Loading...
HomeMy WebLinkAboutHPA COM2024-00085 - COM Permit / Conditions - 10/23/2024 Washington Department of Fish&Wildlife HYDRAULIC PROJECT APPROVAL PO Box43234 Olympia,WA 98504-3234 (360)902-2200 Issued Date: October 23, 2024 Permit Number: 2024-6-400+01 Project End Date: December 23, 2024 FPA/Public Notice Number: N/A Application ID: 36391 PERMITTEE AUTHORIZED AGENT OR CONTRACTOR Glyn Ayr Resort Integrated NW Construction, LLC. ATTENTION: Taylor Jacobs ATTENTION: Caralyn Valdeman 25381 US-101 60 N LAKE CUSHMAN RD, SUITE 109 hoodsport, WA 98548 hoodsport, WA 98548-4529 Project Name: Glyn Ayr Emergency Dock Repair Project Description: Glyn Ayr Resort dock is made of several floats attached via a cable system. During a storm event, the dock was damaged, and on 10/22/2024 the cable system broke, detaching the floats. This project is to resecure the float components via a different system, to prevent impacts from collisions with the other dock pieces or boats. to do this they will: -Install Hewitt 6 Transition Plates, 4' L x VW and replace all rotted fascia and other lumber where transition plates will be installed with untreated AYC (Alaskan Yellow cedar)on ends of dock and install 12 Sea Power Marine Stabilizer Pile Guides, 3' H x 16" Diameter, 5 in internal locations and 7 in external locations along the float to secure the float components to each other and to the piles to prevent the float from breaking apart in storms. PROVISIONS EMERGENCY REQUIREMENTS 1. This permit authorizes only the work necessary to address the emergency condition, which includes installing 12 pile guides, 6 transition plates, and replacing the wood fascia they are attached to. 2. Within 60 days, the applicant must arrange an onsite meeting with the WDFW Habitat Biologist to determine if mitigative actions are needed including but not limited to the removal of emergency response measures. 3. In compliance with WAC 220-660-050(4)(e), within 90 days of completion of work, all remaining impacts must be mitigated or a mitigation plan must be submitted to the Department for approval. 4. Emergency response measures installed that do not meet current WAC standards must be removed and the site restored within 90 days, unless an alternative mitigation plan is approved by the Department.' Note: Removal and restoration must be done in compliance with WAC and an HPA for work must be obtained. 5. All work contained in the mitigation plan must be completed following the timelines identified in the approved mitigation plan. 6. The WDFW Habitat Biologist and HPAapplications@dfw.wa.gov must be notified when work authorized under this permit has been completed. TIMING- PLANS 7. Emergency work is authorized to begin immediately and must be completed by December 23, 2024. 8. Follow plans shown in the documents titled, Glen Ayr Resort Site Plan_10.22.24.pdf', received on October 23, 2024, and verbally approved. 9. Submit finished plans to the Washington Department of Fish and Wildlife within 60 days of completion of work, documenting the emergency work that was conducted. Page 1 of 4 Washington Department of Fish&Wildlife HYDRAULIC PROJECT APPROVAL PO Box43234 Olympia,WA 98504-3234 FISFI�e{fTLDLlFE (360)902-2200 Issued Date: October 23, 2024 Permit Number: 2024-6-400+01 Project End Date: December 23, 2024 FPA/Public Notice Number: N/A Application ID: 36391 PIER, RAMP AND FLOAT 10. This approval is for the repair/replacement of the existing structure only and does not authorize the expansion of the structure. 11. Do not construct skirting, including batter fencing, around piers, docks or floats. 12. Use of treated wood for decking is not authorized but may be used for structural elements. Treated wood subject to abrasion by vessels, floats, or other objects must incorporate approved design features such as rub strips to minimize abrasion of the wood. Use of tires is not approved unless proper post-treatment for aquatic environments is performed. LOCATION#1: Site Name: Glyn Ayr Resort Floating Dock 25381 US-101, hoodsport,WA 98548 WORK START: October 23, 2024 WORK END: December 23, 2024 WRIA Waterbody: Tributary to: 16-Skokomish-Dosewallips Wria 16 Marine 9803 1/4 SEC: Section: Township: Range: Latitude: Longitude: Coun : 01 22 N 04 W 47.420539 -123.130114 Mason Location#1 Driving Directions APPLY TO ALL HYDRAULIC PROJECT APPROVALS This Hydraulic Project Approval pertains only to those requirements of the Washington State Hydraulic Code, specifically Chapter 