HomeMy WebLinkAboutSEP2019-00039 Oil Stain Applicator - SEP Determinations - 6/4/2019 MASON COUNTY
Department of Community Services
Planning Division
615 W Alder St, Shelton WA 98584
lip, (360)427-9670
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-340)
SEP2019-00039
Description of Proposal: Installation of an oil stain applicator located within a
39,000 sf building (dry shed) near the western side of
the property. The applicator applies an oil-based
stain to fence boards. Addition of water lines, a fire
hydrant and sprinkler system to building.
Proponent: Alta Forest Products
Location of Proposal: 780 W State RT 108, Shelton
Parcel Number: 41924-00-00000
Legal Description: Section 24, Twn 19 N, R 4 W.
Directions to Site: 780 W St RT 108, Shelton.
Lead Agency: MASON COUNTY
The Lead Agency for this proposal has determined that it does not have a probably significant adverse
impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW
43.21C.030(2)(c).This decision was made after review of a completed Environmental Checklist and other
information on file with the Lead Agency. This information is available to the public upon request.
Please contact Grace Miller at ext. 360 with any questions. This DNS is issued under WAC 197-11-340(2).
The Lead Agency will not act on this proposal for 14 days from the date shown below, when the
determination is final. Comments must be submitted to Dept. of Community Development, 615 W Alder
St, Shelton WA 98584 by 6/18/2019. Appeal of this determination must be filed within a 14-day period
following this final determination date, per Mason County Code Chapter 15.11 Appeals.
Date: 6/4/2019
Authorized local Government Official
V,
DMA '
Page 1 of 1
Grace Miller - SEP2019-00039 Alta Forest Products
From: Mariah Frazier
To: Squaxin; WA Department of Ecology; Whybrew, Lauren
Date: 6/4/2019 4:17 PM
Subject: SEP2019-00039 Alta Forest Products
CC: Miller, Grace
Attachments: SEP2019-00039.pdf
Good Afternoon,
Please use the Mason County ftp site to access applicants SEPA and related documents.
ftp:H216.235.103.242
Username: DCD
Password: 1Plan*ning!
Files can be found in the directory named "Alta Forest Products", 3 pdf. files are within.
Please access these files as soon as you receive this email. If you are unable to open files, please let us
know in a timely manner. Site may not be accessible on hand held devices.
If you have any questions, please direct them to Planner Grace Miller at gbm@co.mason.wa.us.
Thank you,
Mari. Frani. r
Department of Community Development
Planning Clerical/Address Technician
615 W Alder St
Shelton, WA 98584
360.427.9670 ext 365
file:///C:/Users/gbm/AppData/Local/Temp/XPgrpwi se/5 CF69987Masonmai 11001673 76E 13... 6/5/2019
MASON COUNTY DCD SEPA Contact List
Sent SEPA you — 3 to (check all that apply) on �ti//y ol erce C`� ��
Skokomish Tribal Nation,Nat.Res.Dept. a WA Department of C
ATTN:Julian Sammons reviewteam@commerce.wa.gov
N 541 Tribal Center Rd.,Skokomish Nation,98584
jsammons@skokomish.org U.S.Army Corps of Engineers
dsarff@skokomiosh.org SEPA Reviewer-Jason Sweeney
Skokomish Tribal Historic Preservation Officer PO Box C-3755,Seattle,98124
ATTN: Kris Miller Jason.t.sweeney@usace.army.mil
80 N Tribal Center Rd,Skokomish Nation,98584
shlanay1@skokomish.org WA Dept.of Fish and Wildlife
Quinault Indian Nation SEPAdesk@dfw.wa.gov
ATTN: Mark Mobbs
PO Box 189,Tahola, 98587 r--j WA Dept.of Fish and Wildlife
mmobbs@quinault.org ATTN: ChrisWaldbillig
X I Squaxin Tribal Nation,Natural Res.Dept. 450 Port Orchard Blvd,Suite 290
2952 SE Old Olympic HWY,Shelton 98584 Port Orchard,WA 98366
jdickison@squaxin.us Chris.waldbillig@dfw.wa.gov
emarbet@squaxin.us
szaniewski@squaxin.us WA Dept.of Fish and Wildlife
rfoster@squaxin.us ATTN: Darrin Masters
The Confederated Tribe of the Chehalis 450 Port Orchard Blvd, Suite 290
