originally, Mr. Neyhart was given verbal approval for emergency repairs to his bridge.
The emergency permit was issued based on information provided by Mr. Neyhart at the
time. I have been told that Mr. Neyhart understood that once the emergency work was
completed the project was to undergo a complete review using current regulations for
permit coverage. At this time, it appears that Mr. Neyharts original description of the
(6/13/2008) Pam Bennett-Cumming - Neyhart(Bridge Work on the Tahuya River) Page 2
t ar
emergency repairs is in conflict with what has been completed already. The additional
work proposed by Mr. Neyhart is also in conflict with what was originally agreed upon,
as I understand it. The County is more than willing to work with Mr. Neyhart, but it is
important to note that the proposed project(s) are consistent with what current
code/regulations allow. Work completed outside of what is approved is considered a
violation and will be addressed through enforcement action.
The County looks forward to assisting Mr. Neyhart, but as stated above there are too
many unknowns, which is making things very difficult for the County.
Regards,
Ryan Crater
Land Use Planner / Code Enforcement
Mason County Department of Community Development
411 North 5th
PO BOX 279
Shelton, WA 98584
Phone # 360-427-9670 ext. 577
Fax # 360-427-8425
(6/9/2008,�Pam Bennett-Cumming - RE. Bridge Work (Out of Compliance) Page 1 J.
From: Ryan Crater
To: Hoss, Rick; neyhart@msn.com
Date: 6/9/2008 11:04 AM
Subject: RE: Bridge Work(Out of Compliance)
CC: Bennett-Cumming, Pam; Rogers', 'Gloria
Mr. Hoss,
When I was on site with Mr. Neyhart,I specifically stated that nothing was to be placed forward of the new bridge
abutments without County approval. Mr. Neyhart never obtained approval from the County. During my meeting with Mr.
Neyhart he assured me that no ecology blocks would be placed forward of the new bridge abutments without County
approval. Mr. Neyhart leaves me perplexed as to why he would not hold true to his word.
I will continue to work with Mr. Neyhart,but I need him to understand that there are certain regulations/standards that
need to be met.
I look forward to Mr. Neyhart holding true to his word and coming into full compliance with the County and WDFW HPA
conditions by the giving deadline.
Regards,
Ryan Crater
Land Use Planner/Code Enforcement
Mason County Department of Community Development
411 North 5th
PO BOX 279
Shelton,WA 98584
Phone# 360-427-9670 ext. 577
Fax#360-427-8425
>>> "Rick Hoss" <rhossOhctc.com> 6/9/2008 9:21 am >>>
Mr.Crater,
Mr. Neyhart has a long history of good citizenship; it is likely he either
wasn't aware of further actions due on his part or he inadvertently
neglected it.
Perhaps this reminder is all that is necessary.
If not, please contact me and I will assist with the completion of necessary
work.
Sincerely,
RICHARD T. HOSS
rhoss(-Ohctc.com
HOSS&WILSON-HOSS, LLP
236 W. Birch St., Shelton,WA 98584
Off: (360)426-2999; Fax: (360)426-6715
NOTICES
CONFIDENTIAL&PRIVILEGED: This email message may contain legally
privileged and/or confidential information. If you have received this email
in error, please notify the sender immediately and delete all copies of this
e-mail message and any attachment.
I
(6/WM8)Pam Bennett-Cumming - RE: Bridge Work (Out of Compliance) Page 2
IRS CIRCULAR 230 DISCLOSURE: In compliance with requirements imposed by the
IRS,we hereby notify you that,to the extent that this written
communication addresses tax matters, it is not intended and cannot be used
to avoid tax-related penalties under federal,state or local law.
-----Original Message-----
From: Ryan Crater fmailto:RyanCC-0co.mason.wa.usl
Sent: Monday,June 09,2008 8:29 AM
To: neyhart@msn.com
Cc: Pam Bennett-Cumming; Gloria Rogers; rhoss(a)hctc.com
Subject: Bridge Work(Out of Compliance)
Hard copy mailed on June 5,2008.
Dear Mr. Neyhart,
On May 6, 2008 you agreed in writing to abide by specific County
requirements and permit processes. Based on information provided by Gloria
Rodgers from the Washington Department of Fish and Wildlife(WDFW),you have
failed to comply with the conditions set forth in your HPA,Control #
112510-1 issued May 14, 2008 and expiring on June 15, 2008. Failure to
comply with the HPA is a violation of the County permit. The County has
also been informed that you have expanded your structure outside of the
agreed upon building footprint,which triggers additional permit(s). I have
included a SEPA checklist and Shoreline Permit application that you will
need to fill out and turn into the County. Please be advised additional
permit fees may be required. The portions of the bridge or its associated
structures placed outside of the original agreed upon site plan are not
covered under the SEPA exemption.
In addition, Planner Pam Bennett-Cumming has indicated you have failed to
submit the earlier requested items needed to obtain and finalize your
permit(s)from the County. Therefore, I have no choice but to take
enforcement action at this time. To avoid further enforcement action please
comply with the written agreement and additional requests contained within
this letter.
Failure to comply by the deadline will trigger additional enforcement
action,which could result in your case being forwarded to the Mason County
Hearings Examiner
Initial Compliance:
1)Compliance regarding the HPA means a call from Gloria to myself that you
have fulfilled the HPA requirements by the above date of 7-7-08.
2)Compliance with the County means that all requested permit paperwork has
been submitted to the County and an inspection by the Enforcement Planner
(myself) is completed before 7-7-08 to verify that there are no other
remaining code violations.
The County has tried to work with you on this by giving you extra time to
submit the requested items and other information, but you have failed to
submit the requested items in a timely manner. You are also,not complying
with your signed agreement with the County. July 7, 2008 is your final
deadline. If you fail to complete/submit the requested items by the
deadline your case will be forwarded to the Hearings Examiner.
It is unfortunate that enforcement action has to be taken, but you leave us
no choice in the matter.
You have 20 working days from receipt of this letter to complete the above
requested items.
(6/9/2008)f am Bennett-Cumming - RE Bridge Work (Out of Compliance) Page 3�
If the requested items are not submitted within 20 working days(By July 7,
2008)a hearing may be scheduled. In addition you could face possible fines
up to$1,000 a day for each violation count(From the date of violation
discovery)for violating the above code. You will also be responsible for
the cost of the hearing,which is$1,480.00.
