HomeMy WebLinkAbout08-84 - Res. County Road Project No. 1007-P I
F St..:.,Lt�'IION NO. 8-84
WH10T.M, on 111ason County Road to. 09900 ��= known locally as the
Dayton-Airport _-_-------------________..__ P,oad, and more specifically located in
(Correctional Center west) , m.p. to y®P. 4.0 work de-
fined as "-- - - ,ire the PPIIS Y. nual, Pace 11-63, et seq, is ed to be
necessary and proper, a
WI PETS, this p o ec't. is her dby a de a part of the officially adopted County
Annual Road Program puz:stont to FT q 36.81.130 and assigned # 23 thereon.
MIEF'OR , BE IT t:E,SCIVED BY `Ir ' BOARD OF COCTTIY COMMISSIONERS that it is their
intention to engage a private agency to furnish labor, equipment and material for
the field location of alignments approved by the County Engineer and secure elevations,
cross-sections and topographic information, plus other work.; and the County Engineer
shall prepare the Construction Plans for right-of-way acquisition and construction
preparation.
County Engineering
and that said work is to be forces and co_ntractin accordance with the
(day labor/contract)
Washington State Sta d<rrd Spoc if'--a ions for Road and Bridge Construction as adopted
y Mascal ChAxnt y..
BE IT `TUJRT11:F_'R MOVED that tta<a al:r ve described County Road Project is necessary
and proper, and t<., e`.,T.111c i.".( costs of said pToject are herewith Set out as follows®
E jii,ec i-inc; 14,000
T,l $ 7,000
Bridk,-p� C'ons truction
Engineer's Estivate in detail _s on file in the office of the County Engineer.
The County Poadi Pro;ect 1here n described is HEREBY DEC ATED to he a public neces-
sity, and the County lbad Err i.neer is E,:E..FTRBY ORDERED AND AUTHORIZED to report and pro-
ceed thereon as by law, provided and in accordance with WAC 136-18.
OPM) t1li_s 16th- - day of --aan�aary 19 84
BOARD OF COUgTY COMISSIONERS
MSON COU17T Y, WASHINGTON
Ctaa i_r-rr�an
f
T��.anber`
Clerk of e hAxer
CC., Co. can"nassioners,
Engineer
JOUFW d,e Pub1.. it. , 1/19/84
Ell (CRP Form No. 2)