ATTN: SEPA Reviewer-Glen Connelly Port Orchard,WA 98366
420 Howanut Rd., Oakville,98568 Darrin.Masters@dfw.wa.gov
gconnelly@chehalistribe.org
WA DNR,South Puget Sound Region WA Dept.of Fish and Wildlife
950 Farman Avenue N, Enumclaw,98022-9282 ATTN: Allison Cook
southpuget.region@dnr.wa.gov (Habitat Biologist-S Puget Sound Watershed)
WA DNR,Aquatic Resources 1111 Washington St SE,Olympia WA,98501
PO BOX 47027,Olympia, 98504-7027 allison.cook@dfw.wa.gov
and@dnr.wa.gov
WA DNR,SEPA Center F-1 WA Dept.of Transportation
ATTN: External Coordinator ATTN: Dale Severson
PO BOX 47015,Olympia,98504-7015 P.O. Box 47440, Olympia 98504-7440
sepacenter@dnr.wa.gov OR-SEPA-REVIEW@wsdot.wa.gov
Olympic Region Clean Air Agency
ATTN: Lauren Whybrew r--j City of Shelton
2940-B Limited Ln. NW,Olympia.98502 ATTN:Jason Dose
lauren.whybrew@orcaa.org 525 West Cota St.,Shelton 98584
E3Mason County Transit jasond@ci.shelton.wa.us
ATTN: Danette Brannin
790 E Johns Prairie Rd,Shelton,98584 0 Port of Shelton
dbrannin@masontransit.org ATTN: Brandon Palmer
Mason County PUD#1 21 West Sanderson Way,Shelton 98584
ATTN: Darrin Hall BrandonP@portofshelton.com
N 21971 Hwy 101, Shelton,98584
darrinh@mason-pud1.org Dep't of Archaeology&Historic Preservation
Mason County PUD#3 P.O.Box 48343,Olympia,98504-8343
ATTN: Kristin French SEPA@dahp.wa.gov
kristin.french@masonpud3.org
WA Department of Ecology Tacoma Public Utilities-Real Property Services
Environmental Review Section ATTN: Dave Letterman
PO BOX 47703, Olympia, 98504-7703 3628 S 35th St,Tacoma, 98409-3192
separegister@ecy.wa.gov dletterm@cityoftacoma.org
WA Department of Health
Mason Cty P.W,ATTN: ATTN:Joe Laxson
joe.laxson@doh.wa.gov
Q Mason Cty E.H.ATTN:
Other:
Q Mason Cty Bldg ATTN: Agent:
Applicant:
Q School District:
MC DCD last updated on 2/28/19
RECEIVE® t)P Z61 c}
HN, 01 2019
315 W. Aldpr c;trepE
SEPA ENVIRONMENTAL CHECKLIST °''01 � �
Purpose of checklist:
Governmental agencies use this checklist to help determine whether the environmental impacts of your
proposal are significant. This information is also helpful to determine if available avoidance, minimization
or compensatory mitigation measures will address the probable significant impacts or if an environmental
impact statement will be prepared to further analyze the proposal.
Instructions for applicants:
This environmental checklist asks you to describe some basic information about your proposal. Please
answer each question accurately and carefully, to the best of your knowledge. You may need to consult
with an agency specialist or private consultant for some questions. You may use "not applicable" or
"does not apply" only when you can explain why it does not apply and not when the answer is unknown.
You may also attach or incorporate by reference additional studies reports. Complete and accurate
answers to these questions often avoid delays with the SEPA process as well as later in the decision-
making process.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of
time or on different parcels of land. Attach any additional information that will help describe your proposal
or its environmental effects. The agency to which you submit this checklist may ask you to explain your
answers or provide additional information reasonably related to determining if there may be significant
adverse impact.
Instructions for Lead Agencies:
Please adjust the format of this template as needed. Additional information may be necessary to
evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse
impacts. The checklist is considered the first but not necessarily the only source of information needed to
make an adequate threshold determination. Once a threshold determination is made, the lead agency is
responsible for the completeness and accuracy of the checklist and other supporting documents.