If you have any questions please give me a call at ext. 577.
Regards,
Ryan Crater
Enclosed in the certified mail:
1)SEPA checklist
2)Shoreline Permit application
Land Use Planner/Code Enforcement
Mason County Department of Community Development
411 North 5th
PO BOX 279
Shelton,WA 98584
Phone# 360-427-9670 ext. 577
Fax# 360-427-8425
--- .- --- --- ------ -
(6/9/20K) Pam Bennett-Cumming RE: Bridge Work (Out of Compliance) Page 1
From: "Rick Hoss" <rhoss@hctc.com>
To: "'Ryan Crater"' <RyanC@co.mason.wa.us>, <neyhart@msn.com>
Date: 6/9/2008 9:21 AM
Subject: RE: Bridge Work (Out of Compliance)
CC: "'Pam Bennett-Cumming"' <PamBC@co.mason.wa.us>, "'Gloria Rogers"' <roger...
Mr. Crater,
Mr. Neyhart has a long history of good citizenship; it is likely he either
wasn't aware of further actions due on his part or he inadvertently
neglected it.
Perhaps this reminder is all that is necessary.
If not, please contact me and I will assist with the completion of necessary
work.
Sincerely,
RICHARD T. HOSS
rhoss@hctc.com
HOSS &WILSON-HOSS, LLP
236 W. Birch St., Shelton, WA 98584
Off: (360)426-2999; Fax: (360)426-6715
NOTICES
CONFIDENTIAL & PRIVILEGED: This email message may contain legally
privileged and/or confidential information. If you have received this email
in error, please notify the sender immediately and delete all copies of this
e-mail message and any attachment.
IRS CIRCULAR 230 DISCLOSURE: In compliance with requirements imposed by the
IRS,we hereby notify you that, to the extent that this written
communication addresses tax matters, it is not intended and cannot be used
to avoid tax-related penalties under federal, state or local law.
-----Original Message-----
From: Ryan Crater[mai Ito:Ryan C@co.mason.wa.us]
Sent: Monday, June 09, 2008 8:29 AM
To: neyhart@msn.com
Cc: Pam Bennett-Cumming; Gloria Rogers; rhoss@hctc.com
Subject: Bridge Work (Out of Compliance)
Hard copy mailed on June 5, 2008.
Dear Mr. Neyhart,
On May 6, 2008 you agreed in writing to abide by specific County
requirements and permit processes. Based on information provided by Gloria
Rodgers from the Washington Department of Fish and Wildlife (WDFW), you have
failed to comply with the conditions set forth in your HPA, Control#
112510-1 issued May 14, 2008 and expiring on June 15, 2008. Failure to
comply with the HPA is a violation of the County permit. The County has
also been informed that you have expanded your structure outside of the
agreed upon building footprint, which triggers additional permit(s). I have
1 (6/9/20G41 Pam Bennett-Cumming - RE: Bridge Work (Out of Compliance) Page 2
included a SEPA checklist and Shoreline Permit application that you will
need to fill out and turn into the County. Please be advised additional
permit fees may be required. The portions of the bridge or its associated
structures placed outside of the original agreed upon site plan are not
covered under the SEPA exemption.
In addition, Planner Pam Bennett-Cumming has indicated you have failed to
submit the earlier requested items needed to obtain and finalize your
permit(s)from the County. Therefore, I have no choice but to take
enforcement action at this time. To avoid further enforcement action please
comply with the written agreement and additional requests contained within
this letter.
Failure to comply by the deadline will trigger additional enforcement
action, which could result in your case being forwarded to the Mason County
Hearings Examiner
Initial Compliance:
1)Compliance regarding the HPA means a call from Gloria to myself that you
have fulfilled the HPA requirements by the above date of 7-7-08.
2)Compliance with the County means that all requested permit paperwork has
been submitted to the County and an inspection by the Enforcement Planner
(myself) is completed before 7-7-08 to verify that there are no other
remaining code violations.
The County has tried to work with you on this by giving you extra time to
submit the requested items and other information, but you have failed to
submit the requested items in a timely manner. You are also, not complying
with your signed agreement with the County. July 7, 2008 is your final
deadline. If you fail to complete/submit the requested items by the
deadline your case will be forwarded to the Hearings Examiner.
It is unfortunate that enforcement action has to be taken, but you leave us
no choice in the matter.
You have 20 working days from receipt of this letter to complete the above
requested items.
If the requested items are not submitted within 20 working days (By July 7,
2008)a hearing may be scheduled. In addition you could face possible fines
up to $1,000 a day for each violation count(From the date of violation
discovery)for violating the above code. You will also be responsible for
the cost of the hearing,which is $1,480.00.
If you have any questions please give me a call at ext. 577.
Regards,
Ryan Crater
Enclosed in the certified mail:
1)SEPA checklist
2) Shoreline Permit application
11
(6/9/2�8) Pam Bennett-Cumming - RE. Bridge Work (Out of Compliance) Page 3
s �
Land Use Planner/Code Enforcement
Mason County Department of Community Development
411 North 5th
PO BOX 279
Shelton, WA 98584
Phone#360-427-9670 ext. 577
Fax#360-427-8425
(6/9/2008) Pam Bennett-Cumming -Bridge Work (Out of Compliance) Page-1-1
From: Ryan Crater
To: neyhart@msn.com
Date: 6/9/2008 8:29 AM
Subject: Bridge Work (Out of Compliance)
CC: Bennett-Cumming, Pam; rhoss@hctc.com; Rogers, Gloria
Hard copy mailed on June 5,2008.
Dear Mr. Neyhart,
On May 6, 2008 you agreed in writing to abide by specific County requirements and permit processes. Based on
information provided by Gloria Rodgers from the Washington Department of Fish and Wildlife(WDFW),you have failed to
comply with the conditions set forth in your HPA,Control # 112510-1 issued May 14, 2008 and expiring on June 15, 2008.
Failure to comply with the HPA is a violation of the County permit. The County has also been informed that you have
expanded your structure outside of the agreed upon building footprint,which triggers additional permit(s). I have included
a SEPA checklist and Shoreline Permit application that you will need to fill out and turn into the County. Please be advised
additional permit fees may be required. The portions of the bridge or its associated structures placed outside of the original
agreed upon site plan are not covered under the SEPA exemption.