77.55 RCW. Additional authorization from other public agencies may be necessary for this project. The person(s)to whom this Hydraulic Project Approval is issued is responsible for applying for and obtaining any additional authorization from other public agencies (local, state and/or federal)that may be necessary for this project. This Hydraulic Project Approval shall be available on the job site at all times and all its provisions followed by the person (s)to whom this Hydraulic Project Approval is issued and operator(s)performing the work. This Hydraulic Project Approval does not authorize trespass. The person(s)to whom this Hydraulic Project Approval is issued and operator(s)performing the work may be held liable for any loss or damage to fish life or fish habitat that results from failure to comply with the provisions of this Hydraulic Project Approval. Failure to comply with the provisions of this Hydraulic Project Approval could result in civil action against you, including, but not limited to, a stop work order or notice to comply, and/or a gross misdemeanor criminal charge, possibly punishable by fine and/or imprisonment. Page 2 of 4 Washington Department of Fish&Wildlife HYDRAULIC PROJECT APPROVAL PO Box 43234 Olympia,WA 98504-3234 (1�11,_ {171.ULIFt_ (360)902-2200 Issued Date: October 23, 2024 Permit Number: 2024-6-400+01 Project End Date: December 23, 2024 FPA/Public Notice Number: N/A Application ID: 36391 All Hydraulic Project Approvals issued under RCW 77.55.021 are subject to additional restrictions, conditions, or revocation if the Department of Fish and Wildlife determines that changed conditions require such action. The person(s) to whom this Hydraulic Project Approval is issued has the right to appeal those decisions. Procedures for filing appeals are listed below. MINOR MODIFICATIONS TO THIS HPA: You may request approval of minor modifications to the required work timing or to the plans and specifications approved in this HPA unless this is a General HPA. If this is a General HPA you must use the Major Modification process described below. Any approved minor modification will require issuance of a letter documenting the approval. A minor modification to the required work timing means any change to the work start or end dates of the current work season to enable project or work phase completion. Minor modifications will be approved only if spawning or incubating fish are not present within the vicinity of the project. You may request subsequent minor modifications to the required work timing. A minor modification of the plans and specifications means any changes in the materials, characteristics or construction of your project that does not alter the project's impact to fish life or habitat and does not require a change in the provisions of the HPA to mitigate the impacts of the modification. If you originally applied for your HPA through the online Aquatic Protection Permitting System (APPS), you may request a minor modification through APPS. A link to APPS is at http://wdfw.wa.gov/licensing/hpa/. If you did not use APPS you must submit a written request that clearly indicates you are seeking a minor modification to an existing HPA. Written requests must include the name of the applicant, the name of the authorized agent if one is acting for the applicant, the APP ID number of the HPA, the date issued, the permitting biologist, the requested changes to the HPA, the reason for the requested change, the date of the request, and the requestor's signature. Send by mail to: Washington Department of Fish and Wildlife, PO Box 43234, Olympia, Washington 98504-3234, or by email to HPAapplications@dfw.wa.gov. You should allow up to 45 days for the department to process your request. MAJOR MODIFICATIONS TO THIS HPA: You may request approval of major modifications to any aspect of your HPA. Any approved change other than a minor modification to your HPA will require issuance of a new HPA. If you originally applied for your HPA through the online Aquatic Protection Permitting System (APPS), you may request a major modification through APPS. A link to APPS is at http://wdfw.wa.gov/licensing/hpa/. If you did not use APPS you must submit a written request that clearly indicates you are requesting a major modification to an existing HPA. Written requests must include the name of the applicant, the name of the authorized agent if one is acting for the applicant, the APP ID number of the HPA, the date issued, the