Use of checklist for nonproject proposals:
For nonproject proposals (such as ordinances, regulations, plans and programs), complete the applicable
parts of sections A and B plus the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). Please
completely answer all questions that apply and note that the words "project,""applicant,"and "property or
site" should be read as "proposal," "proponent," and "affected geographic area," respectively.The lead
agency may exclude (for non-projects) questions in Part B - Environmental Elements—that do not
contribute meaningfully to the analysis of the proposal.
A. Background HELP
1. Name of proposed project, if applicable:
Oil Stain Project
2. Name of applicant:
Alta Forest Products
3. Address and phone number of applicant and contact person:
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 1 of 13
Dan Florek: 780 West SR 108,Shelton,WA 98584; 360-426-9721;
danflorek@altafp.com
4. Date checklist prepared:
4/22/2019
5. Agency requesting checklist:
Mason County Planning and Olympic Region Clean Air Ageny (ORCAA)
6. Proposed timing or schedule (including phasing, if applicable):
Spring 2019
7. Do you have any plans for future additions, expansion, or further activity related to or
connected with this proposal? If yes, explain.
No
8. List any environmental information you know about that has been prepared, or will be
prepared, directly related to this proposal.
None directly related to this proposal although the facility has a current and active
SWPPP.
9. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes, explain.
No
10. List any government approvals or permits that will be needed for your proposal, if known.
Mason County Permit, ORCAA Permit,Washington Department of Health
11. Give brief, complete description of your proposal, including the proposed uses and the size
of the project and site. There are several questions later in this checklist that ask you to
describe certain aspects of your proposal. You do not need to repeat those answers on this
page. (Lead agencies may modify this form to include additional specific information on project
description.)
The project includes the installation of an oil stain applicator located within a 39,000
square foot building(Dry Shed) near the western side of property. The applicator
applies an oil-based stain to fence boards. The project also includes the addition of
water lines,a fire hydrant,and sprinkler system to the buiding.
12. Location of the proposal. Give sufficient information for a person to understand the precise
location of your proposed project, including a street address, if any, and section, township, and
range, if known. If a proposal would occur over a range of area, provide the range or
boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic
map, if reasonably available. While you should submit any plans required by the agency, you
are not required to duplicate maps or detailed plans submitted with any permit applications
related to this checklist.
The facility is located at 780 West SR 108,Shelton,WA 98584. The entrance to the site
is located at the east end of the property. The project location is near the west end of
the developed portion of the property. The property is located in Range 4W,
Township 19N,Section 24.
B. Environmental Elements HELP
1. Earth
a. General description of the site:
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 2 of 13
(circle one): Flat oiling hilly, steep slopes, mountainous, other
b. What is the steepest slope on the site (approximate percent slope)?
15%
c. What general types of soils are found on the site (for example, clay, sand, gravel, peat,
muck)? If you know the classification of agricultural soils, specify them and note any
agricultural land of long-term commercial significance and whether the proposal results in
removing any of these soils.
The general site is dominated b sands and ravels. Ground disturbance related to
g Y g
this project will occur only for the addition of water lines.
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so,
describe.
No
e. Describe the purpose, type, total area, and approximate quantities and total affected area of
any filling, excavation, and grading proposed. Indicate source of fill.
Temporary trenching will occur for the new water line to the Dry Shed. Upon
completion,surface contours and type will be returned to the condition found prior to
the project start. Trenches will be backfilled with the material removed during
trenching.
f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe.
As with any contruction activity that includes excavation,some erosion could occur
during contstruction activities. The project will include best management practices
(BMPs)to mitigate erosion during excavation activities.
g. About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)?
The existing site, comprised of 2 parcels is approximately 25% impervious surface.
This will remain unchanged.
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any:
Standard BMPs for trenching will be utilized during applicable project phases.
Examples may include silt fences and straw wattles.
2. Air hel
a. What types of emissions to the air would result from the proposal during construction,
operation, and maintenance when the project is completed? If any, generally describe and
give approximate quantities if known.