In addition, Planner Pam Bennett-Cumming has indicated you have failed to submit the earlier requested items needed to
obtain and finalize your permit(s)from the County. Therefore,I have no choice but to take enforcement action at this
time. To avoid further enforcement action please comply with the written agreement and additional requests contained
within this letter.
Failure to comply by the deadline will trigger additional enforcement action,which could result in your case being forwarded
to the Mason County Hearings Examiner
Initial Compliance:
1)Compliance regarding the HPA means a call from Gloria to myself that you have fulfilled the HPA requirements by the
above date of 7-7-08.
2)Compliance with the County means that all requested permit paperwork has been submitted to the County and an
inspection by the Enforcement Planner(myself) is completed before 7-7-08 to verify that there are no other remaining code
violations.
The County has tried to work with you on this by giving you extra time to submit the requested items and other
information, but you have failed to submit the requested items in a timely manner. You are also, not complying with your
signed agreement with the County. July 7, 2008 is your final deadline. If you fail to complete/submit the requested items
by the deadline your case will be forwarded to the Hearings Examiner.
It is unfortunate that enforcement action has to be taken, but you leave us no choice in the matter.
You have 20 working days from receipt of this letter to complete the above requested items.
If the requested items are not submitted within 20 working days(By July 7, 2008)a hearing may be scheduled. In addition
you could face possible fines up to$1,000 a day for each violation count(From the date of violation discovery)for violating
the above code.You will also be responsible for the cost of the hearing,which is$1,480.00.
If you have any questions please give me a call at ext. 577.
Regards,
Ryan Crater
Enclosed in the certified mail:
1)SEPA checklist
2)Shoreline Permit application
Land Use Planner Code Enforcement
(5/15/2008)Pam Bennett-Cumming - RE: Neyhart Page 1
A op
From: Ryan Crater
To: Bennett-Cumming, Pam; Hoss, Rick
Date: 5/15/2008 8:00 AM
Subject: RE: Neyhart
CC: Ring-Erickson, Lynda
FYI-
Rick, Just so you know,I let Doug know yesterday that I found a way to let the debris removal from the river move
forward without the SEPA being totally complete.
Although the debris removal and deck placement will be moving forward, it is possible SEPA may still need to be completed.
Mr. Neyhart still needs to fill out the checklist and get it into us.
WAC: 197- 11 -880(Emergencies*)
Prevent an imminent threat of serious environmental degradation.
*If portions of the project meet the definition of emergency,those portions can be done immediately without SEPA environmental
review.Other portions may require SEPA review.For example,if a marina collapses in a storm,cleanup may need to occur
immediately to prevent a threat to the public or the environment.This would probably be considered an emergency exemption.
However,the additional reconstruction/repair that can be done over a longer period of time would require SEPA review.
Regards,
Ryan Crater
Land Use Planner/Code Enforcement
Mason County Department of Community Development
411 North 5th
PO BOX 279
Shelton,WA 98584
Phone#360-427-9670 ext. 577
Fax#360-427-8425
>>> Pam Bennett-Cumming 5/13/2008 12:07 pm >>>
Rick,
RE:your email below.
I understand that Ryan will be providing a more detailed response,but in the interest of time....
Essentially what we are saying is that it doesn't appear possible to exempt Mr Neyhart from SEPA review of at least some of the
actions he proposes. And we are aware and happy that Mr. Neyhart was willing to sign agreeing to the points we outlined-that
goes a long way in clarifying your client's willingness to work with us through this process. (Still waiting for the hard copy by the
way).
However we understand that it was the emergency that precipitated the damage to the old bridge,and that it has taken longer than
anyone thought to build the replacement,and timing for placing the bridge deck is getting short. We understand that Mr. Neyhart
may need to proceed at his own risk,recognizing there will still be paperwork and reviews to complete,as he agreed to.
I hope this clarifies Mason County's responsibility in this instance. Pam
Pam Bennett-Cumming, M.E.S
Senior Planner-Water Resource Planning
Mason County Department of Community Development
411 North 5th
PO Box 279
Shelton,WA 98584
phone: (360)427-9670 x287
fax: (360)427-8425
(5/15/2008) Pam Bennett-Cumming- RE: Neyhart x Page 2 l
email: pambc@co.mason.wa.us
>>> "Rick Hoss" <rhoss@hctc.com> 5/13/2008 10:41 AM >>>
Pam,
The crane is scheduled to arrive Thursday($12,000 cost)and the bridge is
coming Friday. I have two points that suggest no SEPA should be required.
First,the category exemptions do not speak of material expansions,and a
simple reading of the plain language of this section says:except
that...only..replacement of structures.. may be exempt.The plain language
and plain meaning is that only minor repair of structures is allowed, but
replacement of structures is allowable.This is exactly what Neyhart Farms
wishes to do: Replacement of structure.The removal of the old bridge and
abutment is allowed by Fisheries under their HPA.The language of the
exemption WAC 197-11-800 follows:
(3)Repair, remodeling and maintenance activities.The following activities
shall be categorically exempt:The repair,remodeling,maintenance,or minor
alteration of existing private or public structures,facilities or
equipment,including utilities, involving no material expansions or changes
in use beyond that previously existing;except that,where undertaken wholly
or in part on lands covered by water,only minor repair or replacement of
structures may be exempt(examples include repair or replacement of piling,
ramps,Floats,or mooring buoys,or minor repair,alteration,or maintenance
of docks).
Second,When Doug received your"Neyhart Project Information for LRE"he
immediately forwarded to you a signed consent to your requirements and
sought advice from you about what was then required for his approvals. I
understand he was told you were out of the case and he should deal with Ryan
Crater.When Doug couldn't get response from Ryan Crater, I started calling
Ryan and leaving detailed voice mails(Last Tuesday,Thursday, Monday).
Gloria Rogers from Fisheries told me she couldn't get a reply form Ryan
Crater after many attempts.So Doug and I have had a wasted week with no
reply from the planner. Doug has made his schedule known well in advance,
and rescheduled once. In the meantime,two of Doug's workers have suffered
injuries because the bridge hasn't yet been replaced.
Please advise if this work can go forward on Friday as planned.If Mason Co.
is going to require the SEPA(it doesn't have to for the reason cited above)
then please advise how fast that application can be processed.