permitting biologist, the requested changes to the HPA, the reason for the requested change, the date of the request, and the requestor's signature. Send your written request by mail to: Washington Department of Fish and Wildlife, PO Box 43234, Olympia, Washington 98504-3234. You may email your request for a major modification to HPAapplications@dfw.wa.gov. You should allow up to 45 days for the department to process your request. APPEALS INFORMATION If you wish to appeal the issuance, denial, conditioning, or modification of a Hydraulic Project Approval (HPA), Washington Department of Fish and Wildlife (WDFW) recommends that you first contact the department employee who issued or denied the HPA to discuss your concerns. Such a discussion may resolve your concerns without the need for further appeal action. If you proceed with an appeal, you may request an informal or formal appeal. WDFW encourages you to take advantage of the informal appeal process before initiating a formal appeal. The informal appeal process includes a review by department management of the HPA or denial and often resolves issues faster and with less legal complexity than the formal appeal process. If the informal appeal process does not resolve your concerns, you may advance your appeal to the formal process. You may contact the HPA Appeals Coordinator at(360)902-2534 for more information. Page 3 of 4 Washington Department of Fish&Wildlife HYDRAULIC PROJECT APPROVAL PO Box 43234 Olympia,WA 98504-3234 FISH 9RDLIFE (360)902-2200 Issued Date: October 23, 2024 Permit Number: 2024-6-400+01 Project End Date: December 23, 2024 FPA/Public Notice Number: N/A Application ID: 36391 A. INFORMAL APPEALS: WAC 220-660-460 is the rule describing how to request an informal appeal of WDFW actions taken under Chapter 77.55 RCW. Please refer to that rule for complete informal appeal procedures. The following information summarizes that rule. A person who is aggrieved by the issuance, denial, conditioning, or modification of an HPA may request an informal appeal of that action. You must send your request to WDFW by mail to the HPA Appeals Coordinator, Department of Fish and Wildlife, Habitat Program, PO Box 43234, Olympia, Washington 98504-3234; e-mail to HPAapplications@dfw.wa.gov;fax to(360)902-2946; or hand-delivery to the Natural Resources Building, 1111 Washington St SE, Habitat Program, Fifth floor. WDFW must receive your request within 30 days from the date you receive notice of the decision. If you agree, and you applied for the HPA, resolution of the appeal may be facilitated through an informal conference with the WDFW employee responsible for the decision and a supervisor. If a resolution is not reached through the informal conference, or you are not the person who applied for the HPA, the HPA Appeals Coordinator or designee may conduct an informal hearing or review and recommend a decision to the Director or designee. If you are not satisfied with the results of the informal appeal, you may file a request for a formal appeal. B. FORMAL APPEALS: WAC 220-660-470 is the rule describing how to request a formal appeal of WDFW actions taken under Chapter 77.55 RCW. Please refer to that rule for complete formal appeal procedures. The following information summarizes that rule. A person who is aggrieved by the issuance, denial, conditioning, or modification of an HPA may request a formal appeal of that action. You must send your request for a formal appeal to the clerk of the Pollution Control Hearings Boards and serve a copy on WDFW within 30 days from the date you receive notice of the decision. You may serve WDFW by mail to the HPA Appeals Coordinator, Department of Fish and Wildlife, Habitat Program, PO Box 43234, Olympia, Washington 98504-3234; e-mail to HPAapplications@dfw.wa.gov;fax to(360)902-2946; or hand-delivery to the Natural Resources Building, 1111 Washington St SE, Habitat Program, Fifth floor. The time period for requesting a formal appeal is suspended during consideration of a timely informal appeal. If there has been an informal appeal, you may request a formal appeal within 30 days from the date you receive the Director's or designee's written decision in response to the informal appeal. C. FAILURE TO APPEAL WITHIN THE REQUIRED TIME PERIODS: If there is no timely request for an appeal, the WDFW action shall be final and unappealable. Habitat Biologist William.Robinson@dfw.wa.gov .� for Director William Robinson 360-890-5912 A04, WDFW Page 4 of 4