Typical enigine emissions from equipment will occur during construction. Once
operational, some emmsions from the oil based stain will occur due to evaporation
from finished boards. However,this should be minimal as the applicator does not
atomize the stain during the staining process. Fence boards are fed into the applicator
where they are coated with stain as it is poured. Excess stain is scraped off the boards
before they leave the applicator. Stain within the applicator is recycled until it is used
completely. Stained boards, upon exiting the applicator,are stacked in units and
wrapped prior to leaving the roofed building.
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 3 of 13
b. Are there any off-site sources of emissions or odor that may affect your proposal? If so,
generally describe.
No
c. Proposed measures to reduce or control emissions or other impacts to air, if any.-
Stain is contained within the applicator. There are no additional control measures.
However,the building does contain fans for both ventilation and air circulation.
3. Water jhelpl
a. Surface Water: hf elpl
1) Is there any surface water body on or in the immediate vicinity of the site (including
year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe
type and provide names. If appropriate, state what stream or river it flows into.
An unnamed seasonal tributary flows along the western portion of the property.
Reitdorf Creek(WDFW Barrier Map) passes through the eastern portion of the
developed property. Reitdorf is a tributary of Skookum Creek, located south of the
site. Prior field review with WDFW staff indicates that both streams are Class 3.
Previous SEPA submittal indicates both streams are Type F.
2) Will the project require any work over, in, or adjacent to (within 200 feet) the described
waters? If yes, please describe and attach available plans.
No. The applicator is located in a roofed building. Additionally, it is greater than 200
feet from the seasonal stream located near the western portion of the property.
3) Estimate the amount of fill and dredge material that would be placed in or removed
from surface water or wetlands and indicate the area of the site that would be affected.
Indicate the source of fill material.
None
4) Will the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate quantities if known.
No
5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan.
No
6) Does the proposal involve any discharges of waste materials to surface waters? If so,
describe the type of waste and anticipated volume of discharge.
No
b. Ground Water: h1 elpl
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 4 of 13
1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so,
give a general description of the well, proposed uses and approximate quantities
withdrawn from the well. Will water be discharged to groundwater? Give general
description, purpose, and approximate quantities if known.
The project includes the expansion of the existing fire suppression system at the site. The
site utilizes a well and holding tank for fire suppression. The well is located near the
western boundary of the property. The project will not increase groundwater extraction
other than to charge the additional piping(or in the event vnetused for an emergency or
testing). No discharges to groundwater are anticipated.
2) Describe waste material that will be discharged into the ground from septic tanks or
other sources, if any (for example: Domestic sewage; industrial, containing the
following chemicals. . . ; agricultural; etc.). Describe the general size of the system, the
number of such systems, the number of houses to be served (if applicable), or the
number of animals or humans the system(s) are expected to serve.
No new discharges are planned as part of this proposal
c. Water runoff(including stormwater):
1) Describe the source of runoff(including storm water) and method of collection
and disposal, if any (include quantities, if known). Where will this water flow?
Will this water flow into other waters? If so, describe.
Water runoff will not be effected by the project. Impervious vs. pervious condtions at
the site will not be permanently changed as a result of the project. The site has an
existing and current SWPPP on site as a condition of the Industrial General Stormwater
Permit administered by the Washington State Department of Ecology.
2) Could waste materials enter ground or surface waters? If so, generally describe.
Leaks or spills from construction equimpment could potentially enter ground or surface
waters. Spill containment equipment should be located near construction activities in
the event of a release.
3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If
so, describe.
No
d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage
pattern impacts, if any:
BMP's in place for conditions encountered during construction. After construction,
runoff and drainage will not be effected by the project.
4. Plants p,,iI i
a. Check the types of vegetation found on the site:
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 5 of 13
... .. . .. _ ...
x deciduous tree: alder, maple, aspen, other
x evergreen tree: fir, cedar, pine, other
x shrubs
x grass
pasture
crop or grain
Orchards, vineyards or other permanent crops.
wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
water plants: water lily, eelgrass, milfoil, other
other types of vegetation
b. What kind and amount of vegetation will be removed or altered?
Trencing in vegetated areas will temporarily disturb vegetation within the excavation.
Such areas will be restored to surface conditons similar to pre-excavation.
c. List threatened and endangered species known to be on or near the site.
