HomeMy WebLinkAboutHPA- Bank and Bridge Armoring - PLN General - 9/3/2008 Ryan Crater 114047-1 Neyhart Bridge Protection.pdf Page 1�
Washington HYDRAULIC PROJECT APPROVAL Coastal
Departrrent of 48 Devonshire Road
FISH and RCW T7.55.021(AG) -Appeal to Hyraulic Appeals Board Montesano, WA 98563
WILDLIFE
(360)2434628
Issue Date:September 03, 2008 Control Number: 114047-1
Project Expiration Date: September 15, 2008 FPA/Publi c Notice#. N/A
PERMITTEE AUTHORIZED AGENT OR CONTRACTOR
Ney hart Farms
ATTENTION:Douglas Neyhart
2297 Tahuya River Road
Tahuya, WA 98588
Fax:206 623-5110
Project Name: Bank and Bridge Armoring
Project Description: Install bridge protection material.
PROVISION S
1. TIMING LIMITATIONS: The project may begin September 3,2008 and shall be completed by
September 15, 2008.
2. Work shall be accomplished per plans and specifications submitted to the Washington
Department of Fish and Wildlife (WDFW), entitled 'Bank Protection' dated August 1,2008, except
as modified bythis Hydraulic Project Approval. Acopy of these plans shall be available on site
during construction.
3. NOTIFICATION REQUIREMENT: The Area Habitat Biologist listed below shall receive written
notification (FAX or mail) from the person to whom this Hydraulic Project Approval (HPA) is issued
(permittee) orthe agent/contractor within seven days ofcompletion ofwork to arrange fora
compliance inspection. The notification shall include the permittee's name, project location, starting
date for work orcompletion date ofwork, and the control number for this HPA.
EQUIPMENT
4. Equipment used for this project shall operate stationed on the bank.
5. Equipment used for this project may operate below the ordinary high water line, provided the
drive mechanisms (wheels, tracks, tires, etc.) shall not enter oroperate in the water.
6. Equipment used for this project shall be free of external petroleum-based products while working
around the stream. Equipment shall be checked daily for leaks and any necessary repairs shall be
completed prior to commencing work activities along the stream.
7. Equipment crossings of the stream are not authorized by this HPA.
BANK AND BRIDGE PROTECTION
8. Bank protection work shall be restricted to work necessary to protect the bank adjacent to the
bridge and the bridge.
Page 1 of 5
Ryan Crater Page
- 114047-1 Neyhart Bridge Protectlon.pdf 2�
w
Washington HYDRAULIC PROJECT APPROVAL Coast
Department of 48 Devonshire Road
FISH and RCW 77.55.021(AG) -Appeal to Hyraulic Appeals Board Montesano, WA 985M
WILDLIFE (360)2434628
Issue Date:September 03, 2008 Control Number: 114047-1
Project Expiration Date: September 15, 2008 FPA/Publi c Notice It. N/A
9. Placement of bank protection material waterward of the ordinary high water line shall be
restricted to the minimum amount necessary to protect the toe of the bank.
10. The toe shall be installed to protect the integrity of bank protection material.
11. Bank sloping shall be accomplished in a manner that avoids release of overburden material
into the water. Overburden material resulting from the project shall be deposited so it will not re-
enter the water.
12. Bank protection material shall be clean, angular rock, and shall be installed to withstand 100-
year peak flows. Ecology blocks may be used in the transition between the existing ecology block
wall and the upstream edge of the bridge, and the downstream edge of the bridge next to the left
bank abutment for approximately 12 feet, and shall be installed to withstand 100-year peak flows.
River gravels orother round cobbles shall not be used asexterior armor.
13. Bank protection shall be placed from the bank. Dumping onto the bank face shall not be
permitted.
14. Bank protection material shall not constrict the flow and cause any appreciable increase (not to
exceed 0.2 feet) in backwater elevation (calculated atthe 100-year flood) orchannel-wide scour,
and shall be aligned to cause the least effect on the hydraulics of the stream.
15. Material that is waterward of the ordinary high water line shall not be utilized for backfill.
16. Excavated or dredged material shall not be stockpiled waterward of the ordinary high water
line.
17. All trenches, depressions, or holes created within the ordinary high water line shall be
backfilled prior to inundation by high water or wave action.
18. As part of the bank protection project to mitigate project impacts, removing the left bank
upstream sand bags and cement pieces falling down the bank is required.
WATER QUALITY
19. Prior to starting work, temporary filter fabric, or pea gravel-filled burlap bag check dam(s) shall
be installed around the work area. Accumulated sediments shall be removed during the project
and prior to removing the check dam(s) after completion of work.
20. Erosion control methods shall be used to prevent silt-laden water from entering the stream.
These may include, but are not limited to, straw bales, filter fabric, temporary sediment ponds,
check dams of pea gravel-filled burlap bags orother material, and/or immediate mulching of
exposed areas.
