Loading...
HomeMy WebLinkAboutGrading Plan Review for GRD2002-00002 - GRD Engineering / Geo-Tech Reports - 2/5/2002 1" MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER Shelton,Washington 98584 DATE: February 5 h, 2002 INTER-DEPARTMENTAL COMMUNICATIONS TO: Tammy Griffey,PAC—Building Inspector FROM: Alan A. Tahja, P/W - Co. Hydr. Engr. WO# BLD-02 SUBJ: Grading Plan Review NAME: McNeil grading g Mickelson Rd GRD2002-00002 I've received and reviewed the materials submitted to PublicWorks pertaining to the McNeil grading proposal located at the corner of the Mason Lake Rd and the Mickelsen Rd. I also visited the site this afternoon with Bill Tabor,Public Work's Deputy Director. The proposal appears to be to fill in the depression on the westerly(opposite side of property from the Mickelsen Rd) side of the property with 2 to 3' of fill material. The plan accompanying the application indicates a"slight depression"to the west and north of the property. Not shown on the plan is an 18"corrugated culvert pipe crossing the Mason Lake Road in the vicinity of the "Bus Stop" shown on the site plan. The property and topography around the McNeil property is fairly flat,making it difficult to determine exactly where stormwater runoff flows through the neighborhood during large storm events. I walked around the back of the property along the Mickelsen Road to see where water would flow or escape in that direction, and feel the farm property to the north&west of the McNeil property is situated in a closed depression which relies on surface runoff escaping the area by way of the depression through the McNeil property and the Mason Lake Road culvert. The whole area is pretty flat, and the water elevation will have to be fairly deep on the farm property for it to escape thru the Mason Lake Road culvert,but still, I feel it is it's only escape from the neighborhood. Runoff flow to the north appears to be effectively stopped by the Mason Lake Road. I feel the depression on the McNeil property is a natural and necessary drainage feature serving much of the area north of the Mason Lake Road, and westerly of the Mickelsen Road, and should not be eliminated, The fill may be pursued,but the drainage of surrounding properties should not be altered, and I would recommend incorporating a large culvert or ditch into the site's development to preserve the existing-drainage. Please feel free to contact me at County extension 461 if you have any questions regarding these comments, or if you feel this proposal needs further Public Works consideration. Sincerely, )WAAA 4 Alan A. Tahj a File: H:\WP\GEO\McNeil.doc 0 WORK ORDER - PUBLIC WORKS DEPT. V4 Date: (p Work Order PERMIT#: C—I[Zn Number= _ Requested by: • Authorized by: Date: Type of Work: 00 9 •�n- az- -g-uw 11I)t, CHARGE TO: NAME AGENCY/COMPANY J BILLING ADDRESS PHONE kki (B) Pub. Works Person in Charge: ............. (c) Project Time Line: (from-to date-) TFAA TO Project SW date: Z tJZ Estimated Fkgsh Date: ESTIMATED TOTAL SS: Approximate hovs: COST ESTIMATE (D) QA12 —Employee IRA, H2-ua Subtotal FrInge% TOTAL$ BAIE TOTAL SS EQUIPMENT USED: MATERIAL USED: ---- --- ... (F) Actual Cost $ BARS: PROD DATE Employee WORKED —Name >L 4 Hours Subtoftl Frinoe% TOTAL$ EQUIPMENT USED: to Unit Rate TOTAL M MATERIAL USED: TOTAL ALL (G) BILLED DATE INV I PAID DATE REC.0 CKAI