None known to be on or near the site.
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance
vegetation on the site, if any:
None
e. List all noxious weeds and invasive species known to be on or near the site.
Himalayan Blackberry
5. Animals [hel
a. List any birds and other animals which have been observed on or near the site or are known
to be on or near the site.
birds: hawk,eagle,songbirds
mammals: deer
fish: salmon
b. List any threatened and endangered species known to be on or near the site.
None known
c. Is the site part of a migration route? If so, explain.
No
d. Proposed measures to preserve or enhance wildlife, if any:
The majority of this project is in a active operating area. Changes to habitat will not
occur.
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 6 of 13
e. List any invasive animal species known to be on or near the site.
None
6. Energy and Natural Resources 111g1pJ
a. What kinds of energy (electric, natural gas, oil, wood stove, solar)will be used to meet
the completed projects energy needs? Describe whether it will be used for heating,
manufacturing, etc.
The equipment installed will be electrically powered. Equipment includes fans, pumps
and wood handling equipment.
b. Would your project affect the potential use of solar energy by adjacent properties?
If so, generally describe.
No,the equipment is housed in an existing building.
c. What kinds of energy conservation features are included in the plans of this proposal?
List other proposed measures to reduce or control energy impacts, if any:
Indoor lighting in the Dry Shed utilizes energy efficient light bulbs.
7. Environmental Health LhelO
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk
of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal?
If so, describe.
No. The coating process is housed indoors. The coated boards are kept indors until
dry and then wrapped before moving the products to outside storage. The oil-base
coater has a built-in secondary containment for the totes of stain.
1) Describe any known or possible contamination at the site from present or past uses.
None
2) Describe existing hazardous chemicals/conditions that might affect project development
and design. This includes underground hazardous liquid and gas transmission pipelines
located within the project area and in the vicinity.
None known in the area
3) Describe any toxic or hazardous chemicals that might be stored, used, or produced
during the project's development or construction, or at any time during the operating
life of the project.
The proposed process uses water based stain followed by oil-based stain.
4) Describe special emergency services that might be required.
The proposed process
5) Proposed measures to reduce or control environmental health hazards, if any:
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 7 of 13
I
b. Noise
1) What types of noise exist in the area which may affect your project (for example:
traffic, equipment, operation, other)?
The staining process will cause less noise than existing mill operations. The stain
applicators will be house in an existing buildings. The boards will be delivered and
removed using forklifts.
2) What types and levels of noise would be created by or associated with the project on a
short-term or a long-term basis (for example: traffic, construction, operation, other)? Indi-
cate what hours noise would come from the site.
The staining process will cause less noise than existing mill operations.
3) Proposed measures to reduce or control noise impacts, if any:
The stain applicators will be house in an existing buildings. Low speed fans will be used
to circulate ambient indoor air to assist in drying the water based stain.
8. Land and Shoreline Use hI e
a. What is the current use of the site and adjacent properties? Will the proposal affect current
land uses on nearby or adjacent properties? If so, describe.
The current land use is Commercial, Mason County lists the land use and "24-Commercial—
Lumber and Wood"and "88 - Resource - Designated Forest Land".
The property has been used and a mill site for decades and will be for the forseeable
future. Adjoining properties are Resource and railroad right-of-way.
b. Has the project site been used as working farmlands or working forest lands? If so, describe.
How much agricultural or forest land of long-term commercial significance will be converted to
other uses as a result of the proposal, if any? If resource lands have not been designated,
how many acres in farmland or forest land tax status will be converted to nonfarm or
nonforest use?
The mill site is in a forested area, it may have been forested before the initial
development. This project is located inside existing buildings and will not change the
usage of any land.
1) Will the proposal affect or be affected by surrounding working farm or forest land normal
business operations, such as oversize equipment access, the application of pesticides,
tilling, and harvesting? If so, how:
The project will not affect or be affected by adjacent land use, the proposed process is
enclosed in existing buildings.
c. Describe any structures on the site.
The existing structures are large scale mill and warehouse buildings.
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 8 of 13
d. Will any structures be demolished? If so, what?
No demolitions will take place.
e. What is the current zoning classification of the site?