Page 2 of 5
Ryan Crater- 114047-1 Neyhart Bridge Protection.pdf
Page
Washington HYDRAULIC PROJECT APPROVAL Coastal
Department of 48 Devonshire Road
FISH and RCW T7.55.021(AG) -Appeal to Hyraulic Appeals Board Montesano, WA 911563
WILDLIFE (360)2434628
Issue Date:September 03, 2008 Control Number: 114047-1
Project Expiration Date: September 15, 2008 FPA/Publi c Notice#: N/A
21. If high flow conditions that may cause siltation are encountered during this project, work shall
stop until the flow subsides.
22. Extreme care shall be taken to ensure that no petroleum products, hydraulic fluid, sediments,
sedime nt-laden water, chemicals, orany other toxic ordeleterious materials are allowed to enter or
leach into the stream. This Hydraulic Project Approval does not authorize the use of cement.
23. Alteration ordisturbance of the bank and bank vegetation shall be limited to that necessary to
construct the project. Within seven calendar days of project completion, all disturbed areas shall be
protected from erosion using vegetation orother means. Within one year of project completion, the
banks shall be revegetated with native orother approved woody species.
24. If at any time, as a result of project activities, fish are observed in distress, a fish kill occurs, or
water quality problems develop (including equipment leaks or spills), immediately stop work except
for efforts to control leaks or spills or prevent toxic substances from entering the water and notify
the Washington Military Department's Emergency Management Division at 1-800-258-599 0,and to
the Area Habitat Biologist listed below. Work shall not restart on the project until approved by the
Area Habitat Biologist.
PROJEC TLOCATIONS
Location#1 Neyhart Farms
WORK START: September 03, 2008 IWORK END: September 15, 2008
WRIA: Waterbo dy: Tributary to:
15.04 46 ITahuya River Hood Canal
1/4 SEC: Section: ITow rr.Np: lRange: ILatitude: 1Longitude: County:
SW 1/4 �13 22 N 03 W N 47.39418 1W 123.01427 Maso n
Location#1 Driving Directions
From Belfair (Highway 3),go SW on Highway 300/North Shore Road 15 miles, cross bridge, take first right to
Tahuya/Betfair Road, go 1 mile, turn right on Tahuya River Road, 2 miles, turn right on the driveway right next to an
old kids bus shelter (now with garbage cans), go approx. 100'and take first driveway to the right. Go to the end of
road driveway.
APPLY TO ALL HYDRAULIC PROJECT APPROVALS
This Hydraulic Project Approval pertains only to those requirements of the Washington State Hydraulic Code,
specifically Chapter 77.55 RCW(formerly RCW 77.20). Additional authorization from other public agencies may be
necessary for this project. The person(s) to whom this Hydraulic Project Approval is issued is responsible for applying
for and obtaining any additional authorization from other public agencies (local, state and/or federal) that may be
necessary for this project.
Page 3 of 5
Ryan Crater - 114047-1 Neyhart Bridge Protection.pdf Page 4
Washington HYDRAULIC PROJECT APPROVAL coastal
Department of 48 Devonshire Road
FISH and RCW T7.55.021(AG) -Appeal 'o Hyraulic Appeals Board Montesano, WA 98563
WILDLIFE
(360)249-4628
Issue Date: September 03, 2008 Control Number: 114047-1
Project Expiration Date: September 15, 2008 FPA/Publi c Notice#: N/A
This Hydraulic Project Approval shall be available on the job site at all times and all its provisions followed by the
person(s) to whom this Hydraulic Project Approval is issued and operator(s) performing the work.
This Hydraulic Project Approval does not authorize trespass.
The person(s) to whom this Hydraulic Project Approval is issued and operator(s) performing the work may be held
liable for any loss or damage to fish life or fish habitat that results from failure to comply with the provisions of this
Hydraulic Project Approval.
Failure to comply with the provisions of this Hydraulic Project Approval could result in a civil penalty of up to one
hundred dollars per day and/or a gross misdemeanor charge, possibly punishable by fine and/or imprisonment.
All Hydraulic Project Approvals issued pursuant to RCW 77.55.021 (EXCEPT agricultural irrigation, stock watering or
bank stabilization projects) or 77.55.141 are subject to additional restrictions, conditions or revocation if the Department
of Fish and Wildlife determines that new biological or physical information indicates the need for such action. The
person(s) to whom this Hydraulic Project Approval is issued has the right pursuant to Chapter 34.04 RCW to appeal
such decisions. AJI agricultural irrigation, stock watering or bank stabilization Hydraulic Project Approvals issued
pursuant to RCW 77.55.021 may be modified by the Department of Fish and Wildlife due to changed conditions after
consultatio in with the person(s) to whom this Hydraulic Project Approval is issued: PROVIDED HOWEVER, that such
modification s shall be subject to appeal to the Hydraulic Appeals Board established in RCW 77.55.301.
APPEALS INFORMATION
If you wish to appeal the issuance or denial of,or conditions provided in a Hydraulic Project Approval, there are
informal and formal appeal processes available.