Sincerely,
RICHARD T. HOSS
rhoss@hctc.com
HOSS&WILSON-HOSS, LLP
236 W. Birch St.,Shelton,WA 98584
Off: (360)426-2999; Fax: (360)426-6715
NOTICES
CONFIDENTIAL&PRIVILEGED: This email message may contain legally
privileged and/or confidential information. If you have received this email
in error,please notify the sender immediately and delete all copies of this
e-mail message and any attachment.
IRS CIRCULAR 230 DISCLOSURE: In compliance with requirements imposed by the
IRS,we hereby notify you that,to the extent that this written
communication addresses tax matters,it is not intended and cannot be used
(5/15/2008) Pam Bennett-Cumming - RE Neyhart Page 3 j,
to avoid tax-related penalties under federal,state or local law.
-----Original Message-----
From: Pam Bennett-Cumming Li Ito:PamBC@co.mason.wa.usl
Sent: Monday, May 12,2008 2:46 PM
To: Rick Hoss
Cc: Ryan Crater; Gloria Rogers
Subject: RE: Neyhart
Rick,
Part of Mr Neyhart's work is going to be below the Ordinary High Water Mark
of the river,and the bridge he is installing is larger. It is not an
exempt activity under WAC197-11-800.
Also,while we were originally able to temporarily exempt this activity(way
back in December at the time of the flood), Mr Neyhart has had plenty of
time to complete his permits,but didnt start until neighbors complained he
was doing work-in late march. There has been substantial activity already
below the Ordinary High Water Mark.
WAC197-11-880 applied back during-and recently after-the flooding,but
again,such a long time has passed,and the case is being challenged by
several. Our only defensible choice would be to require SEPA. If he turns
in the paperwork for the MEP and SEPA,and clarifies his timeline for the
bridge delivery,that would go a long way.We dont want to make things more
difficult for Mr Neyhart than they already are,but we have to be able to
respond to questions knowing that we have treated Mr Neyhart appropriately
under our(and state)regulations. Ecology has already questioned our
decision to review the replacement bridge without requiring a Shoreline
Substantial Development Permit,since the bridge replacement is higher and
longer.
I hope you understand we are trying to work with your client Mr Neyhart to
get through this as easily as possible. It will help greatly if he is clear
that some of the activities that have been occurring below the Ordinary High
Water Mark have contributed to the concerns of others. Lets just find a way
to work through this as quickly as possible.pam
Pam Bennett-Cumming, M.E.S
Senior Planner-Water Resource Planning
Mason County Department of Community Development
411 North 5th
PO Box 279
Shelton,WA 98584
phone: (360)427-9670 x287
fax: (360)427-8425
email: pambc@co.mason.wa.us
>>> "Rick Hoss" <rhoss@hctc.com> 5/12/2008 2:26 PM >>>
Pam,
Thank you for your fast response.I admit to being frustrated last week when
you were not handling this.And it makes me especially pleased with your
prompt reply.
Why the SEPA and not an exemption?Will you please give the code/WAC
citation you are considering?May I suggest a different interpretation?
If Doug does file the SEPA,what is the time frame?
Thanks again.
Sincerely,
Rick
( (5/15/2008) Pam Bennett Cumming - RE: Neyhartf Page 4
RICHARD T. HOSS
rhoss@hctc.com
HOSS&WILSON-HOSS, LLP
236 W. Birch St., Shelton,WA 98584
Off: (360)426-2999; Fax: (360)426-6715
NOTICES
CONFIDENTIAL&PRIVILEGED: This email message may contain legally
privileged and/or confidential information. If you have received this email
in error,please notify the sender immediately and delete all copies of this
e-mail message and any attachment.
IRS CIRCULAR 230 DISCLOSURE: In compliance with requirements imposed by the
IRS,we hereby notify you that,to the extent that this written
communication addresses tax matters, it is not intended and cannot be used
to avoid tax-related penalties under federal,state or local law.
-----Original Message-----
From: Pam Bennett-Cumming rmailto:PamBC@co.mason.wa.usl
Sent: Monday,May 12, 2008 2:16 PM
To: Rick Hoss
Cc: Ryan Crater; Gloria Rogers
Subject: Re: Neyhart
Good afternoon Rick,
Thanks for the email.
My role at this time would be to review the Mason Environmental Permit and
SEPA checklist that Ryan is sending out for completion. Mr Neyhard will
need to submit the completed documents to the permit center for the county
to review.
I also want to be clear that we are looking at this portion of the process
as per Mr Neyhart's response letter faxed to us on May 6,2008. I.e.
removal of the bridge abutment lying in the river,and the old bridge,and
setting the new deck on the replacement abutments. I understand from Gloria
Rogers of WDFW that the second"old"abutment will be cut off.
The sooner we get these completed documents,the sooner we can review them
and work to completion for Mr Neyhart. I hope this clarifies things
somewhat,parr
Pam Bennett-Cumming, M.E.S
Senior Planner-Water Resource Planning
Mason County Department of Community Development
411 North 5th
PO Box 279
Shelton,WA 98584
phone: (360)427-9670 x287
fax: (360)427-8425
email: pambcCa@co.mason.wa.us
>>> "Rick Hoss" <rhoss@hctc.com> 5/12/2008 2:00 PM >>>
Pam,
Can you please help Mr. Neyhart complete his approval process?He and I will
really appreciate your kind assistance.
(5/15/2 m Pam Bennett-Cumming - RE: N eymart 5
From Ryan Crater we now know he is out of the loop and you are back in.
Gloria Rogers has tried to cooperate and I think she will continue to do so.
Both Gloria and I have had trouble getting a return call from Ryan.
Doug had another worker injured last week hauling the very heavy bales of
hay across in the rowboat then up the hill.
Will you lease let Doug and I know just what you require next and why?If
Y P 9 J Y q Y
we have completed all requirements that is great but we need to know.
Thank you.
Sincerely,
Rick
RICHARD T. HOSS
rhossOhctc.com
HOSS&WILSON-HOSS,LLP
236 W. Birch St.,Shelton,WA 98584
Off: (360)426-2999; Fax: (360)426-6715
NOTICES
CONFIDENTIAL&PRIVILEGED: This email message may contain legally
privileged and/or confidential information. If you have received this email
in error,please notify the sender immediately and delete all copies of this
e-mail message and any attachment.