Rural Natural Resource-RNR
f. What is the current comprehensive plan designation of the site?
Rural Area
g. If applicable, what is the current shoreline master program designation of the site?
N/A-The project is not within 200 feet of the waters of the State.
h. Has any part of the site been classified as a critical area by the city or county? If so, specify.
No
i. Approximately how many people would reside or work in the completed project?
None
j. Approximately how many people would the completed project displace?
None
k. Proposed measures to avoid or reduce displacement impacts, if any:
None
L. Proposed measures to ensure the proposal is compatible with existing and projected land
uses and plans, if any:
The work is permitted with help from the Mason County Planning Department. The
proposal is inside existing structures and is compatible with the current use.
m. Proposed measures to reduce or control impacts to agricultural and forest lands of long-term
commercial significance, if any:
None
9. Housing pit 11))
a. Approximately how many units would be provided, if any? Indicate whether high, mid-
dle, or low-income housing.
None
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low-income housing.
None
c. Proposed measures to reduce or control housing impacts, if any:
N/A
10. Aesthetics [[)uip]
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 9 of 13
a. What is the tallest height of any proposed structure(s), not including antennas; what is
the principal exterior building material(s) proposed?
N/A,the project is indoors.
b. What views in the immediate vicinity would be altered or obstructed?
N/A
b. Proposed measures to reduce or control aesthetic impacts, if any:
N/A
11. Light and Glare hf elpl
a. What type of light or glare will the proposal produce? What time of day would it mainly
occur?
None,the proposed process is indoors.
b. Could light or glare from the finished project be a safety hazard or interfere with views?
No
c. What existing off-site sources of light or glare may affect your proposal?
None
d. Proposed measures to reduce or control light and glare impacts, if any:
N/A
12. Recreation hf elpl
a. What designated and informal recreational opportunities are in the immediate vicinity?
N/A
b. Would the proposed project displace any existing recreational uses? If so, describe.
N/A
c. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any:
N/A
13. Historic and cultural preservation hf elpl
a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years
old listed in or eligible for listing in national, state, or local preservation registers ? If so,
specifically describe.
No
A review of available databases identified a local pioneer cemetery:
Kamilchie Cemetery, 90 W State Route 108, Kamilchie,WA
While Google maps places that address approximately 800 feet south of the rail line
on the southern boundary of the property,the Washington Information System for
Architectural &Archaeological Records Data (WISAARD)GIS database describes the
location: "This rural cemetery is located on the north side of State Route 108, near its
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 10 of 13
intersection with Highway 101. The cemetery is located in an increasingly heavily
developed commercial area,and is surrounded by various businesses and other
establishments. It is relatively small in area,approximately an acre. . ." Given this
description,the cemetery is approximately one mile west of the Property. No
additional sites were identified in the vicinity of the mill.
b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation?
This may include human burials or old cemeteries. Are there any material evidence, artifacts,
or areas of cultural importance on or near the site? Please list any professional studies
conducted at the site to identify such resources.
No
c. Describe the methods used to assess the potential impacts to cultural and historic resources
on or near the project site. Examples include consultation with tribes and the department of
archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc.
Visual observation of the site
d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance
to resources. Please include plans for the above and any permits that may be required.
If anything is found that may be cultural or historic,work will stop immediately and
the appropriate entitiys/agencies will be notified.
14. Transportation tjjel
a. Identify public streets and highways serving the site or affected geographic area and
describe proposed access to the existing street system. Show on site plans, if any.
SR 108. Access and traffic load/patterns will not be influenced by the project.
b. Is the site or affected geographic area currently served by public transit? If so, generally
describe. If not, what is the approximate distance to the nearest transit stop?
MTA generally serves the Mason County area and has a transit stop approximately
0.75 miles away at the Squaxin Island Casino.
c. How many additional parking spaces would the completed project or non-project proposal
have? How many would the project or proposal eliminate?
N/A
d. Will the proposal require any new or improvements to existing roads, streets, pedestrian,
bicycle or state transportation facilities, not including driveways? If so, generally describe
(indicate whether public or private).
No
e. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air
transportation? If so, generally describe.
There is a rail line to the south of the property. The project will not influence rail
traffic or rail line use.
