Loading...
HomeMy WebLinkAbout08-84 - Res. County Road Project No. 1007-P I F St..:.,Lt�'IION NO. 8-84 WH10T.M, on 111ason County Road to. 09900 ��= known locally as the Dayton-Airport _-_-------------________..__ P,oad, and more specifically located in (Correctional Center west) , m.p. to y®P. 4.0 work de- fined as "-- - - ,ire the PPIIS Y. nual, Pace 11-63, et seq, is ed to be necessary and proper, a WI PETS, this p o ec't. is her dby a de a part of the officially adopted County Annual Road Program puz:stont to FT q 36.81.130 and assigned # 23 thereon. MIEF'OR , BE IT t:E,SCIVED BY `Ir ' BOARD OF COCTTIY COMMISSIONERS that it is their intention to engage a private agency to furnish labor, equipment and material for the field location of alignments approved by the County Engineer and secure elevations, cross-sections and topographic information, plus other work.; and the County Engineer shall prepare the Construction Plans for right-of-way acquisition and construction preparation. County Engineering and that said work is to be forces and co_ntractin accordance with the (day labor/contract) Washington State Sta d<rrd Spoc if'--a ions for Road and Bridge Construction as adopted y Mascal ChAxnt y.. BE IT `TUJRT11:F_'R MOVED that tta<a al:r ve described County Road Project is necessary and proper, and t<., e`.,T.111c i.".( costs of said pToject are herewith Set out as follows® E jii,ec i-inc; 14,000 T,l $ 7,000 Bridk,-p� C'ons truction Engineer's Estivate in detail _s on file in the office of the County Engineer. The County Poadi Pro;ect 1here n described is HEREBY DEC ATED to he a public neces- sity, and the County lbad Err i.neer is E,:E..FTRBY ORDERED AND AUTHORIZED to report and pro- ceed thereon as by law, provided and in accordance with WAC 136-18. OPM) t1li_s 16th- - day of --aan�aary 19 84 BOARD OF COUgTY COMISSIONERS MSON COU17T Y, WASHINGTON Ctaa i_r-rr�an f T��.anber` Clerk of e hAxer CC., Co. can"nassioners, Engineer JOUFW d,e Pub1.. it. , 1/19/84 Ell (CRP Form No. 2)