IRS CIRCULAR 230 DISCLOSURE: In compliance with requirements imposed by the
IRS,we hereby notify you that,to the extent that this written
communication addresses tax matters, it is not intended and cannot be used
to avoid tax-related penalties under federal,state or local law.
1 (5/13/2008) Pam Bennett-Cumming{- RE: Neyhart mm_ Page 1_
From: Pam Bennett-Cumming
To: Rick Hoss
Subject: RE: Neyhart
Rick,
RE: your email below.
I understand that Ryan will be providing a more detailed response, but in the interest of time....
Essentially what we are saying is that it doesn't appear possible to exempt Mr Neyhart from SEPA review
of at least some of the actions he proposes. And we are aware and happy that Mr. Neyhart was willing to
sign agreeing to the points we outlined -that goes a long way in clarifying your client's willingness to work
with us through this process. (Still waiting for the hard copy by the way).
However we understand that it was the emergency that precipitated the damage to the old bridge, and that
it has taken longer than anyone thought to build the replacement, and timing for placing the bridge deck is
getting short. We understand that Mr. Neyhart may need to proceed at his own risk, recognizing there will
still be paperwork and reviews to complete, as he agreed to.
hope this clarifies Mason County's responsibility in this instance. Pam
>>>"Rick Hoss"<rhoss(a)hctc.com> 5/13/2008 10:41 AM >>>
Pam,
The crane is scheduled to arrive Thursday($12,000 cost)and the bridge is
coming Friday. I have two points that suggest no SEPA should be required.
First, the category exemptions do not speak of material expansions, and a
simple reading of the plain language of this section says: except
that...only..replacement of structures.. may be exempt. The plain language
and plain meaning is that only minor repair of structures is allowed, but
replacement of structures is allowable. This is exactly what Neyhart Farms
wishes to do: Replacement of structure. The removal of the old bridge and
abutment is allowed by Fisheries under their HPA. The language of the
exemption WAC 197-11-800 follows:
(3) Repair, remodeling and maintenance activities. The following activities
shall be categorically exempt: The repair, remodeling, maintenance, or minor
alteration of existing private or public structures,facilities or
equipment, including utilities, involving no material expansions or changes
in use beyond that previously existing; except that, where undertaken wholly
or in part on lands covered by water, only minor repair or replacement of
structures may be exempt (examples include repair or replacement of piling,
ramps, floats, or mooring buoys, or minor repair, alteration, or maintenance
of docks).
Second, When Doug received your"Neyhart Project Information for LRE" he
immediately forwarded to you a signed consent to your requirements and
sought advice from you about what was then required for his approvals. I
understand he was told you were out of the case and he should deal with Ryan
Crater. When Doug couldn't get response from Ryan Crater, I started calling
Ryan and leaving detailed voice mails (Last Tuesday, Thursday, Monday).
Gloria Rogers from Fisheries told me she couldn't get a reply form Ryan
Crater after many attempts. So Doug and I have had a wasted week with no
reply from the planner. Doug has made his schedule known well in advance,
and rescheduled once. In the meantime, two of Doug's workers have suffered
injuries because the bridge hasn't yet been replaced.
_ --- _ _
(5/13/2008) Pam Bennett-Cumming -RE: Neyhart Page 2 1.
Please advise if this work can go forward on Friday as planned. If Mason Co.
is going to require the SEPA(it doesn't have to for the reason cited above)
then please advise how fast that application can be processed.
Sincerely,
RICHARD T. HOSS
rhoss(c�hctc.com
HOSS &W ILSON-HOSS, LLP
236 W. Birch St., Shelton, WA 98584
Off: (360)426-2999; Fax: (360)426-6715
NOTICES
CONFIDENTIAL& PRIVILEGED: This email message may contain legally
privileged and/or confidential information. If you have received this email
in error, please notify the sender immediately and delete all copies of this
e-mail message and any attachment.
IRS CIRCULAR 230 DISCLOSURE: In compliance with requirements imposed by the
IRS,we hereby notify you that, to the extent that this written
communication addresses tax matters, it is not intended and cannot be used
to avoid tax-related penalties under federal, state or local law.
-----Original Message-----
From: Pam Bennett-Cumming fmailto:PamBC(a-)co.mason.wa.usl
Sent: Monday, May 12, 2008 2:46 PM
To: Rick Hoss
Cc: Ryan Crater; Gloria Rogers
Subject: RE: Neyhart
Rick,
Part of Mr Neyhart's work is going to be below the Ordinary High Water Mark
of the river, and the bridge he is installing is larger. It is not an
exempt activity under WAC197-11-800.
Also,while we were originally able to temporarily exempt this activity(way
back in December at the time of the flood), Mr Neyhart has had plenty of
time to complete his permits, but didnt start until neighbors complained he
was doing work- in late march. There has been substantial activity already
below the Ordinary High Water Mark.
WAC197-11-880 applied back during-and recently after-the flooding, but
again, such a long time has passed, and the case is being challenged by
several. Our only defensible choice would be to require SEPA. If he turns
in the paperwork for the MEP and SEPA, and clarifies his timeline for the
bridge delivery, that would go a long way. We dont want to make things more
difficult for Mr Neyhart than they already are, but we have to be able to
respond to questions knowing that we have treated Mr Neyhart appropriately
under our(and state)regulations. Ecology has already questioned our
decision to review the replacement bridge without requiring a Shoreline
[(5/13/2008) Pam Bennett-Cumming - RE Neyhart Page 3 1
Substantial Development Permit, since the bridge replacement is higher and
longer.
I hope you understand we are trying to work with your client Mr Neyhart to
get through this as easily as possible. It will help greatly if he is clear
that some of the activities that have been occurring below the Ordinary High
Water Mark have contributed to the concerns of others. Lets just find a way
to work through this as quickly as possible. pam
Pam Bennett-Cumming, M.E.S
Senior Planner-Water Resource Planning
Mason County Department of Community Development
411 North 5th
PO Box 279
Shelton, WA 98584
phone: (360)427-9670 x287
fax: (360)427-8425
email: pambcaco.mason.wa.us
>>>"Rick Hoss" <rhossa_hctc.com> 5/12/2008 2:26 PM >>>
Pam,
Thank you for your fast response. I admit to being frustrated last week when
you were not handling this. And it makes me especially pleased with your
prompt reply.