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 11 of 13
f. How many vehicular trips per day would be generated by the completed project or proposal?
If known, indicate when peak volumes would occur and what percentage of the volume would
be trucks (such as commercial and nonpassenger vehicles). What data or transportation
models were used to make these estimates?
No additional vehicular traffic is anticipated as a result of the project.
g. Will the proposal interfere with, affect or be affected by the movement of agricultural and
forest products on roads or streets in the area? If so, generally describe.
No
h. Proposed measures to reduce or control transportation impacts, if any:
N/A
15. Public Services [helpi
a. Would the project result in an increased need for public services (for example: fire protection,
police protection, public transit, health care, schools, other)? If so, generally describe.
No
b. Proposed measures to reduce or control direct impacts on public services, if any.
N/A
16. Utilities 11,::ip1
a. C
lectricity, natural gas, water, refuse service, telephon sanitary sewe(ED
other
c. Describe the utilities that are proposed for the project, the utility providing the service,
and the general construction activities on the site or in the immediate vicinity which might
be needed.
The project will include the addition of water piping at the site for the purpose of fire
protection. Additionally, alterations to existing electrical systems to acoomodate the
addition of the oil applicator, located in the Dry Shed building, near the west end of
the property.
C. Signature HELP
The above answers are true and complete to the best of my knowledge. I understand that the
lead agency is relying on them to make its decision.
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 12 of 13
Signature: ilia
Name of signee �^
Position and Agency/Organization IZIl/
Date Submitted: U I Z
SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 13 of 13
EX15T'G. 1
UNLIMITED BLDG. 0
YARD
2/01-011
I�SG� SG! 1 O4'-O" - - - - - - - -
�5EPER -
C�. #2 ALLTIO C . Ol n
01(
--ARE-A t1511 AREA " Alt ,
23,400 E FT. 15kOO 50.' FT.
V, V S¢-
1�0
rA,ockt n,1- 1 1/2 HR FIRE
5+or454r- -0/;1 DOOR5
UNLIMITED
YARD -1 O'-Ott
201 -011 &01-011 150'-0►'
UNLIMITED
YARD
SITE F1.... AN
011
ILn/n
HTDRA4T WYDRAIT OIL HOUSE
?`6` 320 SF
!fir OPF" ._ _ - VE7p00 9F
23,00 6F -_
SPRINKLER �`-
VALVE
MANOR"ILL -FIRE WALL SHOP
FIRE SUPPRESSION 22P005r
WATER TANK .3O0 BF
TEST
FIRE PUMP HOUSE STdJD 50000 SF -500 Al;ON
t FUEL STORAGE //' fi WE TANK
^`~~ D000 EG LLM IE
7
�—•���J HYDRANT--rJ-1 �„----._
J
PAGKAC NG kr
26000`✓"� -
m@
P
m � i
PROPOSED
HYDRANT STORAGE
S s3
3?,000 00 � 61
425 PT TOTAL
UNDERGROUND I
FIRE LINE TO
HYDRANT
\` no
\ 0 50' t00' 200,
ALTA FSIiELTOp wRODUCTS
SITE PUN
"""„�' " °"'µ""''• '° PROPOSED FIRE HYDRANT ADDITION
sow¢K ro,.Yaeuco r�0.vu, pR�. q,w wR 5
rw ue.uiicu nrmaiprisr ter.iousi wxun `r— wn us rt uur e60-0 184g�— Q 1
Mason County WA GIS Web Map
At I Al
t
,ZAP
,, f ,fir 'may• i '
i
�(, is . ...ter. • 1 � - .�� S J. y �.f• �v.� r � r.
` 4 _
• � F
'r •gip -
A /►'-. -
of
#4
#4
6/4/2019 3:31:37 PM 1:3,077
0 0.03 0.05 0.1 mi
County Boundary
0 0.04 0.08 0.16 km
Cl Tax Parcels (Zoom in to 1-30,000)
Esri, HERE, Gannin, (c) OpenStreetMap contributors, and the GIS user
community, Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographies,
CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User
Community
Mason County WA GIS Web Map Application
Richard Diaz I Earthstar Geographies I Esri,HERE,Garmin