Loading...
HomeMy WebLinkAboutSkookum Lumber Drainage Plan - PLN General - 10/25/1993 MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER Shelton, Washington 98584 October 25, 1993 INTER-DEPARTMENTAL COMMUNICATIONS DATE TO: _ DON BRUSH, Shoreline Planner - DCD FROM: ALAN A. TAHJA, Office Tech. - P/W 1 SUBJ: Skookum Lumber Drainage Plan Don, I have reviewed the proposed drainage plan for the two Skookum Lumber Company replacement buildings and have been in contact with "Larry" from Floyd Brown's office. I was informed that the pond depicted on their proposal is an existing facility complete with a weir discharge structure. The pipe sizes appear to be adequate. Since the existing pond was apparently adequate for the destroyed structure, I feel it is acceptable as an interim facility until the more complete comprehensive storm drainage system is designed and built. 4. 4==]V,r_ ALANf A. TAHJA File: H:\WP\LETTERS\SKOOK.DRN