Why the SEPA and not an exemption?Will you please give the code/WAC
citation you are considering? May I suggest a different interpretation?
If Doug does file the SEPA,what is the time frame?
Thanks again.
Sincerely,
Rick
RICHARD T. HOSS
rhossa.hctc.com
HOSS &WILSON-HOSS, LLP
236 W. Birch St., Shelton, WA 98584
Off: (360)426-2999; Fax: (360)426-6715
NOTICES
CONFIDENTIAL& PRIVILEGED: This email message may contain legally
privileged and/or confidential information. If you have received this email
in error, please notify the sender immediately and delete all copies of this
e-mail message and any attachment.
IRS CIRCULAR 230 DISCLOSURE: In compliance with requirements imposed by the
IRS, we hereby notify you that, to the extent that this written
communication addresses tax matters, it is not intended and cannot be used
(5/13/2008) Pam Bennett-Cumming - RE: Neyhart Page 4
to avoid tax-related penalties under federal, state or local law.
-----Original Message-----
From: Pam Bennett-Cumming [mailto:PamBC(cDco.mason.wa.usl
Sent: Monday, May 12, 2008 2:16 PM
To: Rick Hoss
Cc: Ryan Crater; Gloria Rogers
Subject: Re: Neyhart
Good afternoon Rick,
Thanks for the email.
My role at this time would be to review the Mason Environmental Permit and
SEPA checklist that Ryan is sending out for completion. Mr Neyhard will
need to submit the completed documents to the permit center for the county
to review.
I also want to be clear that we are looking at this portion of the process
as per Mr Neyhart's response letter faxed to us on May 6, 2008. Le.
removal of the bridge abutment lying in the river, and the old bridge, and
setting the new deck on the replacement abutments. I understand from Gloria
Rogers of WDFW that the second "old"abutment will be cut off.
The sooner we get these completed documents, the sooner we can review them
and work to completion for Mr Neyhart. I hope this clarifies things
somewhat, pam
Pam Bennett-Cumming, M.E.S
Senior Planner-Water Resource Planning
Mason County Department of Community Development
411 North 5th
PO Box 279
Shelton, WA 98584
phone: (360)427-9670 x287
fax: (360)427-8425
email: pambcaco.mason.wa.us
>>>"Rick Hoss" <rhoss(a)hctc.com> 5/12/2008 2:00 PM >>>
Pam,
Can you please help Mr. Neyhart complete his approval process? He and 1 will
really appreciate your kind assistance.
From Ryan Crater we now know he is out of the loop and you are back in.
Gloria Rogers has tried to cooperate and I think she will continue to do so.
Both Gloria and I have had trouble getting a return call from Ryan.
Doug had another worker injured last week hauling the very heavy bales of
hay across in the rowboat then up the hill.
Will you please let Doug and I know just what you require next, and why? If
we have completed all requirements that is great but we need to know.
(5/13/2008) Pam Bennett-Cumming - RE: Neyhart Page 5
Thank you.
Sincerely,
Rick
RICHARD T. HOSS
rhoss(a_hctc.com
HOSS &WILSON-HOSS, LLP
236 W. Birch St., Shelton, WA 98584
Off: (360)426-2999; Fax: (360)426-6715
NOTICES
CONFIDENTIAL& PRIVILEGED: This email message may contain legally
privileged and/or confidential information. If you have received this email
in error, please notify the sender immediately and delete all copies of this
e-mail message and any attachment.
IRS CIRCULAR 230 DISCLOSURE: In compliance with requirements imposed by the
IRS, we hereby notify you that, to the extent that this written
communication addresses tax matters, it is not intended and cannot be used
to avoid tax-related penalties under federal, state or local law.
CC: Lynda Ring-Erickson; Ryan Crater
(4/30/2008) Pam Bennett-Cumming - ECOLOGY BLOCKS Page 1
From: "DOUGLAS J. NEYHART" <neyhart@msn.com>
To: "Pam Bennett-Cumming" <PamBC@co.mason.wa.us>
Date: 4/30/2008 1:49 PM
Subject: ECOLOGY BLOCKS
CC: "Gloria Rogers" <rogergsr@DFW.WA.GOV>
DEAR PAM.
THIS EMAIL IS TO MAKE SURE THAT WE ARE ALL ON THE SAME PAGE.
MY AGREEMENT WITH GLORIA ROGERS, IS THAT NO ECOLOGY BLOCKS, WILL
BE PERMANENTLY PLACED WATERWARD OF THE NEW ABUTMENTS. ANY ECOLOGY
BLOCKS THAT ARE WATERWARD OF THE NEW ABUTMENTS, ARE TEMPORARY
STORED UNTIL THE CRANE GETS TO THE SITE. ALL THESE ECOLOGY BLOCKS WILL
BE MOVED ACROSS THE RIVER, AND BE USED TO HOLD THE RAMPS UP TO BRIDGE.
ALSO THE CRANE WILL FIRST REMOVE THE ABUTMENT THAT IS LAYING IN THE
RIVER, SECOND THE CRANE WILL REMOVE THE TEN TO TWELVE ECOLOGY BLOCKS
THAT ARE LAYING IN THE RIVER, THEN THE BRIDGE WILL BE PLACED ON THE
ABUTMENTS. THE LAST THING TO BE REMOVED FROM THE RIVER WILL BE
THE OLD BRIDGE, ON TO A LOG TRUCK.
ANY PLACEMENTS OF ECOLOGY BLOCKS WATERWARD OF THE NEW ABUTMENTS
WILL BE BY SEPARATE PERMIT.
I HOPE THIS CLEARS UP ANY MISUNDERSTANDING.
SINCERELY YOURS
DOUGLAS J. NEYHART
NEYHART FARMS
206-818-3188
I
(4/29/2008) Pam Bennett-Cumming - Neyhart Page 1
From: Pam Bennett-Cumming
To: Ryan Crater
Date: 4/29/2008 2:57 PM
Subject: Neyhart
CC: Gloria Rogers; neyhart@msn.com; Vanzwalenburg, Kim
Rya n,
Please note that this email is also cc'd to applicant Doug Neyhart, Gloria Rogers of
WDFW, and Kim Vanzwalenburg of Ecology shorelines.
1. We understand that you did site review of the Neyhart farm bridge abutments
yesterday. To clarify, he was not authorized to place blocks waterward of his new
bridge abutments. In fact based on his site plan and engineering drawings for the
abutments, no other material is to be placed.