A INFORMAL APPEALS (WAC 220-110-340) OF DEPARTMENT ACTIONS TAKEN PURSUANT TO RCW 77.55.021,
77.55.141, 77.55.181, and 77.55.291: A person who is aggrieved or adversely affected by the following Department
action s may request an informal review of:
(A)The denial or issuance of a Hydraulic Project Approval, or the conditions or provisions made part of a Hydraulic
Project Approval; or
(B)An order imposing civil penalties. A request for an INFORMAL REVIEW shall be in WRITING to the Department
of Fish and Wildlife HPA Appeals Coordinator, 600 Capitol Way North, Olympia, Washington 98501-1091 and shall be
RECEIVED by the Department within 30 days of the denial or issuance of a Hydraulic Project Approval or receipt of an
order imposing civil penalties. If agreed to by the aggrieved party,and the aggrieved party is the Hydraulic Project
Approval applicant, resolution of the concems will be facilitated through discussions with the Area Habitat Biologist and
his/her supervisor. If resolution is not reached, or the aggrieved party is not the Hydraulic Project Approval applicant,
the Habitat Technical Services Division Manager or his/her designee shall conduct a review and recommend a decision
to the Director or his/her designee. If you are not satisfied with the results of this informal appeal, a formal appeal may
be filed.
B. FORMAL APPEALS (WAC 220-110-350) OF DEPARTMENT ACTIONS TAKEN PURSUANT TO RCW 77.55.021
(EXCEPT agricultural irrigation, stock watering or bank stabilization projects) or 77.55.291:
A person who is aggrieved or adversely affected by the following Department actions may request a formal review of:
(A)The denial or issuance of a Hydraulic Project Approval, or the conditions or provisions made part of a Hydraulic
Project Approval;
(B)An order imposing civil penalties, or
(C)Any other 'agency action' for which an adjudicative proceeding is required under the Administrative Procedure
Act,Chapter 34.05 RCW.
A request for a FORMAL APPEAL shall be in WRITING to the Department of Fish and Wildlife HPA Appeals
Coordinat or, shall be plainly labeled as'REQUEST FOR FORMAL APPEAL' and shall be RECEIVED DURING
OFFICE HOURS by the Department at 600 Capitol Way North, Olympia, Washington 98501-1091, within 30-days of
the Department action that is being challenged. The time period for requesting a formal appeal is suspended during
Page 4 of 5
Ryan Crater 114047-1 Neyhart Bridge Protectlon.pdf Page 5
A.Washington HYDRAULIC PROJECT APPROVAL coastal
Department of 48 Devonshire Road
FISH and RCW 77.55.021(AG) -Appeal to Hyraulic Appeals Board Montesano, WA 98563
WILDLIFE (360)249.4628
Issue Date:September 03, 2008 Control Number: 114047-1
Project Expiration Date: September 15, 2008 FPA/Publi c Notice*P. N/A
consideration of a timely informal appeal. If there has been an informal appeal, the deadline for requesting a formal
appeal shall be within 30tiays of the date of the Department's written decision in response to the informal appeal.
C. FORMAL APPEALS OF DEPARTMENT ACTIONS TAKEN PURSUANT TO RCW 77.55.021 (agricultural irrigation,
stock watering or bank stabilization only), 77.55.141, 77.55.181, or 77.55.241: A person who is aggrieved or adversely
affected by the denial or issuance of a Hydraulic Project Approval, or the conditions or provisions made part of a
Hydraulic Project Approval may request a formal appeal. The request for FORMAL APPEAL shall be in WRITING to
the Hydraulic Appeals Board per WAC 259-04 at Environmental Hearings Office,4224 Sixth Avenue SE, Building Two-
Rowe Six, Lacey, Washington 98504; telephone 360/459.6327.
D. FORMAL APPEALS OF DEPARTMENT ACTIONS TAKEN PURSUANT TO CHAPTER 43.21L RCW: A person
who is aggrieved or adversely affected by the denial or issuance of a Hydraulic Project Approval, or the conditions or
provisions made part of a Hydraulic Project Approval may request a formal appeal. The FORMAL APPEAL shall be in
accordance with the provisions of Chapter 43.21L RCW and Chapter 199-08 WAC. The request for FORMAL APPEAL
shall be in WRITING to the Environmental and Land Use Hearings Board at Environmental Hearings Office,
Environme ntal and Land Use Hearings Board, 4224 Sixth Avenue SE, Building Two-Rowe Six, P.O. Box 40903,
Lacey, Washington 98504; telephone 360/4596327.
E.FAILURE TO APPEAL WITHIN THE REQUIRED TIME PERIODS results in forfeiture of all appeal rights. Ifthere is
no timely request for an appeal, the department action shall be final and unappealable.
ENFORCEMENT: Sergeant Jackson (29) P1
Habitat Biologist for Director
Gloria Rogers 360-249-46 28 / A -- WDFW
CC: Mason County Department of Community Development (email)
Ryan Crater
P.O. Box 279
Shelton, WA98584
Page 5 of 5