2. After reviewing the photos that Gloria Rogers of WDFW sent to us, this is to let you
know that the additional blocks placed by Mr Neyhart were never discussed as part of
any bridge abutment work. They would not be allowed under the current review. The
agreement was that we would review his application for block in line with the new
footings - however since we do not have any kind of a site plan showing that, we would
review the submitted materials on the understanding that all existing block noted and
photographed when Jim and I did our site visit - will be removed. Now what I see is
that more have been added.
3. Both Gloria Rogers and myself have been very clear with Mr Neyhart that only the
9 Y rY Y Y
new bridge footings with bridge overlay are being reviewed currently under this
emergency permit, together with the work DNR proposes to do upstream. NOTHING
else would be permitted. The current unreviewed activities should receive a STOP
WORK.
At present he does not have any approved permits in hand from either Mason County,
or Fish and Wildlife.
We have been trying to work with Mr Neyhart through what we recognize has been a
difficult time for him due to flooding and damage to his farm. However we cannot
change the regulations because of that. Please take whatever steps you need to take
to ensure that the unauthorized materials are removed. At this time it would be very
difficult for us to continue review of his permit until this is resolved. Pam Bennett-
Cumming
Pam Bennett-Cumming, M.E.S
Senior Planner - Water Resource Planning
Mason County Department of Community Development
411 North 5th
(4/29/2n08) Pam Bennett-Cumming - Neyhart' Page 2
0
PO Box 279
Shelton, WA 98584
phone: (360) 427-9670 x287
fax: (360) 427-8425
email: pambc@co.mason.wa.us
(4/28/2008) Pam Bennett-Cumming - Ecology Blocks Page 1
From: "Gloria Rogers" <rogergsr@DFW.WA.GOV>
To: <neyhart@msn.com>
Date: 4/28/2008 2:16 PM
Subject: Ecology Blocks
CC: <pambc@co.mason.wa.us>, <ryanc@co.mason.wa.us>, "Ted Jackson"
<jackstwj@...
Hello Doug,
This email is to make sure we are on the same page.
The ecology blocks shall not extend or be placed in front/waterward of
the new abutments when the project is finished. There are currently
blocks that extend from the sides waterward or that have been placed
parallel in front(waterward)of the new abutment on the right bank.
These blocks will need to be removed.
If you intend to place the ecology blocks around the sides of the
abutments, please show on your plans how these blocks are going to be
positioned.
Sincerely,
Gloria Rogers
Area Habitat Biologist
Washington Department of Fish and Wildlife
48 Devonshire Rd
Montesano,WA 98563
360-249-4628 x 249
(4/22/2008) Pam Bennett-Cumming - Site plan for bridge replacement Page 1
From: Pam Bennett-Cumming
To: neyhart@msn.com
Subject: Site plan for bridge replacement
Dear Mr. Neyhart:
Below is a copy of the text of a letter just sent to you regarding the need for a site plan.
"When planning staff conducted our site visit to discuss your proposed bridge repair,we indicated that you
would need to submit a site plan with the application. We understood later from you that you had later
submitted one with the additional bridge engineering required. Staff has spoken with Plans Examiner Rich
Balderston, and examined the case file. As of today we still do not have a site plan. Enclosed with this
letter is an example of what a site plan looks like. Distances can be represented as approximate. This
can be hand drawn. We suggest that in the interest of speed you fax us the plan at 360.427.8425. We
look forward to reviewing the plan and continuing review of your project."
So far we don't have any site plan at all. Below is a link to the county website, which has a description of
what should go on a site plan. Faxing would be the fastest way to get this to us. Right now this is what we
are waiting for in order to move forward. We hope you can get this in as soon as possible so your project
can be reviewed as quickly as possible.
http://www.co.mason.wa.us/forms/Community Dev/site plan.pdf
Thank you. pbc
CC: Gloria Rogers
T..
1 (4/22/2008) Pam Bennett-Cumming - No Neyhart site plan yet Page 1
From: Pam Bennett-Cumming
To: Gloria Rogers
Subject: No Neyhart site plan yet
Hi there,
I understand you are meeting with some folks out there on Friday. Had some interesting comments from
neighbors. (you too?)
I still have no site plan. Neyhart says he turned it in later with additional engineering but I reviewed the
plans file and spoke with our plan reviewer, and no, he didnt. I sent him this letter today:
"When planning staff conducted our site visit to discuss your proposed bridge repair, we indicated that you
would need to submit a site plan with the application. We understood later from you that you had later
submitted one with the additional bridge engineering required. Staff has spoken with Plans Examiner Rich
Balderston, and examined the case file. As of today we still do not have a site plan. Enclosed with this
letter is an example of what a site plan looks like. Distances can be represented as approximate. This
can be hand drawn. We suggest that in the interest of speed you fax us the plan at 360.427.8425. We
look forward to reviewing the plan and continuing review of your project."
Please let me know how the meeting goes on Friday, take care... parr
(4/7/2008) Grace Miller- Neyhart bridge HPA conditions Pagel J
From: Pam Bennett-Cumming
To: Gloria Rogers
Date: 4/3/2008 5:06 PM
Subject: Neyhart bridge HPA conditions
CC: Grace Miller
Hi there,
Since I will be out of town next week (April 7-11), 1 wanted you to know that I have
given the Neyhart file to Grace, in case you are ready to issue the HPA. Please connect
with her (cc me) to make sure she has the HPA conditions to put on the plan. Also, did
Neyhart give you a site plan so that you have something to mark up. We didnt get one,
so if there is one, mark it up and fax it to Grace too.
Thats all I know. I will be in New Mexico so not thinking about work at all. Take care,
pam
Pam Bennett-Cumming, M.E.S
Senior Planner - Water Resource Planning
Mason County Department of Community Development
411 North 5th
PO Box 279
Shelton, WA 98584
phone: (360) 427-9670 x287
fax: (360) 427-8425
email: pambc@co.mason.wa.us
(3/14/2008) Pam Bennett-Cumming =Re: Fwd ENF2008-00021 Page 1 I
From: "Gloria Rogers" <rogergsr@DFW.WA.GOV>
To: <JimSc@co.mason.wa.us>, <PamBC@co.mason.wa.us>,
<RyanC@co.mason.wa.us>
Date: 3/14/2008 3:51 PM
Subject: Re: Fwd: ENF2008-00021
Attachments: 111526-1 Neyhart.pdf
Hello All,
On 12/19/2007, Debbie Carnevali reviewed the site. Deb helped me out
on the Tahuya and Union Rivers during the storm. She issued an
expedited HPA on 12/21/2007. The expiration date was 1/15/2008. She
made it very clear to Doug that he was to contact the county to obtain
all of your permits.
I just happened to be at Doug's looking at a different project on 3/10
and had the chance to see the bridge project. I was surprise to see the
project had not been completed. Doug was informed that he must now
obtain all permits prior to any further work since an emergency no
longer exists. I will not issue the HPA until the SEPA process has been
completed by the county.
As far as the footings go, the toe of the footing on the right bank
(RB)seemed pretty substantial (wide) but it looked like it had been
placed as required in the HPA. I can look again. He was and will be
required to remove the old bridge and footings. The concrete blocks
were to be repositioned. The new permit will have him remove the blocks
now with the bridge/footings and then reinstall them during the work
window. He was also talking about constructing a footing and/or placing
riprap in front of them,just to give you a heads up.
All the above mentioned material will be removed and placed on the land
above the limits of the flood water...not on the banks nor on the flat
in the bend of the river! Also, he does not think he can remove the RB
footing. If it can not be lifted out, the footing may have to be
excavate down to the scour level then cut off.
Here is another heads up. DNR contacted me about a program to remove
the storm woody debris from agricultural lands. Doug has applied for
this help. Instead of burning all the woody material, I have suggested
the material be used to fill a scour hole just north of his training
track on the river's edge. Doug wanted to place riprap. This fix is
great for fish and is considered to be an bioengineering alternative to
riprap. A down stream log jam helped create the hole. Some of the
remaining logs will be swung around and the material placed behind them.
Some logs will be driven like piles to hold the material in place.
There is going to have to be a short turn around for this permit.
Equipment will be heading to Lewis County as soon as the muck dries out
a bit more, maybe as soon as three weeks. I have asked DNR to figure
out if they will be able to exempt the work otherwise we need to talk
and hopefully figure out something.
Due to past activities, the neighbors have been quite concerned with
the construction activities. You will probably receive some calls as
well.
I
(3/14/2008) Pam Bennett-Cumming - Re: Fwd: ENF2008-00021 _ - Page 2
Hope this information helps.
Gloria Rogers
Area Habitat Biologist
Washington Department of Fish and Wildlife
48 Devonshire Rd
Montesano, WA 98563
360-249-4628 x 249
>>>"Pam Bennett-Cumming"<PamBC@co.mason.wa.us> 3/13/2008 5:00 PM >>>
Wow! doesnt exactly look like he described it... but I knew it would
look bad,just not necessarily that gargantuan. I know he worked with
Gloria, and what I actually told him, since he told me he was able to
get a bridge THAT WEEKEND right after the flood, and his farm was cut
off from access and feed for the animals, was do what Gloria said about
putting the abutments back from the creek, and turn in the permits asap.
What I did NOT say was and if the bridge doesnt arrive, you dont have
to turn in permits yet. He needs to get started right now.
Not sure what the ecology blocks are for. He will definitely need
engineering for the bridge. He'll definitely need engineering (standard
procedure for a bridge project, even if a replacement of storm damage),
and if there is fill for the approaches, his engineer will have to show
that it doesn't increase the BFE for the floodway. The second I am
checking on....
Pam Bennett-Cumming, M.E.S
Senior Planner-Water Resource Planning
Mason County Department of Community Development
411 North 5th
PO Box 279
Shelton, WA 98584
phone: (360)427-9670 x287
fax: (360)427-8425
email: pambc@co.mason.wa.us
>>> Ryan Crater 3/13/2008 4:44 PM >>>
Pam and Jim see attached message.
Gloria -was an HPA issued for this work?
Land Use Planner/Code Enforcement
Mason County Department of Community Development
411 North 5th
PO BOX 279
Shelton, WA 98584
Phone#360-427-9670 ext. 577
Fax#360-427-8425
(3/18/2008) Pam Bennett Cumming - Neyhart Page 1
From: "Gloria Rogers" <rogergsr@DFW.WA.GOV>
To: <pambc@co.mason.wa.us>
Date: 3/18/2008 3:28 PM
Subject: Neyhart
Pam,
I don't have a problem with Doug using a crane to pull out the old
bridge, footings and blocks providing he fulfills your requirements.
I'll just issue another HPA for that. He must wait for the fish window
to replace any of the blocks because it sounds like he wants to muck
around.
have not heard back from DNR so frankly I do not know what's up with
that. It would be a great project. It would be a better project if
done during the fish window but it sounds like the program (equipment)
will not be available after several more weeks. If I can ever get in
touch with them, I'm going to try to see if there is any chance to do
the project later. I'll forward two emails which contain some
conceptual designs and ortho for this project to you. The idea is to
fill the scour hole with woody material and use pilings, etc to secure
the material in place.
It's Steven Griswold on the Burma Rd side. His contractor was hoping
to arrange a meeting for next Monday. If it's not yours could you
please let Jim know we need to coordinate a meeting. Thanks
Hope this helps. I'll be around the office tomorrow so pPlease call me
at 753-2600 x 249 at any time.
Gloria
(3/13/2008)Jim Scholz- ENF2008-00021- _ _.w _.__ __ ____�_ __,_.___._--- __--- "Page 1
From: Mindi Brock
To: Ryan Crater
Date: 3/13/2008 3:37 PM
Subject: ENF2008-00021
Attachments: P1010006.JPG; P1010002.JPG; P1010003.JPG; P1010004.JPG; P1010005.3PG; 2297
NE Tahuya River Rd_1.3PG
Hey Ryan
Attached are photos of bridge being constructed at 2297 NE Tahuya River Rd.,Tahuya. The owner(Doug?)said that he
was told by someone named Pam told him that he needed a permit until after the work was finished. Regardless,a permit
is needed,of course. He claims that he has a State Hydraulic permit and that the Fisheries has been monitoring his work
every week since December.
He was told to get a permit within 10 working days. We did not stop work him,so technically, no double fees from building
dept. .....yet.
The photos are attached.
Contact me if you have any questions.
Thanks- Mindi